blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP2824095

EP2824095 - SHAPED REFRACTORY AND PROCESS FOR PRODUCING SAME [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  03.09.2021
Database last updated on 14.06.2024
FormerThe patent has been granted
Status updated on  25.09.2020
FormerGrant of patent is intended
Status updated on  24.05.2020
FormerExamination is in progress
Status updated on  05.10.2018
Most recent event   Tooltip14.06.2024Lapse of the patent in a contracting state
New state(s): TR
published on 17.07.2024 [2024/29]
Applicant(s)For all designated states
JFE Steel Corporation
2-3, Uchisaiwaicho 2-chome Chiyoda-ku
Tokyo 100-0011 / JP
[2015/03]
Inventor(s)01 / KIYOTA Yoshisato
c/o Intellectual Property Dept.
JFE Steel Corporation
2-3 Uchisaiwai-cho 2-chome
Chiyoda-ku
Tokyo 100-0011 / JP
 [2015/03]
Representative(s)Hoffmann Eitle
Patent- und Rechtsanwälte PartmbB
Arabellastraße 30
81925 München / DE
[2015/03]
Application number, filing date13758667.304.03.2013
[2020/44]
WO2013JP55871
Priority number, dateJP2012004748505.03.2012         Original published format: JP 2012047485
[2015/03]
Filing languageJA
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2013133222
Date:12.09.2013
Language:JA
[2013/37]
Type: A1 Application with search report 
No.:EP2824095
Date:14.01.2015
Language:EN
[2015/03]
Type: B1 Patent specification 
No.:EP2824095
Date:28.10.2020
Language:EN
[2020/44]
Search report(s)International search report - published on:JP12.09.2013
(Supplementary) European search report - dispatched on:EP21.10.2015
ClassificationIPC:C04B41/85, B22D41/02, C04B35/047, C04B41/87, C04B41/50, C04B38/00, C04B41/00
[2015/46]
CPC:
B22D41/02 (EP); C04B35/047 (EP); C04B38/0054 (EP);
C04B41/009 (EP); C04B41/5033 (EP); C04B41/87 (EP)
C-Set:
C04B38/0054, C04B35/047 (EP);
C04B41/009, C04B35/047, C04B38/00 (EP);
C04B41/5033, C04B41/4539 (EP)
Former IPC [2015/03]C04B41/85, B22D41/02, C04B35/047
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2015/03]
Extension statesBANot yet paid
MENot yet paid
TitleGerman:GEFORMTES FEUERFESTPRODUKT UND VERFAHREN ZUR HERSTELLUNG DAVON[2015/03]
English:SHAPED REFRACTORY AND PROCESS FOR PRODUCING SAME[2015/03]
French:PRODUIT RÉFRACTAIRE FAÇONNÉ ET SON PROCÉDÉ DE FABRICATION[2015/03]
Entry into regional phase01.09.2014Translation filed 
01.09.2014National basic fee paid 
01.09.2014Search fee paid 
01.09.2014Designation fee(s) paid 
01.09.2014Examination fee paid 
Examination procedure01.09.2014Examination requested  [2015/03]
28.04.2016Amendment by applicant (claims and/or description)
08.10.2018Despatch of a communication from the examining division (Time limit: M04)
10.01.2019Reply to a communication from the examining division
03.03.2020Date of oral proceedings
08.05.2020Minutes of oral proceedings despatched
