EP2837624 - 4-SUBSTITUENT-2-HYDROXYLMORPHOLINE-3-ONE AND PREPARATION METHOD THEREOF [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 03.05.2019 Database last updated on 11.05.2024 | |
Former | The patent has been granted Status updated on 25.05.2018 | ||
Former | Grant of patent is intended Status updated on 04.01.2018 | ||
Former | Examination is in progress Status updated on 14.07.2017 | Most recent event Tooltip | 01.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 03.08.2022 [2022/31] | Applicant(s) | For all designated states Zhejiang Hisun Pharmaceutical Co. Ltd. No. 46 Waisha Road Jiaojiang District Taizhou Zhejiang 318000 / CN | For all designated states Shanghai Institute Of Pharmaceutical Industry No.1320 West Beijing Road Jing'an District Shanghai 200040 / CN | [2015/08] | Inventor(s) | 01 /
ZHANG, Fuli No.1320 West Beijing Road Jing'an District Shanghai 200040 / CN | 02 /
LIU, Chonghao No.1320 West Beijing Road Jing'an District Shanghai 200040 / CN | 03 /
QIU, Pengcheng No.1320 West Beijing Road Jing'an District Shanghai 200040 / CN | 04 /
CHAI, Jian No.46 Waisha Road Jiaojiang District Taizhou Zhejiang 318000 / CN | 05 /
CAI, Qingfeng No.46 Waisha Road Jiaojiang District Taizhou Zhejiang 318000 / CN | [2015/08] | Representative(s) | dompatent von Kreisler Selting Werner - Partnerschaft von Patent- und Rechtsanwälten mbB Deichmannhaus am Dom Bahnhofsvorplatz 1 50667 Köln / DE | [2018/26] |
Former [2015/08] | Von Kreisler Selting Werner - Partnerschaft von Patentanwälten und Rechtsanwälten mbB Deichmannhaus am Dom Bahnhofsvorplatz 1 50667 Köln / DE | Application number, filing date | 13775919.7 | 15.04.2013 | [2018/26] | WO2013CN74202 | Priority number, date | CN201210112140 | 13.04.2012 Original published format: CN201210112140 | [2015/08] | Filing language | ZH | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2013152741 | Date: | 17.10.2013 | Language: | ZH | [2013/42] | Type: | A1 Application with search report | No.: | EP2837624 | Date: | 18.02.2015 | Language: | EN | [2015/08] | Type: | B1 Patent specification | No.: | EP2837624 | Date: | 27.06.2018 | Language: | EN | [2018/26] | Search report(s) | International search report - published on: | CN | 17.10.2013 | (Supplementary) European search report - dispatched on: | EP | 07.08.2015 | Classification | IPC: | C07D265/32, C07D413/06 | [2015/08] | CPC: |
C07D265/32 (EP,US);
