blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP2934980

EP2934980 - RAIL SYSTEM, COMPRISING A RAIL VEHICLE THAT CAN BE MOVED ALONG A RAIL SECTION [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  28.02.2020
Database last updated on 14.09.2024
FormerThe patent has been granted
Status updated on  22.03.2019
FormerGrant of patent is intended
Status updated on  04.12.2018
Most recent event   Tooltip01.07.2022Lapse of the patent in a contracting state
New state(s): MK
published on 03.08.2022  [2022/31]
Applicant(s)For all designated states
SEW-EURODRIVE GmbH & Co. KG
Ernst-Blickle-Str. 42
76646 Bruchsal / DE
[2019/17]
Former [2015/44]For all designated states
Sew-Eurodrive GmbH & Co. KG
Ernst-Blickle-Str. 42
76646 Bruchsal / DE
Inventor(s)01 / BECKER, Günter
Abergavennystraße 30
76684 Östringen / DE
02 / DEGEN, Dirk
Gondelsheimer Straße 43
76646 Bruchsal / DE
 [2015/44]
Application number, filing date13798566.913.11.2013
[2015/44]
WO2013EP03414
Priority number, dateDE2012102469318.12.2012         Original published format: DE102012024693
[2015/44]
Filing languageDE
Procedural languageDE
PublicationType: A1 Application with search report
No.:WO2014094943
Date:26.06.2014
Language:DE
[2014/26]
Type: A1 Application with search report 
No.:EP2934980
Date:28.10.2015
Language:DE
The application published by WIPO in one of the EPO official languages on 26.06.2014 takes the place of the publication of the European patent application.
[2015/44]
Type: B1 Patent specification 
No.:EP2934980
Date:24.04.2019
Language:DE
[2019/17]
Search report(s)International search report - published on:EP26.06.2014
ClassificationIPC:B61B3/02, B61B13/12, B61C13/04
[2018/49]
CPC:
B61B13/12 (EP,CN,US); B61B3/02 (US); B61C13/04 (EP,CN,US)
Former IPC [2015/44]B61B3/02
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2015/44]
Extension statesBANot yet paid
MENot yet paid
TitleGerman:SCHIENENANLAGE, UMFASSEND EIN ENTLANG EINER SCHIENENSTRECKE BEWEGBARES SCHIENENFAHRZEUG[2015/44]
English:RAIL SYSTEM, COMPRISING A RAIL VEHICLE THAT CAN BE MOVED ALONG A RAIL SECTION[2015/44]
French:SYSTÈME FERROVIAIRE COMPRENANT UN VÉHICULE FERROVIAIRE MOBILE LE LONG D'UNE VOIE FERRÉE[2015/44]
Entry into regional phase20.07.2015National basic fee paid 
20.07.2015Designation fee(s) paid 
20.07.2015Examination fee paid 
Examination procedure20.07.2015Examination requested  [2015/44]
25.08.2015Amendment by applicant (claims and/or description)
05.12.2018Communication of intention to grant the patent
08.03.2019Receipt of the translation of the claim(s)
11.03.2019Fee for grant paid
11.03.2019Fee for publishing/printing paid
Divisional application(s)The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  05.12.2018
Opposition(s)27.01.2020No opposition filed within time limit [2020/14]
Fees paidRenewal fee
30.11.2015Renewal fee patent year 03
30.11.2016Renewal fee patent year 04
