EP2923420 - NESTED FEEDBACK LOOP COHERENT BEAM COMBINING LASER SYSTEM [Right-click to bookmark this link] | |||
Former [2015/40] | NESTED FEEDBACK LOOP COHERENT BEAM COMBINING SYSTEM | ||
[2022/08] | Status | No opposition filed within time limit Status updated on 19.05.2023 Database last updated on 06.07.2024 | |
Former | The patent has been granted Status updated on 10.06.2022 | ||
Former | Grant of patent is intended Status updated on 06.03.2022 | ||
Former | Examination is in progress Status updated on 10.08.2018 | Most recent event Tooltip | 14.06.2024 | Lapse of the patent in a contracting state New state(s): TR | published on 17.07.2024 [2024/29] | Applicant(s) | For all designated states Northrop Grumman Systems Corporation 2980 Fairview Park Drive Falls Church, VA 22042-4511 / US | [2015/40] | Inventor(s) | 01 /
GOODNO, Gregory D. 6048 W 75th Street Los Angeles, CA 90045 / US | 02 /
CHEUNG, Eric 20013 Mildred Avenue Torrance, CA 90503 / US | 03 /
LONG, Jr., William H. 5106 Lee Street Torrance, CA 90503 / US | [2015/40] | Representative(s) | Murgitroyd & Company 165-169 Scotland Street Glasgow G5 8PL / GB | [N/P] |
Former [2022/28] | Murgitroyd & Company Murgitroyd House 165-169 Scotland Street Glasgow G5 8PL / GB | ||
Former [2015/40] | Curley, Donnacha John, et al Hanna Moore + Curley 13 Lower Lad Lane Dublin 2, D02 T668 / IE | Application number, filing date | 13798438.1 | 08.11.2013 | [2015/40] | WO2013US69039 | Priority number, date | US201213683005 | 21.11.2012 Original published format: US201213683005 | [2015/40] | Filing language | EN | Procedural language | EN | Publication | Type: | A2 Application without search report | No.: | WO2014081582 | Date: | 30.05.2014 | Language: | EN | [2014/22] | Type: | A2 Application without search report | No.: | EP2923420 | Date: | 30.09.2015 | Language: | EN | The application published by WIPO in one of the EPO official languages on 30.05.2014 takes the place of the publication of the European patent application. | [2015/40] | Type: | B1 Patent specification | No.: | EP2923420 | Date: | 13.07.2022 | Language: | EN | [2022/28] | Search report(s) | International search report - published on: | EP | 07.08.2014 | Classification | IPC: | H01S3/13, H01S3/23 | [2022/08] | CPC: |
H01S3/1305 (EP,US);
H01S3/10053 (US);
H01S3/1307 (EP,US);
H01S3/2308 (EP,US);
H01S3/2383 (EP,US);
G02F2203/50 (EP,US)
|
Former IPC [2015/40] | H01S3/10, H01S3/13, H01S3/23 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2015/40] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | KOHÄRENTES STRAHLENBÜNDELUNGSSYSTEM MIT EINER VERSCHACHTELTEN RÜCKKOPPLUNGSSCHLEIFE | [2022/08] | English: | NESTED FEEDBACK LOOP COHERENT BEAM COMBINING LASER SYSTEM | [2022/08] | French: | SYSTÈME DE COMBINAISON DE FAISCEAU COHÉRENT À BOUCLE IMBRIQUÉE | [2015/40] |