25.05.2020Communication of intention to grant the patent
16.09.2020Fee for grant paid
16.09.2020Fee for publishing/printing paid
16.09.2020Receipt of the translation of the claim(s)
Divisional application(s)The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  08.10.2018
Opposition(s)29.07.2021No opposition filed within time limit [2021/40]
Fees paidRenewal fee
23.03.2015Renewal fee patent year 03
14.03.2016Renewal fee patent year 04
13.03.2017Renewal fee patent year 05
21.03.2018Renewal fee patent year 06
15.03.2019Renewal fee patent year 07
06.03.2020Renewal fee patent year 08
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU04.03.2013
AL28.10.2020
CY28.10.2020
CZ28.10.2020
DK28.10.2020
EE28.10.2020
ES28.10.2020
FI28.10.2020
HR28.10.2020
IT28.10.2020
LT28.10.2020
LV28.10.2020
MC28.10.2020
MK28.10.2020
NL28.10.2020
PL28.10.2020
RO28.10.2020
RS28.10.2020
SE28.10.2020
SI28.10.2020
SK28.10.2020
SM28.10.2020
TR28.10.2020
BG28.01.2021
NO28.01.2021
GR29.01.2021
IS28.02.2021
PT01.03.2021
IE04.03.2021
LU04.03.2021
BE31.03.2021
CH31.03.2021
LI31.03.2021
[2024/29]
Former [2024/22]HU04.03.2013
AL28.10.2020
CY28.10.2020
CZ28.10.2020
DK28.10.2020
EE28.10.2020
ES28.10.2020
FI28.10.2020
HR28.10.2020
IT28.10.2020
LT28.10.2020
LV28.10.2020
MC28.10.2020
MK28.10.2020
NL28.10.2020
PL28.10.2020
RO28.10.2020
RS28.10.2020
SE28.10.2020
SI28.10.2020
SK28.10.2020
SM28.10.2020
BG28.01.2021
NO28.01.2021
GR29.01.2021
IS28.02.2021
PT01.03.2021
IE04.03.2021
LU04.03.2021
BE31.03.2021
CH31.03.2021
LI31.03.2021
Former [2023/30]HU04.03.2013
AL28.10.2020
CY28.10.2020
CZ28.10.2020
DK28.10.2020
EE28.10.2020
ES28.10.2020
FI28.10.2020
HR28.10.2020
IT28.10.2020
LT28.10.2020
LV28.10.2020
MC28.10.2020
NL28.10.2020
PL28.10.2020
RO28.10.2020
RS28.10.2020
SE28.10.2020
SI28.10.2020
SK28.10.2020
SM28.10.2020
BG28.01.2021
NO28.01.2021
GR29.01.2021
IS28.02.2021
PT01.03.2021
IE04.03.2021
LU04.03.2021
BE31.03.2021
CH31.03.2021
LI31.03.2021
Former [2023/27]HU04.03.2013
AL28.10.2020
CZ28.10.2020
DK28.10.2020
EE28.10.2020
ES28.10.2020
FI28.10.2020
HR28.10.2020
IT28.10.2020
LT28.10.2020
LV28.10.2020
MC28.10.2020
NL28.10.2020
PL28.10.2020
RO28.10.2020
RS28.10.2020
SE28.10.2020
SI28.10.2020
SK28.10.2020
SM28.10.2020
BG28.01.2021
NO28.01.2021
GR29.01.2021
IS28.02.2021
PT01.03.2021
IE04.03.2021
LU04.03.2021
BE31.03.2021
CH31.03.2021
LI31.03.2021
Former [2022/34]AL28.10.2020
CZ28.10.2020
DK28.10.2020
EE28.10.2020
ES28.10.2020
FI28.10.2020
HR28.10.2020
IT28.10.2020
LT28.10.2020
LV28.10.2020
MC28.10.2020
NL28.10.2020
PL28.10.2020
RO28.10.2020
RS28.10.2020
SE28.10.2020
SI28.10.2020
SK28.10.2020
SM28.10.2020
BG28.01.2021
NO28.01.2021
GR29.01.2021
IS28.02.2021
PT01.03.2021
IE04.03.2021
LU04.03.2021
BE31.03.2021
CH31.03.2021
LI31.03.2021
Former [2022/23]AL28.10.2020
CZ28.10.2020
DK28.10.2020
EE28.10.2020
