| EP2858569 - SYSTEM OF MONITORING AND CONTROL OF ULTRAFILTRATION VOLUME DURING PERITONEAL DIALYSIS USING SEGMENTAL BIOIMPEDANCE [Right-click to bookmark this link] | |||
| Former [2015/16] | SYSTEM AND METHOD OF MONITORING AND CONTROL OF ULTRAFILTRATION VOLUME DURING PERITONEAL DIALYSIS USING SEGMENTAL BIOIMPEDANCE | ||
| [2017/27] | Status | No opposition filed within time limit Status updated on 12.10.2018 Database last updated on 11.04.2026 | |
| Former | The patent has been granted Status updated on 03.11.2017 | ||
| Former | Grant of patent is intended Status updated on 22.06.2017 | Most recent event Tooltip | 17.07.2020 | Lapse of the patent in a contracting state New state(s): AL, IS | published on 19.08.2020 [2020/34] | Applicant(s) | For all designated states Fresenius Medical Care Holdings, Inc. 920 Winter Street Waltham, MA 02451 / US | [2015/16] | Inventor(s) | 01 /
ZHU, Fansan 30-29 148th Street Flushing, NY 11354 / US | 02 /
LEVIN, Nathan, W. 181 East 90th Street 7B New York, NY 10128 / US | [2015/16] | Representative(s) | Kirkham, Nicholas Andrew, et al Graham Watt & Co. LLP St. Botolph's House 7-9 St. Botolph's Road Sevenoaks, Kent TN13 3AJ / GB | [2015/16] | Application number, filing date | 13800441.1 | 07.06.2013 | [2017/49] | WO2013US44795 | Priority number, date | US201261657271P | 08.06.2012 Original published format: US 201261657271 P | [2015/16] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2013185080 | Date: | 12.12.2013 | Language: | EN | [2013/50] | Type: | A1 Application with search report | No.: | EP2858569 | Date: | 15.04.2015 | Language: | EN | The application published by WIPO in one of the EPO official languages on 12.12.2013 takes the place of the publication of the European patent application. | [2015/16] | Type: | B1 Patent specification | No.: | EP2858569 | Date: | 06.12.2017 | Language: | EN | [2017/49] | Search report(s) | International search report - published on: | US | 12.12.2013 | (Supplementary) European search report - dispatched on: | EP | 22.12.2015 | Classification | IPC: | A61B5/1455, A61B5/00, A61B5/05, A61B6/00, A61M1/14, A61M1/28, A61M5/142, G01N21/35, A61B5/145 | [2016/03] | CPC: |
A61M1/28 (EP,CN,US);
A61M1/281 (KR);
A61B5/1451 (KR,US);
A61B5/4848 (KR,US);
A61B5/6866 (EP,CN,KR,US);
A61M1/282 (EP,KR,US);
A61M1/284 (KR);
A61M2205/17 (KR,US);
A61M2205/18 (KR,US);
A61M2205/3317 (EP,CN,KR,US);
A61M2205/3344 (KR,US);
A61M2205/3379 (EP,CN,KR,US);
A61M2205/3569 (EP,CN,KR,US);
