EP2848052 - METHOD FOR INDICATION OF REFERENCE SYMBOL TRANSMISSION POWER CHANGE IN CELLULAR NETWORK [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 01.01.2021 Database last updated on 15.06.2024 | |
Former | The patent has been granted Status updated on 24.01.2020 | ||
Former | Grant of patent is intended Status updated on 15.09.2019 | ||
Former | Examination is in progress Status updated on 12.02.2019 | Most recent event Tooltip | 08.07.2022 | Lapse of the patent in a contracting state New state(s): AL, MK | published on 10.08.2022 [2022/32] | Applicant(s) | For all designated states Nokia Technologies Oy Karakaari 7 02610 Espoo / FI | [2019/36] |
Former [2015/32] | For all designated states Nokia Technologies Oy Karaportti 3 02610 Espoo / FI | ||
Former [2015/12] | For all designated states Nokia Corporation Karakaari 7 02610 Espoo / FI | Inventor(s) | 01 /
RIBEIRO, Cassio Barbosa Pellavakaski 5 I 17 FI-02340 Espoo / FI | 02 /
CIERNY, Michal Kaarlenkatu 12 B 54 FI-00530 Helsinki / FI | [2015/12] | Representative(s) | Ruuskanen, Juha-Pekka, et al Page White & Farrer Limited Bedford House 21A John Street London WC1N 2BF / GB | [N/P] |
Former [2020/09] | Ruuskanen, Juha-Pekka, et al Page White & Farrer Bedford House John Street London WC1N 2BF / GB | ||
Former [2015/12] | Nokia Corporation Intellectual Property Department Karakaari 7 02610 Espoo / FI | Application number, filing date | 13788217.1 | 08.05.2013 | [2020/09] | WO2013FI50506 | Priority number, date | US201261645857P | 11.05.2012 Original published format: US 201261645857 P | [2015/12] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2013167808 | Date: | 14.11.2013 | Language: | EN | [2013/46] | Type: | A1 Application with search report | No.: | EP2848052 | Date: | 18.03.2015 | Language: | EN | The application published by WIPO in one of the EPO official languages on 14.11.2013 takes the place of the publication of the European patent application. | [2015/12] | Type: | B1 Patent specification | No.: | EP2848052 | Date: | 26.02.2020 | Language: | EN | [2020/09] | Search report(s) | International search report - published on: | FI | 14.11.2013 | (Supplementary) European search report - dispatched on: | EP | 15.10.2015 | Classification | IPC: | H04W52/54, H04W28/12, H04J3/02, H04L5/22, H04W52/38, // H04W52/58, H04W52/32 | [2015/46] | CPC: |
H04W52/244 (EP,US);
H04W52/54 (US);
H04L5/0094 (EP,US);
H04W52/38 (EP,US);
H04W52/325 (EP,US);
H04W52/58 (EP,US)
|
