EP2866021 - STATE DETERMINATION METHOD, STATE NOTIFICATION SYSTEM AND STATE DETERMINATION PROGRAM [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 14.06.2019 Database last updated on 19.10.2024 | |
Former | The patent has been granted Status updated on 06.07.2018 | ||
Former | Grant of patent is intended Status updated on 31.01.2018 | Most recent event Tooltip | 01.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 03.08.2022 [2022/31] | Applicant(s) | For all designated states Nabtesco Corporation 7-9, Hirakawa-cho 2-chome Chiyoda-ku Tokyo 102-0093 / JP | [2015/18] | Inventor(s) | 01 /
OHNUMA, Yoshinori c/o Nabtesco Corporation 7-9 Hirakawacho 2-chome Chiyoda-ku Tokyo 102-0093 / JP | 02 /
SHIRATA, Takuya c/o Nabtesco Corporation 7-9 Hirakawacho 2-chome Chiyoda-ku Tokyo 102-0093 / JP | 03 /
IDA, Yasuhito c/o Nabtesco Corporation 7-9 Hirakawacho 2-chome Chiyoda-ku Tokyo 102-0093 / JP | [2015/18] | Representative(s) | Grünecker Patent- und Rechtsanwälte PartG mbB Leopoldstraße 4 80802 München / DE | [2015/18] | Application number, filing date | 13807215.2 | 21.06.2013 | [2018/32] | WO2013JP67069 | Priority number, date | JP20120141486 | 22.06.2012 Original published format: JP 2012141486 | [2015/18] | Filing language | JA | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2013191273 | Date: | 27.12.2013 | Language: | JA | [2013/52] | Type: | A1 Application with search report | No.: | EP2866021 | Date: | 29.04.2015 | Language: | EN | [2015/18] | Type: | B1 Patent specification | No.: | EP2866021 | Date: | 08.08.2018 | Language: | EN | [2018/32] | Search report(s) | International search report - published on: | JP | 27.12.2013 | (Supplementary) European search report - dispatched on: | EP | 12.05.2016 | Classification | IPC: | G01N21/25, G01N33/28, G01N21/85, G01N21/59, // G01J3/46 | [2018/04] | CPC: |
G01N21/251 (EP,US);
G01N21/31 (US);
G01N21/59 (EP,US);
G01N21/8507 (EP,US);
G01N21/94 (EP,US);
G01N33/2888 (EP,US);
G01J2003/466 (EP,US);
G01N2021/8514 (EP,US);
G01N2201/062 (US);
G01N2201/12 (US)
(-)
|
Former IPC [2016/24] | G01N21/25, G01N33/28, // G01J3/46 | ||
Former IPC [2015/18] | G01N21/27 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2015/18] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | ZUSTANDSERMITTLUNGSVERFAHREN, ZUSTANDSBENACHRICHTIGUNGSSYSTEM UND ZUSTANDSERMITTLUNGSPROGRAMM | [2015/18] | English: | STATE DETERMINATION METHOD, STATE NOTIFICATION SYSTEM AND STATE DETERMINATION PROGRAM | [2015/18] | French: | PROCÉDÉ DE DÉTERMINATION D'ÉTAT, SYSTÈME DE NOTIFICATION D'ÉTAT ET PROGRAMME DE DÉTERMINATION D'ÉTAT | [2015/18] | Entry into regional phase | 15.01.2015 | Translation filed | 15.01.2015 | National basic fee paid | 15.01.2015 | Search fee paid | 15.01.2015 | Designation fee(s) paid | 15.01.2015 | Examination fee paid | Examination procedure | 15.01.2015 | Examination requested [2015/18] | 09.12.2016 | Amendment by applicant (claims and/or description) | 