blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP2920465

EP2920465 - PERISTALTIC PUMP CASSETTE [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  06.03.2020
Database last updated on 07.10.2024
FormerThe patent has been granted
Status updated on  29.03.2019
FormerGrant of patent is intended
Status updated on  15.11.2018
FormerExamination is in progress
Status updated on  15.03.2018
Most recent event   Tooltip01.07.2022Lapse of the patent in a contracting state
New state(s): MK
published on 03.08.2022  [2022/31]
Applicant(s)For all designated states
KPR U.S., LLC
777 West Street
Mansfield, MA 02048 / US
[2018/07]
Former [2015/39]For all designated states
Covidien LP
15 Hampshire Street
Mansfield, MA 02048 / US
Inventor(s)01 / BREITWEISER, Kenneth, M.
1725 Fosterburg Road
Brighton, IL 62012 / US
02 / HARR, James, M.
34 Wynnston Woods Court
Wentzville, MO 63385 / US
03 / WIESNER, Joel, D.
1110 Treeshade Drive
St. Peters, MO 63376 / US
 [2015/39]
Representative(s)Prock, Thomas
Marks & Clerk LLP
15 Fetter Lane
London EC4A 1BW / GB
[N/P]
Former [2019/18]Prock, Thomas
Marks & Clerk LLP
90 Long Acre
London WC2E 9RA / GB
Former [2015/39]Gray, James, et al
Withers & Rogers LLP
4 More London Riverside
London SE1 2AU / GB
Application number, filing date13762712.109.09.2013
[2015/39]
WO2013US58741
Priority number, dateUS201261726283P14.11.2012         Original published format: US 201261726283 P
[2015/39]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2014077940
Date:22.05.2014
Language:EN
[2014/21]
Type: A1 Application with search report 
No.:EP2920465
Date:23.09.2015
Language:EN
The application published by WIPO in one of the EPO official languages on 22.05.2014 takes the place of the publication of the European patent application.
[2015/39]
Type: B1 Patent specification 
No.:EP2920465
Date:01.05.2019
Language:EN
[2019/18]
Search report(s)International search report - published on:EP22.05.2014
ClassificationIPC:F04B43/12, A61M5/142
[2015/39]
CPC:
A61M5/14232 (EP,CN,KR,US); F04B43/0072 (CN,US); A61M5/16804 (CN,US);
A61M5/16831 (EP,CN,US); F04B43/082 (CN,US); F04B43/12 (US);
F04B43/1223 (CN,KR,US); F04B43/1253 (EP,CN,KR,US); F04B43/1269 (CN,KR,US);
A61M2205/12 (EP,CN,US); A61M2205/3317 (EP,CN,US) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2015/39]
Extension statesBANot yet paid
MENot yet paid
TitleGerman:PERISTALTISCHE PUMPENKASSETTE[2015/39]
English:PERISTALTIC PUMP CASSETTE[2015/39]
French:CASSETTE DE POMPE PÉRISTALTIQUE[2015/39]
Entry into regional phase05.05.2015National basic fee paid 
05.05.2015Designation fee(s) paid 
05.05.2015Examination fee paid 
Examination procedure27.03.2014Request for preliminary examination filed
International Preliminary Examining Authority: US
05.05.2015Examination requested  [2015/39]
02.09.2015Amendment by applicant (claims and/or description)
02.05.2016Despatch of a communication from the examining division (Time limit: M04)
24.08.2016Reply to a communication from the examining division
05.03.2018Despatch of a communication from the examining division (Time limit: M06)
30.07.2018Reply to a communication from the examining division
16.11.2018Communication of intention to grant the patent
25.03.2019Fee for grant paid
25.03.2019Fee for publishing/printing paid
25.03.2019Receipt of the translation of the claim(s)
Divisional application(s)EP19169683.0  / EP3540223
EP21157229.2  / EP3842638
The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  02.05.2016
Opposition(s)04.02.2020No opposition filed within time limit [2020/15]
Fees paidRenewal fee
28.09.2015Renewal fee patent year 03
23.09.2016Renewal fee patent year 04
22.09.2017Renewal fee patent year 05
27.09.2018Renewal fee patent year 06
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU09.09.2013
AL01.05.2019
AT01.05.2019
CY01.05.2019
CZ01.05.2019
DK01.05.2019
EE01.05.2019
FI01.05.2019
HR01.05.2019
LT01.05.2019
LV01.05.2019
MC01.05.2019
MK01.05.2019
MT01.05.2019
PL01.05.2019
RO01.05.2019
RS01.05.2019
SI01.05.2019