C07D413/06 (EP,US)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2015/08] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | 4-SUBSTITUENT-2-HYDROXYLMORPHOLIN-3-ON UND HERSTELLUNGSVERFAHREN DAFÜR | [2015/08] | English: | 4-SUBSTITUENT-2-HYDROXYLMORPHOLINE-3-ONE AND PREPARATION METHOD THEREOF | [2015/08] | French: | 2-HYDROXYMORPHOLINE-3-ONE 4-SUBSTITUÉE ET SON PROCÉDÉ DE PRÉPARATION | [2015/08] | Entry into regional phase | 06.11.2014 | Translation filed | 06.11.2014 | National basic fee paid | 06.11.2014 | Search fee paid | 06.11.2014 | Designation fee(s) paid | 06.11.2014 | Examination fee paid | Examination procedure | 06.11.2014 | Examination requested [2015/08] | 23.01.2016 | Amendment by applicant (claims and/or description) | 17.07.2017 | Despatch of a communication from the examining division (Time limit: M04) | 27.11.2017 | Reply to a communication from the examining division | 05.01.2018 | Communication of intention to grant the patent | 14.05.2018 | Fee for grant paid | 14.05.2018 | Fee for publishing/printing paid | 14.05.2018 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 17.07.2017 | Opposition(s) | 28.03.2019 | No opposition filed within time limit [2019/23] | Fees paid | Renewal fee | 27.04.2015 | Renewal fee patent year 03 | 27.04.2016 | Renewal fee patent year 04 | 28.04.2017 | Renewal fee patent year 05 | 27.04.2018 | Renewal fee patent year 06 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 15.04.2013 | AL | 27.06.2018 | AT | 27.06.2018 | CY | 27.06.2018 | CZ | 27.06.2018 | DK | 27.06.2018 | EE | 27.06.2018 | ES | 27.06.2018 | FI | 27.06.2018 | HR | 27.06.2018 | IT | 27.06.2018 | LT | 27.06.2018 | LV | 27.06.2018 | MC | 27.06.2018 | MK | 27.06.2018 | MT | 27.06.2018 | NL | 27.06.2018 | PL | 27.06.2018 | RO | 27.06.2018 | RS | 27.06.2018 | SE | 27.06.2018 | SI | 27.06.2018 | SK | 27.06.2018 | SM | 27.06.2018 | TR | 27.06.2018 | BG | 27.09.2018 | NO | 27.09.2018 | GR | 28.09.2018 | IS | 27.10.2018 | PT | 29.10.2018 | [2022/31] |
Former [2021/34] | HU | 15.04.2013 | |
AL | 27.06.2018 | ||
AT | 27.06.2018 | ||
CY | 27.06.2018 | ||
CZ | 27.06.2018 | ||
DK | 27.06.2018 | ||
EE | 27.06.2018 | ||
ES | 27.06.2018 | ||
FI | 27.06.2018 | ||
HR | 27.06.2018 | ||
IT | 27.06.2018 | ||
LT | 27.06.2018 | ||
LV | 27.06.2018 | ||
MC | 27.06.2018 | ||
MT | 27.06.2018 | ||
NL | 27.06.2018 | ||
PL | 27.06.2018 | ||
RO | 27.06.2018 | ||
RS | 27.06.2018 | ||
SE | 27.06.2018 | ||
SI | 27.06.2018 | ||
SK | 27.06.2018 | ||
SM | 27.06.2018 | ||
TR | 27.06.2018 | ||
BG | 27.09.2018 | ||
NO | 27.09.2018 | ||
GR | 28.09.2018 | ||
IS | 27.10.2018 | ||
PT | 29.10.2018 | ||
Former [2021/32] | HU | 15.04.2013 | |
AL | 27.06.2018 | ||
AT | 27.06.2018 | ||
CY | 27.06.2018 | ||
CZ | 27.06.2018 | ||
DK | 27.06.2018 | ||
EE | 27.06.2018 | ||
