EP2935164 - PROCESS FOR THE MANUFACTURE OF ETHYLENE DICHLORIDE (EDC) [Right-click to bookmark this link] | |||
Former [2015/44] | PROCESS FOR THE MANUFACTURE OF ETHYLENE DICHLORIDE (EDC), AND PROCESS FOR THE MANUFACTURE OF VINYL CHLORIDE MONOMER (VCM) AND OF POLYVINYL CHLORIDE (PVC) | ||
[2018/19] | Status | No opposition filed within time limit Status updated on 26.07.2019 Database last updated on 15.06.2024 | |
Former | The patent has been granted Status updated on 17.08.2018 | ||
Former | Grant of patent is intended Status updated on 24.04.2018 | ||
Former | Examination is in progress Status updated on 20.01.2017 | Most recent event Tooltip | 03.07.2020 | Lapse of the patent in a contracting state New state(s): CY, MK | published on 05.08.2020 [2020/32] | Applicant(s) | For all designated states Inovyn Europe Limited Runcorn Site HQ South Parade PO Box 9 Runcorn, Cheshire WA7 4JE / GB | [2019/23] |
Former [2015/44] | For all designated states Solvay SA Rue de Ransbeek, 310 1120 Bruxelles / BE | Inventor(s) | 01 /
DEGRAEVE, Paul Julius Chemin du Castillon 32 B-7822 Isières / BE | 02 /
MARTIN CARNICERO, Maria Rue de Savoie 99-RDC B-1060 Brussels / BE | [2016/02] |
Former [2015/44] | 01 /
DEGRAEVE, Paul Julius Chemin du Castillon 32 B-7822 Isières / BE | ||
02 /
MARTIN CARNICERO, Maria Rue du Midi 106 Boîte 1 B-1000 Brussels / BE | Representative(s) | King, Alex, et al Mathisen & Macara LLP Charta House 30-38 Church Street Staines-upon-Thames, Middlesex TW18 4EP / GB | [N/P] |
Former [2018/38] | King, Alex, et al Mathisen & Macara LLP Communications House South Street Staines-upon-Thames, Middx TW18 4PR / GB | ||
Former [2015/44] | Vande Gucht, Anne, et al Solvay S.A. Intellectual Assets Management Rue de Ransbeek, 310 1120 Bruxelles / BE | Application number, filing date | 13801591.2 | 09.12.2013 | [2015/44] | WO2013EP75884 | Priority number, date | EP20120198593 | 20.12.2012 Original published format: EP 12198593 | [2015/44] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2014095441 | Date: | 26.06.2014 | Language: | EN | [2014/26] | Type: | A1 Application with search report | No.: | EP2935164 | Date: | 28.10.2015 | Language: | EN | The application published by WIPO in one of the EPO official languages on 26.06.2014 takes the place of the publication of the European patent application. | [2015/44] | Type: | B1 Patent specification | No.: | EP2935164 | Date: | 19.09.2018 | Language: | EN | [2018/38] | Search report(s) | International search report - published on: | EP | 26.06.2014 | Classification | IPC: | C07C17/02, C07C17/156, C07C17/25, C07C19/045, C07C21/06 | [2015/44] | CPC: |