Former [2015/40] | MIT EINER VERSCHACHTELTEN RÜCKKOPPLUNGSSCHLEIFE KOHÄRENTES STRAHLENBÜNDELUNGSSYSTEM | ||
Former [2015/40] | NESTED FEEDBACK LOOP COHERENT BEAM COMBINING SYSTEM | Entry into regional phase | 16.06.2015 | National basic fee paid | 16.06.2015 | Designation fee(s) paid | 16.06.2015 | Examination fee paid | Examination procedure | 16.06.2015 | Examination requested [2015/40] | 21.12.2015 | Amendment by applicant (claims and/or description) | 13.08.2018 | Invitation to indicate the basis for amendments (Time limit: M01) | 27.08.2018 | Reply to an invitation to indicate the basis for amendments | 24.01.2020 | Despatch of a communication from the examining division (Time limit: M06) | 17.08.2020 | Reply to a communication from the examining division | 07.03.2022 | Communication of intention to grant the patent | 01.06.2022 | Fee for grant paid | 01.06.2022 | Fee for publishing/printing paid | 01.06.2022 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 24.01.2020 | Opposition(s) | 14.04.2023 | No opposition filed within time limit [2023/25] | Request for further processing for: | The application is deemed to be withdrawn due to failure to reply to the examination report | 17.08.2020 | Request for further processing filed | 17.08.2020 | Full payment received (date of receipt of payment) Request granted | 26.08.2020 | Decision despatched | Fees paid | Renewal fee | 24.11.2015 | Renewal fee patent year 03 | 23.11.2016 | Renewal fee patent year 04 | 24.11.2017 | Renewal fee patent year 05 | 21.02.2019 | Renewal fee patent year 06 | 26.11.2019 | Renewal fee patent year 07 | 20.11.2020 | Renewal fee patent year 08 | 24.11.2021 | Renewal fee patent year 09 | Penalty fee | Additional fee for renewal fee | 30.11.2018 | 06   M06   Fee paid on   21.02.2019 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 08.11.2013 | AL | 13.07.2022 | AT | 13.07.2022 | CY | 13.07.2022 | CZ | 13.07.2022 | DK | 13.07.2022 | EE | 13.07.2022 | ES | 13.07.2022 | FI | 13.07.2022 | HR | 13.07.2022 | IT | 13.07.2022 | LT | 13.07.2022 | LV | 13.07.2022 | MC | 13.07.2022 | MK | 13.07.2022 | NL | 13.07.2022 | PL | 13.07.2022 | RO | 13.07.2022 | RS | 13.07.2022 | SE | 13.07.2022 | SI | 13.07.2022 | SK | 13.07.2022 | SM | 13.07.2022 | TR | 13.07.2022 | NO | 13.10.2022 | GR | 14.10.2022 | GB | 08.11.2022 | IE | 08.11.2022 | LU | 08.11.2022 | IS | 13.11.2022 | PT | 14.11.2022 | BE | 30.11.2022 | CH | 30.11.2022 | FR | 30.11.2022 | LI | 30.11.2022 | [2024/29] |
Former [2024/27] | HU | 08.11.2013 | |
AL | 13.07.2022 | ||
AT | 13.07.2022 | ||
CY | 13.07.2022 | ||
CZ | 13.07.2022 | ||
DK | 13.07.2022 | ||
EE | 13.07.2022 | ||
ES | 13.07.2022 | ||
FI | 13.07.2022 | ||
HR | 13.07.2022 | ||
IT | 13.07.2022 | ||
LT | 13.07.2022 | ||
LV | 13.07.2022 | ||
MC | 13.07.2022 | ||
MK | 13.07.2022 | ||
NL | 13.07.2022 | ||
PL | 13.07.2022 | ||
RO | 13.07.2022 | ||
RS | 13.07.2022 | ||