30.11.2017Renewal fee patent year 05
30.11.2018Renewal fee patent year 06
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU13.11.2013
AL24.04.2019
CY24.04.2019
CZ24.04.2019
EE24.04.2019
ES24.04.2019
FI24.04.2019
HR24.04.2019
LT24.04.2019
LV24.04.2019
MC24.04.2019
MK24.04.2019
MT24.04.2019
PL24.04.2019
RO24.04.2019
RS24.04.2019
SI24.04.2019
SK24.04.2019
SM24.04.2019
TR24.04.2019
BG24.07.2019
NO24.07.2019
GR25.07.2019
IS24.08.2019
PT24.08.2019
IE13.11.2019
LU13.11.2019
BE30.11.2019
[2022/31]
Former [2021/34]HU13.11.2013
AL24.04.2019
CY24.04.2019
CZ24.04.2019
EE24.04.2019
ES24.04.2019
FI24.04.2019
HR24.04.2019
LT24.04.2019
LV24.04.2019
MC24.04.2019
MT24.04.2019
PL24.04.2019
RO24.04.2019
RS24.04.2019
SI24.04.2019
SK24.04.2019
SM24.04.2019
TR24.04.2019
BG24.07.2019
NO24.07.2019
GR25.07.2019
IS24.08.2019
PT24.08.2019
IE13.11.2019
LU13.11.2019
BE30.11.2019
Former [2021/32]HU13.11.2013
AL24.04.2019
CY24.04.2019
CZ24.04.2019
EE24.04.2019
ES24.04.2019
FI24.04.2019
HR24.04.2019
LT24.04.2019
LV24.04.2019
MC24.04.2019
PL24.04.2019
RO24.04.2019
RS24.04.2019
SI24.04.2019
SK24.04.2019
SM24.04.2019
TR24.04.2019
BG24.07.2019
NO24.07.2019
GR25.07.2019
IS24.08.2019
PT24.08.2019
IE13.11.2019
LU13.11.2019
BE30.11.2019
Former [2021/26]AL24.04.2019
CY24.04.2019
CZ24.04.2019
EE24.04.2019
ES24.04.2019
FI24.04.2019
HR24.04.2019
LT24.04.2019
LV24.04.2019
MC24.04.2019
PL24.04.2019
RO24.04.2019
RS24.04.2019
SI24.04.2019
SK24.04.2019
SM24.04.2019
TR24.04.2019
BG24.07.2019
NO24.07.2019
GR25.07.2019
IS24.08.2019
PT24.08.2019
IE13.11.2019
LU13.11.2019
BE30.11.2019
Former [2020/51]AL24.04.2019
CZ24.04.2019
EE24.04.2019
ES24.04.2019
FI24.04.2019
HR24.04.2019
LT24.04.2019
LV24.04.2019
MC24.04.2019
PL24.04.2019
RO24.04.2019
RS24.04.2019
SI24.04.2019
SK24.04.2019
SM24.04.2019
TR24.04.2019
BG24.07.2019
NO24.07.2019
GR25.07.2019
IS24.08.2019
PT24.08.2019
IE13.11.2019
LU13.11.2019
BE30.11.2019
Former [2020/46]AL24.04.2019
CZ24.04.2019
EE24.04.2019
ES24.04.2019
FI24.04.2019
HR24.04.2019
LT24.04.2019
LV24.04.2019
MC24.04.2019
PL24.04.2019
RO24.04.2019
RS24.04.2019
SI24.04.2019
SK24.04.2019
SM24.04.2019
TR24.04.2019
BG24.07.2019
NO24.07.2019
GR25.07.2019
IS24.08.2019
PT24.08.2019
IE13.11.2019
LU13.11.2019
Former [2020/36]AL24.04.2019
CZ24.04.2019
EE24.04.2019
ES24.04.2019
FI24.04.2019
HR24.04.2019
LT24.04.2019
LV24.04.2019
MC24.04.2019
PL24.04.2019
RO24.04.2019
RS24.04.2019
SI24.04.2019
SK24.04.2019
SM24.04.2019
TR24.04.2019
BG24.07.2019
NO24.07.2019
GR25.07.2019
IS24.08.2019
PT24.08.2019
LU13.11.2019
Former [2020/35]AL24.04.2019
CZ24.04.2019
EE24.04.2019
ES24.04.2019
FI24.04.2019
HR24.04.2019
LT24.04.2019
LV24.04.2019
PL24.04.2019
RO24.04.2019
RS24.04.2019
SI24.04.2019
SK24.04.2019
SM24.04.2019
TR24.04.2019
BG24.07.2019
NO24.07.2019
GR25.07.2019
IS24.08.2019
PT24.08.2019
LU13.11.2019
Former [2020/26]AL24.04.2019
CZ24.04.2019
EE24.04.2019
ES24.04.2019
FI24.04.2019
HR24.04.2019
LT24.04.2019
