EP2849490 - MOBILE STATION AND MOBILE COMMUNICATION METHOD [Right-click to bookmark this link] | |||
Former [2015/12] | MOBILE STATION AND MOBILE COMMUNICATION METHOD | ||
[2017/49] | Status | No opposition filed within time limit Status updated on 05.04.2019 Database last updated on 06.07.2024 | |
Former | The patent has been granted Status updated on 27.04.2018 | ||
Former | Grant of patent is intended Status updated on 24.11.2017 | ||
Former | Examination is in progress Status updated on 17.03.2017 | Most recent event Tooltip | 01.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 03.08.2022 [2022/31] | Applicant(s) | For all designated states NTT DOCOMO, INC. Sanno Park Tower 11-1, Nagata-cho 2-chome Chiyoda-ku Tokyo 100-6150 / JP | [2015/12] | Inventor(s) | 01 /
TAKAHASHI, Hideaki c/o Intellectual Property Department NTT DOCOMO INC. SANNO PARK TOWER 11-1 Nagatacho 2-chome, Chiyoda-ku Tokyo 100-6150 / JP | [2015/12] | Representative(s) | Hoffmann Eitle Patent- und Rechtsanwälte PartmbB Arabellastraße 30 81925 München / DE | [2015/12] | Application number, filing date | 13779042.4 | 16.04.2013 | [2018/22] | WO2013JP61261 | Priority number, date | JP20120093009 | 16.04.2012 Original published format: JP 2012093009 | [2015/12] | Filing language | JA | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2013157537 | Date: | 24.10.2013 | Language: | JA | [2013/43] | Type: | A1 Application with search report | No.: | EP2849490 | Date: | 18.03.2015 | Language: | EN | [2015/12] | Type: | B1 Patent specification | No.: | EP2849490 | Date: | 30.05.2018 | Language: | EN | [2018/22] | Search report(s) | International search report - published on: | JP | 24.10.2013 | (Supplementary) European search report - dispatched on: | EP | 02.02.2016 | Classification | IPC: | H04W36/02 | [2016/09] | CPC: |
H04L5/001 (EP,US);
H04W36/0016 (US);
H04L5/0098 (EP,US);
H04W36/0069 (US);
H04W36/00692 (EP);
H04L5/00 (US)
|
Former IPC [2015/12] | H04W36/02, H04W16/32, H04W72/04 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2015/12] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | MOBILSTATION UND MOBILKOMMUNIKATIONSVERFAHREN | [2018/18] | English: | MOBILE STATION AND MOBILE COMMUNICATION METHOD | [2018/18] | French: | STATION MOBILE ET PROCÉDÉ DE COMMUNICATION MOBILE | [2018/18] |
Former [2015/12] | MOBILSTATION UND MOBILES KOMMUNIKATIONSVERFAHREN | ||
Former [2015/12] | MOBILE STATION AND MOBILE COMMUNICATION METHOD | ||
Former [2015/12] | STATION MOBILE ET PROCÉDÉ DE COMMUNICATION MOBILE | Entry into regional phase | 21.10.2014 | Translation filed | 21.10.2014 | National basic fee paid | 21.10.2014 | Search fee paid | 21.10.2014 | Designation fee(s) paid | 21.10.2014 | Examination fee paid | Examination procedure | 21.10.2014 | Examination requested [2015/12] | 29.08.2016 | Amendment by applicant (claims and/or description) | 17.03.2017 | Despatch of a communication from the examining division (Time limit: M04) | 18.07.2017 | Reply to a communication from the examining division | 