A61M2205/3592 (EP,CN,KR,US);
A61M2210/1017 (KR,US);
A61M2230/005 (KR,US)
(-)
|
| Former IPC [2015/16] | A61B5/1455, A61B5/00, A61B5/05, A61B6/00, A61M1/14, A61M1/28, A61M5/142, G01N21/35 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2015/16] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | SYSTEM ZUR ÜBERWACHUNG UND STEUERUNG VON ULTRAFILTRATIONSVOLUMINA WÄHREND EINER PERITONEALDIALYSE MITTELS SEGMENTALER BIOIMPEDANZ | [2017/27] | English: | SYSTEM OF MONITORING AND CONTROL OF ULTRAFILTRATION VOLUME DURING PERITONEAL DIALYSIS USING SEGMENTAL BIOIMPEDANCE | [2017/27] | French: | SYSTÈME DE SURVEILLANCE ET DE COMMANDE DU VOLUME D'ULTRAFILTRATION PENDANT UNE DIALYSE PÉRITONÉALE À L'AIDE D'UNE BIO-IMPÉDANCE SEGMENTAIRE | [2017/27] |
| Former [2015/16] | SYSTEM UND VERFAHREN ZUR ÜBERWACHUNG UND STEUERUNG VON ULTRAFILTRATIONSVOLUMINA WÄHREND EINER PERITONEALDIALYSE MITTELS SEGMENTALER BIOIMPEDANZ | ||
| Former [2015/16] | SYSTEM AND METHOD OF MONITORING AND CONTROL OF ULTRAFILTRATION VOLUME DURING PERITONEAL DIALYSIS USING SEGMENTAL BIOIMPEDANCE | ||
| Former [2015/16] | SYSTÈME ET PROCÉDÉ DE SURVEILLANCE ET DE COMMANDE DU VOLUME D'ULTRAFILTRATION PENDANT UNE DIALYSE PÉRITONÉALE À L'AIDE D'UNE BIO-IMPÉDANCE SEGMENTAIRE | Entry into regional phase | 04.12.2014 | National basic fee paid | 04.12.2014 | Search fee paid | 04.12.2014 | Designation fee(s) paid | 04.12.2014 | Examination fee paid | Examination procedure | 04.12.2014 | Examination requested [2015/16] | 20.07.2016 | Amendment by applicant (claims and/or description) | 23.06.2017 | Communication of intention to grant the patent | 18.10.2017 | Fee for grant paid | 18.10.2017 | Fee for publishing/printing paid | 18.10.2017 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 23.06.2017 | Opposition(s) | 07.09.2018 | No opposition filed within time limit [2018/46] | Fees paid | Renewal fee | 25.06.2015 | Renewal fee patent year 03 | 23.06.2016 | Renewal fee patent year 04 | 22.06.2017 | Renewal fee patent year 05 |
| Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
| Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 07.06.2013 | AL | 06.12.2017 | AT | 06.12.2017 | CY | 06.12.2017 | CZ | 06.12.2017 | DK | 06.12.2017 | EE | 06.12.2017 | ES | 06.12.2017 | FI | 06.12.2017 | HR | 06.12.2017 | LT | 06.12.2017 | LV | 06.12.2017 | MC | 06.12.2017 | MK | 06.12.2017 | NL | 06.12.2017 | PL | 06.12.2017 | PT | 06.12.2017 | RO | 06.12.2017 | RS | 06.12.2017 | SI | 06.12.2017 | SK | 06.12.2017 | SM | 06.12.2017 | TR | 06.12.2017 | BG | 06.03.2018 | NO | 06.03.2018 | GR | 07.03.2018 | IS | 06.04.2018 | IE | 07.06.2018 | LU | 07.06.2018 | MT | 07.06.2018 | BE | 30.06.2018 | CH | 30.06.2018 | LI | 30.06.2018 | [2020/33] |