Former IPC [2015/12] | H04W52/54, H04W28/12, H04J3/02, H04L5/22 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2015/12] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | VERFAHREN ZUR ANZEIGE VON REFERENZSYMBOLÜBERTRAGUNGSLEISTUNGSWECHSEL IN EINEM ZELLULAREN NETZWERK | [2015/12] | English: | METHOD FOR INDICATION OF REFERENCE SYMBOL TRANSMISSION POWER CHANGE IN CELLULAR NETWORK | [2015/12] | French: | PROCÉDÉ PERMETTANT D'INDIQUER UN CHANGEMENT DE LA PUISSANCE DE TRANSMISSION D'UN SYMBOLE DE RÉFÉRENCE DANS UN RÉSEAU CELLULAIRE | [2015/12] | Entry into regional phase | 03.11.2014 | National basic fee paid | 03.11.2014 | Search fee paid | 03.11.2014 | Designation fee(s) paid | 03.11.2014 | Examination fee paid | Examination procedure | 03.11.2014 | Examination requested [2015/12] | 22.04.2016 | Amendment by applicant (claims and/or description) | 15.02.2019 | Despatch of a communication from the examining division (Time limit: M06) | 19.08.2019 | Reply to a communication from the examining division | 16.09.2019 | Communication of intention to grant the patent | 15.01.2020 | Fee for grant paid | 15.01.2020 | Fee for publishing/printing paid | 15.01.2020 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 15.02.2019 | Opposition(s) | 27.11.2020 | No opposition filed within time limit [2021/05] | Fees paid | Renewal fee | 12.05.2015 | Renewal fee patent year 03 | 10.05.2016 | Renewal fee patent year 04 | 10.05.2017 | Renewal fee patent year 05 | 11.05.2018 | Renewal fee patent year 06 | 15.05.2019 | Renewal fee patent year 07 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 08.05.2013 | AL | 26.02.2020 | AT | 26.02.2020 | CY | 26.02.2020 | CZ | 26.02.2020 | DK | 26.02.2020 | EE | 26.02.2020 | ES | 26.02.2020 | FI | 26.02.2020 | HR | 26.02.2020 | IT | 26.02.2020 | LT | 26.02.2020 | LV | 26.02.2020 | MC | 26.02.2020 | MK | 26.02.2020 | MT | 26.02.2020 | NL | 26.02.2020 | PL | 26.02.2020 | RO | 26.02.2020 | RS | 26.02.2020 | SE | 26.02.2020 | SI | 26.02.2020 | SK | 26.02.2020 | SM | 26.02.2020 | TR | 26.02.2020 | IE | 08.05.2020 | LU | 08.05.2020 | BG | 26.05.2020 | GB | 26.05.2020 | NO | 26.05.2020 | GR | 27.05.2020 | BE | 31.05.2020 | CH | 31.05.2020 | FR | 31.05.2020 | LI | 31.05.2020 | IS | 26.06.2020 | PT | 19.07.2020 | [2022/31] |
Former [2022/27] | HU | 08.05.2013 | |
AT | 26.02.2020 | ||
CY | 26.02.2020 | ||
CZ | 26.02.2020 | ||
DK | 26.02.2020 | ||
EE | 26.02.2020 | ||
ES | 26.02.2020 | ||
FI | 26.02.2020 | ||
HR | 26.02.2020 | ||
IT | 26.02.2020 | ||
LT | 26.02.2020 | ||
LV | 26.02.2020 | ||
MC | 26.02.2020 | ||
MT | 26.02.2020 | ||
NL | 26.02.2020 | ||
PL | 26.02.2020 | ||
RO | 26.02.2020 | ||
RS | 26.02.2020 | ||
SE | 26.02.2020 | ||
SI | 26.02.2020 | ||
SK | 26.02.2020 | ||
SM | 26.02.2020 | ||
TR | 26.02.2020 | ||
IE | 08.05.2020 | ||
LU | 08.05.2020 | ||
BG | 26.05.2020 | ||
GB | 26.05.2020 | ||
NO | 26.05.2020 | ||