ES | 27.06.2018 | ||
FI | 27.06.2018 | ||
HR | 27.06.2018 | ||
IT | 27.06.2018 | ||
LT | 27.06.2018 | ||
LV | 27.06.2018 | ||
MC | 27.06.2018 | ||
NL | 27.06.2018 | ||
PL | 27.06.2018 | ||
RO | 27.06.2018 | ||
RS | 27.06.2018 | ||
SE | 27.06.2018 | ||
SI | 27.06.2018 | ||
SK | 27.06.2018 | ||
SM | 27.06.2018 | ||
TR | 27.06.2018 | ||
BG | 27.09.2018 | ||
NO | 27.09.2018 | ||
GR | 28.09.2018 | ||
IS | 27.10.2018 | ||
PT | 29.10.2018 | ||
Former [2021/26] | AL | 27.06.2018 | |
AT | 27.06.2018 | ||
CY | 27.06.2018 | ||
CZ | 27.06.2018 | ||
DK | 27.06.2018 | ||
EE | 27.06.2018 | ||
ES | 27.06.2018 | ||
FI | 27.06.2018 | ||
HR | 27.06.2018 | ||
IT | 27.06.2018 | ||
LT | 27.06.2018 | ||
LV | 27.06.2018 | ||
MC | 27.06.2018 | ||
NL | 27.06.2018 | ||
PL | 27.06.2018 | ||
RO | 27.06.2018 | ||
RS | 27.06.2018 | ||
SE | 27.06.2018 | ||
SI | 27.06.2018 | ||
SK | 27.06.2018 | ||
SM | 27.06.2018 | ||
TR | 27.06.2018 | ||
BG | 27.09.2018 | ||
NO | 27.09.2018 | ||
GR | 28.09.2018 | ||
IS | 27.10.2018 | ||
PT | 29.10.2018 | ||
Former [2020/29] | AL | 27.06.2018 | |
AT | 27.06.2018 | ||
CZ | 27.06.2018 | ||
DK | 27.06.2018 | ||
EE | 27.06.2018 | ||
ES | 27.06.2018 | ||
FI | 27.06.2018 | ||
HR | 27.06.2018 | ||
IT | 27.06.2018 | ||
LT | 27.06.2018 | ||
LV | 27.06.2018 | ||
MC | 27.06.2018 | ||
NL | 27.06.2018 | ||
PL | 27.06.2018 | ||
RO | 27.06.2018 | ||
RS | 27.06.2018 | ||
SE | 27.06.2018 | ||
SI | 27.06.2018 | ||
SK | 27.06.2018 | ||
SM | 27.06.2018 | ||
TR | 27.06.2018 | ||
BG | 27.09.2018 | ||
NO | 27.09.2018 | ||
GR | 28.09.2018 | ||
IS | 27.10.2018 | ||
PT | 29.10.2018 | ||
Former [2020/16] | AL | 27.06.2018 | |
AT | 27.06.2018 | ||
CZ | 27.06.2018 | ||
DK | 27.06.2018 | ||
EE | 27.06.2018 | ||
ES | 27.06.2018 | ||
FI | 27.06.2018 | ||
HR | 27.06.2018 | ||
IT | 27.06.2018 | ||
LT | 27.06.2018 | ||
LV | 27.06.2018 | ||
MC | 27.06.2018 | ||
NL | 27.06.2018 | ||
PL | 27.06.2018 | ||
RO | 27.06.2018 | ||
RS | 27.06.2018 | ||
SE | 27.06.2018 | ||
SI | 27.06.2018 | ||
SK | 27.06.2018 | ||
SM | 27.06.2018 | ||
TR | 27.06.2018 | ||
BG | 27.09.2018 | ||
NO | 27.09.2018 | ||
GR | 28.09.2018 | ||
IS | 27.10.2018 | ||
Former [2020/02] | AL | 27.06.2018 | |
AT | 27.06.2018 | ||
CZ | 27.06.2018 | ||
DK | 27.06.2018 | ||
EE | 27.06.2018 | ||
ES | 27.06.2018 | ||
FI | 27.06.2018 | ||
HR | 27.06.2018 | ||
IT | 27.06.2018 | ||
LT | 27.06.2018 | ||
LV | 27.06.2018 | ||
MC | 27.06.2018 | ||
NL | 27.06.2018 | ||
PL | 27.06.2018 | ||
RO | 27.06.2018 | ||
RS | 27.06.2018 | ||
SE | 27.06.2018 | ||
SI | 27.06.2018 | ||
SK | 27.06.2018 | ||
SM | 27.06.2018 | ||
BG | 27.09.2018 | ||
NO | 27.09.2018 | ||