ES28.10.2020
FI28.10.2020
HR28.10.2020
IT28.10.2020
LT28.10.2020
LV28.10.2020
MC28.10.2020
NL28.10.2020
PL28.10.2020
RO28.10.2020
RS28.10.2020
SE28.10.2020
SI28.10.2020
SK28.10.2020
SM28.10.2020
BG28.01.2021
NO28.01.2021
GR29.01.2021
IS28.02.2021
PT01.03.2021
IE04.03.2021
LU04.03.2021
CH31.03.2021
LI31.03.2021
Former [2022/10]AL28.10.2020
CZ28.10.2020
DK28.10.2020
EE28.10.2020
ES28.10.2020
FI28.10.2020
HR28.10.2020
IT28.10.2020
LT28.10.2020
LV28.10.2020
MC28.10.2020
NL28.10.2020
PL28.10.2020
RO28.10.2020
RS28.10.2020
SE28.10.2020
SI28.10.2020
SK28.10.2020
SM28.10.2020
BG28.01.2021
NO28.01.2021
GR29.01.2021
PT01.03.2021
IE04.03.2021
LU04.03.2021
CH31.03.2021
LI31.03.2021
Former [2022/09]AL28.10.2020
CZ28.10.2020
DK28.10.2020
EE28.10.2020
ES28.10.2020
FI28.10.2020
HR28.10.2020
IT28.10.2020
LT28.10.2020
LV28.10.2020
MC28.10.2020
NL28.10.2020
PL28.10.2020
RO28.10.2020
RS28.10.2020
SE28.10.2020
SI28.10.2020
SK28.10.2020
SM28.10.2020
BG28.01.2021
NO28.01.2021
GR29.01.2021
IS28.02.2021
PT01.03.2021
IE04.03.2021
LU04.03.2021
Former [2022/07]AL28.10.2020
CZ28.10.2020
DK28.10.2020
EE28.10.2020
ES28.10.2020
FI28.10.2020
HR28.10.2020
IT28.10.2020
LT28.10.2020
LV28.10.2020
MC28.10.2020
NL28.10.2020
PL28.10.2020
RO28.10.2020
RS28.10.2020
SE28.10.2020
SI28.10.2020
SK28.10.2020
SM28.10.2020
BG28.01.2021
NO28.01.2021
GR29.01.2021
IS28.02.2021
PT01.03.2021
IE04.03.2021
Former [2021/49]AL28.10.2020
CZ28.10.2020
DK28.10.2020
EE28.10.2020
ES28.10.2020
FI28.10.2020
HR28.10.2020
IT28.10.2020
LT28.10.2020
LV28.10.2020
MC28.10.2020
NL28.10.2020
PL28.10.2020
RO28.10.2020
RS28.10.2020
SE28.10.2020
SI28.10.2020
SK28.10.2020
SM28.10.2020
BG28.01.2021
NO28.01.2021
GR29.01.2021
IS28.02.2021
PT01.03.2021
Former [2021/48]AL28.10.2020
CZ28.10.2020
DK28.10.2020
EE28.10.2020
ES28.10.2020
FI28.10.2020
HR28.10.2020
IT28.10.2020
LT28.10.2020
LV28.10.2020
MC28.10.2020
NL28.10.2020
PL28.10.2020
RO28.10.2020
RS28.10.2020
SE28.10.2020
SK28.10.2020
SM28.10.2020
BG28.01.2021
NO28.01.2021
GR29.01.2021
IS28.02.2021
PT01.03.2021
Former [2021/45]AL28.10.2020
CZ28.10.2020
DK28.10.2020
EE28.10.2020
ES28.10.2020
FI28.10.2020
HR28.10.2020
LT28.10.2020
LV28.10.2020
MC28.10.2020
NL28.10.2020
PL28.10.2020
RO28.10.2020
RS28.10.2020
SE28.10.2020
SK28.10.2020
SM28.10.2020
BG28.01.2021
NO28.01.2021
GR29.01.2021
IS28.02.2021
PT01.03.2021
Former [2021/37]CZ28.10.2020
DK28.10.2020
EE28.10.2020
ES28.10.2020
FI28.10.2020
HR28.10.2020
LT28.10.2020
LV28.10.2020
NL28.10.2020
PL28.10.2020
RO28.10.2020
RS28.10.2020
SE28.10.2020
SK28.10.2020
SM28.10.2020
BG28.01.2021
NO28.01.2021
GR29.01.2021
IS28.02.2021
PT01.03.2021
Former [2021/36]CZ28.10.2020
EE28.10.2020
ES28.10.2020
FI28.10.2020
HR28.10.2020
LT28.10.2020
LV28.10.2020
NL28.10.2020
PL28.10.2020
RO28.10.2020
RS28.10.2020
SE28.10.2020
SK28.10.2020
SM28.10.2020
