EP2912429 - GEOTHERMAL HEATING AND/OR COOLING SYSTEM GROUT TESTING [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 10.07.2020 Database last updated on 19.10.2024 | |
Former | The patent has been granted Status updated on 02.08.2019 | ||
Former | Grant of patent is intended Status updated on 20.05.2019 | ||
Former | Examination is in progress Status updated on 26.03.2019 | ||
Former | Grant of patent is intended Status updated on 15.11.2018 | ||
Former | Examination is in progress Status updated on 16.03.2018 | Most recent event Tooltip | 01.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 03.08.2022 [2022/31] | Applicant(s) | For all designated states Halliburton Energy Services Inc. 3000 N. Sam Houston Parkway E. Houston, Texas 77032 / US | [2019/25] |
Former [2019/23] | For all designated states Halliburton Energy Services, Inc. 3000 N. Sam Houston Parkway E. Houston, TX 77032 / US | ||
Former [2015/36] | For all designated states Halliburton Energy Services, Inc. 10200 Bellaire Boulevard Houston, TX 77072 / US | Inventor(s) | 01 /
COLLINS, Ryan Patrick 1039 Lemm Road 1 Spring, Texas 77373 / US | 02 /
STONE, Shantel 768 Holly Springs Drive Conroe, Texas 77302 / US | 03 /
KURI, Laura 7303 Spring Cypress Road 635 Spring, Texas 77379 / US | [2015/36] | Representative(s) | Turner, Craig Robert AA Thornton IP LLP 8th Floor, 125 Old Broad Street London EC2N 1AR / GB | [N/P] |
Former [2015/36] | Turner, Craig Robert A.A. Thornton & Co. 10 Old Bailey London EC4M 7NG / GB | Application number, filing date | 13774868.7 | 24.09.2013 | [2015/36] | WO2013US61444 | Priority number, date | US201213661744 | 26.10.2012 Original published format: US201213661744 | [2015/36] | Filing language | EN | Procedural language | EN | Publication | Type: | A2 Application without search report | No.: | WO2014065977 | Date: | 01.05.2014 | Language: | EN | [2014/18] | Type: | A2 Application without search report | No.: | EP2912429 | Date: | 02.09.2015 | Language: | EN | The application published by WIPO in one of the EPO official languages on 01.05.2014 takes the place of the publication of the European patent application. | [2015/36] | Type: | B1 Patent specification | No.: | EP2912429 | Date: | 04.09.2019 | Language: | EN | [2019/36] | Search report(s) | International search report - published on: | EP | 18.12.2014 | Classification | IPC: | G01N1/00, C04B24/38, C04B28/02, E02D1/04, G01N25/18, G01N1/38, F24T10/00 | [2018/46] | CPC: |
F24T10/10 (EP,US);
C04B24/383 (US);
C04B28/02 (US);
E02D1/04 (EP,US);
G01N25/18 (US);
F24T2010/53 (EP,US);
|
Former IPC [2018/03] | G01N1/00, F24J3/08, C04B24/38, C04B28/02, E02D1/04, G01N25/18, G01N1/38 | ||