C07C17/02 (EP,RU);
C07C17/156 (EP,RU);
C07C17/25 (EP,RU);
Y02P20/10 (EP)
| C-Set: |
C07C17/02, C07C19/045 (EP);
C07C17/156, C07C19/045 (EP);
C07C17/25, C07C21/06 (EP)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2015/44] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | VERFAHREN ZUR HERSTELLUNG VON ETHYLENDICHLORID (EDC) | [2018/19] | English: | PROCESS FOR THE MANUFACTURE OF ETHYLENE DICHLORIDE (EDC) | [2018/19] | French: | PROCÉDÉ DE FABRICATION DE DICHLORURE D'ÉTHYLÈNE (EDC) | [2018/19] |
Former [2015/44] | VERFAHREN ZUR HERSTELLUNG VON ETHYLENDICHLORID (EDC) UND VERFAHREN ZUR HERSTELLUNG VON VINYLCHLORIDMONOMER (VCM) UND VON POLYVINYLCHLORID (PVC) | ||
Former [2015/44] | PROCESS FOR THE MANUFACTURE OF ETHYLENE DICHLORIDE (EDC), AND PROCESS FOR THE MANUFACTURE OF VINYL CHLORIDE MONOMER (VCM) AND OF POLYVINYL CHLORIDE (PVC) | ||
Former [2015/44] | PROCÉDÉ DE FABRICATION DE DICHLORURE D'ÉTHYLÈNE (EDC) ET PROCÉDÉ DE FABRICATION DE CHLORURE DE VINYLE MONOMÈRE (VCM) ET DE POLYCHLORURE DE VINYLE (PVC) | Entry into regional phase | 20.07.2015 | National basic fee paid | 20.07.2015 | Designation fee(s) paid | 20.07.2015 | Examination fee paid | Examination procedure | 20.07.2015 | Examination requested [2015/44] | 15.02.2016 | Amendment by applicant (claims and/or description) | 19.01.2017 | Despatch of a communication from the examining division (Time limit: M04) | 11.05.2017 | Reply to a communication from the examining division | 24.08.2017 | Despatch of a communication from the examining division (Time limit: M04) | 04.12.2017 | Reply to a communication from the examining division | 25.04.2018 | Communication of intention to grant the patent | 09.08.2018 | Fee for grant paid | 09.08.2018 | Fee for publishing/printing paid | 09.08.2018 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 19.01.2017 | Opposition(s) | 20.06.2019 | No opposition filed within time limit [2019/35] | Fees paid | Renewal fee | 04.01.2016 | Renewal fee patent year 03 | 02.01.2017 | Renewal fee patent year 04 | 02.01.2018 | Renewal fee patent year 05 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | AL | 19.09.2018 | AT | 19.09.2018 | CY | 19.09.2018 | CZ | 19.09.2018 | DK | 19.09.2018 | EE | 19.09.2018 | FI | 19.09.2018 | HR | 19.09.2018 | IT | 19.09.2018 | LT | 19.09.2018 | LV | 19.09.2018 | MC | 19.09.2018 | MK | 19.09.2018 | RO | 19.09.2018 | RS | 19.09.2018 | SE | 19.09.2018 | SI | 19.09.2018 | SK | 19.09.2018 | SM | 19.09.2018 | TR | 19.09.2018 | IE | 09.12.2018 | LU | 09.12.2018 | MT | 09.12.2018 | BG | 19.12.2018 | GB | 19.12.2018 | NO | 19.12.2018 | GR | 20.12.2018 | CH | 31.12.2018 | LI | 31.12.2018 | IS | 19.01.2019 | PT | 19.01.2019 | [2020/31] |