01.02.2018 | Communication of intention to grant the patent | 18.05.2018 | Fee for grant paid | 18.05.2018 | Fee for publishing/printing paid | 18.05.2018 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 01.02.2018 | Opposition(s) | 09.05.2019 | No opposition filed within time limit [2019/29] | Fees paid | Renewal fee | 19.06.2015 | Renewal fee patent year 03 | 27.06.2016 | Renewal fee patent year 04 | 27.06.2017 | Renewal fee patent year 05 | 27.06.2018 | Renewal fee patent year 06 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 21.06.2013 | AL | 08.08.2018 | AT | 08.08.2018 | CY | 08.08.2018 | CZ | 08.08.2018 | DK | 08.08.2018 | EE | 08.08.2018 | ES | 08.08.2018 | FI | 08.08.2018 | HR | 08.08.2018 | IT | 08.08.2018 | LT | 08.08.2018 | LV | 08.08.2018 | MC | 08.08.2018 | MK | 08.08.2018 | MT | 08.08.2018 | NL | 08.08.2018 | PL | 08.08.2018 | RO | 08.08.2018 | RS | 08.08.2018 | SE | 08.08.2018 | SI | 08.08.2018 | SK | 08.08.2018 | SM | 08.08.2018 | TR | 08.08.2018 | BG | 08.11.2018 | NO | 08.11.2018 | GR | 09.11.2018 | IS | 08.12.2018 | PT | 08.12.2018 | [2022/31] |
Former [2021/34] | HU | 21.06.2013 | |
AL | 08.08.2018 | ||
AT | 08.08.2018 | ||
CY | 08.08.2018 | ||
CZ | 08.08.2018 | ||
DK | 08.08.2018 | ||
EE | 08.08.2018 | ||
ES | 08.08.2018 | ||
FI | 08.08.2018 | ||
HR | 08.08.2018 | ||
IT | 08.08.2018 | ||
LT | 08.08.2018 | ||
LV | 08.08.2018 | ||
MC | 08.08.2018 | ||
MT | 08.08.2018 | ||
NL | 08.08.2018 | ||
PL | 08.08.2018 | ||
RO | 08.08.2018 | ||
RS | 08.08.2018 | ||
SE | 08.08.2018 | ||
SI | 08.08.2018 | ||
SK | 08.08.2018 | ||
SM | 08.08.2018 | ||
TR | 08.08.2018 | ||
BG | 08.11.2018 | ||
NO | 08.11.2018 | ||
GR | 09.11.2018 | ||
IS | 08.12.2018 | ||
PT | 08.12.2018 | ||
Former [2021/32] | HU | 21.06.2013 | |
AL | 08.08.2018 | ||
AT | 08.08.2018 | ||
CY | 08.08.2018 | ||
CZ | 08.08.2018 | ||
DK | 08.08.2018 | ||
EE | 08.08.2018 | ||
ES | 08.08.2018 | ||
FI | 08.08.2018 | ||
HR | 08.08.2018 | ||
IT | 08.08.2018 | ||
LT | 08.08.2018 | ||
LV | 08.08.2018 | ||
MC | 08.08.2018 | ||
NL | 08.08.2018 | ||
PL | 08.08.2018 | ||
RO | 08.08.2018 | ||
RS | 08.08.2018 | ||
SE | 08.08.2018 | ||
SI | 08.08.2018 | ||
SK | 08.08.2018 | ||
SM | 08.08.2018 | ||
TR | 08.08.2018 | ||
BG | 08.11.2018 | ||
NO | 08.11.2018 | ||
GR | 09.11.2018 | ||
IS | 08.12.2018 | ||
PT | 08.12.2018 | ||
Former [2021/26] | AL | 08.08.2018 | |
AT | 08.08.2018 | ||
CY | 08.08.2018 | ||
CZ | 08.08.2018 | ||
DK | 08.08.2018 | ||
EE | 08.08.2018 | ||
ES | 08.08.2018 | ||
FI | 08.08.2018 | ||
HR | 08.08.2018 | ||
IT | 08.08.2018 | ||
LT | 08.08.2018 | ||
LV | 08.08.2018 | ||
MC | 08.08.2018 | ||
NL | 08.08.2018 | ||
PL | 08.08.2018 | ||
RO | 08.08.2018 | ||
RS | 08.08.2018 | ||
SE | 08.08.2018 | ||
SI | 08.08.2018 | ||
SK | 08.08.2018 | ||
SM | 08.08.2018 | ||
TR | 08.08.2018 | ||
BG | 08.11.2018 | ||
NO | 08.11.2018 | ||
GR | 09.11.2018 | ||
IS | 08.12.2018 | ||
PT | 08.12.2018 | ||
Former [2020/29] | AL | 08.08.2018 | |