Former IPC [2015/36] | G01N1/00, F24J3/08 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2015/36] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | EINPRESSMÖRTELTEST FÜR ERDWÄRMEHEIZ- UND/ODER KÜHLSYSTEM | [2015/36] | English: | GEOTHERMAL HEATING AND/OR COOLING SYSTEM GROUT TESTING | [2015/36] | French: | TEST DE COULIS DE SYSTÈME DE CHAUFFAGE ET/OU DE REFROIDISSEMENT GÉOTHERMIQUE | [2015/36] | Entry into regional phase | 11.05.2015 | National basic fee paid | 11.05.2015 | Designation fee(s) paid | 11.05.2015 | Examination fee paid | Examination procedure | 11.05.2015 | Examination requested [2015/36] | 13.01.2016 | Amendment by applicant (claims and/or description) | 15.03.2018 | Despatch of a communication from the examining division (Time limit: M04) | 07.06.2018 | Reply to a communication from the examining division | 16.11.2018 | Communication of intention to grant the patent | 22.03.2019 | Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO | 22.03.2019 | Fee for grant paid | 22.03.2019 | Fee for publishing/printing paid | 28.05.2019 | Communication of intention to grant the patent | 24.07.2019 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 15.03.2018 | Opposition(s) | 05.06.2020 | No opposition filed within time limit [2020/33] | Fees paid | Renewal fee | 08.09.2015 | Renewal fee patent year 03 | 25.07.2016 | Renewal fee patent year 04 | 11.08.2017 | Renewal fee patent year 05 | 09.07.2018 | Renewal fee patent year 06 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 24.09.2013 | AL | 04.09.2019 | AT | 04.09.2019 | CY | 04.09.2019 | CZ | 04.09.2019 | DK | 04.09.2019 | EE | 04.09.2019 | ES | 04.09.2019 | FI | 04.09.2019 | HR | 04.09.2019 | IT | 04.09.2019 | LT | 04.09.2019 | LV | 04.09.2019 | MC | 04.09.2019 | MK | 04.09.2019 | MT | 04.09.2019 | NL | 04.09.2019 | PL | 04.09.2019 | RO | 04.09.2019 | RS | 04.09.2019 | SE | 04.09.2019 | SI | 04.09.2019 | SK | 04.09.2019 | SM | 04.09.2019 | TR | 04.09.2019 | IE | 24.09.2019 | LU | 24.09.2019 | BE | 30.09.2019 | CH | 30.09.2019 | LI | 30.09.2019 | FR | 04.11.2019 | BG | 04.12.2019 | GR | 05.12.2019 | IS | 05.01.2020 | PT | 06.01.2020 | DE | 01.04.2020 | [2022/31] |
Former [2022/26] | HU | 24.09.2013 | |
AL | 04.09.2019 | ||
AT | 04.09.2019 | ||
CY | 04.09.2019 | ||
CZ | 04.09.2019 | ||
DK | 04.09.2019 | ||
EE | 04.09.2019 | ||
ES | 04.09.2019 | ||
FI | 04.09.2019 | ||
HR | 04.09.2019 | ||
IT | 04.09.2019 | ||
LT | 04.09.2019 | ||
LV | 04.09.2019 | ||
MC | 04.09.2019 | ||
MT | 04.09.2019 | ||
NL | 04.09.2019 | ||
PL | 04.09.2019 | ||
RO | 04.09.2019 | ||
RS | 04.09.2019 | ||
SE | 04.09.2019 | ||
SI | 04.09.2019 | ||
SK | 04.09.2019 | ||
SM | 04.09.2019 | ||
TR | 04.09.2019 | ||
IE | 24.09.2019 | ||
LU | 24.09.2019 | ||
BE | 30.09.2019 | ||
CH | 30.09.2019 | ||
LI | 30.09.2019 | ||
FR | 04.11.2019 | ||
BG | 04.12.2019 | ||
GR | 05.12.2019 | ||
IS | 05.01.2020 | ||
PT | 06.01.2020 | ||
DE | 01.04.2020 | ||
Former [2021/34] | HU | 24.09.2013 | |