| Former [2020/31] | HU | 07.06.2013 | |
| AT | 06.12.2017 | ||
| CY | 06.12.2017 | ||
| CZ | 06.12.2017 | ||
| DK | 06.12.2017 | ||
| EE | 06.12.2017 | ||
| ES | 06.12.2017 | ||
| FI | 06.12.2017 | ||
| HR | 06.12.2017 | ||
| LT | 06.12.2017 | ||
| LV | 06.12.2017 | ||
| MC | 06.12.2017 | ||
| MK | 06.12.2017 | ||
| NL | 06.12.2017 | ||
| PL | 06.12.2017 | ||
| PT | 06.12.2017 | ||
| RO | 06.12.2017 | ||
| RS | 06.12.2017 | ||
| SI | 06.12.2017 | ||
| SK | 06.12.2017 | ||
| SM | 06.12.2017 | ||
| TR | 06.12.2017 | ||
| BG | 06.03.2018 | ||
| NO | 06.03.2018 | ||
| GR | 07.03.2018 | ||
| IE | 07.06.2018 | ||
| LU | 07.06.2018 | ||
| MT | 07.06.2018 | ||
| BE | 30.06.2018 | ||
| CH | 30.06.2018 | ||
| LI | 30.06.2018 | ||
| Former [2020/30] | HU | 07.06.2013 | |
| AT | 06.12.2017 | ||
| CZ | 06.12.2017 | ||
| DK | 06.12.2017 | ||
| EE | 06.12.2017 | ||
| ES | 06.12.2017 | ||
| FI | 06.12.2017 | ||
| HR | 06.12.2017 | ||
| LT | 06.12.2017 | ||
| LV | 06.12.2017 | ||
| MC | 06.12.2017 | ||
| NL | 06.12.2017 | ||
| PL | 06.12.2017 | ||
| PT | 06.12.2017 | ||
| RO | 06.12.2017 | ||
| RS | 06.12.2017 | ||
| SI | 06.12.2017 | ||
| SK | 06.12.2017 | ||
| SM | 06.12.2017 | ||
| TR | 06.12.2017 | ||
| BG | 06.03.2018 | ||
| NO | 06.03.2018 | ||
| GR | 07.03.2018 | ||
| IE | 07.06.2018 | ||
| LU | 07.06.2018 | ||
| MT | 07.06.2018 | ||
| BE | 30.06.2018 | ||
| CH | 30.06.2018 | ||
| LI | 30.06.2018 | ||
| Former [2020/28] | AT | 06.12.2017 | |
| CZ | 06.12.2017 | ||
| DK | 06.12.2017 | ||
| EE | 06.12.2017 | ||
| ES | 06.12.2017 | ||
| FI | 06.12.2017 | ||
| HR | 06.12.2017 | ||
| LT | 06.12.2017 | ||
| LV | 06.12.2017 | ||
| MC | 06.12.2017 | ||
| NL | 06.12.2017 | ||
| PL | 06.12.2017 | ||
| PT | 06.12.2017 | ||
| RO | 06.12.2017 | ||
| RS | 06.12.2017 | ||
| SI | 06.12.2017 | ||
| SK | 06.12.2017 | ||
| SM | 06.12.2017 | ||
| TR | 06.12.2017 | ||
| BG | 06.03.2018 | ||
| NO | 06.03.2018 | ||
| GR | 07.03.2018 | ||
| IE | 07.06.2018 | ||
| LU | 07.06.2018 | ||
| MT | 07.06.2018 | ||
| BE | 30.06.2018 | ||
| CH | 30.06.2018 | ||
| LI | 30.06.2018 | ||
| Former [2020/16] | AT | 06.12.2017 | |
| CZ | 06.12.2017 | ||
| DK | 06.12.2017 | ||
| EE | 06.12.2017 | ||