Former [2020/17] | AL | 19.09.2018 | |
AT | 19.09.2018 | ||
CZ | 19.09.2018 | ||
DK | 19.09.2018 | ||
EE | 19.09.2018 | ||
FI | 19.09.2018 | ||
HR | 19.09.2018 | ||
IT | 19.09.2018 | ||
LT | 19.09.2018 | ||
LV | 19.09.2018 | ||
MC | 19.09.2018 | ||
RO | 19.09.2018 | ||
RS | 19.09.2018 | ||
SE | 19.09.2018 | ||
SI | 19.09.2018 | ||
SK | 19.09.2018 | ||
SM | 19.09.2018 | ||
TR | 19.09.2018 | ||
IE | 09.12.2018 | ||
LU | 09.12.2018 | ||
MT | 09.12.2018 | ||
BG | 19.12.2018 | ||
GB | 19.12.2018 | ||
NO | 19.12.2018 | ||
GR | 20.12.2018 | ||
CH | 31.12.2018 | ||
LI | 31.12.2018 | ||
IS | 19.01.2019 | ||
PT | 19.01.2019 | ||
Former [2020/08] | AL | 19.09.2018 | |
AT | 19.09.2018 | ||
CZ | 19.09.2018 | ||
DK | 19.09.2018 | ||
EE | 19.09.2018 | ||
FI | 19.09.2018 | ||
HR | 19.09.2018 | ||
IT | 19.09.2018 | ||
LT | 19.09.2018 | ||
LV | 19.09.2018 | ||
MC | 19.09.2018 | ||
RO | 19.09.2018 | ||
RS | 19.09.2018 | ||
SE | 19.09.2018 | ||
SI | 19.09.2018 | ||
SK | 19.09.2018 | ||
SM | 19.09.2018 | ||
IE | 09.12.2018 | ||
LU | 09.12.2018 | ||
MT | 09.12.2018 | ||
BG | 19.12.2018 | ||
GB | 19.12.2018 | ||
NO | 19.12.2018 | ||
GR | 20.12.2018 | ||
CH | 31.12.2018 | ||
LI | 31.12.2018 | ||
IS | 19.01.2019 | ||
PT | 19.01.2019 | ||
Former [2020/04] | AL | 19.09.2018 | |
AT | 19.09.2018 | ||
CZ | 19.09.2018 | ||
DK | 19.09.2018 | ||
EE | 19.09.2018 | ||
FI | 19.09.2018 | ||
HR | 19.09.2018 | ||
IT | 19.09.2018 | ||
LT | 19.09.2018 | ||
LV | 19.09.2018 | ||
MC | 19.09.2018 | ||
RO | 19.09.2018 | ||
RS | 19.09.2018 | ||
SE | 19.09.2018 | ||
SI | 19.09.2018 | ||
SK | 19.09.2018 | ||
SM | 19.09.2018 | ||
IE | 09.12.2018 | ||
LU | 09.12.2018 | ||
BG | 19.12.2018 | ||
GB | 19.12.2018 | ||
NO | 19.12.2018 | ||
GR | 20.12.2018 | ||
CH | 31.12.2018 | ||
LI | 31.12.2018 | ||
IS | 19.01.2019 | ||
PT | 19.01.2019 | ||
Former [2020/03] | AL | 19.09.2018 | |
AT | 19.09.2018 | ||
CZ | 19.09.2018 | ||
DK | 19.09.2018 | ||
EE | 19.09.2018 | ||
FI | 19.09.2018 | ||
HR | 19.09.2018 | ||
IT | 19.09.2018 | ||
LT | 19.09.2018 | ||
LV | 19.09.2018 | ||
MC | 19.09.2018 | ||
RO | 19.09.2018 | ||
RS | 19.09.2018 | ||
SE | 19.09.2018 | ||
SI | 19.09.2018 | ||
SK | 19.09.2018 | ||