AL | 04.09.2019 | ||
AT | 04.09.2019 | ||
CY | 04.09.2019 | ||
CZ | 04.09.2019 | ||
DK | 04.09.2019 | ||
EE | 04.09.2019 | ||
ES | 04.09.2019 | ||
FI | 04.09.2019 | ||
HR | 04.09.2019 | ||
IT | 04.09.2019 | ||
LT | 04.09.2019 | ||
LV | 04.09.2019 | ||
MC | 04.09.2019 | ||
MT | 04.09.2019 | ||
NL | 04.09.2019 | ||
PL | 04.09.2019 | ||
RO | 04.09.2019 | ||
RS | 04.09.2019 | ||
SE | 04.09.2019 | ||
SI | 04.09.2019 | ||
SK | 04.09.2019 | ||
SM | 04.09.2019 | ||
IE | 24.09.2019 | ||
LU | 24.09.2019 | ||
BE | 30.09.2019 | ||
CH | 30.09.2019 | ||
LI | 30.09.2019 | ||
FR | 04.11.2019 | ||
BG | 04.12.2019 | ||
GR | 05.12.2019 | ||
IS | 05.01.2020 | ||
PT | 06.01.2020 | ||
DE | 01.04.2020 | ||
Former [2021/32] | HU | 24.09.2013 | |
AL | 04.09.2019 | ||
AT | 04.09.2019 | ||
CY | 04.09.2019 | ||
CZ | 04.09.2019 | ||
DK | 04.09.2019 | ||
EE | 04.09.2019 | ||
ES | 04.09.2019 | ||
FI | 04.09.2019 | ||
HR | 04.09.2019 | ||
IT | 04.09.2019 | ||
LT | 04.09.2019 | ||
LV | 04.09.2019 | ||
MC | 04.09.2019 | ||
NL | 04.09.2019 | ||
PL | 04.09.2019 | ||
RO | 04.09.2019 | ||
RS | 04.09.2019 | ||
SE | 04.09.2019 | ||
SI | 04.09.2019 | ||
SK | 04.09.2019 | ||
SM | 04.09.2019 | ||
IE | 24.09.2019 | ||
LU | 24.09.2019 | ||
BE | 30.09.2019 | ||
CH | 30.09.2019 | ||
LI | 30.09.2019 | ||
FR | 04.11.2019 | ||
BG | 04.12.2019 | ||
GR | 05.12.2019 | ||
IS | 05.01.2020 | ||
PT | 06.01.2020 | ||
DE | 01.04.2020 | ||
Former [2021/26] | AL | 04.09.2019 | |
AT | 04.09.2019 | ||
CY | 04.09.2019 | ||
CZ | 04.09.2019 | ||
DK | 04.09.2019 | ||
EE | 04.09.2019 | ||
ES | 04.09.2019 | ||
FI | 04.09.2019 | ||
HR | 04.09.2019 | ||
IT | 04.09.2019 | ||
LT | 04.09.2019 | ||
LV | 04.09.2019 | ||
MC | 04.09.2019 | ||
NL | 04.09.2019 | ||
PL | 04.09.2019 | ||
RO | 04.09.2019 | ||
RS | 04.09.2019 | ||
SE | 04.09.2019 | ||
SI | 04.09.2019 | ||
SK | 04.09.2019 | ||
SM | 04.09.2019 | ||
IE | 24.09.2019 | ||
LU | 24.09.2019 | ||
BE | 30.09.2019 | ||
CH | 30.09.2019 | ||
LI | 30.09.2019 | ||
FR | 04.11.2019 | ||
BG | 04.12.2019 | ||
GR | 05.12.2019 | ||
IS | 05.01.2020 | ||
PT | 06.01.2020 | ||
DE | 01.04.2020 | ||
Former [2020/49] | AL | 04.09.2019 | |
AT | 04.09.2019 | ||
CZ | 04.09.2019 | ||
DK | 04.09.2019 | ||
EE | 04.09.2019 | ||
ES | 04.09.2019 | ||
FI | 04.09.2019 | ||
HR | 04.09.2019 | ||
IT | 04.09.2019 | ||
LT | 04.09.2019 | ||
LV | 04.09.2019 | ||
MC | 04.09.2019 | ||
NL | 04.09.2019 | ||
PL | 04.09.2019 | ||
RO | 04.09.2019 | ||
RS | 04.09.2019 | ||
SE | 04.09.2019 | ||
SI | 04.09.2019 | ||
SK | 04.09.2019 | ||
SM | 04.09.2019 | ||
IE | 24.09.2019 | ||
LU | 24.09.2019 | ||
BE | 30.09.2019 | ||
CH | 30.09.2019 | ||
LI | 30.09.2019 | ||
FR | 04.11.2019 | ||
BG | 04.12.2019 | ||
GR | 05.12.2019 | ||
IS | 05.01.2020 | ||
PT | 06.01.2020 | ||
DE | 01.04.2020 | ||
Former [2020/37] | AL | 04.09.2019 | |