GR | 27.05.2020 | ||
BE | 31.05.2020 | ||
CH | 31.05.2020 | ||
FR | 31.05.2020 | ||
LI | 31.05.2020 | ||
IS | 26.06.2020 | ||
PT | 19.07.2020 | ||
Former [2022/26] | AT | 26.02.2020 | |
CZ | 26.02.2020 | ||
DK | 26.02.2020 | ||
EE | 26.02.2020 | ||
ES | 26.02.2020 | ||
FI | 26.02.2020 | ||
HR | 26.02.2020 | ||
IT | 26.02.2020 | ||
LT | 26.02.2020 | ||
LV | 26.02.2020 | ||
MC | 26.02.2020 | ||
NL | 26.02.2020 | ||
PL | 26.02.2020 | ||
RO | 26.02.2020 | ||
RS | 26.02.2020 | ||
SE | 26.02.2020 | ||
SI | 26.02.2020 | ||
SK | 26.02.2020 | ||
SM | 26.02.2020 | ||
TR | 26.02.2020 | ||
IE | 08.05.2020 | ||
LU | 08.05.2020 | ||
BG | 26.05.2020 | ||
GB | 26.05.2020 | ||
NO | 26.05.2020 | ||
GR | 27.05.2020 | ||
BE | 31.05.2020 | ||
CH | 31.05.2020 | ||
FR | 31.05.2020 | ||
LI | 31.05.2020 | ||
IS | 26.06.2020 | ||
PT | 19.07.2020 | ||
Former [2021/23] | AT | 26.02.2020 | |
CZ | 26.02.2020 | ||
DK | 26.02.2020 | ||
EE | 26.02.2020 | ||
ES | 26.02.2020 | ||
FI | 26.02.2020 | ||
HR | 26.02.2020 | ||
IT | 26.02.2020 | ||
LT | 26.02.2020 | ||
LV | 26.02.2020 | ||
MC | 26.02.2020 | ||
NL | 26.02.2020 | ||
PL | 26.02.2020 | ||
RO | 26.02.2020 | ||
RS | 26.02.2020 | ||
SE | 26.02.2020 | ||
SI | 26.02.2020 | ||
SK | 26.02.2020 | ||
SM | 26.02.2020 | ||
IE | 08.05.2020 | ||
LU | 08.05.2020 | ||
BG | 26.05.2020 | ||
GB | 26.05.2020 | ||
NO | 26.05.2020 | ||
GR | 27.05.2020 | ||
BE | 31.05.2020 | ||
CH | 31.05.2020 | ||
FR | 31.05.2020 | ||
LI | 31.05.2020 | ||
IS | 26.06.2020 | ||
PT | 19.07.2020 | ||
Former [2021/22] | AT | 26.02.2020 | |
CZ | 26.02.2020 | ||
DK | 26.02.2020 | ||
EE | 26.02.2020 | ||
ES | 26.02.2020 | ||
FI | 26.02.2020 | ||
HR | 26.02.2020 | ||
IT | 26.02.2020 | ||
LT | 26.02.2020 | ||
LV | 26.02.2020 | ||
MC | 26.02.2020 | ||
NL | 26.02.2020 | ||
PL | 26.02.2020 | ||
RO | 26.02.2020 | ||
RS | 26.02.2020 | ||
SE | 26.02.2020 | ||
SI | 26.02.2020 | ||
SK | 26.02.2020 | ||
SM | 26.02.2020 | ||
IE | 08.05.2020 | ||
LU | 08.05.2020 | ||
BG | 26.05.2020 | ||
GB | 26.05.2020 | ||
NO | 26.05.2020 | ||
GR | 27.05.2020 | ||
CH | 31.05.2020 | ||
LI | 31.05.2020 | ||
IS | 26.06.2020 | ||
PT | 19.07.2020 | ||
Former [2021/20] | AT | 26.02.2020 | |
CZ | 26.02.2020 | ||
DK | 26.02.2020 | ||
EE | 26.02.2020 | ||
ES | 26.02.2020 | ||
FI | 26.02.2020 | ||
HR | 26.02.2020 | ||
IT | 26.02.2020 | ||
LT | 26.02.2020 | ||
LV | 26.02.2020 | ||
MC | 26.02.2020 | ||
NL | 26.02.2020 | ||
PL | 26.02.2020 | ||
RO | 26.02.2020 | ||
RS | 26.02.2020 | ||
SE | 26.02.2020 | ||
SI | 26.02.2020 | ||
SK | 26.02.2020 | ||
SM | 26.02.2020 | ||
IE | 08.05.2020 | ||
LU | 08.05.2020 | ||
BG | 26.05.2020 | ||
NO | 26.05.2020 | ||
GR | 27.05.2020 | ||
CH | 31.05.2020 | ||
LI | 31.05.2020 | ||