23.11.2017 | Communication of intention to grant the patent | 16.03.2018 | Fee for grant paid | 16.03.2018 | Fee for publishing/printing paid | 16.03.2018 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 17.03.2017 | Opposition(s) | 01.03.2019 | No opposition filed within time limit [2019/19] | Fees paid | Renewal fee | 27.04.2015 | Renewal fee patent year 03 | 17.03.2016 | Renewal fee patent year 04 | 20.04.2017 | Renewal fee patent year 05 | 20.04.2018 | Renewal fee patent year 06 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 16.04.2013 | AL | 30.05.2018 | AT | 30.05.2018 | CY | 30.05.2018 | DK | 30.05.2018 | EE | 30.05.2018 | FI | 30.05.2018 | HR | 30.05.2018 | IT | 30.05.2018 | LT | 30.05.2018 | LV | 30.05.2018 | MC | 30.05.2018 | MK | 30.05.2018 | MT | 30.05.2018 | NL | 30.05.2018 | PL | 30.05.2018 | RO | 30.05.2018 | RS | 30.05.2018 | SE | 30.05.2018 | SI | 30.05.2018 | SK | 30.05.2018 | SM | 30.05.2018 | TR | 30.05.2018 | BG | 30.08.2018 | NO | 30.08.2018 | GR | 31.08.2018 | IS | 30.09.2018 | PT | 01.10.2018 | [2022/31] |
Former [2021/34] | HU | 16.04.2013 | |
AL | 30.05.2018 | ||
AT | 30.05.2018 | ||
CY | 30.05.2018 | ||
DK | 30.05.2018 | ||
EE | 30.05.2018 | ||
FI | 30.05.2018 | ||
HR | 30.05.2018 | ||
IT | 30.05.2018 | ||
LT | 30.05.2018 | ||
LV | 30.05.2018 | ||
MC | 30.05.2018 | ||
MT | 30.05.2018 | ||
NL | 30.05.2018 | ||
PL | 30.05.2018 | ||
RO | 30.05.2018 | ||
RS | 30.05.2018 | ||
SE | 30.05.2018 | ||
SI | 30.05.2018 | ||
SK | 30.05.2018 | ||
SM | 30.05.2018 | ||
TR | 30.05.2018 | ||
BG | 30.08.2018 | ||
NO | 30.08.2018 | ||
GR | 31.08.2018 | ||
IS | 30.09.2018 | ||
PT | 01.10.2018 | ||
Former [2021/32] | HU | 16.04.2013 | |
AL | 30.05.2018 | ||
AT | 30.05.2018 | ||
CY | 30.05.2018 | ||
DK | 30.05.2018 | ||
EE | 30.05.2018 | ||
FI | 30.05.2018 | ||
HR | 30.05.2018 | ||
IT | 30.05.2018 | ||
LT | 30.05.2018 | ||
LV | 30.05.2018 | ||
MC | 30.05.2018 | ||
NL | 30.05.2018 | ||
PL | 30.05.2018 | ||
RO | 30.05.2018 | ||
RS | 30.05.2018 | ||
SE | 30.05.2018 | ||
SI | 30.05.2018 | ||
SK | 30.05.2018 | ||
SM | 30.05.2018 | ||
TR | 30.05.2018 | ||
BG | 30.08.2018 | ||
NO | 30.08.2018 | ||
GR | 31.08.2018 | ||
IS | 30.09.2018 | ||
PT | 01.10.2018 | ||
Former [2021/31] | AL | 30.05.2018 | |
AT | 30.05.2018 | ||
CY | 30.05.2018 | ||
DK | 30.05.2018 | ||
EE | 30.05.2018 | ||
FI | 30.05.2018 | ||
HR | 30.05.2018 | ||
IT | 30.05.2018 | ||
LT | 30.05.2018 | ||
LV | 30.05.2018 | ||
MC | 30.05.2018 | ||
NL | 30.05.2018 | ||
PL | 30.05.2018 | ||
RO | 30.05.2018 | ||
RS | 30.05.2018 | ||
SE | 30.05.2018 | ||
SI | 30.05.2018 | ||
SK | 30.05.2018 | ||
SM | 30.05.2018 | ||
TR | 30.05.2018 | ||
BG | 30.08.2018 | ||
NO | 30.08.2018 | ||
GR | 31.08.2018 | ||
IS | 30.09.2018 | ||
PT | 01.10.2018 | ||
Former [2020/29] | AL | 30.05.2018 | |
AT | 30.05.2018 | ||
CY | 30.05.2018 | ||
DK | 30.05.2018 | ||
EE | 30.05.2018 | ||
FI | 30.05.2018 | ||
HR | 30.05.2018 | ||
IT | 30.05.2018 | ||
LT | 30.05.2018 | ||
LV | 30.05.2018 | ||
MC | 30.05.2018 | ||
NL | 30.05.2018 | ||