SM | 19.09.2018 | ||
IE | 09.12.2018 | ||
LU | 09.12.2018 | ||
BG | 19.12.2018 | ||
GB | 19.12.2018 | ||
NO | 19.12.2018 | ||
GR | 20.12.2018 | ||
IS | 19.01.2019 | ||
PT | 19.01.2019 | ||
Former [2019/50] | AL | 19.09.2018 | |
AT | 19.09.2018 | ||
CZ | 19.09.2018 | ||
DK | 19.09.2018 | ||
EE | 19.09.2018 | ||
FI | 19.09.2018 | ||
HR | 19.09.2018 | ||
IT | 19.09.2018 | ||
LT | 19.09.2018 | ||
LV | 19.09.2018 | ||
MC | 19.09.2018 | ||
RO | 19.09.2018 | ||
RS | 19.09.2018 | ||
SE | 19.09.2018 | ||
SI | 19.09.2018 | ||
SK | 19.09.2018 | ||
SM | 19.09.2018 | ||
IE | 09.12.2018 | ||
LU | 09.12.2018 | ||
BG | 19.12.2018 | ||
NO | 19.12.2018 | ||
GR | 20.12.2018 | ||
IS | 19.01.2019 | ||
PT | 19.01.2019 | ||
Former [2019/48] | AL | 19.09.2018 | |
AT | 19.09.2018 | ||
CZ | 19.09.2018 | ||
DK | 19.09.2018 | ||
EE | 19.09.2018 | ||
FI | 19.09.2018 | ||
HR | 19.09.2018 | ||
IT | 19.09.2018 | ||
LT | 19.09.2018 | ||
LV | 19.09.2018 | ||
MC | 19.09.2018 | ||
RO | 19.09.2018 | ||
RS | 19.09.2018 | ||
SE | 19.09.2018 | ||
SK | 19.09.2018 | ||
SM | 19.09.2018 | ||
IE | 09.12.2018 | ||
LU | 09.12.2018 | ||
BG | 19.12.2018 | ||
NO | 19.12.2018 | ||
GR | 20.12.2018 | ||
IS | 19.01.2019 | ||
PT | 19.01.2019 | ||
Former [2019/40] | AL | 19.09.2018 | |
AT | 19.09.2018 | ||
CZ | 19.09.2018 | ||
DK | 19.09.2018 | ||
EE | 19.09.2018 | ||
FI | 19.09.2018 | ||
HR | 19.09.2018 | ||
IT | 19.09.2018 | ||
LT | 19.09.2018 | ||
LV | 19.09.2018 | ||
MC | 19.09.2018 | ||
RO | 19.09.2018 | ||
RS | 19.09.2018 | ||
SE | 19.09.2018 | ||
SK | 19.09.2018 | ||
SM | 19.09.2018 | ||
LU | 09.12.2018 | ||
BG | 19.12.2018 | ||
NO | 19.12.2018 | ||
GR | 20.12.2018 | ||
IS | 19.01.2019 | ||
PT | 19.01.2019 | ||
Former [2019/39] | AL | 19.09.2018 | |
AT | 19.09.2018 | ||
CZ | 19.09.2018 | ||
DK | 19.09.2018 | ||
EE | 19.09.2018 | ||
FI | 19.09.2018 | ||
HR | 19.09.2018 | ||
IT | 19.09.2018 | ||
LT | 19.09.2018 | ||
LV | 19.09.2018 | ||
RO | 19.09.2018 | ||
RS | 19.09.2018 | ||
SE | 19.09.2018 | ||
SK | 19.09.2018 | ||
SM | 19.09.2018 | ||
LU | 09.12.2018 | ||
BG | 19.12.2018 | ||
NO | 19.12.2018 | ||
GR | 20.12.2018 | ||
IS | 19.01.2019 | ||
PT | 19.01.2019 | ||
Former [2019/34] | AL | 19.09.2018 | |
AT | 19.09.2018 | ||
CZ | 19.09.2018 | ||
DK | 19.09.2018 | ||
EE | 19.09.2018 | ||
FI | 19.09.2018 | ||
HR | 19.09.2018 | ||
IT | 19.09.2018 | ||
LT | 19.09.2018 | ||
LV | 19.09.2018 | ||
RO | 19.09.2018 | ||
RS | 19.09.2018 | ||
SE | 19.09.2018 | ||
SK | 19.09.2018 | ||
SM | 19.09.2018 | ||
BG | 19.12.2018 | ||