SE | 13.07.2022 | ||
SI | 13.07.2022 | ||
SK | 13.07.2022 | ||
SM | 13.07.2022 | ||
NO | 13.10.2022 | ||
GR | 14.10.2022 | ||
GB | 08.11.2022 | ||
IE | 08.11.2022 | ||
LU | 08.11.2022 | ||
IS | 13.11.2022 | ||
PT | 14.11.2022 | ||
BE | 30.11.2022 | ||
CH | 30.11.2022 | ||
FR | 30.11.2022 | ||
LI | 30.11.2022 | ||
Former [2024/21] | HU | 08.11.2013 | |
AL | 13.07.2022 | ||
AT | 13.07.2022 | ||
CY | 13.07.2022 | ||
CZ | 13.07.2022 | ||
DK | 13.07.2022 | ||
EE | 13.07.2022 | ||
ES | 13.07.2022 | ||
FI | 13.07.2022 | ||
HR | 13.07.2022 | ||
IT | 13.07.2022 | ||
LT | 13.07.2022 | ||
LV | 13.07.2022 | ||
MC | 13.07.2022 | ||
NL | 13.07.2022 | ||
PL | 13.07.2022 | ||
RO | 13.07.2022 | ||
RS | 13.07.2022 | ||
SE | 13.07.2022 | ||
SI | 13.07.2022 | ||
SK | 13.07.2022 | ||
SM | 13.07.2022 | ||
NO | 13.10.2022 | ||
GR | 14.10.2022 | ||
GB | 08.11.2022 | ||
IE | 08.11.2022 | ||
LU | 08.11.2022 | ||
IS | 13.11.2022 | ||
PT | 14.11.2022 | ||
BE | 30.11.2022 | ||
CH | 30.11.2022 | ||
FR | 30.11.2022 | ||
LI | 30.11.2022 | ||
Former [2024/18] | HU | 08.11.2013 | |
AL | 13.07.2022 | ||
AT | 13.07.2022 | ||
CZ | 13.07.2022 | ||
DK | 13.07.2022 | ||
EE | 13.07.2022 | ||
ES | 13.07.2022 | ||
FI | 13.07.2022 | ||
HR | 13.07.2022 | ||
IT | 13.07.2022 | ||
LT | 13.07.2022 | ||
LV | 13.07.2022 | ||
MC | 13.07.2022 | ||
NL | 13.07.2022 | ||
PL | 13.07.2022 | ||
RO | 13.07.2022 | ||
RS | 13.07.2022 | ||
SE | 13.07.2022 | ||
SI | 13.07.2022 | ||
SK | 13.07.2022 | ||
SM | 13.07.2022 | ||
NO | 13.10.2022 | ||
GR | 14.10.2022 | ||
GB | 08.11.2022 | ||
IE | 08.11.2022 | ||
LU | 08.11.2022 | ||
IS | 13.11.2022 | ||
PT | 14.11.2022 | ||
BE | 30.11.2022 | ||
CH | 30.11.2022 | ||
FR | 30.11.2022 | ||
LI | 30.11.2022 | ||
Former [2024/11] | AL | 13.07.2022 | |
AT | 13.07.2022 | ||
CZ | 13.07.2022 | ||
DK | 13.07.2022 | ||
EE | 13.07.2022 | ||
ES | 13.07.2022 | ||
FI | 13.07.2022 | ||
HR | 13.07.2022 | ||
IT | 13.07.2022 | ||
LT | 13.07.2022 | ||
LV | 13.07.2022 | ||
MC | 13.07.2022 | ||
NL | 13.07.2022 | ||
PL | 13.07.2022 | ||
RO | 13.07.2022 | ||
RS | 13.07.2022 | ||
SE | 13.07.2022 | ||
SI | 13.07.2022 | ||
SK | 13.07.2022 | ||
SM | 13.07.2022 | ||
NO | 13.10.2022 | ||
GR | 14.10.2022 | ||
GB | 08.11.2022 | ||
IE | 08.11.2022 | ||
LU | 08.11.2022 | ||
IS | 13.11.2022 | ||
PT | 14.11.2022 | ||
BE | 30.11.2022 | ||
CH | 30.11.2022 | ||
FR | 30.11.2022 | ||
LI | 30.11.2022 | ||
Former [2023/52] | AL | 13.07.2022 | |
AT | 13.07.2022 | ||
CZ | 13.07.2022 | ||
DK | 13.07.2022 | ||
EE | 13.07.2022 | ||
ES | 13.07.2022 | ||
FI | 13.07.2022 | ||
HR | 13.07.2022 | ||
LT | 13.07.2022 | ||
LV | 13.07.2022 | ||
MC | 13.07.2022 | ||
NL | 13.07.2022 | ||
PL | 13.07.2022 | ||
RO | 13.07.2022 | ||
RS | 13.07.2022 | ||
SE | 13.07.2022 | ||
SI | 13.07.2022 | ||
SK | 13.07.2022 | ||
SM | 13.07.2022 | ||
NO | 13.10.2022 | ||
GR | 14.10.2022 | ||
