EP2867942 - LITHIUM-ION BATTERY WITH A CATHODE WITH VARIABLE POROSITY AND CORRESPONDING METHOD [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 19.03.2021 Database last updated on 07.06.2024 | |
Former | The patent has been granted Status updated on 10.04.2020 | ||
Former | Grant of patent is intended Status updated on 09.12.2019 | ||
Former | Examination is in progress Status updated on 15.12.2017 | Most recent event Tooltip | 08.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 10.08.2022 [2022/32] | Applicant(s) | For all designated states Commissariat à l'Énergie Atomique et aux Énergies Alternatives 25, rue Leblanc Bâtiment le Ponant D 75015 Paris / FR | [2015/19] | Inventor(s) | 01 /
NIZOU, Sylvain 19, rue du 8 mai 1945 F-37210 Noizay / FR | 02 /
LOPEZ, Nicolas 85 impasse du Goncelin F-38620 Montferrat / FR | 03 /
ROUCHOU, Jouhaiz 28 rue des Bonnais F-38120 Saint Egreve / FR | 04 /
SECOUARD, Christophe 3 allée Corboz-Deruelle F-95290 L'isle-adam / FR | [2020/20] |
Former [2015/19] | 01 /
NIZOU, Sylvain 474 rue de Beaumont F-37210 Noizay / FR | ||
02 /
LOPEZ, Nicolas 85 impasse du Goncelin F-38620 Montferrat / FR | |||
03 /
ROUCHOU, Jouhaiz 28 rue des Bonnais F-38120 Saint Egreve / FR | |||
04 /
SECOUARD, Christophe 3 allée Corboz-Deruelle F-95290 L'isle-adam / FR | Representative(s) | Gevers & Orès Immeuble le Palatin 2 3 Cours du Triangle CS 80165 92939 Paris La Défense Cedex / FR | [2020/20] |
Former [2015/19] | Corret, Hélène, et al Cabinet Orès 36, rue de St Pétersbourg 75008 Paris / FR | Application number, filing date | 13765435.6 | 25.06.2013 | [2020/20] | WO2013IB55198 | Priority number, date | FR20120001850 | 29.06.2012 Original published format: FR 1201850 | [2015/19] | Filing language | FR | Procedural language | FR | Publication | Type: | A1 Application with search report | No.: | WO2014002002 | Date: | 03.01.2014 | Language: | FR | [2014/01] | Type: | A1 Application with search report | No.: | EP2867942 | Date: | 06.05.2015 | Language: | FR | The application published by WIPO in one of the EPO official languages on 03.01.2014 takes the place of the publication of the European patent application. | [2015/19] | Type: | B1 Patent specification | No.: | EP2867942 | Date: | 13.05.2020 | Language: | FR | [2020/20] | Search report(s) | International search report - published on: | EP | 03.01.2014 | Classification | IPC: | H01M10/0562, H01M6/40, H01M10/0525, H01M10/0585, H01M4/13, H01M4/139, H01M4/04 | [2019/49] | CPC: |
H01M4/0423 (EP,US);
H01M10/0562 (EP,US);
H01M10/0436 (US);
H01M10/0525 (EP,US);
H01M10/0585 (EP,US);
H01M4/0404 (US);
H01M4/13 (EP,US);
H01M4/134 (US);
H01M4/139 (EP,US);
H01M4/1395 (US);
H01M4/38 (US);
H01M6/40 (EP,US);
H01M2004/021 (US);
H01M2004/028 (US);
H01M2300/0068 (EP,US);
|