NO | 19.12.2018 | ||
GR | 20.12.2018 | ||
IS | 19.01.2019 | ||
PT | 19.01.2019 | ||
Former [2019/26] | AL | 19.09.2018 | |
AT | 19.09.2018 | ||
CZ | 19.09.2018 | ||
EE | 19.09.2018 | ||
FI | 19.09.2018 | ||
HR | 19.09.2018 | ||
IT | 19.09.2018 | ||
LT | 19.09.2018 | ||
LV | 19.09.2018 | ||
RO | 19.09.2018 | ||
RS | 19.09.2018 | ||
SE | 19.09.2018 | ||
SK | 19.09.2018 | ||
SM | 19.09.2018 | ||
BG | 19.12.2018 | ||
NO | 19.12.2018 | ||
GR | 20.12.2018 | ||
IS | 19.01.2019 | ||
PT | 19.01.2019 | ||
Former [2019/23] | AL | 19.09.2018 | |
AT | 19.09.2018 | ||
CZ | 19.09.2018 | ||
EE | 19.09.2018 | ||
FI | 19.09.2018 | ||
HR | 19.09.2018 | ||
IT | 19.09.2018 | ||
LT | 19.09.2018 | ||
LV | 19.09.2018 | ||
RO | 19.09.2018 | ||
RS | 19.09.2018 | ||
SE | 19.09.2018 | ||
SK | 19.09.2018 | ||
BG | 19.12.2018 | ||
NO | 19.12.2018 | ||
GR | 20.12.2018 | ||
IS | 19.01.2019 | ||
Former [2019/22] | AL | 19.09.2018 | |
CZ | 19.09.2018 | ||
FI | 19.09.2018 | ||
HR | 19.09.2018 | ||
IT | 19.09.2018 | ||
LT | 19.09.2018 | ||
LV | 19.09.2018 | ||
RO | 19.09.2018 | ||
RS | 19.09.2018 | ||
SE | 19.09.2018 | ||
BG | 19.12.2018 | ||
NO | 19.12.2018 | ||
GR | 20.12.2018 | ||
IS | 19.01.2019 | ||
Former [2019/21] | AL | 19.09.2018 | |
FI | 19.09.2018 | ||
HR | 19.09.2018 | ||
IT | 19.09.2018 | ||
LT | 19.09.2018 | ||
LV | 19.09.2018 | ||
RS | 19.09.2018 | ||
SE | 19.09.2018 | ||
BG | 19.12.2018 | ||
NO | 19.12.2018 | ||
GR | 20.12.2018 | ||
IS | 19.01.2019 | ||
Former [2019/12] | AL | 19.09.2018 | |
FI | 19.09.2018 | ||
HR | 19.09.2018 | ||
LT | 19.09.2018 | ||
LV | 19.09.2018 | ||
RS | 19.09.2018 | ||
SE | 19.09.2018 | ||
BG | 19.12.2018 | ||
NO | 19.12.2018 | ||
GR | 20.12.2018 | ||
Former [2019/11] | FI | 19.09.2018 | |
HR | 19.09.2018 | ||
LT | 19.09.2018 | ||
RS | 19.09.2018 | ||
SE | 19.09.2018 | ||
BG | 19.12.2018 | ||
NO | 19.12.2018 | ||
GR | 20.12.2018 | ||
Former [2019/10] | FI | 19.09.2018 | |
LT | 19.09.2018 | ||
RS | 19.09.2018 | ||
SE | 19.09.2018 | ||
BG | 19.12.2018 | ||
NO | 19.12.2018 | ||
GR | 20.12.2018 | ||
Former [2019/08] | FI | 19.09.2018 | |
LT | 19.09.2018 | ||
NO | 19.12.2018 | ||
Former [2019/07] | LT | 19.09.2018 | Cited in | International search | [I]WO2010034392 (UHDE GMBH [DE], et al) [I] 1-15 * Page 1, lines 1-7; page 3, line 30 - page 5, line 8. *; | [A]WO0121564 (KRUPP UHDE GMBH [DE], et al) [A] 1-15 * figure 1; claim 2 *; | [X]WO2012110371 (SOLVAY [BE], et al) [X] 13-15 * claims 14,15 * | Examination | US7182840 | by applicant | US4788357 | US7182840 |