EP2882840 - METHOD AND DEVICE FOR CONTINUOUS DRY METHANISATION [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 07.01.2022 Database last updated on 26.07.2024 | |
Former | The patent has been granted Status updated on 29.01.2021 | ||
Former | Grant of patent is intended Status updated on 23.07.2020 | ||
Former | Examination is in progress Status updated on 07.09.2018 | Most recent event Tooltip | 27.04.2024 | Lapse of the patent in a contracting state New state(s): MK | published on 29.05.2024 [2024/22] | Applicant(s) | For all designated states Arkolia Energies ZA du Bosc 16, rue des Vergers 34130 Mudaison / FR | For all designated states Bonhomme, Michel 9 Ancienne Route de Genève 74150 Rumilly / FR | [2016/34] |
Former [2015/25] | For all designated states METHA ENR 65 rue de la Garriguette 34130 Saint Aunes / FR | ||
For all designated states Bonhomme, Michel 9 Ancienne Route de Genève 74150 Rumilly / FR | Inventor(s) | 01 /
BONHOMME, Michel 9 Ancienne Route de Genève 74150 Rumilly / FR | [2015/25] | Representative(s) | Cornuejols, Georges Cassiopi 230 Avenue de l'Aube Rouge 34170 Castelnau-le-Lez / FR | [2021/09] |
Former [2015/25] | Cornuejols, Georges Schmit-Chrétien SAS 836, rue du Mas de Verchant 34000 Montpellier / FR | Application number, filing date | 13773279.8 | 13.08.2013 | [2021/09] | WO2013FR51938 | Priority number, date | FR20120057782 | 13.08.2012 Original published format: FR 1257782 | FR20120062512 | 20.12.2012 Original published format: FR 1262512 | FR20120062513 | 20.12.2012 Original published format: FR 1262513 | FR20120062514 | 20.12.2012 Original published format: FR 1262514 | [2015/25] | Filing language | FR | Procedural language | FR | Publication | Type: | A1 Application with search report | No.: | WO2014027165 | Date: | 20.02.2014 | Language: | FR | [2014/08] | Type: | A1 Application with search report | No.: | EP2882840 | Date: | 17.06.2015 | Language: | FR | The application published by WIPO in one of the EPO official languages on 20.02.2014 takes the place of the publication of the European patent application. | [2015/25] | Type: | B1 Patent specification | No.: | EP2882840 | Date: | 03.03.2021 | Language: | FR | [2021/09] | Search report(s) | International search report - published on: | EP | 20.02.2014 | Classification | IPC: | C12M1/107, C12M1/00, C12M1/16 | [2015/25] | CPC: |
C12M21/04 (EP,US);
C12P5/023 (US);
C12M21/16 (EP,US);
C12M23/34 (EP,US);
C12M29/06 (EP,US);
C12M29/14 (EP,US);
C12M29/18 (EP,US);
C12M29/24 (EP,US);
C12M41/00 (EP,US);
C12M41/18 (EP,US);
C12M41/26 (EP,US);
C12M45/09 (EP,US);
Y02E50/30 (EP,US)
(-)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2015/25] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | VERFAHREN UND VORRICHTUNG ZUR KONTINUIERLICHEN TROCKENEN METAHNISIERUNG | [2020/33] | English: | METHOD AND DEVICE FOR CONTINUOUS DRY METHANISATION | [2015/25] | French: | PROCÉDÉ ET DISPOSITIF DE MÉTHANISATION CONTINUE EN VOIE SÈCHE | [2015/25] |