AT | 04.09.2019 | ||
CZ | 04.09.2019 | ||
DK | 04.09.2019 | ||
EE | 04.09.2019 | ||
ES | 04.09.2019 | ||
FI | 04.09.2019 | ||
HR | 04.09.2019 | ||
IT | 04.09.2019 | ||
LT | 04.09.2019 | ||
LV | 04.09.2019 | ||
MC | 04.09.2019 | ||
NL | 04.09.2019 | ||
PL | 04.09.2019 | ||
RO | 04.09.2019 | ||
RS | 04.09.2019 | ||
SE | 04.09.2019 | ||
SI | 04.09.2019 | ||
SK | 04.09.2019 | ||
SM | 04.09.2019 | ||
IE | 24.09.2019 | ||
LU | 24.09.2019 | ||
BE | 30.09.2019 | ||
CH | 30.09.2019 | ||
LI | 30.09.2019 | ||
BG | 04.12.2019 | ||
GR | 05.12.2019 | ||
IS | 05.01.2020 | ||
PT | 06.01.2020 | ||
DE | 01.04.2020 | ||
Former [2020/36] | AL | 04.09.2019 | |
AT | 04.09.2019 | ||
CZ | 04.09.2019 | ||
DK | 04.09.2019 | ||
EE | 04.09.2019 | ||
ES | 04.09.2019 | ||
FI | 04.09.2019 | ||
HR | 04.09.2019 | ||
IT | 04.09.2019 | ||
LT | 04.09.2019 | ||
LV | 04.09.2019 | ||
NL | 04.09.2019 | ||
PL | 04.09.2019 | ||
RO | 04.09.2019 | ||
RS | 04.09.2019 | ||
SE | 04.09.2019 | ||
SK | 04.09.2019 | ||
SM | 04.09.2019 | ||
IE | 24.09.2019 | ||
LU | 24.09.2019 | ||
CH | 30.09.2019 | ||
LI | 30.09.2019 | ||
BG | 04.12.2019 | ||
GR | 05.12.2019 | ||
IS | 05.01.2020 | ||
PT | 06.01.2020 | ||
DE | 01.04.2020 | ||
Former [2020/35] | AL | 04.09.2019 | |
AT | 04.09.2019 | ||
CZ | 04.09.2019 | ||
EE | 04.09.2019 | ||
ES | 04.09.2019 | ||
FI | 04.09.2019 | ||
HR | 04.09.2019 | ||
IT | 04.09.2019 | ||
LT | 04.09.2019 | ||
LV | 04.09.2019 | ||
NL | 04.09.2019 | ||
PL | 04.09.2019 | ||
RO | 04.09.2019 | ||
RS | 04.09.2019 | ||
SE | 04.09.2019 | ||
SK | 04.09.2019 | ||
SM | 04.09.2019 | ||
LU | 24.09.2019 | ||
CH | 30.09.2019 | ||
LI | 30.09.2019 | ||
BG | 04.12.2019 | ||
GR | 05.12.2019 | ||
PT | 06.01.2020 | ||
IS | 24.02.2020 | ||
DE | 01.04.2020 | ||
Former [2020/34] | AL | 04.09.2019 | |
AT | 04.09.2019 | ||
CZ | 04.09.2019 | ||
EE | 04.09.2019 | ||
ES | 04.09.2019 | ||
FI | 04.09.2019 | ||
HR | 04.09.2019 | ||
IT | 04.09.2019 | ||
LT | 04.09.2019 | ||
LV | 04.09.2019 | ||
NL | 04.09.2019 | ||
PL | 04.09.2019 | ||
RO | 04.09.2019 | ||
RS | 04.09.2019 | ||
SE | 04.09.2019 | ||
SK | 04.09.2019 | ||
SM | 04.09.2019 | ||
CH | 30.09.2019 | ||
LI | 30.09.2019 | ||
BG | 04.12.2019 | ||
GR | 05.12.2019 | ||
PT | 06.01.2020 | ||
IS | 24.02.2020 | ||
DE | 01.04.2020 | ||
Former [2020/27] | AL | 04.09.2019 | |
AT | 04.09.2019 | ||
CZ | 04.09.2019 | ||
EE | 04.09.2019 | ||
ES | 04.09.2019 | ||
FI | 04.09.2019 | ||
HR | 04.09.2019 | ||
IT | 04.09.2019 | ||
LT | 04.09.2019 | ||
LV | 04.09.2019 | ||
NL | 04.09.2019 | ||
PL | 04.09.2019 | ||
RO | 04.09.2019 | ||
RS | 04.09.2019 | ||
SE | 04.09.2019 | ||
SK | 04.09.2019 | ||
SM | 04.09.2019 | ||
BG | 04.12.2019 | ||
GR | 05.12.2019 | ||
PT | 06.01.2020 | ||
IS | 24.02.2020 | ||
Former [2020/25] | AL | 04.09.2019 | |
AT | 04.09.2019 | ||
CZ | 04.09.2019 | ||
EE | 04.09.2019 | ||