Former IPC [2015/19] | H01M6/40, H01M10/0525, H01M10/0585, H01M4/13, H01M4/139, H01M4/04 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2015/19] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | LITHIUMIONENBATTERIE MIT EINER KATHODE VON VARIABLER DURCHLÄSSIGKEIT UND ENTSPRECHENDES VERFAHREN | [2015/19] | English: | LITHIUM-ION BATTERY WITH A CATHODE WITH VARIABLE POROSITY AND CORRESPONDING METHOD | [2015/19] | French: | BATTERIE DE TYPE LITHIUM-ION AVEC UNE CATHODE A POROSITÉ VARIABLE ET PROCÉDÉ CORRESPONDANT | [2015/19] | Entry into regional phase | 28.01.2015 | National basic fee paid | 28.01.2015 | Designation fee(s) paid | 28.01.2015 | Examination fee paid | Examination procedure | 28.01.2015 | Amendment by applicant (claims and/or description) | 28.01.2015 | Examination requested [2015/19] | 19.12.2017 | Despatch of a communication from the examining division (Time limit: M04) | 18.04.2018 | Reply to a communication from the examining division | 19.06.2019 | Despatch of a communication from the examining division (Time limit: M04) | 16.10.2019 | Reply to a communication from the examining division | 10.12.2019 | Communication of intention to grant the patent | 31.03.2020 | Fee for grant paid | 31.03.2020 | Fee for publishing/printing paid | 31.03.2020 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 19.12.2017 | Opposition(s) | 16.02.2021 | No opposition filed within time limit [2021/16] | Fees paid | Renewal fee | 22.05.2015 | Renewal fee patent year 03 | 27.05.2016 | Renewal fee patent year 04 | 30.05.2017 | Renewal fee patent year 05 | 28.05.2018 | Renewal fee patent year 06 | 27.05.2019 | Renewal fee patent year 07 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 25.06.2013 | AL | 13.05.2020 | AT | 13.05.2020 | CY | 13.05.2020 | CZ | 13.05.2020 | DK | 13.05.2020 | EE | 13.05.2020 | ES | 13.05.2020 | FI | 13.05.2020 | HR | 13.05.2020 | IT | 13.05.2020 | LT | 13.05.2020 | LV | 13.05.2020 | MC | 13.05.2020 | MK | 13.05.2020 | MT | 13.05.2020 | NL | 13.05.2020 | PL | 13.05.2020 | RO | 13.05.2020 | RS | 13.05.2020 | SE | 13.05.2020 | SI | 13.05.2020 | SK | 13.05.2020 | SM | 13.05.2020 | TR | 13.05.2020 | IE | 25.06.2020 | LU | 25.06.2020 | BE | 30.06.2020 | CH | 30.06.2020 | LI | 30.06.2020 | BG | 13.08.2020 | NO | 13.08.2020 | GR | 14.08.2020 | IS | 13.09.2020 | PT | 14.09.2020 | [2022/32] |
Former [2022/27] | HU | 25.06.2013 | |
AL | 13.05.2020 | ||
AT | 13.05.2020 | ||
CY | 13.05.2020 | ||
CZ | 13.05.2020 | ||
DK | 13.05.2020 | ||
EE | 13.05.2020 | ||
ES | 13.05.2020 | ||
FI | 13.05.2020 | ||
HR | 13.05.2020 | ||
IT | 13.05.2020 | ||
LT | 13.05.2020 | ||
LV | 13.05.2020 | ||
MC | 13.05.2020 | ||
MT | 13.05.2020 | ||
NL | 13.05.2020 | ||
PL | 13.05.2020 | ||
RO | 13.05.2020 | ||
RS | 13.05.2020 | ||
SE | 13.05.2020 | ||
SI | 13.05.2020 | ||
SK | 13.05.2020 | ||
SM | 13.05.2020 | ||
TR | 13.05.2020 | ||
IE | 25.06.2020 | ||
LU | 25.06.2020 | ||
BE | 30.06.2020 | ||
CH | 30.06.2020 | ||
LI | 30.06.2020 | ||
BG | 13.08.2020 | ||
NO | 13.08.2020 | ||
GR | 14.08.2020 | ||
IS | 13.09.2020 | ||
PT | 14.09.2020 | ||
Former [2022/26] | AL | 13.05.2020 | |
AT | 13.05.2020 | ||
CZ | 13.05.2020 | ||
DK | 13.05.2020 | ||
EE | 13.05.2020 | ||
ES | 13.05.2020 | ||
FI | 13.05.2020 | ||
HR | 13.05.2020 | ||
IT | 13.05.2020 | ||
LT | 13.05.2020 | ||
LV | 13.05.2020 | ||
MC | 13.05.2020 | ||
NL | 13.05.2020 | ||
PL | 13.05.2020 | ||