Former [2015/25] | VERFAHREN UND VORRICHTUNG FÜR KONTINUIERLICHE TROCKENMETHANISIERUNG | Entry into regional phase | 12.03.2015 | National basic fee paid | 12.03.2015 | Designation fee(s) paid | 12.03.2015 | Examination fee paid | Examination procedure | 12.03.2015 | Examination requested [2015/25] | 16.10.2015 | Amendment by applicant (claims and/or description) | 10.09.2018 | Despatch of a communication from the examining division (Time limit: M04) | 20.12.2018 | Reply to a communication from the examining division | 16.05.2019 | Despatch of a communication from the examining division (Time limit: M04) | 16.09.2019 | Reply to a communication from the examining division | 02.07.2020 | Cancellation of oral proceeding that was planned for 09.07.2020 | 09.07.2020 | Date of oral proceedings (cancelled) | 24.07.2020 | Communication of intention to grant the patent | 22.10.2020 | Fee for grant paid | 22.10.2020 | Fee for publishing/printing paid | 22.10.2020 | Receipt of the translation of the claim(s) | 11.01.2021 | Despatch of communication that the application is deemed to be withdrawn, reason: fee for grant / fee for printing not paid in time | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 10.09.2018 | Opposition(s) | 06.12.2021 | No opposition filed within time limit [2022/06] | Request for further processing for: | 15.01.2021 | Request for further processing filed | 15.01.2021 | Full payment received (date of receipt of payment) Request granted | 28.01.2021 | Decision despatched | Fees paid | Renewal fee | 21.08.2015 | Renewal fee patent year 03 | 29.07.2016 | Renewal fee patent year 04 | 31.08.2017 | Renewal fee patent year 05 | 30.07.2018 | Renewal fee patent year 06 | 28.08.2019 | Renewal fee patent year 07 | 30.07.2020 | Renewal fee patent year 08 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 13.08.2013 | AL | 03.03.2021 | AT | 03.03.2021 | CY | 03.03.2021 | CZ | 03.03.2021 | DK | 03.03.2021 | EE | 03.03.2021 | ES | 03.03.2021 | FI | 03.03.2021 | HR | 03.03.2021 | IT | 03.03.2021 | LT | 03.03.2021 | LV | 03.03.2021 | MC | 03.03.2021 | MK | 03.03.2021 | NL | 03.03.2021 | PL | 03.03.2021 | RO | 03.03.2021 | RS | 03.03.2021 | SE | 03.03.2021 | SI | 03.03.2021 | SK | 03.03.2021 | SM | 03.03.2021 | BG | 03.06.2021 | NO | 03.06.2021 | GR | 04.06.2021 | IS | 03.07.2021 | PT | 05.07.2021 | LU | 13.08.2021 | [2024/22] |
Former [2023/30] | HU | 13.08.2013 | |
AL | 03.03.2021 | ||
AT | 03.03.2021 | ||
CY | 03.03.2021 | ||
CZ | 03.03.2021 | ||
DK | 03.03.2021 | ||
EE | 03.03.2021 | ||
ES | 03.03.2021 | ||
FI | 03.03.2021 | ||
HR | 03.03.2021 | ||
IT | 03.03.2021 | ||
LT | 03.03.2021 | ||
LV | 03.03.2021 | ||
MC | 03.03.2021 | ||
NL | 03.03.2021 | ||
PL | 03.03.2021 | ||
RO | 03.03.2021 | ||
RS | 03.03.2021 | ||
SE | 03.03.2021 | ||
SI | 03.03.2021 | ||
SK | 03.03.2021 | ||
SM | 03.03.2021 | ||
BG | 03.06.2021 | ||
NO | 03.06.2021 | ||
GR | 04.06.2021 | ||
IS | 03.07.2021 | ||
PT | 05.07.2021 | ||
LU | 13.08.2021 | ||
Former [2023/27] | HU | 13.08.2013 | |
AL | 03.03.2021 | ||
AT | 03.03.2021 | ||
CZ | 03.03.2021 | ||
DK | 03.03.2021 | ||
EE | 03.03.2021 | ||
ES | 03.03.2021 | ||
FI | 03.03.2021 | ||
HR | 03.03.2021 | ||
IT | 03.03.2021 | ||
LT | 03.03.2021 | ||
LV | 03.03.2021 | ||
MC | 03.03.2021 | ||
NL | 03.03.2021 | ||