LV24.04.2019
PL24.04.2019
RO24.04.2019
RS24.04.2019
SI24.04.2019
SK24.04.2019
SM24.04.2019
TR24.04.2019
BG24.07.2019
NO24.07.2019
GR25.07.2019
IS24.08.2019
PT24.08.2019
Former [2020/17]AL24.04.2019
CZ24.04.2019
EE24.04.2019
ES24.04.2019
FI24.04.2019
HR24.04.2019
LT24.04.2019
LV24.04.2019
PL24.04.2019
RO24.04.2019
RS24.04.2019
SK24.04.2019
SM24.04.2019
TR24.04.2019
BG24.07.2019
NO24.07.2019
GR25.07.2019
IS24.08.2019
PT24.08.2019
Former [2020/14]AL24.04.2019
CZ24.04.2019
EE24.04.2019
ES24.04.2019
FI24.04.2019
HR24.04.2019
LT24.04.2019
LV24.04.2019
PL24.04.2019
RO24.04.2019
RS24.04.2019
SK24.04.2019
SM24.04.2019
BG24.07.2019
NO24.07.2019
GR25.07.2019
IS24.08.2019
PT24.08.2019
Former [2020/11]AL24.04.2019
CZ24.04.2019
EE24.04.2019
ES24.04.2019
FI24.04.2019
HR24.04.2019
LT24.04.2019
LV24.04.2019
PL24.04.2019
RO24.04.2019
RS24.04.2019
SK24.04.2019
BG24.07.2019
NO24.07.2019
GR25.07.2019
IS24.08.2019
PT24.08.2019
Former [2020/10]AL24.04.2019
CZ24.04.2019
ES24.04.2019
FI24.04.2019
HR24.04.2019
LT24.04.2019
LV24.04.2019
PL24.04.2019
RO24.04.2019
RS24.04.2019
BG24.07.2019
NO24.07.2019
GR25.07.2019
IS24.08.2019
PT24.08.2019
Former [2020/09]AL24.04.2019
CZ24.04.2019
ES24.04.2019
FI24.04.2019
HR24.04.2019
LT24.04.2019
LV24.04.2019
PL24.04.2019
RS24.04.2019
BG24.07.2019
NO24.07.2019
GR25.07.2019
IS24.08.2019
PT24.08.2019
Former [2020/04]AL24.04.2019
ES24.04.2019
FI24.04.2019
HR24.04.2019
LT24.04.2019
LV24.04.2019
PL24.04.2019
RS24.04.2019
BG24.07.2019
NO24.07.2019
GR25.07.2019
IS24.08.2019
PT24.08.2019
Former [2019/52]AL24.04.2019
ES24.04.2019
FI24.04.2019
HR24.04.2019
LT24.04.2019
LV24.04.2019
PL24.04.2019
RS24.04.2019
BG24.07.2019
NO24.07.2019
GR25.07.2019
PT24.08.2019
Former [2019/51]AL24.04.2019
ES24.04.2019
FI24.04.2019
HR24.04.2019
LT24.04.2019
LV24.04.2019
RS24.04.2019
BG24.07.2019
NO24.07.2019
GR25.07.2019
PT24.08.2019
Former [2019/50]AL24.04.2019
ES24.04.2019
FI24.04.2019
HR24.04.2019
LT24.04.2019
LV24.04.2019
RS24.04.2019
NO24.07.2019
GR25.07.2019
PT24.08.2019
Former [2019/48]ES24.04.2019
FI24.04.2019
LT24.04.2019
NO24.07.2019
PT24.08.2019
Former [2019/47]ES24.04.2019
FI24.04.2019
LT24.04.2019
NO24.07.2019
Cited inInternational search[A]DE232661  (G. LUTHER AKT.-GES. [DE]) [A] 1* page 1, line 1 - page 1, line 72; figures 1-3 *;
 [A]EP0442248  (F SISTEMI AUTOMAZIONI FLESSIBI [IT]) [A] 1 * column 2, line 15 - column 3, line 35; figures 1-3 *;
 [A]DE9200973U  (CFC-FÖRDERSYSTEME GMBH [DE]) [A] 1 * page 10, line 26 - page 17, line 35; figures 1-3 *;
 [A]DE29509605U  (AFT GMBH [DE]) [A] 1 * page 7, line 20 - page 12, line 13; figures 1-5 *;
 [A]DE102007037764  (EISENMANN ANLAGENBAU GMBH & CO [DE]) [A] 1 * page 2, paragraph 0019 - page 4, paragraph 0036; figures 1-4 *;
 [A]EP2172381  (EISENMANN ANLAGENBAU GMBH & CO [DE]) [A] 1 * column 5, paragraph 0022 - column 9, paragraph 0042; figures 1-5 *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.