AT | 08.08.2018 | ||
CZ | 08.08.2018 | ||
DK | 08.08.2018 | ||
EE | 08.08.2018 | ||
ES | 08.08.2018 | ||
FI | 08.08.2018 | ||
HR | 08.08.2018 | ||
IT | 08.08.2018 | ||
LT | 08.08.2018 | ||
LV | 08.08.2018 | ||
MC | 08.08.2018 | ||
NL | 08.08.2018 | ||
PL | 08.08.2018 | ||
RO | 08.08.2018 | ||
RS | 08.08.2018 | ||
SE | 08.08.2018 | ||
SI | 08.08.2018 | ||
SK | 08.08.2018 | ||
SM | 08.08.2018 | ||
TR | 08.08.2018 | ||
BG | 08.11.2018 | ||
NO | 08.11.2018 | ||
GR | 09.11.2018 | ||
IS | 08.12.2018 | ||
PT | 08.12.2018 | ||
Former [2020/16] | AL | 08.08.2018 | |
AT | 08.08.2018 | ||
CZ | 08.08.2018 | ||
DK | 08.08.2018 | ||
EE | 08.08.2018 | ||
ES | 08.08.2018 | ||
FI | 08.08.2018 | ||
HR | 08.08.2018 | ||
IT | 08.08.2018 | ||
LT | 08.08.2018 | ||
LV | 08.08.2018 | ||
MC | 08.08.2018 | ||
NL | 08.08.2018 | ||
PL | 08.08.2018 | ||
RO | 08.08.2018 | ||
RS | 08.08.2018 | ||
SE | 08.08.2018 | ||
SI | 08.08.2018 | ||
SK | 08.08.2018 | ||
SM | 08.08.2018 | ||
TR | 08.08.2018 | ||
BG | 08.11.2018 | ||
NO | 08.11.2018 | ||
GR | 09.11.2018 | ||
IS | 08.12.2018 | ||
Former [2020/08] | AL | 08.08.2018 | |
AT | 08.08.2018 | ||
CZ | 08.08.2018 | ||
DK | 08.08.2018 | ||
EE | 08.08.2018 | ||
ES | 08.08.2018 | ||
FI | 08.08.2018 | ||
HR | 08.08.2018 | ||
IT | 08.08.2018 | ||
LT | 08.08.2018 | ||
LV | 08.08.2018 | ||
MC | 08.08.2018 | ||
NL | 08.08.2018 | ||
PL | 08.08.2018 | ||
RO | 08.08.2018 | ||
RS | 08.08.2018 | ||
SE | 08.08.2018 | ||
SI | 08.08.2018 | ||
SK | 08.08.2018 | ||
SM | 08.08.2018 | ||
BG | 08.11.2018 | ||
NO | 08.11.2018 | ||
GR | 09.11.2018 | ||
IS | 08.12.2018 | ||
Former [2019/37] | AL | 08.08.2018 | |
AT | 08.08.2018 | ||
CZ | 08.08.2018 | ||
DK | 08.08.2018 | ||
EE | 08.08.2018 | ||
ES | 08.08.2018 | ||
FI | 08.08.2018 | ||
HR | 08.08.2018 | ||
IT | 08.08.2018 | ||
LT | 08.08.2018 | ||
LV | 08.08.2018 | ||
NL | 08.08.2018 | ||
PL | 08.08.2018 | ||
RO | 08.08.2018 | ||
RS | 08.08.2018 | ||
SE | 08.08.2018 | ||
SI | 08.08.2018 | ||
SK | 08.08.2018 | ||
SM | 08.08.2018 | ||
BG | 08.11.2018 | ||
NO | 08.11.2018 | ||
GR | 09.11.2018 | ||
IS | 08.12.2018 | ||
Former [2019/26] | AL | 08.08.2018 | |
AT | 08.08.2018 | ||
CZ | 08.08.2018 | ||
DK | 08.08.2018 | ||
EE | 08.08.2018 | ||
ES | 08.08.2018 | ||
FI | 08.08.2018 | ||
HR | 08.08.2018 | ||
IT | 08.08.2018 | ||
LT | 08.08.2018 | ||
LV | 08.08.2018 | ||
NL | 08.08.2018 | ||
PL | 08.08.2018 | ||
RO | 08.08.2018 | ||
RS | 08.08.2018 | ||
SE | 08.08.2018 | ||
SK | 08.08.2018 | ||
SM | 08.08.2018 | ||
BG | 08.11.2018 | ||
NO | 08.11.2018 | ||
GR | 09.11.2018 | ||
IS | 08.12.2018 | ||
Former [2019/23] | AL | 08.08.2018 | |
AT | 08.08.2018 | ||
CZ | 08.08.2018 | ||
EE | 08.08.2018 | ||
ES | 08.08.2018 | ||
FI | 08.08.2018 | ||
HR | 08.08.2018 | ||
IT | 08.08.2018 | ||
LT | 08.08.2018 | ||
LV | 08.08.2018 | ||
NL | 08.08.2018 | ||
PL | 08.08.2018 | ||
RO | 08.08.2018 | ||
RS | 08.08.2018 | ||
SE | 08.08.2018 | ||
SK | 08.08.2018 | ||