PL | 03.03.2021 | ||
RO | 03.03.2021 | ||
RS | 03.03.2021 | ||
SE | 03.03.2021 | ||
SI | 03.03.2021 | ||
SK | 03.03.2021 | ||
SM | 03.03.2021 | ||
BG | 03.06.2021 | ||
NO | 03.06.2021 | ||
GR | 04.06.2021 | ||
IS | 03.07.2021 | ||
PT | 05.07.2021 | ||
LU | 13.08.2021 | ||
Former [2022/23] | AL | 03.03.2021 | |
AT | 03.03.2021 | ||
CZ | 03.03.2021 | ||
DK | 03.03.2021 | ||
EE | 03.03.2021 | ||
ES | 03.03.2021 | ||
FI | 03.03.2021 | ||
HR | 03.03.2021 | ||
IT | 03.03.2021 | ||
LT | 03.03.2021 | ||
LV | 03.03.2021 | ||
MC | 03.03.2021 | ||
NL | 03.03.2021 | ||
PL | 03.03.2021 | ||
RO | 03.03.2021 | ||
RS | 03.03.2021 | ||
SE | 03.03.2021 | ||
SI | 03.03.2021 | ||
SK | 03.03.2021 | ||
SM | 03.03.2021 | ||
BG | 03.06.2021 | ||
NO | 03.06.2021 | ||
GR | 04.06.2021 | ||
IS | 03.07.2021 | ||
PT | 05.07.2021 | ||
LU | 13.08.2021 | ||
Former [2022/18] | AL | 03.03.2021 | |
AT | 03.03.2021 | ||
CZ | 03.03.2021 | ||
DK | 03.03.2021 | ||
EE | 03.03.2021 | ||
ES | 03.03.2021 | ||
FI | 03.03.2021 | ||
HR | 03.03.2021 | ||
LT | 03.03.2021 | ||
LV | 03.03.2021 | ||
MC | 03.03.2021 | ||
NL | 03.03.2021 | ||
PL | 03.03.2021 | ||
RO | 03.03.2021 | ||
RS | 03.03.2021 | ||
SE | 03.03.2021 | ||
SI | 03.03.2021 | ||
SK | 03.03.2021 | ||
SM | 03.03.2021 | ||
BG | 03.06.2021 | ||
NO | 03.06.2021 | ||
GR | 04.06.2021 | ||
PT | 05.07.2021 | ||
Former [2022/13] | AL | 03.03.2021 | |
AT | 03.03.2021 | ||
CZ | 03.03.2021 | ||
DK | 03.03.2021 | ||
EE | 03.03.2021 | ||
ES | 03.03.2021 | ||
FI | 03.03.2021 | ||
HR | 03.03.2021 | ||
LT | 03.03.2021 | ||
LV | 03.03.2021 | ||
NL | 03.03.2021 | ||
PL | 03.03.2021 | ||
RO | 03.03.2021 | ||
RS | 03.03.2021 | ||
SE | 03.03.2021 | ||
SI | 03.03.2021 | ||
SK | 03.03.2021 | ||
SM | 03.03.2021 | ||
BG | 03.06.2021 | ||
NO | 03.06.2021 | ||
GR | 04.06.2021 | ||
PT | 05.07.2021 | ||
Former [2022/10] | AL | 03.03.2021 | |
AT | 03.03.2021 | ||
CZ | 03.03.2021 | ||
DK | 03.03.2021 | ||
EE | 03.03.2021 | ||
ES | 03.03.2021 | ||
FI | 03.03.2021 | ||
HR | 03.03.2021 | ||
LT | 03.03.2021 | ||
LV | 03.03.2021 | ||
NL | 03.03.2021 | ||
PL | 03.03.2021 | ||
RO | 03.03.2021 | ||
RS | 03.03.2021 | ||
SE | 03.03.2021 | ||
SK | 03.03.2021 | ||
SM | 03.03.2021 | ||
BG | 03.06.2021 | ||
NO | 03.06.2021 | ||
GR | 04.06.2021 | ||
PT | 05.07.2021 | ||
Former [2022/08] | AL | 03.03.2021 | |
AT | 03.03.2021 | ||
CZ | 03.03.2021 | ||
DK | 03.03.2021 | ||
EE | 03.03.2021 | ||
ES | 03.03.2021 | ||
FI | 03.03.2021 | ||
HR | 03.03.2021 | ||
LT | 03.03.2021 | ||
LV | 03.03.2021 | ||
NL | 03.03.2021 | ||
PL | 03.03.2021 | ||
RO | 03.03.2021 | ||
RS | 03.03.2021 | ||
SE | 03.03.2021 | ||
SK | 03.03.2021 | ||
SM | 03.03.2021 | ||
BG | 03.06.2021 | ||
NO | 03.06.2021 | ||
GR | 04.06.2021 | ||
IS | 03.07.2021 | ||
PT | 05.07.2021 | ||
Former [2022/07] | AL | 03.03.2021 | |
AT | 03.03.2021 | ||
CZ | 03.03.2021 | ||
EE | 03.03.2021 | ||
ES | 03.03.2021 | ||
FI | 03.03.2021 | ||
HR | 03.03.2021 | ||
LT | 03.03.2021 | ||
LV | 03.03.2021 | ||
NL | 03.03.2021 | ||
PL | 03.03.2021 | ||
RO | 03.03.2021 | ||
RS | 03.03.2021 | ||
SE | 03.03.2021 | ||
SK | 03.03.2021 | ||
SM | 03.03.2021 | ||
BG | 03.06.2021 | ||