PL | 30.05.2018 | ||
RO | 30.05.2018 | ||
RS | 30.05.2018 | ||
SE | 30.05.2018 | ||
SI | 30.05.2018 | ||
SK | 30.05.2018 | ||
SM | 30.05.2018 | ||
TR | 30.05.2018 | ||
BG | 30.08.2018 | ||
NO | 30.08.2018 | ||
GR | 31.08.2018 | ||
PT | 01.10.2018 | ||
Former [2020/16] | AL | 30.05.2018 | |
AT | 30.05.2018 | ||
CY | 30.05.2018 | ||
DK | 30.05.2018 | ||
EE | 30.05.2018 | ||
FI | 30.05.2018 | ||
HR | 30.05.2018 | ||
IT | 30.05.2018 | ||
LT | 30.05.2018 | ||
LV | 30.05.2018 | ||
MC | 30.05.2018 | ||
NL | 30.05.2018 | ||
PL | 30.05.2018 | ||
RO | 30.05.2018 | ||
RS | 30.05.2018 | ||
SE | 30.05.2018 | ||
SI | 30.05.2018 | ||
SK | 30.05.2018 | ||
SM | 30.05.2018 | ||
TR | 30.05.2018 | ||
BG | 30.08.2018 | ||
NO | 30.08.2018 | ||
GR | 31.08.2018 | ||
Former [2020/02] | AL | 30.05.2018 | |
AT | 30.05.2018 | ||
CY | 30.05.2018 | ||
DK | 30.05.2018 | ||
EE | 30.05.2018 | ||
FI | 30.05.2018 | ||
HR | 30.05.2018 | ||
IT | 30.05.2018 | ||
LT | 30.05.2018 | ||
LV | 30.05.2018 | ||
MC | 30.05.2018 | ||
NL | 30.05.2018 | ||
PL | 30.05.2018 | ||
RO | 30.05.2018 | ||
RS | 30.05.2018 | ||
SE | 30.05.2018 | ||
SI | 30.05.2018 | ||
SK | 30.05.2018 | ||
SM | 30.05.2018 | ||
BG | 30.08.2018 | ||
NO | 30.08.2018 | ||
GR | 31.08.2018 | ||
Former [2019/51] | AL | 30.05.2018 | |
AT | 30.05.2018 | ||
CY | 30.05.2018 | ||
DK | 30.05.2018 | ||
EE | 30.05.2018 | ||
FI | 30.05.2018 | ||
HR | 30.05.2018 | ||
IT | 30.05.2018 | ||
LT | 30.05.2018 | ||
LV | 30.05.2018 | ||
NL | 30.05.2018 | ||
PL | 30.05.2018 | ||
RO | 30.05.2018 | ||
RS | 30.05.2018 | ||
SE | 30.05.2018 | ||
SI | 30.05.2018 | ||
SK | 30.05.2018 | ||
SM | 30.05.2018 | ||
BG | 30.08.2018 | ||
NO | 30.08.2018 | ||
GR | 31.08.2018 | ||
Former [2019/26] | AT | 30.05.2018 | |
CY | 30.05.2018 | ||
DK | 30.05.2018 | ||
EE | 30.05.2018 | ||
FI | 30.05.2018 | ||
HR | 30.05.2018 | ||
IT | 30.05.2018 | ||
LT | 30.05.2018 | ||
LV | 30.05.2018 | ||
NL | 30.05.2018 | ||
PL | 30.05.2018 | ||
RO | 30.05.2018 | ||
RS | 30.05.2018 | ||
SE | 30.05.2018 | ||
SI | 30.05.2018 | ||
SK | 30.05.2018 | ||
SM | 30.05.2018 | ||
BG | 30.08.2018 | ||
NO | 30.08.2018 | ||
GR | 31.08.2018 | ||
Former [2019/11] | AT | 30.05.2018 | |
CY | 30.05.2018 | ||
DK | 30.05.2018 | ||
EE | 30.05.2018 | ||
FI | 30.05.2018 | ||
HR | 30.05.2018 | ||
IT | 30.05.2018 | ||
LT | 30.05.2018 | ||
LV | 30.05.2018 | ||
NL | 30.05.2018 | ||
PL | 30.05.2018 | ||
RO | 30.05.2018 | ||
RS | 30.05.2018 | ||
SE | 30.05.2018 | ||
SK | 30.05.2018 | ||
SM | 30.05.2018 | ||
BG | 30.08.2018 | ||
NO | 30.08.2018 | ||
GR | 31.08.2018 | ||
Former [2019/10] | AT | 30.05.2018 | |
CY | 30.05.2018 | ||
DK | 30.05.2018 | ||
EE | 30.05.2018 | ||
FI | 30.05.2018 | ||
HR | 30.05.2018 | ||
LT | 30.05.2018 | ||
LV | 30.05.2018 | ||
NL | 30.05.2018 | ||
PL | 30.05.2018 | ||
RO | 30.05.2018 | ||
RS | 30.05.2018 | ||
SE | 30.05.2018 | ||
SK | 30.05.2018 | ||
BG | 30.08.2018 | ||
NO | 30.08.2018 | ||
GR | 31.08.2018 | ||
Former [2019/09] | CY | 30.05.2018 | |
DK | 30.05.2018 | ||
EE | 30.05.2018 | ||
FI | 30.05.2018 | ||
