blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP2917101

EP2917101 - AN AIRPLANE WING, AN AIRPLANE AND A FLAP SYSTEM [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  13.10.2017
Database last updated on 19.07.2024
FormerThe patent has been granted
Status updated on  04.11.2016
Most recent event   Tooltip17.07.2020Lapse of the patent in a contracting state
New state(s): AL
published on 19.08.2020  [2020/34]
Applicant(s)For all designated states
Fokker Aerostructures B.V.
Industrieweg 4
3351 LB Papendrecht / NL
[2015/38]
Inventor(s)01 / BASTIAANSEN, Adrianus Marinus Franciscus
4 Weerschijnvlinder
NL-4814 VA Breda / NL
02 / SCHOONHOVEN, Michel
58 Grootveldsweer
NL-3371 CD Hardinxveld-Giessendam / NL
 [2015/38]
Representative(s)EP&C
P.O. Box 3241
2280 GE Rijswijk / NL
[2015/38]
Application number, filing date13786556.429.10.2013
[2015/38]
WO2013NL50767
Priority number, dateNL2012200976206.11.2012         Original published format: NL 2009762
[2015/38]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2014073954
Date:15.05.2014
Language:EN
[2014/20]
Type: A1 Application with search report 
No.:EP2917101
Date:16.09.2015
Language:EN
The application published by WIPO in one of the EPO official languages on 15.05.2014 takes the place of the publication of the European patent application.
[2015/38]
Type: B1 Patent specification 
No.:EP2917101
Date:07.12.2016
Language:EN
[2016/49]
Search report(s)International search report - published on:EP15.05.2014
ClassificationIPC:B64C9/20, B64C9/18
[2015/38]
CPC:
B64C9/16 (EP,US); B64C9/38 (US); B64C13/00 (US);
B64C9/18 (EP,US); Y02T50/30 (US)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2015/38]
Extension statesBANot yet paid
MENot yet paid
TitleGerman:FLUGZEUGFLÜGEL, FLUGZEUG UND KLAPPENSYSTEM[2016/24]
English:AN AIRPLANE WING, AN AIRPLANE AND A FLAP SYSTEM[2015/38]
French:AILE D'UN AVION, AVION ET SYSTÈME DE VOLET[2016/24]
Former [2015/38]EINEM FLUGZEUGFLÜGEL, FLUGZEUGE UND EIN LAMELLENSYSTEM
Former [2015/38]AILE D'AVION, ET AVION ET SYSTÈME DE VOLET
Entry into regional phase22.05.2015National basic fee paid 
22.05.2015Designation fee(s) paid 
22.05.2015Examination fee paid 
Examination procedure22.05.2015Examination requested  [2015/38]
03.06.2016Communication of intention to grant the patent
30.09.2016Fee for grant paid
30.09.2016Fee for publishing/printing paid
30.09.2016Receipt of the translation of the claim(s)
Divisional application(s)The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  03.06.2016
Opposition(s)08.09.2017No opposition filed within time limit [2017/46]
Fees paidRenewal fee
30.10.2015Renewal fee patent year 03
27.10.2016Renewal fee patent year 04
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU29.10.2013
AL07.12.2016
AT07.12.2016
BE07.12.2016
CY07.12.2016
CZ07.12.2016
DK07.12.2016
EE07.12.2016
ES07.12.2016
FI07.12.2016
HR07.12.2016
LT07.12.2016
LV07.12.2016
MC07.12.2016
MK07.12.2016
NL07.12.2016
PL07.12.2016
RO07.12.2016
RS07.12.2016
SE07.12.2016
SI07.12.2016
SK07.12.2016
SM07.12.2016
TR07.12.2016
BG07.03.2017
NO07.03.2017
GR08.03.2017
IS07.04.2017
PT07.04.2017
[2020/34]
Former [2020/15]HU29.10.2013
AT07.12.2016
BE07.12.2016
CY07.12.2016
CZ07.12.2016
DK07.12.2016
EE07.12.2016