RO | 13.05.2020 | ||
RS | 13.05.2020 | ||
SE | 13.05.2020 | ||
SI | 13.05.2020 | ||
SK | 13.05.2020 | ||
SM | 13.05.2020 | ||
TR | 13.05.2020 | ||
IE | 25.06.2020 | ||
LU | 25.06.2020 | ||
BE | 30.06.2020 | ||
CH | 30.06.2020 | ||
LI | 30.06.2020 | ||
BG | 13.08.2020 | ||
NO | 13.08.2020 | ||
GR | 14.08.2020 | ||
IS | 13.09.2020 | ||
PT | 14.09.2020 | ||
Former [2021/24] | AL | 13.05.2020 | |
AT | 13.05.2020 | ||
CZ | 13.05.2020 | ||
DK | 13.05.2020 | ||
EE | 13.05.2020 | ||
ES | 13.05.2020 | ||
FI | 13.05.2020 | ||
HR | 13.05.2020 | ||
IT | 13.05.2020 | ||
LT | 13.05.2020 | ||
LV | 13.05.2020 | ||
MC | 13.05.2020 | ||
NL | 13.05.2020 | ||
PL | 13.05.2020 | ||
RO | 13.05.2020 | ||
RS | 13.05.2020 | ||
SE | 13.05.2020 | ||
SI | 13.05.2020 | ||
SK | 13.05.2020 | ||
SM | 13.05.2020 | ||
IE | 25.06.2020 | ||
LU | 25.06.2020 | ||
BE | 30.06.2020 | ||
CH | 30.06.2020 | ||
LI | 30.06.2020 | ||
BG | 13.08.2020 | ||
NO | 13.08.2020 | ||
GR | 14.08.2020 | ||
IS | 13.09.2020 | ||
PT | 14.09.2020 | ||
Former [2021/20] | AL | 13.05.2020 | |
AT | 13.05.2020 | ||
CZ | 13.05.2020 | ||
DK | 13.05.2020 | ||
EE | 13.05.2020 | ||
ES | 13.05.2020 | ||
FI | 13.05.2020 | ||
HR | 13.05.2020 | ||
IT | 13.05.2020 | ||
LT | 13.05.2020 | ||
LV | 13.05.2020 | ||
MC | 13.05.2020 | ||
NL | 13.05.2020 | ||
PL | 13.05.2020 | ||
RO | 13.05.2020 | ||
RS | 13.05.2020 | ||
SE | 13.05.2020 | ||
SK | 13.05.2020 | ||
SM | 13.05.2020 | ||
IE | 25.06.2020 | ||
LU | 25.06.2020 | ||
CH | 30.06.2020 | ||
LI | 30.06.2020 | ||
BG | 13.08.2020 | ||
NO | 13.08.2020 | ||
GR | 14.08.2020 | ||
IS | 13.09.2020 | ||
PT | 14.09.2020 | ||
Former [2021/15] | AL | 13.05.2020 | |
AT | 13.05.2020 | ||
CZ | 13.05.2020 | ||
DK | 13.05.2020 | ||
EE | 13.05.2020 | ||
ES | 13.05.2020 | ||
FI | 13.05.2020 | ||
HR | 13.05.2020 | ||
IT | 13.05.2020 | ||
LT | 13.05.2020 | ||
LV | 13.05.2020 | ||
MC | 13.05.2020 | ||
NL | 13.05.2020 | ||
PL | 13.05.2020 | ||
RO | 13.05.2020 | ||
RS | 13.05.2020 | ||
SE | 13.05.2020 | ||
SK | 13.05.2020 | ||
SM | 13.05.2020 | ||
LU | 25.06.2020 | ||
BG | 13.08.2020 | ||
NO | 13.08.2020 | ||
GR | 14.08.2020 | ||
IS | 13.09.2020 | ||
PT | 14.09.2020 | ||
Former [2021/13] | AL | 13.05.2020 | |
AT | 13.05.2020 | ||
CZ | 13.05.2020 | ||
DK | 13.05.2020 | ||
EE | 13.05.2020 | ||
ES | 13.05.2020 | ||
FI | 13.05.2020 | ||
HR | 13.05.2020 | ||
IT | 13.05.2020 | ||
LT | 13.05.2020 | ||
LV | 13.05.2020 | ||
MC | 13.05.2020 | ||
NL | 13.05.2020 | ||
PL | 13.05.2020 | ||
RO | 13.05.2020 | ||
RS | 13.05.2020 | ||
SE | 13.05.2020 | ||
SK | 13.05.2020 | ||
SM | 13.05.2020 | ||
BG | 13.08.2020 | ||
NO | 13.08.2020 | ||
GR | 14.08.2020 | ||
IS | 13.09.2020 | ||
PT | 14.09.2020 | ||
Former [2021/10] | AL | 13.05.2020 | |
AT | 13.05.2020 | ||
CZ | 13.05.2020 | ||
DK | 13.05.2020 | ||
EE | 13.05.2020 | ||
ES | 13.05.2020 | ||
FI | 13.05.2020 | ||
HR | 13.05.2020 | ||
IT | 13.05.2020 | ||
LT | 13.05.2020 | ||
LV | 13.05.2020 | ||
NL | 13.05.2020 | ||
PL | 13.05.2020 | ||
RO | 13.05.2020 | ||
RS | 13.05.2020 | ||
SE | 13.05.2020 | ||
SK | 13.05.2020 | ||
SM | 13.05.2020 | ||
BG | 13.08.2020 | ||