IS | 26.06.2020 | ||
PT | 19.07.2020 | ||
Former [2021/15] | AT | 26.02.2020 | |
CZ | 26.02.2020 | ||
DK | 26.02.2020 | ||
EE | 26.02.2020 | ||
ES | 26.02.2020 | ||
FI | 26.02.2020 | ||
HR | 26.02.2020 | ||
IT | 26.02.2020 | ||
LT | 26.02.2020 | ||
LV | 26.02.2020 | ||
MC | 26.02.2020 | ||
NL | 26.02.2020 | ||
PL | 26.02.2020 | ||
RO | 26.02.2020 | ||
RS | 26.02.2020 | ||
SE | 26.02.2020 | ||
SI | 26.02.2020 | ||
SK | 26.02.2020 | ||
SM | 26.02.2020 | ||
LU | 08.05.2020 | ||
BG | 26.05.2020 | ||
NO | 26.05.2020 | ||
GR | 27.05.2020 | ||
CH | 31.05.2020 | ||
LI | 31.05.2020 | ||
IS | 26.06.2020 | ||
PT | 19.07.2020 | ||
Former [2021/10] | AT | 26.02.2020 | |
CZ | 26.02.2020 | ||
DK | 26.02.2020 | ||
EE | 26.02.2020 | ||
ES | 26.02.2020 | ||
FI | 26.02.2020 | ||
HR | 26.02.2020 | ||
IT | 26.02.2020 | ||
LT | 26.02.2020 | ||
LV | 26.02.2020 | ||
MC | 26.02.2020 | ||
NL | 26.02.2020 | ||
PL | 26.02.2020 | ||
RO | 26.02.2020 | ||
RS | 26.02.2020 | ||
SE | 26.02.2020 | ||
SI | 26.02.2020 | ||
SK | 26.02.2020 | ||
SM | 26.02.2020 | ||
BG | 26.05.2020 | ||
NO | 26.05.2020 | ||
GR | 27.05.2020 | ||
CH | 31.05.2020 | ||
LI | 31.05.2020 | ||
IS | 26.06.2020 | ||
PT | 19.07.2020 | ||
Former [2021/07] | CZ | 26.02.2020 | |
DK | 26.02.2020 | ||
EE | 26.02.2020 | ||
ES | 26.02.2020 | ||
FI | 26.02.2020 | ||
HR | 26.02.2020 | ||
LT | 26.02.2020 | ||
LV | 26.02.2020 | ||
NL | 26.02.2020 | ||
RO | 26.02.2020 | ||
RS | 26.02.2020 | ||
SE | 26.02.2020 | ||
SK | 26.02.2020 | ||
SM | 26.02.2020 | ||
BG | 26.05.2020 | ||
NO | 26.05.2020 | ||
GR | 27.05.2020 | ||
CH | 31.05.2020 | ||
LI | 31.05.2020 | ||
IS | 26.06.2020 | ||
PT | 19.07.2020 | ||
Former [2020/50] | CZ | 26.02.2020 | |
DK | 26.02.2020 | ||
EE | 26.02.2020 | ||
ES | 26.02.2020 | ||
FI | 26.02.2020 | ||
HR | 26.02.2020 | ||
LT | 26.02.2020 | ||
LV | 26.02.2020 | ||
NL | 26.02.2020 | ||
RO | 26.02.2020 | ||
RS | 26.02.2020 | ||
SE | 26.02.2020 | ||
SK | 26.02.2020 | ||
SM | 26.02.2020 | ||
BG | 26.05.2020 | ||
NO | 26.05.2020 | ||
GR | 27.05.2020 | ||
IS | 26.06.2020 | ||
PT | 19.07.2020 | ||
Former [2020/49] | CZ | 26.02.2020 | |
DK | 26.02.2020 | ||
ES | 26.02.2020 | ||
FI | 26.02.2020 | ||
HR | 26.02.2020 | ||
LT | 26.02.2020 | ||
LV | 26.02.2020 | ||
NL | 26.02.2020 | ||
RO | 26.02.2020 | ||
RS | 26.02.2020 | ||
SE | 26.02.2020 | ||
SK | 26.02.2020 | ||
SM | 26.02.2020 | ||
BG | 26.05.2020 | ||
NO | 26.05.2020 | ||
GR | 27.05.2020 | ||
IS | 26.06.2020 | ||
PT | 19.07.2020 | ||
Former [2020/48] | DK | 26.02.2020 | |
ES | 26.02.2020 | ||
FI | 26.02.2020 | ||
HR | 26.02.2020 | ||
LT | 26.02.2020 | ||
LV | 26.02.2020 | ||
NL | 26.02.2020 | ||
RO | 26.02.2020 | ||
RS | 26.02.2020 | ||