GR | 28.09.2018 | ||
IS | 27.10.2018 | ||
Former [2019/51] | AL | 27.06.2018 | |
AT | 27.06.2018 | ||
CZ | 27.06.2018 | ||
DK | 27.06.2018 | ||
EE | 27.06.2018 | ||
ES | 27.06.2018 | ||
FI | 27.06.2018 | ||
HR | 27.06.2018 | ||
IT | 27.06.2018 | ||
LT | 27.06.2018 | ||
LV | 27.06.2018 | ||
NL | 27.06.2018 | ||
PL | 27.06.2018 | ||
RO | 27.06.2018 | ||
RS | 27.06.2018 | ||
SE | 27.06.2018 | ||
SI | 27.06.2018 | ||
SK | 27.06.2018 | ||
SM | 27.06.2018 | ||
BG | 27.09.2018 | ||
NO | 27.09.2018 | ||
GR | 28.09.2018 | ||
IS | 27.10.2018 | ||
Former [2019/37] | AT | 27.06.2018 | |
CZ | 27.06.2018 | ||
DK | 27.06.2018 | ||
EE | 27.06.2018 | ||
ES | 27.06.2018 | ||
FI | 27.06.2018 | ||
HR | 27.06.2018 | ||
IT | 27.06.2018 | ||
LT | 27.06.2018 | ||
LV | 27.06.2018 | ||
NL | 27.06.2018 | ||
PL | 27.06.2018 | ||
RO | 27.06.2018 | ||
RS | 27.06.2018 | ||
SE | 27.06.2018 | ||
SI | 27.06.2018 | ||
SK | 27.06.2018 | ||
SM | 27.06.2018 | ||
BG | 27.09.2018 | ||
NO | 27.09.2018 | ||
GR | 28.09.2018 | ||
IS | 27.10.2018 | ||
Former [2019/26] | AT | 27.06.2018 | |
CZ | 27.06.2018 | ||
DK | 27.06.2018 | ||
EE | 27.06.2018 | ||
ES | 27.06.2018 | ||
FI | 27.06.2018 | ||
HR | 27.06.2018 | ||
IT | 27.06.2018 | ||
LT | 27.06.2018 | ||
LV | 27.06.2018 | ||
NL | 27.06.2018 | ||
PL | 27.06.2018 | ||
RO | 27.06.2018 | ||
RS | 27.06.2018 | ||
SE | 27.06.2018 | ||
SK | 27.06.2018 | ||
SM | 27.06.2018 | ||
BG | 27.09.2018 | ||
NO | 27.09.2018 | ||
GR | 28.09.2018 | ||
IS | 27.10.2018 | ||
Former [2019/12] | AT | 27.06.2018 | |
CZ | 27.06.2018 | ||
EE | 27.06.2018 | ||
ES | 27.06.2018 | ||
FI | 27.06.2018 | ||
HR | 27.06.2018 | ||
IT | 27.06.2018 | ||
LT | 27.06.2018 | ||
LV | 27.06.2018 | ||
NL | 27.06.2018 | ||
PL | 27.06.2018 | ||
RO | 27.06.2018 | ||
RS | 27.06.2018 | ||
SE | 27.06.2018 | ||
SK | 27.06.2018 | ||
SM | 27.06.2018 | ||
BG | 27.09.2018 | ||
NO | 27.09.2018 | ||
GR | 28.09.2018 | ||
IS | 27.10.2018 | ||
Former [2019/11] | AT | 27.06.2018 | |
CZ | 27.06.2018 | ||
EE | 27.06.2018 | ||
FI | 27.06.2018 | ||
HR | 27.06.2018 | ||
IT | 27.06.2018 | ||
LT | 27.06.2018 | ||
LV | 27.06.2018 | ||
NL | 27.06.2018 | ||
PL | 27.06.2018 | ||
RO | 27.06.2018 | ||
RS | 27.06.2018 | ||
SE | 27.06.2018 | ||
SK | 27.06.2018 | ||
SM | 27.06.2018 | ||
BG | 27.09.2018 | ||
NO | 27.09.2018 | ||
GR | 28.09.2018 | ||
IS | 27.10.2018 | ||
Former [2019/10] | AT | 27.06.2018 | |
CZ | 27.06.2018 | ||
EE | 27.06.2018 | ||
FI | 27.06.2018 | ||
HR | 27.06.2018 | ||
LT | 27.06.2018 | ||
LV | 27.06.2018 | ||
NL | 27.06.2018 | ||
PL | 27.06.2018 | ||
RO | 27.06.2018 | ||
RS | 27.06.2018 | ||