GB | 08.11.2022 | ||
IE | 08.11.2022 | ||
LU | 08.11.2022 | ||
IS | 13.11.2022 | ||
PT | 14.11.2022 | ||
BE | 30.11.2022 | ||
CH | 30.11.2022 | ||
FR | 30.11.2022 | ||
LI | 30.11.2022 | ||
Former [2023/49] | AL | 13.07.2022 | |
AT | 13.07.2022 | ||
CZ | 13.07.2022 | ||
DK | 13.07.2022 | ||
EE | 13.07.2022 | ||
ES | 13.07.2022 | ||
FI | 13.07.2022 | ||
HR | 13.07.2022 | ||
LT | 13.07.2022 | ||
LV | 13.07.2022 | ||
MC | 13.07.2022 | ||
NL | 13.07.2022 | ||
PL | 13.07.2022 | ||
RO | 13.07.2022 | ||
RS | 13.07.2022 | ||
SE | 13.07.2022 | ||
SI | 13.07.2022 | ||
SK | 13.07.2022 | ||
SM | 13.07.2022 | ||
NO | 13.10.2022 | ||
GR | 14.10.2022 | ||
GB | 08.11.2022 | ||
IE | 08.11.2022 | ||
LU | 08.11.2022 | ||
IS | 13.11.2022 | ||
PT | 14.11.2022 | ||
BE | 30.11.2022 | ||
CH | 30.11.2022 | ||
LI | 30.11.2022 | ||
Former [2023/48] | AL | 13.07.2022 | |
AT | 13.07.2022 | ||
CZ | 13.07.2022 | ||
DK | 13.07.2022 | ||
EE | 13.07.2022 | ||
ES | 13.07.2022 | ||
FI | 13.07.2022 | ||
HR | 13.07.2022 | ||
LT | 13.07.2022 | ||
LV | 13.07.2022 | ||
MC | 13.07.2022 | ||
NL | 13.07.2022 | ||
PL | 13.07.2022 | ||
RO | 13.07.2022 | ||
RS | 13.07.2022 | ||
SE | 13.07.2022 | ||
SI | 13.07.2022 | ||
SK | 13.07.2022 | ||
SM | 13.07.2022 | ||
NO | 13.10.2022 | ||
GR | 14.10.2022 | ||
GB | 08.11.2022 | ||
IE | 08.11.2022 | ||
LU | 08.11.2022 | ||
IS | 13.11.2022 | ||
PT | 14.11.2022 | ||
CH | 30.11.2022 | ||
LI | 30.11.2022 | ||
Former [2023/47] | AL | 13.07.2022 | |
AT | 13.07.2022 | ||
CZ | 13.07.2022 | ||
DK | 13.07.2022 | ||
EE | 13.07.2022 | ||
ES | 13.07.2022 | ||
FI | 13.07.2022 | ||
HR | 13.07.2022 | ||
LT | 13.07.2022 | ||
LV | 13.07.2022 | ||
MC | 13.07.2022 | ||
NL | 13.07.2022 | ||
PL | 13.07.2022 | ||
RO | 13.07.2022 | ||
RS | 13.07.2022 | ||
SE | 13.07.2022 | ||
SI | 13.07.2022 | ||
SK | 13.07.2022 | ||
SM | 13.07.2022 | ||
NO | 13.10.2022 | ||
GR | 14.10.2022 | ||
GB | 08.11.2022 | ||
LU | 08.11.2022 | ||
IS | 13.11.2022 | ||
PT | 14.11.2022 | ||
CH | 30.11.2022 | ||
LI | 30.11.2022 | ||
Former [2023/37] | AL | 13.07.2022 | |
AT | 13.07.2022 | ||
CZ | 13.07.2022 | ||
DK | 13.07.2022 | ||
EE | 13.07.2022 | ||
ES | 13.07.2022 | ||
FI | 13.07.2022 | ||
HR | 13.07.2022 | ||
LT | 13.07.2022 | ||
LV | 13.07.2022 | ||
MC | 13.07.2022 | ||
NL | 13.07.2022 | ||
PL | 13.07.2022 | ||
RO | 13.07.2022 | ||
RS | 13.07.2022 | ||
SE | 13.07.2022 | ||
SI | 13.07.2022 | ||
SK | 13.07.2022 | ||
SM | 13.07.2022 | ||
NO | 13.10.2022 | ||
GR | 14.10.2022 | ||
LU | 08.11.2022 | ||
IS | 13.11.2022 | ||
PT | 14.11.2022 | ||
CH | 30.11.2022 | ||
LI | 30.11.2022 | ||
Former [2023/35] | AL | 13.07.2022 | |
AT | 13.07.2022 | ||
CZ | 13.07.2022 | ||
DK | 13.07.2022 | ||
EE | 13.07.2022 | ||
ES | 13.07.2022 | ||
FI | 13.07.2022 | ||
HR | 13.07.2022 | ||
LT | 13.07.2022 | ||
LV | 13.07.2022 | ||
MC | 13.07.2022 | ||
NL | 13.07.2022 | ||
PL | 13.07.2022 | ||