NO | 03.06.2021 | ||
GR | 04.06.2021 | ||
IS | 03.07.2021 | ||
PT | 05.07.2021 | ||
Former [2021/51] | AT | 03.03.2021 | |
CZ | 03.03.2021 | ||
EE | 03.03.2021 | ||
ES | 03.03.2021 | ||
FI | 03.03.2021 | ||
HR | 03.03.2021 | ||
LT | 03.03.2021 | ||
LV | 03.03.2021 | ||
NL | 03.03.2021 | ||
PL | 03.03.2021 | ||
RO | 03.03.2021 | ||
RS | 03.03.2021 | ||
SE | 03.03.2021 | ||
SK | 03.03.2021 | ||
SM | 03.03.2021 | ||
BG | 03.06.2021 | ||
NO | 03.06.2021 | ||
GR | 04.06.2021 | ||
IS | 03.07.2021 | ||
PT | 05.07.2021 | ||
Former [2021/50] | AT | 03.03.2021 | |
CZ | 03.03.2021 | ||
EE | 03.03.2021 | ||
FI | 03.03.2021 | ||
HR | 03.03.2021 | ||
LT | 03.03.2021 | ||
LV | 03.03.2021 | ||
NL | 03.03.2021 | ||
PL | 03.03.2021 | ||
RO | 03.03.2021 | ||
RS | 03.03.2021 | ||
SE | 03.03.2021 | ||
SK | 03.03.2021 | ||
SM | 03.03.2021 | ||
BG | 03.06.2021 | ||
NO | 03.06.2021 | ||
GR | 04.06.2021 | ||
PT | 05.07.2021 | ||
Former [2021/48] | AT | 03.03.2021 | |
CZ | 03.03.2021 | ||
EE | 03.03.2021 | ||
FI | 03.03.2021 | ||
HR | 03.03.2021 | ||
LT | 03.03.2021 | ||
LV | 03.03.2021 | ||
NL | 03.03.2021 | ||
PL | 03.03.2021 | ||
RS | 03.03.2021 | ||
SE | 03.03.2021 | ||
SM | 03.03.2021 | ||
BG | 03.06.2021 | ||
NO | 03.06.2021 | ||
GR | 04.06.2021 | ||
Former [2021/46] | AT | 03.03.2021 | |
FI | 03.03.2021 | ||
HR | 03.03.2021 | ||
LT | 03.03.2021 | ||
LV | 03.03.2021 | ||
NL | 03.03.2021 | ||
PL | 03.03.2021 | ||
RS | 03.03.2021 | ||
SE | 03.03.2021 | ||
SM | 03.03.2021 | ||
BG | 03.06.2021 | ||
NO | 03.06.2021 | ||
GR | 04.06.2021 | ||
Former [2021/43] | FI | 03.03.2021 | |
HR | 03.03.2021 | ||
LT | 03.03.2021 | ||
LV | 03.03.2021 | ||
NL | 03.03.2021 | ||
PL | 03.03.2021 | ||
RS | 03.03.2021 | ||
SE | 03.03.2021 | ||
BG | 03.06.2021 | ||
NO | 03.06.2021 | ||
GR | 04.06.2021 | ||
Former [2021/39] | FI | 03.03.2021 | |
HR | 03.03.2021 | ||
LT | 03.03.2021 | ||
LV | 03.03.2021 | ||
PL | 03.03.2021 | ||
RS | 03.03.2021 | ||
SE | 03.03.2021 | ||
BG | 03.06.2021 | ||
NO | 03.06.2021 | ||
GR | 04.06.2021 | ||
Former [2021/38] | FI | 03.03.2021 | |
HR | 03.03.2021 | ||
LT | 03.03.2021 | ||
LV | 03.03.2021 | ||
RS | 03.03.2021 | ||
SE | 03.03.2021 | ||
BG | 03.06.2021 | ||
NO | 03.06.2021 | ||
GR | 04.06.2021 | ||
Former [2021/37] | FI | 03.03.2021 | |
HR | 03.03.2021 | ||
LT | 03.03.2021 | ||
LV | 03.03.2021 | ||
RS | 03.03.2021 | ||
BG | 03.06.2021 | ||
NO | 03.06.2021 | ||
GR | 04.06.2021 | ||
Former [2021/36] | FI | 03.03.2021 | |
HR | 03.03.2021 | ||
LT | 03.03.2021 | ||
BG | 03.06.2021 | ||
NO | 03.06.2021 | ||
GR | 04.06.2021 | ||
Former [2021/35] | FI | 03.03.2021 | |
HR | 03.03.2021 | ||
LT | 03.03.2021 | ||
NO | 03.06.2021 | ||
Former [2021/33] | FI | 03.03.2021 | |
LT | 03.03.2021 | ||
NO | 03.06.2021 | Cited in | International search | [XY]FR874378 (BAUDOT HARDOLL & O F T A REUNI) [X] 1,4,5,13,18,19,22,27 * the whole document * [Y] 2,3,16,17; | [Y]FR2794472 (BONHOMME MICHEL [FR]) [Y] 2,3,16,17 * page 1, line 5 - line 7 ** page 3, line 16 - line 35; figure 1; claims 1, 7 *; | [X]CN202022920U (DONGGUAN CAMDA GENERATOR WORK) [X] 1,4,5,13,15,18,19,22 * abstract * | by applicant | FR2794472 |