| ES | 06.12.2017 | ||
| FI | 06.12.2017 | ||
| HR | 06.12.2017 | ||
| LT | 06.12.2017 | ||
| LV | 06.12.2017 | ||
| MC | 06.12.2017 | ||
| NL | 06.12.2017 | ||
| PL | 06.12.2017 | ||
| RO | 06.12.2017 | ||
| RS | 06.12.2017 | ||
| SI | 06.12.2017 | ||
| SK | 06.12.2017 | ||
| SM | 06.12.2017 | ||
| TR | 06.12.2017 | ||
| BG | 06.03.2018 | ||
| NO | 06.03.2018 | ||
| GR | 07.03.2018 | ||
| IE | 07.06.2018 | ||
| LU | 07.06.2018 | ||
| MT | 07.06.2018 | ||
| BE | 30.06.2018 | ||
| CH | 30.06.2018 | ||
| LI | 30.06.2018 | ||
| Former [2020/08] | AT | 06.12.2017 | |
| CZ | 06.12.2017 | ||
| DK | 06.12.2017 | ||
| EE | 06.12.2017 | ||
| ES | 06.12.2017 | ||
| FI | 06.12.2017 | ||
| HR | 06.12.2017 | ||
| LT | 06.12.2017 | ||
| LV | 06.12.2017 | ||
| MC | 06.12.2017 | ||
| NL | 06.12.2017 | ||
| PL | 06.12.2017 | ||
| RO | 06.12.2017 | ||
| RS | 06.12.2017 | ||
| SI | 06.12.2017 | ||
| SK | 06.12.2017 | ||
| SM | 06.12.2017 | ||
| BG | 06.03.2018 | ||
| NO | 06.03.2018 | ||
| GR | 07.03.2018 | ||
| IE | 07.06.2018 | ||
| LU | 07.06.2018 | ||
| MT | 07.06.2018 | ||
| BE | 30.06.2018 | ||
| CH | 30.06.2018 | ||
| LI | 30.06.2018 | ||
| Former [2019/24] | AT | 06.12.2017 | |
| CZ | 06.12.2017 | ||
| DK | 06.12.2017 | ||
| EE | 06.12.2017 | ||
| ES | 06.12.2017 | ||
| FI | 06.12.2017 | ||
| HR | 06.12.2017 | ||
| LT | 06.12.2017 | ||
| LV | 06.12.2017 | ||
| MC | 06.12.2017 | ||
| NL | 06.12.2017 | ||
| PL | 06.12.2017 | ||
| RO | 06.12.2017 | ||
| RS | 06.12.2017 | ||
| SI | 06.12.2017 | ||
| SK | 06.12.2017 | ||
| SM | 06.12.2017 | ||
| BG | 06.03.2018 | ||
| NO | 06.03.2018 | ||
| GR | 07.03.2018 | ||
| IE | 07.06.2018 | ||
| LU | 07.06.2018 | ||
| BE | 30.06.2018 | ||
| CH | 30.06.2018 | ||
| LI | 30.06.2018 | ||
| Former [2019/21] | AT | 06.12.2017 | |
| CZ | 06.12.2017 | ||
| DK | 06.12.2017 | ||
| EE | 06.12.2017 | ||
| ES | 06.12.2017 | ||
| FI | 06.12.2017 | ||
| HR | 06.12.2017 | ||
| LT | 06.12.2017 | ||
| LV | 06.12.2017 | ||
| MC | 06.12.2017 | ||
| NL | 06.12.2017 | ||
| PL | 06.12.2017 | ||
| RO | 06.12.2017 | ||
| RS | 06.12.2017 | ||
| SI | 06.12.2017 | ||
| SK | 06.12.2017 | ||
| SM | 06.12.2017 | ||
| BG | 06.03.2018 | ||
| NO | 06.03.2018 | ||
| GR | 07.03.2018 | ||
| IE | 07.06.2018 | ||
| LU | 07.06.2018 | ||
| CH | 30.06.2018 | ||
| LI | 30.06.2018 | ||
| Former [2019/19] | AT | 06.12.2017 | |
| CZ | 06.12.2017 | ||
| DK | 06.12.2017 | ||
| EE | 06.12.2017 | ||
| ES | 06.12.2017 | ||
| FI | 06.12.2017 | ||