SK01.05.2019
SM01.05.2019
TR01.05.2019
BG01.08.2019
NO01.08.2019
GR02.08.2019
IS01.09.2019
PT01.09.2019
LU09.09.2019
[2022/31]
Former [2021/34]HU09.09.2013
AL01.05.2019
AT01.05.2019
CY01.05.2019
CZ01.05.2019
DK01.05.2019
EE01.05.2019
FI01.05.2019
HR01.05.2019
LT01.05.2019
LV01.05.2019
MC01.05.2019
MT01.05.2019
PL01.05.2019
RO01.05.2019
RS01.05.2019
SI01.05.2019
SK01.05.2019
SM01.05.2019
TR01.05.2019
BG01.08.2019
NO01.08.2019
GR02.08.2019
IS01.09.2019
PT01.09.2019
LU09.09.2019
Former [2021/33]HU09.09.2013
AL01.05.2019
AT01.05.2019
CY01.05.2019
CZ01.05.2019
DK01.05.2019
EE01.05.2019
FI01.05.2019
HR01.05.2019
LT01.05.2019
LV01.05.2019
MC01.05.2019
PL01.05.2019
RO01.05.2019
RS01.05.2019
SI01.05.2019
SK01.05.2019
SM01.05.2019
TR01.05.2019
BG01.08.2019
NO01.08.2019
GR02.08.2019
IS01.09.2019
PT01.09.2019
LU09.09.2019
Former [2021/26]AL01.05.2019
AT01.05.2019
CY01.05.2019
CZ01.05.2019
DK01.05.2019
EE01.05.2019
FI01.05.2019
HR01.05.2019
LT01.05.2019
LV01.05.2019
MC01.05.2019
PL01.05.2019
RO01.05.2019
RS01.05.2019
SI01.05.2019
SK01.05.2019
SM01.05.2019
TR01.05.2019
BG01.08.2019
NO01.08.2019
GR02.08.2019
IS01.09.2019
PT01.09.2019
LU09.09.2019
Former [2020/35]AL01.05.2019
AT01.05.2019
CZ01.05.2019
DK01.05.2019
EE01.05.2019
FI01.05.2019
HR01.05.2019
LT01.05.2019
LV01.05.2019
MC01.05.2019
PL01.05.2019
RO01.05.2019
RS01.05.2019
SI01.05.2019
SK01.05.2019
SM01.05.2019
TR01.05.2019
BG01.08.2019
NO01.08.2019
GR02.08.2019
IS01.09.2019
PT01.09.2019
LU09.09.2019
Former [2020/25]AL01.05.2019
AT01.05.2019
CZ01.05.2019
DK01.05.2019
EE01.05.2019
FI01.05.2019
HR01.05.2019
LT01.05.2019
LV01.05.2019
MC01.05.2019
PL01.05.2019
RO01.05.2019
RS01.05.2019
SI01.05.2019
SK01.05.2019
SM01.05.2019
TR01.05.2019
BG01.08.2019
NO01.08.2019
GR02.08.2019
IS01.09.2019
PT01.09.2019
Former [2020/17]AL01.05.2019
AT01.05.2019
CZ01.05.2019
DK01.05.2019
EE01.05.2019
FI01.05.2019
HR01.05.2019
LT01.05.2019
LV01.05.2019
RO01.05.2019
RS01.05.2019
SK01.05.2019
SM01.05.2019
TR01.05.2019
BG01.08.2019
NO01.08.2019
GR02.08.2019
IS01.09.2019
PT01.09.2019
Former [2020/14]AL01.05.2019
AT01.05.2019
CZ01.05.2019
DK01.05.2019
EE01.05.2019
FI01.05.2019
HR01.05.2019
LT01.05.2019
LV01.05.2019
RO01.05.2019
RS01.05.2019
SK01.05.2019
SM01.05.2019
BG01.08.2019
NO01.08.2019
GR02.08.2019
IS01.09.2019
PT01.09.2019
Former [2020/11]AL01.05.2019
AT01.05.2019
CZ01.05.2019
DK01.05.2019
EE01.05.2019
FI01.05.2019
HR01.05.2019
LT01.05.2019
LV01.05.2019
RO01.05.2019
RS01.05.2019
SK01.05.2019
BG01.08.2019
NO01.08.2019
GR02.08.2019
IS01.09.2019
PT01.09.2019
Former [2020/10]AL01.05.2019
AT01.05.2019
CZ01.05.2019
DK01.05.2019
FI01.05.2019
HR01.05.2019
LT01.05.2019
LV01.05.2019
RO01.05.2019
RS01.05.2019
BG01.08.2019
NO01.08.2019
GR02.08.2019
IS01.09.2019
PT01.09.2019
Former [2020/09]AL01.05.2019
CZ01.05.2019
DK01.05.2019
FI01.05.2019
HR01.05.2019
LT01.05.2019
LV01.05.2019
RS01.05.2019
BG01.08.2019
NO01.08.2019
GR02.08.2019
IS01.09.2019
PT01.09.2019
Former [2020/04]AL01.05.2019
FI01.05.2019
HR01.05.2019
LT01.05.2019
LV01.05.2019
RS01.05.2019
BG01.08.2019
NO01.08.2019
GR02.08.2019
IS01.09.2019
PT01.09.2019
Former [2019/51]AL01.05.2019
FI01.05.2019
HR01.05.2019
LT01.05.2019
LV01.05.2019
RS01.05.2019
BG01.08.2019
NO01.08.2019
GR02.08.2019
PT01.09.2019
Former [2019/50]AL01.05.2019
FI01.05.2019
HR01.05.2019
LT01.05.2019
LV01.05.2019
RS01.05.2019
NO01.08.2019
GR02.08.2019
PT01.09.2019
Former [2019/48]FI01.05.2019
LT01.05.2019
NO01.08.2019
PT01.09.2019
Former [2019/47]FI01.05.2019
LT01.05.2019
NO01.08.2019
Cited inInternational search[Y]FR2598182  (VOLPI ANDRE [FR]) [Y] 3,9 * figure 3 *;
 [XYI]US2004057856  (SAXER DANIEL [CH], et al) [X] 1,2,4-6,11,12,14-17,19,20,22 * paragraphs [0007] , [0015]; figures 1,4 * [Y] 3 [I] 18,21;
 [X]US2007217932  (VOYEUX CLAUDE [FR], et al) [X] 1,11,22 * figure 4 *;
 [XY]US2009053085  (THOMPSON LOREN M [US], et al) [X] 7,8,10,13 * figure 7 * [Y] 9;
 [AD]US7534099  (KNAUPER CHRISTOPHER A [US], et al) [AD] 1-22* the whole document *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.