RO | 13.07.2022 | ||
RS | 13.07.2022 | ||
SE | 13.07.2022 | ||
SK | 13.07.2022 | ||
SM | 13.07.2022 | ||
NO | 13.10.2022 | ||
GR | 14.10.2022 | ||
IS | 13.11.2022 | ||
PT | 14.11.2022 | ||
CH | 30.11.2022 | ||
LI | 30.11.2022 | ||
Former [2023/30] | AL | 13.07.2022 | |
AT | 13.07.2022 | ||
CZ | 13.07.2022 | ||
DK | 13.07.2022 | ||
EE | 13.07.2022 | ||
ES | 13.07.2022 | ||
FI | 13.07.2022 | ||
HR | 13.07.2022 | ||
LT | 13.07.2022 | ||
LV | 13.07.2022 | ||
MC | 13.07.2022 | ||
NL | 13.07.2022 | ||
PL | 13.07.2022 | ||
RO | 13.07.2022 | ||
RS | 13.07.2022 | ||
SE | 13.07.2022 | ||
SK | 13.07.2022 | ||
SM | 13.07.2022 | ||
NO | 13.10.2022 | ||
GR | 14.10.2022 | ||
IS | 13.11.2022 | ||
PT | 14.11.2022 | ||
Former [2023/29] | AL | 13.07.2022 | |
AT | 13.07.2022 | ||
CZ | 13.07.2022 | ||
DK | 13.07.2022 | ||
EE | 13.07.2022 | ||
ES | 13.07.2022 | ||
FI | 13.07.2022 | ||
HR | 13.07.2022 | ||
LT | 13.07.2022 | ||
LV | 13.07.2022 | ||
NL | 13.07.2022 | ||
PL | 13.07.2022 | ||
RO | 13.07.2022 | ||
RS | 13.07.2022 | ||
SE | 13.07.2022 | ||
SK | 13.07.2022 | ||
SM | 13.07.2022 | ||
NO | 13.10.2022 | ||
GR | 14.10.2022 | ||
IS | 13.11.2022 | ||
PT | 14.11.2022 | ||
Former [2023/23] | AT | 13.07.2022 | |
CZ | 13.07.2022 | ||
DK | 13.07.2022 | ||
EE | 13.07.2022 | ||
ES | 13.07.2022 | ||
FI | 13.07.2022 | ||
HR | 13.07.2022 | ||
LT | 13.07.2022 | ||
LV | 13.07.2022 | ||
NL | 13.07.2022 | ||
PL | 13.07.2022 | ||
RO | 13.07.2022 | ||
RS | 13.07.2022 | ||
SE | 13.07.2022 | ||
SK | 13.07.2022 | ||
SM | 13.07.2022 | ||
NO | 13.10.2022 | ||
GR | 14.10.2022 | ||
IS | 13.11.2022 | ||
PT | 14.11.2022 | ||
Former [2023/22] | AT | 13.07.2022 | |
CZ | 13.07.2022 | ||
DK | 13.07.2022 | ||
ES | 13.07.2022 | ||
FI | 13.07.2022 | ||
HR | 13.07.2022 | ||
LT | 13.07.2022 | ||
LV | 13.07.2022 | ||
NL | 13.07.2022 | ||
PL | 13.07.2022 | ||
RO | 13.07.2022 | ||
RS | 13.07.2022 | ||
SE | 13.07.2022 | ||
SM | 13.07.2022 | ||
NO | 13.10.2022 | ||
GR | 14.10.2022 | ||
IS | 13.11.2022 | ||
PT | 14.11.2022 | ||
Former [2023/21] | DK | 13.07.2022 | |
ES | 13.07.2022 | ||
FI | 13.07.2022 | ||
HR | 13.07.2022 | ||
LT | 13.07.2022 | ||
LV | 13.07.2022 | ||
NL | 13.07.2022 | ||
PL | 13.07.2022 | ||
RS | 13.07.2022 | ||
SE | 13.07.2022 | ||
SM | 13.07.2022 | ||
NO | 13.10.2022 | ||
GR | 14.10.2022 | ||
IS | 13.11.2022 | ||
PT | 14.11.2022 | ||
Former [2023/20] | ES | 13.07.2022 | |
FI | 13.07.2022 | ||
HR | 13.07.2022 | ||
LT | 13.07.2022 | ||
LV | 13.07.2022 | ||
NL | 13.07.2022 | ||
PL | 13.07.2022 | ||
RS | 13.07.2022 | ||
SE | 13.07.2022 | ||
SM | 13.07.2022 | ||
NO | 13.10.2022 | ||
GR | 14.10.2022 | ||
IS | 13.11.2022 | ||
PT | 14.11.2022 | ||
Former [2023/12] | ES | 13.07.2022 | |
FI | 13.07.2022 | ||
HR | 13.07.2022 | ||
LT | 13.07.2022 | ||
LV | 13.07.2022 | ||
NL | 13.07.2022 | ||
PL | 13.07.2022 | ||
RS | 13.07.2022 | ||
SE | 13.07.2022 | ||