| HR | 06.12.2017 | ||
| LT | 06.12.2017 | ||
| LV | 06.12.2017 | ||
| MC | 06.12.2017 | ||
| NL | 06.12.2017 | ||
| PL | 06.12.2017 | ||
| RO | 06.12.2017 | ||
| RS | 06.12.2017 | ||
| SI | 06.12.2017 | ||
| SK | 06.12.2017 | ||
| SM | 06.12.2017 | ||
| BG | 06.03.2018 | ||
| NO | 06.03.2018 | ||
| GR | 07.03.2018 | ||
| IE | 07.06.2018 | ||
| LU | 07.06.2018 | ||
| Former [2019/17] | AT | 06.12.2017 | |
| CZ | 06.12.2017 | ||
| DK | 06.12.2017 | ||
| EE | 06.12.2017 | ||
| ES | 06.12.2017 | ||
| FI | 06.12.2017 | ||
| HR | 06.12.2017 | ||
| LT | 06.12.2017 | ||
| LV | 06.12.2017 | ||
| MC | 06.12.2017 | ||
| NL | 06.12.2017 | ||
| PL | 06.12.2017 | ||
| RO | 06.12.2017 | ||
| RS | 06.12.2017 | ||
| SI | 06.12.2017 | ||
| SK | 06.12.2017 | ||
| SM | 06.12.2017 | ||
| BG | 06.03.2018 | ||
| NO | 06.03.2018 | ||
| GR | 07.03.2018 | ||
| LU | 07.06.2018 | ||
| Former [2019/15] | AT | 06.12.2017 | |
| CZ | 06.12.2017 | ||
| DK | 06.12.2017 | ||
| EE | 06.12.2017 | ||
| ES | 06.12.2017 | ||
| FI | 06.12.2017 | ||
| HR | 06.12.2017 | ||
| LT | 06.12.2017 | ||
| LV | 06.12.2017 | ||
| MC | 06.12.2017 | ||
| NL | 06.12.2017 | ||
| PL | 06.12.2017 | ||
| RO | 06.12.2017 | ||
| RS | 06.12.2017 | ||
| SI | 06.12.2017 | ||
| SK | 06.12.2017 | ||
| SM | 06.12.2017 | ||
| BG | 06.03.2018 | ||
| NO | 06.03.2018 | ||
| GR | 07.03.2018 | ||
| Former [2018/52] | AT | 06.12.2017 | |
| CZ | 06.12.2017 | ||
| DK | 06.12.2017 | ||
| EE | 06.12.2017 | ||
| ES | 06.12.2017 | ||
| FI | 06.12.2017 | ||
| HR | 06.12.2017 | ||
| LT | 06.12.2017 | ||
| LV | 06.12.2017 | ||
| NL | 06.12.2017 | ||
| PL | 06.12.2017 | ||
| RO | 06.12.2017 | ||
| RS | 06.12.2017 | ||
| SI | 06.12.2017 | ||
| SK | 06.12.2017 | ||
| SM | 06.12.2017 | ||
| BG | 06.03.2018 | ||
| NO | 06.03.2018 | ||
| GR | 07.03.2018 | ||
| Former [2018/51] | AT | 06.12.2017 | |
| CZ | 06.12.2017 | ||
| DK | 06.12.2017 | ||
| EE | 06.12.2017 | ||
| ES | 06.12.2017 | ||
| FI | 06.12.2017 | ||
| HR | 06.12.2017 | ||
| LT | 06.12.2017 | ||
| LV | 06.12.2017 | ||
| NL | 06.12.2017 | ||
| PL | 06.12.2017 | ||
| RO | 06.12.2017 | ||
| RS | 06.12.2017 | ||
| SK | 06.12.2017 | ||
| SM | 06.12.2017 | ||
| BG | 06.03.2018 | ||
| NO | 06.03.2018 | ||
| GR | 07.03.2018 | ||
| Former [2018/40] | AT | 06.12.2017 | |
| CZ | 06.12.2017 | ||
| EE | 06.12.2017 | ||
| ES | 06.12.2017 | ||
| FI | 06.12.2017 | ||
| HR | 06.12.2017 | ||
| LT | 06.12.2017 | ||
| LV | 06.12.2017 | ||
| NL | 06.12.2017 | ||
| PL | 06.12.2017 | ||