HR | 30.05.2018 | ||
LT | 30.05.2018 | ||
LV | 30.05.2018 | ||
NL | 30.05.2018 | ||
RS | 30.05.2018 | ||
SE | 30.05.2018 | ||
BG | 30.08.2018 | ||
NO | 30.08.2018 | ||
GR | 31.08.2018 | ||
Former [2019/08] | CY | 30.05.2018 | |
DK | 30.05.2018 | ||
FI | 30.05.2018 | ||
HR | 30.05.2018 | ||
LT | 30.05.2018 | ||
LV | 30.05.2018 | ||
NL | 30.05.2018 | ||
RS | 30.05.2018 | ||
SE | 30.05.2018 | ||
BG | 30.08.2018 | ||
NO | 30.08.2018 | ||
GR | 31.08.2018 | ||
Former [2019/03] | CY | 30.05.2018 | |
FI | 30.05.2018 | ||
HR | 30.05.2018 | ||
LT | 30.05.2018 | ||
LV | 30.05.2018 | ||
NL | 30.05.2018 | ||
RS | 30.05.2018 | ||
SE | 30.05.2018 | ||
BG | 30.08.2018 | ||
NO | 30.08.2018 | ||
GR | 31.08.2018 | ||
Former [2018/52] | CY | 30.05.2018 | |
FI | 30.05.2018 | ||
HR | 30.05.2018 | ||
LT | 30.05.2018 | ||
LV | 30.05.2018 | ||
RS | 30.05.2018 | ||
SE | 30.05.2018 | ||
BG | 30.08.2018 | ||
NO | 30.08.2018 | ||
GR | 31.08.2018 | ||
Former [2018/51] | CY | 30.05.2018 | |
FI | 30.05.2018 | ||
HR | 30.05.2018 | ||
LT | 30.05.2018 | ||
LV | 30.05.2018 | ||
RS | 30.05.2018 | ||
SE | 30.05.2018 | ||
BG | 30.08.2018 | ||
NO | 30.08.2018 | ||
Former [2018/50] | CY | 30.05.2018 | |
FI | 30.05.2018 | ||
HR | 30.05.2018 | ||
LT | 30.05.2018 | ||
SE | 30.05.2018 | ||
BG | 30.08.2018 | ||
NO | 30.08.2018 | ||
Former [2018/49] | CY | 30.05.2018 | |
FI | 30.05.2018 | ||
LT | 30.05.2018 | ||
SE | 30.05.2018 | ||
BG | 30.08.2018 | ||
NO | 30.08.2018 | ||
Former [2018/47] | FI | 30.05.2018 | |
LT | 30.05.2018 | ||
NO | 30.08.2018 | Documents cited: | Search | [XY] - LG ELECTRONICS INC, "SCell handling at handover", 3GPP DRAFT; R2-106575 SCELL HANDLING AT HANDOVER, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20101109), vol. RAN WG2, no. Jacksonville, USA; 20101115, XP050492350 [X] 1 * pargaraph 2 figure 1(b) * [Y] 2-4 | [Y] - SAMSUNG, "Handover with CA- stage 2 level issues", 3GPP DRAFT; R2-103113 HANDOVER WITH CA - HIGH LEVEL ISSUES, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20100503), vol. RAN WG2, no. Montreal, Canada; 20100510 - 20100514, XP050605127 [Y] 2-4 * paragraph 10.1.2.1.1 figure 10.1.2.1.1-1 * | [A] - POTEVIO, "Miscellaneous corrections to TS 36.300 on Carrier Aggregation", 3GPP DRAFT; R2-110976 MISCELLANEOUS CORRECTIONS TO TS 36.300 ON CARRIER AGGREGATION, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20110212), vol. RAN WG2, no. Taipei, Taiwan; 20110221, XP050493310 [A] 1-4 * paragraph 7.5 paragraph 10.1.2.1 annex J.3.2 * | [A] - NOKIA CORPORATION ET AL, "SCC reconfiguration and relation to Activation of SCC", 3GPP DRAFT; R2-102883 SCC RECONFIGURATION, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20100504), vol. RAN WG2, no. Montreal, Canada; 20100510, XP050423177 [A] 1-4 * paragraph 4 figure 1 * | International search | [A]JP2012005084 (NTT DOCOMO INC); | [A] - ALCATEL-LUCENT ET AL., "Handover procedure in CA", 3GPP TSG-RAN WG2 #70, R2-103155, (20110511), URL: http://www.3gpp.org/ftp/tsg_ran/WG2_RL2/TSGR2_70/Docs/R2-103155.zip, (20121015), XP050423097 |