SE | 26.02.2020 | ||
SM | 26.02.2020 | ||
BG | 26.05.2020 | ||
NO | 26.05.2020 | ||
GR | 27.05.2020 | ||
IS | 26.06.2020 | ||
PT | 19.07.2020 | ||
Former [2020/47] | DK | 26.02.2020 | |
ES | 26.02.2020 | ||
FI | 26.02.2020 | ||
HR | 26.02.2020 | ||
LT | 26.02.2020 | ||
LV | 26.02.2020 | ||
NL | 26.02.2020 | ||
RS | 26.02.2020 | ||
SE | 26.02.2020 | ||
BG | 26.05.2020 | ||
NO | 26.05.2020 | ||
GR | 27.05.2020 | ||
IS | 26.06.2020 | ||
Former [2020/45] | FI | 26.02.2020 | |
HR | 26.02.2020 | ||
LV | 26.02.2020 | ||
NL | 26.02.2020 | ||
RS | 26.02.2020 | ||
SE | 26.02.2020 | ||
BG | 26.05.2020 | ||
NO | 26.05.2020 | ||
GR | 27.05.2020 | ||
IS | 26.06.2020 | ||
Former [2020/40] | FI | 26.02.2020 | |
HR | 26.02.2020 | ||
LV | 26.02.2020 | ||
RS | 26.02.2020 | ||
SE | 26.02.2020 | ||
BG | 26.05.2020 | ||
NO | 26.05.2020 | ||
GR | 27.05.2020 | ||
IS | 26.06.2020 | ||
Former [2020/39] | FI | 26.02.2020 | |
HR | 26.02.2020 | ||
LV | 26.02.2020 | ||
RS | 26.02.2020 | ||
SE | 26.02.2020 | ||
BG | 26.05.2020 | ||
NO | 26.05.2020 | ||
GR | 27.05.2020 | ||
Former [2020/38] | FI | 26.02.2020 | |
HR | 26.02.2020 | ||
LV | 26.02.2020 | ||
RS | 26.02.2020 | ||
SE | 26.02.2020 | ||
NO | 26.05.2020 | ||
GR | 27.05.2020 | ||
Former [2020/37] | FI | 26.02.2020 | |
HR | 26.02.2020 | ||
LV | 26.02.2020 | ||
RS | 26.02.2020 | ||
SE | 26.02.2020 | ||
NO | 26.05.2020 | ||
Former [2020/35] | FI | 26.02.2020 | |
NO | 26.05.2020 | Documents cited: | Search | [XI]US2009041151 (KHAN FAROOQ [US], et al) [X] 1,2,9,10,14,15 * [0060]-[0076], [0079]-[0096] * [I] 3,11; | [XI]KR20100111608 (LG ELECTRONICS INC [KR]) [X] 1,2,8,9,14,15 * [0005]-[0009], [0041]-[0044], [0046], [0048], [0071], [0074], [0087]-[0090], [0105]-[0121], [0129]-[0153] * [I] 3,5,10,12; | [X]EP2418894 (SAMSUNG ELECTRONICS CO LTD [KR]) [X] 1,9,14,15* [0010]-[0015], [0027]-[0035], [0061]-[0081] *; | [XI]US2012113843 (WATFA MAHMOUD [CA], et al) [X] 1-6,9-15 * paragraph [0033] - paragraph [0034] * * paragraph [0036] - paragraph [0040] * * paragraph [0041] * * paragraph [0045] * * paragraph [0052] * * paragraph [0053] * * paragraph [0054] - paragraph [0058] * * paragraph [0059] - paragraph [0061] * * paragraph [0062] - paragraph [0065] * * paragraph [0066] * * paragraph [0067] - paragraph [0083] * * paragraph [0068] - paragraph [0083] * [I] 7 | International search | [X]US2009041151 (KHAN FAROOQ [US], et al); | [A]US2010189093 (PALANKI RAVI [US], et al); | [X]KR20100111608 (LG ELECTRONICS INC [KR]); | [A]US2011201291 (SUZUKI MOTOTSUGU [JP], et al); | [X]US2012039282 (KIM SUNG TAE [KR], et al) | Examination | WO2012060067 | US2013215811 | by applicant | US2009041151 | KR20100111608 | EP2418894 | US2012113843 |