ES07.12.2016
FI07.12.2016
HR07.12.2016
LT07.12.2016
LV07.12.2016
MC07.12.2016
MK07.12.2016
NL07.12.2016
PL07.12.2016
RO07.12.2016
RS07.12.2016
SE07.12.2016
SI07.12.2016
SK07.12.2016
SM07.12.2016
TR07.12.2016
BG07.03.2017
NO07.03.2017
GR08.03.2017
IS07.04.2017
PT07.04.2017
Former [2019/51]HU29.10.2013
AT07.12.2016
BE07.12.2016
CY07.12.2016
CZ07.12.2016
DK07.12.2016
EE07.12.2016
ES07.12.2016
FI07.12.2016
HR07.12.2016
LT07.12.2016
LV07.12.2016
MC07.12.2016
MK07.12.2016
NL07.12.2016
PL07.12.2016
RO07.12.2016
RS07.12.2016
SE07.12.2016
SI07.12.2016
SK07.12.2016
SM07.12.2016
BG07.03.2017
NO07.03.2017
GR08.03.2017
IS07.04.2017
PT07.04.2017
Former [2019/47]HU29.10.2013
AT07.12.2016
BE07.12.2016
CY07.12.2016
CZ07.12.2016
DK07.12.2016
EE07.12.2016
ES07.12.2016
FI07.12.2016
HR07.12.2016
LT07.12.2016
LV07.12.2016
MC07.12.2016
NL07.12.2016
PL07.12.2016
RO07.12.2016
RS07.12.2016
SE07.12.2016
SI07.12.2016
SK07.12.2016
SM07.12.2016
BG07.03.2017
NO07.03.2017
GR08.03.2017
IS07.04.2017
PT07.04.2017
Former [2019/31]HU29.10.2013
AT07.12.2016
BE07.12.2016
CZ07.12.2016
DK07.12.2016
EE07.12.2016
ES07.12.2016
FI07.12.2016
HR07.12.2016
LT07.12.2016
LV07.12.2016
MC07.12.2016
NL07.12.2016
PL07.12.2016
RO07.12.2016
RS07.12.2016
SE07.12.2016
SI07.12.2016
SK07.12.2016
SM07.12.2016
BG07.03.2017
NO07.03.2017
GR08.03.2017
IS07.04.2017
PT07.04.2017
Former [2018/30]AT07.12.2016
BE07.12.2016
CZ07.12.2016
DK07.12.2016
EE07.12.2016
ES07.12.2016
FI07.12.2016
HR07.12.2016
LT07.12.2016
LV07.12.2016
MC07.12.2016
NL07.12.2016
PL07.12.2016
RO07.12.2016
RS07.12.2016
SE07.12.2016
SI07.12.2016
SK07.12.2016
SM07.12.2016
BG07.03.2017
NO07.03.2017
GR08.03.2017
IS07.04.2017
PT07.04.2017
Former [2017/52]AT07.12.2016
BE07.12.2016
CZ07.12.2016
DK07.12.2016
EE07.12.2016
ES07.12.2016
FI07.12.2016
HR07.12.2016
LT07.12.2016
LV07.12.2016
NL07.12.2016
PL07.12.2016
RO07.12.2016
RS07.12.2016
SE07.12.2016
SI07.12.2016
SK07.12.2016
SM07.12.2016
BG07.03.2017
NO07.03.2017
GR08.03.2017
IS07.04.2017
PT07.04.2017
Former [2017/38]AT07.12.2016
BE07.12.2016
CZ07.12.2016
EE07.12.2016
ES07.12.2016
FI07.12.2016
HR07.12.2016
LT07.12.2016
LV07.12.2016
NL07.12.2016
PL07.12.2016
RO07.12.2016
RS07.12.2016
SE07.12.2016
SK07.12.2016
SM07.12.2016
BG07.03.2017
NO07.03.2017
GR08.03.2017
IS07.04.2017
PT07.04.2017
Former [2017/36]BE07.12.2016
CZ07.12.2016
EE07.12.2016
ES07.12.2016
FI07.12.2016
HR07.12.2016
LT07.12.2016
LV07.12.2016
NL07.12.2016
PL07.12.2016
RO07.12.2016
RS07.12.2016
SE07.12.2016
SK07.12.2016
NO07.03.2017
GR08.03.2017
IS07.04.2017
Former [2017/34]CZ07.12.2016
ES07.12.2016
FI07.12.2016
HR07.12.2016
LT07.12.2016
LV07.12.2016
NL07.12.2016
RS07.12.2016
SE07.12.2016
NO07.03.2017
GR08.03.2017
Former [2017/31]ES07.12.2016
FI07.12.2016
HR07.12.2016
LT07.12.2016
LV07.12.2016
NL07.12.2016
RS07.12.2016
SE07.12.2016
NO07.03.2017
GR08.03.2017
Former [2017/28]ES07.12.2016
FI07.12.2016
HR07.12.2016
LT07.12.2016
LV07.12.2016
RS07.12.2016
SE07.12.2016
NO07.03.2017
GR08.03.2017
Former [2017/12]LV07.12.2016
Cited inInternational search[AD]US2207453  (WALTER BLUME) [AD] 1,14-16 * the whole document *;
 [A]GB2038737  (BOEING CO) [A] 1,14-16* page 4, line 130 - page 5, line 125; figures 9-12 *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.