NO | 13.08.2020 | ||
GR | 14.08.2020 | ||
IS | 13.09.2020 | ||
PT | 14.09.2020 | ||
Former [2021/09] | AL | 13.05.2020 | |
AT | 13.05.2020 | ||
CZ | 13.05.2020 | ||
DK | 13.05.2020 | ||
EE | 13.05.2020 | ||
ES | 13.05.2020 | ||
FI | 13.05.2020 | ||
HR | 13.05.2020 | ||
IT | 13.05.2020 | ||
LT | 13.05.2020 | ||
LV | 13.05.2020 | ||
NL | 13.05.2020 | ||
RO | 13.05.2020 | ||
RS | 13.05.2020 | ||
SE | 13.05.2020 | ||
SM | 13.05.2020 | ||
BG | 13.08.2020 | ||
NO | 13.08.2020 | ||
GR | 14.08.2020 | ||
IS | 13.09.2020 | ||
PT | 14.09.2020 | ||
Former [2021/08] | AL | 13.05.2020 | |
DK | 13.05.2020 | ||
ES | 13.05.2020 | ||
FI | 13.05.2020 | ||
HR | 13.05.2020 | ||
LT | 13.05.2020 | ||
LV | 13.05.2020 | ||
NL | 13.05.2020 | ||
RO | 13.05.2020 | ||
RS | 13.05.2020 | ||
SE | 13.05.2020 | ||
SM | 13.05.2020 | ||
BG | 13.08.2020 | ||
NO | 13.08.2020 | ||
GR | 14.08.2020 | ||
IS | 13.09.2020 | ||
PT | 14.09.2020 | ||
Former [2021/04] | AL | 13.05.2020 | |
FI | 13.05.2020 | ||
HR | 13.05.2020 | ||
LT | 13.05.2020 | ||
LV | 13.05.2020 | ||
NL | 13.05.2020 | ||
RS | 13.05.2020 | ||
SE | 13.05.2020 | ||
BG | 13.08.2020 | ||
NO | 13.08.2020 | ||
GR | 14.08.2020 | ||
IS | 13.09.2020 | ||
PT | 14.09.2020 | ||
Former [2021/01] | FI | 13.05.2020 | |
HR | 13.05.2020 | ||
LT | 13.05.2020 | ||
LV | 13.05.2020 | ||
RS | 13.05.2020 | ||
SE | 13.05.2020 | ||
BG | 13.08.2020 | ||
NO | 13.08.2020 | ||
GR | 14.08.2020 | ||
IS | 13.09.2020 | ||
PT | 14.09.2020 | ||
Former [2020/51] | FI | 13.05.2020 | |
HR | 13.05.2020 | ||
LT | 13.05.2020 | ||
LV | 13.05.2020 | ||
RS | 13.05.2020 | ||
SE | 13.05.2020 | ||
NO | 13.08.2020 | ||
GR | 14.08.2020 | ||
IS | 13.09.2020 | ||
PT | 14.09.2020 | ||
Former [2020/50] | FI | 13.05.2020 | |
HR | 13.05.2020 | ||
LT | 13.05.2020 | ||
LV | 13.05.2020 | ||
SE | 13.05.2020 | ||
NO | 13.08.2020 | ||
GR | 14.08.2020 | ||
IS | 13.09.2020 | ||
PT | 14.09.2020 | ||
Former [2020/48] | FI | 13.05.2020 | |
LT | 13.05.2020 | ||
SE | 13.05.2020 | ||
NO | 13.08.2020 | ||
IS | 13.09.2020 | ||
PT | 14.09.2020 | ||
Former [2020/47] | LT | 13.05.2020 | |
NO | 13.08.2020 | ||
IS | 13.09.2020 | ||
Former [2020/46] | IS | 13.09.2020 | Cited in | International search | [X]US2011168550 (WANG CONNIE P [US], et al) [X] 1-10 * page 2, paragraph 35 - page 3, paragraph 43 * * page 11, paragraph 127 *; | [X]US2011070489 (CHIANG YET-MING [US], et al) [X] 1-4,6-10 * page 2, paragraph 20 - page 3, paragraph 43 * * page 5, paragraphs 58,59 - page 7, paragraph 76 *; | [X]US2006024579 (KOLOSNITSYN VLADIMIR [RU], et al) [X] 1-6 * page 3, paragraphs 21,31; claim 41 *; | [I]US2011076567 (BOUILLON PIERRE [FR]) [I] 7-10 * page 1, paragraphs 13,19 * | Examination | US2009011217 | by applicant | EP2320502 | - B. FLEUTOT ET AL., "Characterization of all-solid-state Li/LiPONB/TiOS microbatteries produced at the pilot scale", JOURNAL OF POWER SOURCES, (2011), vol. 196, doi:doi:10.1016/j.jpowsour.2011.07.018, pages 10289 - 10296, XP028303466 DOI: http://dx.doi.org/10.1016/j.jpowsour.2011.07.018 | - A. BILLARD; F. PERRY, "Pulvérisation cathodique magnétron", TECHNIQUES DE L'INGéNIEUR |