ES | 04.09.2019 | ||
FI | 04.09.2019 | ||
HR | 04.09.2019 | ||
IT | 04.09.2019 | ||
LT | 04.09.2019 | ||
LV | 04.09.2019 | ||
NL | 04.09.2019 | ||
PL | 04.09.2019 | ||
RO | 04.09.2019 | ||
RS | 04.09.2019 | ||
SE | 04.09.2019 | ||
SK | 04.09.2019 | ||
BG | 04.12.2019 | ||
GR | 05.12.2019 | ||
PT | 06.01.2020 | ||
IS | 24.02.2020 | ||
Former [2020/24] | AL | 04.09.2019 | |
AT | 04.09.2019 | ||
EE | 04.09.2019 | ||
ES | 04.09.2019 | ||
FI | 04.09.2019 | ||
HR | 04.09.2019 | ||
IT | 04.09.2019 | ||
LT | 04.09.2019 | ||
LV | 04.09.2019 | ||
NL | 04.09.2019 | ||
PL | 04.09.2019 | ||
RO | 04.09.2019 | ||
RS | 04.09.2019 | ||
SE | 04.09.2019 | ||
BG | 04.12.2019 | ||
GR | 05.12.2019 | ||
PT | 06.01.2020 | ||
IS | 24.02.2020 | ||
Former [2020/23] | AL | 04.09.2019 | |
AT | 04.09.2019 | ||
EE | 04.09.2019 | ||
ES | 04.09.2019 | ||
FI | 04.09.2019 | ||
HR | 04.09.2019 | ||
IT | 04.09.2019 | ||
LT | 04.09.2019 | ||
LV | 04.09.2019 | ||
NL | 04.09.2019 | ||
PL | 04.09.2019 | ||
RO | 04.09.2019 | ||
RS | 04.09.2019 | ||
SE | 04.09.2019 | ||
BG | 04.12.2019 | ||
GR | 05.12.2019 | ||
PT | 06.01.2020 | ||
Former [2020/22] | AL | 04.09.2019 | |
EE | 04.09.2019 | ||
ES | 04.09.2019 | ||
FI | 04.09.2019 | ||
HR | 04.09.2019 | ||
LT | 04.09.2019 | ||
LV | 04.09.2019 | ||
NL | 04.09.2019 | ||
RS | 04.09.2019 | ||
SE | 04.09.2019 | ||
BG | 04.12.2019 | ||
GR | 05.12.2019 | ||
PT | 06.01.2020 | ||
Former [2020/20] | AL | 04.09.2019 | |
ES | 04.09.2019 | ||
FI | 04.09.2019 | ||
HR | 04.09.2019 | ||
LT | 04.09.2019 | ||
LV | 04.09.2019 | ||
NL | 04.09.2019 | ||
RS | 04.09.2019 | ||
SE | 04.09.2019 | ||
BG | 04.12.2019 | ||
GR | 05.12.2019 | ||
Former [2020/15] | AL | 04.09.2019 | |
ES | 04.09.2019 | ||
FI | 04.09.2019 | ||
HR | 04.09.2019 | ||
LT | 04.09.2019 | ||
LV | 04.09.2019 | ||
RS | 04.09.2019 | ||
SE | 04.09.2019 | ||
BG | 04.12.2019 | ||
GR | 05.12.2019 | ||
Former [2020/11] | ES | 04.09.2019 | |
FI | 04.09.2019 | ||
HR | 04.09.2019 | ||
LT | 04.09.2019 | ||
LV | 04.09.2019 | ||
RS | 04.09.2019 | ||
SE | 04.09.2019 | ||
BG | 04.12.2019 | ||
GR | 05.12.2019 | ||
Former [2020/10] | FI | 04.09.2019 | |
LT | 04.09.2019 | ||
SE | 04.09.2019 | ||
BG | 04.12.2019 | ||
Former [2020/09] | FI | 04.09.2019 | |
LT | 04.09.2019 | ||
Former [2020/08] | LT | 04.09.2019 | Cited in | International search | [Y]US2005166802 (MATULA GARY W [US], et al) [Y] 1-35,40 * the whole document *; | [A]US2008251755 (MATULA GARY W [US], et al) [A] 1-40* paragraph [0009] *; | [A]WO2011157987 (HALLIBURTON ENERGY SERV INC [US], et al) [A] 1-40 * the whole document *; | [XY] - Monique Cerro, "Mesurer un taux d'argile pour des enduits terre", (20110730), Maison.com, URL: http://www.maison.com/brico-travaux/revetements/mesurer-taux-argile-terre-4724/, (20140717), XP002727346 [X] 36-39 * the whole document * [Y] 1-35,40 |