BG | 08.11.2018 | ||
NO | 08.11.2018 | ||
GR | 09.11.2018 | ||
IS | 08.12.2018 | ||
Former [2019/22] | AL | 08.08.2018 | |
AT | 08.08.2018 | ||
CZ | 08.08.2018 | ||
FI | 08.08.2018 | ||
HR | 08.08.2018 | ||
IT | 08.08.2018 | ||
LT | 08.08.2018 | ||
LV | 08.08.2018 | ||
NL | 08.08.2018 | ||
PL | 08.08.2018 | ||
RO | 08.08.2018 | ||
RS | 08.08.2018 | ||
SE | 08.08.2018 | ||
BG | 08.11.2018 | ||
NO | 08.11.2018 | ||
GR | 09.11.2018 | ||
IS | 08.12.2018 | ||
Former [2019/21] | AL | 08.08.2018 | |
AT | 08.08.2018 | ||
FI | 08.08.2018 | ||
HR | 08.08.2018 | ||
IT | 08.08.2018 | ||
LT | 08.08.2018 | ||
LV | 08.08.2018 | ||
NL | 08.08.2018 | ||
PL | 08.08.2018 | ||
RS | 08.08.2018 | ||
SE | 08.08.2018 | ||
BG | 08.11.2018 | ||
NO | 08.11.2018 | ||
GR | 09.11.2018 | ||
IS | 08.12.2018 | ||
Former [2019/12] | AL | 08.08.2018 | |
AT | 08.08.2018 | ||
FI | 08.08.2018 | ||
HR | 08.08.2018 | ||
LT | 08.08.2018 | ||
LV | 08.08.2018 | ||
NL | 08.08.2018 | ||
PL | 08.08.2018 | ||
RS | 08.08.2018 | ||
SE | 08.08.2018 | ||
BG | 08.11.2018 | ||
NO | 08.11.2018 | ||
GR | 09.11.2018 | ||
IS | 08.12.2018 | ||
Former [2019/11] | AT | 08.08.2018 | |
FI | 08.08.2018 | ||
HR | 08.08.2018 | ||
LT | 08.08.2018 | ||
NL | 08.08.2018 | ||
PL | 08.08.2018 | ||
RS | 08.08.2018 | ||
SE | 08.08.2018 | ||
BG | 08.11.2018 | ||
NO | 08.11.2018 | ||
GR | 09.11.2018 | ||
IS | 08.12.2018 | ||
Former [2019/10] | AT | 08.08.2018 | |
FI | 08.08.2018 | ||
LT | 08.08.2018 | ||
NL | 08.08.2018 | ||
PL | 08.08.2018 | ||
RS | 08.08.2018 | ||
SE | 08.08.2018 | ||
BG | 08.11.2018 | ||
NO | 08.11.2018 | ||
GR | 09.11.2018 | ||
IS | 08.12.2018 | ||
Former [2019/09] | FI | 08.08.2018 | |
LT | 08.08.2018 | ||
NL | 08.08.2018 | ||
NO | 08.11.2018 | ||
IS | 08.12.2018 | ||
Former [2019/08] | FI | 08.08.2018 | |
LT | 08.08.2018 | ||
NO | 08.11.2018 | ||
IS | 08.12.2018 | ||
Former [2019/07] | LT | 08.08.2018 | Documents cited: | Search | [Y]CN101539528 (UNIV XI AN JIAOTONG) [Y] 1-9 * the whole document *; | [Y]EP2447704 (NAT UNIVERSITY CORP UNIVERSITY OF FUKUI [JP]) [Y] 1-9 * page 5, line 46 - page 6, line 22 * * page 8, line 21 - line 35 *; | [A] - C. V. OSSIA ET AL, "Novel Chromatic Technique Based on Optical Absorbance in Characterizing Mineral Hydraulic Oil Degradation", ADVANCES IN TRIBOLOGY, (20120412), vol. 49, no. 200305, doi:10.1108/00368790610640109, ISSN 1687-5915, pages 24 - 8, XP055270321 [A] 1-9 * abstract * * 3.1 Calibration and chromatic processing * * table 1 * DOI: http://dx.doi.org/10.1155/2012/131956 | International search | [A]JPH0634541 (NIPPON OIL CO LTD, et al); | [A]JPH0720049 (NIPPON DENSO CO); | [Y]JP2000146696 (MK SEIKO CO LTD); | [A]JP2007198767 (NTN TOYO BEARING CO LTD); | [A]US2008024761 (KONG HOSUNG [KR], et al); | [Y]WO2010150526 (NAT UNIVERSITY CORP UNIVERSITY OF FUKUI [JP], et al); | [Y]JP2012107898 (VISCAS CORP, et al); | [A]WO2012074109 (NABTESCO CORP [JP], et al) | by applicant | JPH0634541 | JP2007198767 | US7612874 |