BG28.01.2021
NO28.01.2021
GR29.01.2021
IS28.02.2021
PT01.03.2021
Former [2021/35]CZ28.10.2020
ES28.10.2020
FI28.10.2020
HR28.10.2020
LT28.10.2020
LV28.10.2020
NL28.10.2020
PL28.10.2020
RO28.10.2020
RS28.10.2020
SE28.10.2020
SK28.10.2020
SM28.10.2020
BG28.01.2021
NO28.01.2021
GR29.01.2021
IS28.02.2021
PT01.03.2021
Former [2021/34]CZ28.10.2020
ES28.10.2020
FI28.10.2020
HR28.10.2020
LT28.10.2020
LV28.10.2020
NL28.10.2020
PL28.10.2020
RS28.10.2020
SE28.10.2020
SM28.10.2020
BG28.01.2021
NO28.01.2021
GR29.01.2021
IS28.02.2021
PT01.03.2021
Former [2021/33]ES28.10.2020
FI28.10.2020
HR28.10.2020
LT28.10.2020
LV28.10.2020
NL28.10.2020
PL28.10.2020
RS28.10.2020
SE28.10.2020
SM28.10.2020
BG28.01.2021
NO28.01.2021
GR29.01.2021
IS28.02.2021
PT01.03.2021
Former [2021/32]ES28.10.2020
FI28.10.2020
HR28.10.2020
LV28.10.2020
NL28.10.2020
PL28.10.2020
RS28.10.2020
SE28.10.2020
SM28.10.2020
BG28.01.2021
NO28.01.2021
GR29.01.2021
IS28.02.2021
PT01.03.2021
Former [2021/28]ES28.10.2020
FI28.10.2020
HR28.10.2020
LV28.10.2020
NL28.10.2020
PL28.10.2020
RS28.10.2020
SE28.10.2020
BG28.01.2021
NO28.01.2021
GR29.01.2021
IS28.02.2021
PT01.03.2021
Former [2021/25]ES28.10.2020
FI28.10.2020
LV28.10.2020
NL28.10.2020
PL28.10.2020
RS28.10.2020
SE28.10.2020
BG28.01.2021
NO28.01.2021
GR29.01.2021
IS28.02.2021
PT01.03.2021
Former [2021/24]FI28.10.2020
LV28.10.2020
NL28.10.2020
RS28.10.2020
SE28.10.2020
BG28.01.2021
NO28.01.2021
GR29.01.2021
PT01.03.2021
Former [2021/23]FI28.10.2020
LV28.10.2020
NL28.10.2020
RS28.10.2020
SE28.10.2020
NO28.01.2021
GR29.01.2021
PT01.03.2021
Former [2021/22]FI28.10.2020
NL28.10.2020
RS28.10.2020
NO28.01.2021
PT01.03.2021
Former [2021/21]FI28.10.2020
NL28.10.2020
PT01.03.2021
Former [2021/20]FI28.10.2020
Documents cited:Search[I]JPH0952755  ;
 [A]GB1087035  (SHINAGAWA FIRE BRICK CO LTD) [A] 1-10 * examples 1,2; claims 1-5; tables 1-4 *;
 [A]US3717497  (STRADLEY N, et al) [A] 1-10 * Column 2, lines 44-51;; examples 1,2; claims 1,2 *;
 [A]US2009188347  (TABER WADE ALBERT [US], et al) [A] 1-10* Paragraphs: [0023], [0031] to [0033], [0041];; examples 1,2; claims 1, 14,18 *;
 [I]  - DATABASE WPI, 0, Derwent World Patents Index, vol. 1997, no. 18, Database accession no. 1997-197138, XP002745380 & JPH0952755 A 19970225 (SUMITOMO METAL IND LTD) [I] 1-4,6,8,9 * Abstract; Paragraphs: [0033] to [0037], [0042] - [0043], [0047]-[0048] *
International search[Y]JPH06321662  (SUMITOMO METAL IND);
 [Y]JPH08290958  (NIPPON STEEL CORP);
 [X]JPH0952755  (SUMITOMO METAL IND);
 [A]JP2000191364  (SUMITOMO METAL IND);
 [Y]JP2003306385  (MURATA MANUFACTURING CO);
 [A]WO2006041174  (IBIDEN CO LTD [JP], et al);
 [A]JP2010501463  (REFRACTORY INTELLECTUAL PROPERTY GMBH & CO. KG);
 [X]JP2011001204  (JFE STEEL CORP, et al)
by applicantJPH0952755
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.