NO | 13.10.2022 | ||
GR | 14.10.2022 | ||
IS | 13.11.2022 | ||
PT | 14.11.2022 | ||
Former [2023/11] | ES | 13.07.2022 | |
FI | 13.07.2022 | ||
HR | 13.07.2022 | ||
LT | 13.07.2022 | ||
LV | 13.07.2022 | ||
NL | 13.07.2022 | ||
PL | 13.07.2022 | ||
RS | 13.07.2022 | ||
SE | 13.07.2022 | ||
NO | 13.10.2022 | ||
GR | 14.10.2022 | ||
PT | 14.11.2022 | ||
Former [2023/10] | ES | 13.07.2022 | |
FI | 13.07.2022 | ||
HR | 13.07.2022 | ||
LT | 13.07.2022 | ||
LV | 13.07.2022 | ||
NL | 13.07.2022 | ||
RS | 13.07.2022 | ||
SE | 13.07.2022 | ||
NO | 13.10.2022 | ||
GR | 14.10.2022 | ||
PT | 14.11.2022 | ||
Former [2023/09] | ES | 13.07.2022 | |
FI | 13.07.2022 | ||
LT | 13.07.2022 | ||
LV | 13.07.2022 | ||
NL | 13.07.2022 | ||
RS | 13.07.2022 | ||
SE | 13.07.2022 | ||
NO | 13.10.2022 | ||
PT | 14.11.2022 | ||
Former [2023/08] | ES | 13.07.2022 | |
FI | 13.07.2022 | ||
LT | 13.07.2022 | ||
NL | 13.07.2022 | ||
RS | 13.07.2022 | ||
SE | 13.07.2022 | ||
NO | 13.10.2022 | ||
Former [2023/06] | NL | 13.07.2022 | Cited in | International search | [Y]EP0980123 (TRW INC [US]) [Y] 1-20 * Figs. 1 and 2 and related parts of the description * * the whole document *; | [YDA]US7058098 (SHAY THOMAS M [US]) [YD] 5,17 * paragraph [0008] - paragraph [0001] * * the whole document * [A] 1-4,6-16,18-20; | [YDA]US7187492 (SHAY THOMAS M [US]) [YD] 5,17 * the whole document * [A] 1-4,6-16,18-20; | [Y]US2007201795 (RICE ROBERT R [US], et al) [Y] 1-20 * paragraph [0020] - paragraph [0025]; figure 2 * * the whole document *; | [XY]WO2008045655 (NORTHROP GRUMMAN CORP [US], et al) [X] 1,9,13 * paragraph [0024] - paragraph [0038]; figures 1,7 * * paragraph [0044] - paragraph [0046] * * the whole document * [Y] 2-8,10-12,14-20; | [A]US2011032604 (ROTHENBERG JOSHUA ELLIOTT [US], et al) [A] 1-20 * Figs. 22-26 and related parts of the description * * the whole document *; | [Y]US2012188626 (ROTHENBERG JOSHUA E [US], et al) [Y] 1-20 * Figs. 2, 4b, 4C and related parts of the description * * the whole document *; | [Y]US2012212802 (ROTHENBERG JOSHUA ELLIOTT [US], et al) [Y] 1-20 * Figs. 24, 33 and related parts of the description * * the whole document *; | [YDA] - JESSE ANDEREGG ET AL, " DOI: http://dx.doi.org/10.1117/12.650138 | [YDA] - M. A. VORONTSOV ET AL, "Stochastic parallel-gradient-descent technique for high-resolution wave-front phase-distortion correction", JOURNAL OF THE OPTICAL SOCIETY OF AMERICA A, (19981001), vol. 15, no. 10, doi:10.1364/JOSAA.15.002745, ISSN 1084-7529, page 2745, XP055103264 [YD] 5,17 * the whole document * [A] 1-4,6-16,18-20 DOI: http://dx.doi.org/10.1364/JOSAA.15.002745 | by applicant | US7058098 | US7187492 | US7223433 | - M. A. VORONTSOV; V. P. SIVOKON, "Stochastic parallel- gradient-descent technique for high-resolution wave-front phase-distortion correction", J. OPT. SOC. AM. A, (1998), vol. 15, pages 2745 - 2758 |