| RO | 06.12.2017 | ||
| RS | 06.12.2017 | ||
| SK | 06.12.2017 | ||
| SM | 06.12.2017 | ||
| BG | 06.03.2018 | ||
| NO | 06.03.2018 | ||
| GR | 07.03.2018 | ||
| Former [2018/38] | AT | 06.12.2017 | |
| CZ | 06.12.2017 | ||
| EE | 06.12.2017 | ||
| ES | 06.12.2017 | ||
| FI | 06.12.2017 | ||
| HR | 06.12.2017 | ||
| LT | 06.12.2017 | ||
| LV | 06.12.2017 | ||
| NL | 06.12.2017 | ||
| PL | 06.12.2017 | ||
| RS | 06.12.2017 | ||
| SK | 06.12.2017 | ||
| SM | 06.12.2017 | ||
| BG | 06.03.2018 | ||
| NO | 06.03.2018 | ||
| GR | 07.03.2018 | ||
| Former [2018/37] | CZ | 06.12.2017 | |
| EE | 06.12.2017 | ||
| ES | 06.12.2017 | ||
| FI | 06.12.2017 | ||
| HR | 06.12.2017 | ||
| LT | 06.12.2017 | ||
| LV | 06.12.2017 | ||
| NL | 06.12.2017 | ||
| PL | 06.12.2017 | ||
| RS | 06.12.2017 | ||
| SK | 06.12.2017 | ||
| SM | 06.12.2017 | ||
| BG | 06.03.2018 | ||
| NO | 06.03.2018 | ||
| GR | 07.03.2018 | ||
| Former [2018/34] | ES | 06.12.2017 | |
| FI | 06.12.2017 | ||
| HR | 06.12.2017 | ||
| LT | 06.12.2017 | ||
| LV | 06.12.2017 | ||
| NL | 06.12.2017 | ||
| RS | 06.12.2017 | ||
| BG | 06.03.2018 | ||
| NO | 06.03.2018 | ||
| GR | 07.03.2018 | ||
| Former [2018/25] | ES | 06.12.2017 | |
| FI | 06.12.2017 | ||
| HR | 06.12.2017 | ||
| LT | 06.12.2017 | ||
| LV | 06.12.2017 | ||
| RS | 06.12.2017 | ||
| BG | 06.03.2018 | ||
| NO | 06.03.2018 | ||
| GR | 07.03.2018 | ||
| Former [2018/22] | ES | 06.12.2017 | |
| FI | 06.12.2017 | ||
| LT | 06.12.2017 | ||
| NO | 06.03.2018 | Documents cited: | Search | [A] WO2011094113 (BAXTER INT et al.) [A] 1-5 * paragraphs [0005] - [0010] * | [A] US7354417 (LEVIN NATHAN W et al.) [A] 1-5 * column 2, lines 5-15 * * column 3, lines 28-48 * * column 5, lines 38-57 * * column 7, line 58 - column 8, line 6 * * example 2 * | [A] WO2011046797 (BAXTER INT et al.) [A] 1-5 * paragraphs [0005] - [0017] * | by applicant | LINDHOLM B.; WERYNSKI A.; BERGSTROM J.: "Fluid transport in peritoneal dialysis", INT J ARTIF ORGANS, vol. 13, 1990, pages 352 - 358 | KORBET M. S.: "Evaluation of ultrafiltration failure", ADVANCES IN RENAL REPLACEMENT THERAPY, vol. 5, no. 3, 1998, pages 194 - 204 | TWARDOWSKI Z. J.; NOLPH K. O.; KHANNA R.; PROWANT B. F.; RYAN L. P.; MOORE H. L.; NIELSEN M. P: "Peritoneal Equilibration Test", PERIL DIAL BULL, vol. 7, 1987, pages 138 - 147, XP009134060 | SMIT W.: "Estimates of peritoneal membrane function-new insights", NEPHROL DIAL TRANSPLANT, vol. 21, 2006, pages IIL6 - IIL9 |