SE | 27.06.2018 | ||
SK | 27.06.2018 | ||
BG | 27.09.2018 | ||
NO | 27.09.2018 | ||
GR | 28.09.2018 | ||
IS | 27.10.2018 | ||
Former [2019/09] | EE | 27.06.2018 | |
FI | 27.06.2018 | ||
HR | 27.06.2018 | ||
LT | 27.06.2018 | ||
LV | 27.06.2018 | ||
NL | 27.06.2018 | ||
RS | 27.06.2018 | ||
SE | 27.06.2018 | ||
BG | 27.09.2018 | ||
NO | 27.09.2018 | ||
GR | 28.09.2018 | ||
IS | 27.10.2018 | ||
Former [2019/08] | FI | 27.06.2018 | |
HR | 27.06.2018 | ||
LT | 27.06.2018 | ||
LV | 27.06.2018 | ||
NL | 27.06.2018 | ||
RS | 27.06.2018 | ||
SE | 27.06.2018 | ||
BG | 27.09.2018 | ||
NO | 27.09.2018 | ||
GR | 28.09.2018 | ||
IS | 27.10.2018 | ||
Former [2019/03] | FI | 27.06.2018 | |
HR | 27.06.2018 | ||
LT | 27.06.2018 | ||
LV | 27.06.2018 | ||
NL | 27.06.2018 | ||
RS | 27.06.2018 | ||
SE | 27.06.2018 | ||
BG | 27.09.2018 | ||
NO | 27.09.2018 | ||
GR | 28.09.2018 | ||
Former [2018/52] | FI | 27.06.2018 | |
HR | 27.06.2018 | ||
LT | 27.06.2018 | ||
LV | 27.06.2018 | ||
RS | 27.06.2018 | ||
SE | 27.06.2018 | ||
BG | 27.09.2018 | ||
NO | 27.09.2018 | ||
GR | 28.09.2018 | ||
Former [2018/51] | FI | 27.06.2018 | |
HR | 27.06.2018 | ||
LT | 27.06.2018 | ||
LV | 27.06.2018 | ||
RS | 27.06.2018 | ||
SE | 27.06.2018 | ||
BG | 27.09.2018 | ||
NO | 27.09.2018 | ||
Former [2018/50] | FI | 27.06.2018 | |
HR | 27.06.2018 | ||
LT | 27.06.2018 | ||
SE | 27.06.2018 | ||
BG | 27.09.2018 | ||
NO | 27.09.2018 | ||
Former [2018/49] | FI | 27.06.2018 | |
LT | 27.06.2018 | ||
SE | 27.06.2018 | ||
BG | 27.09.2018 | ||
NO | 27.09.2018 | ||
Former [2018/47] | FI | 27.06.2018 | |
LT | 27.06.2018 | ||
NO | 27.09.2018 | Documents cited: | Search | [ID] - BRANDS, K. M. J. ET AL., "Efficient Synthesis of NK1 Receptor Antagonist Aprepitant Using a Crystallization-Induced Diastereoselective Transformation", JOURNAL OF THE AMERICAN CHEMICAL SOCIETY., AMERICAN CHEMICAL SOCIETY, WASHINGTON, DC.; US, (2003), vol. 125, no. 8, doi:10.1021/ja027458g, ISSN 0002-7863, pages 2129 - 2135, XP002742845 [ID] 1-9 * page 2130, column 2, paragraph 2 * * page 2131, column 1 * * Scheme 8; page 2134 * * page 2135, column 1 * DOI: http://dx.doi.org/10.1021/ja027458g | International search | [A]WO0194322 (MERCK & CO INC [US], et al); | [A]WO0196319 (MERCK & CO INC [US], et al); | [A]CN102153522 (WUHAN QIRUI PHARMACEUTICALS CO LTD, et al); | [XP]CN102675240 (ZHEJIANG HISUN PHARM CO LTD, et al) | by applicant | - KAREL M. J. BRANDS ET AL., J. AM. CHEM. SOC., (2003), vol. 125, pages 2129 - 2135 | - TODD D. NELSON, TETRAHEDRON LETTERS, (2004), vol. 45, pages 8917 - 8920 | - J. AM. CHEM. SOC., (2003), vol. 125, pages 2129 - 2135 |