EP2931781 - MODIFIED EPOXY RESINS [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 10.09.2021 Database last updated on 13.07.2024 | |
Former | The patent has been granted Status updated on 02.10.2020 | ||
Former | Grant of patent is intended Status updated on 27.05.2020 | ||
Former | Examination is in progress Status updated on 25.01.2019 | Most recent event Tooltip | 22.07.2022 | Lapse of the patent in a contracting state New state(s): BE | published on 24.08.2022 [2022/34] | Applicant(s) | For all designated states Blue Cube IP LLC 190 Carondelet Plaza, Suite 1530 Clayton, Missouri 63105 / US | [2018/36] |
Former [2015/43] | For all designated states Blue Cube IP LLC 2030 Dow Center Midland MI 48674 / US | Inventor(s) | 01 /
AGUIRRE VARGAS, Fabio 114 Spanish Oak Circle Lake Jackson, TX 77566 / US | 02 /
GUO, Yinzhong 5308 Vandemere Drive Midland, MI 48642 / US | 03 /
ZHANG, Yong 303 Stonyhill Drive Chalfont, PA 18914 / US | [2015/43] | Representative(s) | Greaves Brewster LLP Copa House Station Road Cheddar, Somerset BS27 3AH / GB | [2020/45] |
Former [2015/43] | Beck Greener Fulwood House 12 Fulwood Place London WC1V 6HR / GB | Application number, filing date | 13811324.6 | 05.12.2013 | [2015/43] | WO2013US73257 | Priority number, date | US201261737179P | 14.12.2012 Original published format: US 201261737179 P | [2015/43] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2014093117 | Date: | 19.06.2014 | Language: | EN | [2014/25] | Type: | A1 Application with search report | No.: | EP2931781 | Date: | 21.10.2015 | Language: | EN | The application published by WIPO in one of the EPO official languages on 19.06.2014 takes the place of the publication of the European patent application. | [2015/43] | Type: | B1 Patent specification | No.: | EP2931781 | Date: | 04.11.2020 | Language: | EN | [2020/45] | Search report(s) | International search report - published on: | EP | 19.06.2014 | Classification | IPC: | C08G59/14, C08G59/50 | [2015/43] | CPC: |
C08G59/1477 (EP,US);
C09D163/00 (US);
C08G59/1494 (EP,US);
C08G59/50 (EP,US)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2015/43] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | MODIFIZIERTE EPOXIDHARZE | [2015/43] | English: | MODIFIED EPOXY RESINS | [2015/43] | French: | RÉSINES ÉPOXYDE MODIFIÉES | [2015/43] | Entry into regional phase | 14.07.2015 | National basic fee paid | 14.07.2015 | Designation fee(s) paid | 14.07.2015 | Examination fee paid | Examination procedure | 14.07.2015 | Examination requested [2015/43] | 22.01.2016 | Amendment by applicant (claims and/or description) | 23.01.2019 | Despatch of a communication from the examining division (Time limit: M04) | 31.05.2019 | Reply to a communication from the examining division | 28.08.2019 | Despatch of a communication from the examining division (Time limit: M06) | 05.03.2020 | Reply to a communication from the examining division | 28.05.2020 | Communication of intention to grant the patent | 08.09.2020 | Receipt of the translation of the claim(s) | 23.09.2020 | Fee for grant paid | 23.09.2020 | Fee for publishing/printing paid | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 23.01.2019 | Opposition(s) | 05.08.2021 | No opposition filed within time limit [2021/41] | Fees paid | Renewal fee | 10.12.2015 | Renewal fee patent year 03 | 13.12.2016 | Renewal fee patent year 04 | 12.12.2017 | Renewal fee patent year 05 | 12.12.2018 | Renewal fee patent year 06 | 13.12.2019 | Renewal fee patent year 07 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 05.12.2013 | AL | 04.11.2020 | AT | 04.11.2020 | CY | 04.11.2020 | CZ | 04.11.2020 | DK | 04.11.2020 | EE | 04.11.2020 | ES | 04.11.2020 | FI | 04.11.2020 | HR | 04.11.2020 | IT | 04.11.2020 | LT | 04.11.2020 | LV | 04.11.2020 | MC | 04.11.2020 | MK | 04.11.2020 | MT | 04.11.2020 | NL | 04.11.2020 | PL | 04.11.2020 | RO | 04.11.2020 | RS | 04.11.2020 | SE | 04.11.2020 | SI | 04.11.2020 | SK | 04.11.2020 | SM | 04.11.2020 | TR | 04.11.2020 | IE | 05.12.2020 | LU | 05.12.2020 | BE | 31.12.2020 | CH | 31.12.2020 | LI | 31.12.2020 | BG | 04.02.2021 | NO | 04.02.2021 | GR | 05.02.2021 | IS | 04.03.2021 | PT | 04.03.2021 | [2022/34] |
Former [2022/32] | HU | 05.12.2013 | |
AL | 04.11.2020 | ||
AT | 04.11.2020 | ||
CY | 04.11.2020 | ||
CZ | 04.11.2020 | ||
DK | 04.11.2020 | ||
EE | 04.11.2020 | ||
ES | 04.11.2020 | ||
FI | 04.11.2020 | ||
HR | 04.11.2020 | ||
IT | 04.11.2020 | ||
LT | 04.11.2020 | ||
LV | 04.11.2020 | ||
MC | 04.11.2020 | ||
MK | 04.11.2020 | ||
MT | 04.11.2020 | ||
NL | 04.11.2020 | ||
PL | 04.11.2020 | ||
RO | 04.11.2020 | ||
RS | 04.11.2020 | ||
SE | 04.11.2020 | ||
SI | 04.11.2020 | ||
SK | 04.11.2020 | ||
SM | 04.11.2020 | ||
TR | 04.11.2020 | ||
IE | 05.12.2020 | ||
LU | 05.12.2020 | ||
CH | 31.12.2020 | ||
LI | 31.12.2020 | ||
BG | 04.02.2021 | ||
NO | 04.02.2021 | ||
GR | 05.02.2021 | ||
IS | 04.03.2021 | ||
PT | 04.03.2021 | ||
Former [2022/27] | HU | 05.12.2013 | |
AL | 04.11.2020 | ||
AT | 04.11.2020 | ||
CY | 04.11.2020 | ||
CZ | 04.11.2020 | ||
DK | 04.11.2020 | ||
EE | 04.11.2020 | ||
ES | 04.11.2020 | ||
FI | 04.11.2020 | ||
HR | 04.11.2020 | ||
IT | 04.11.2020 | ||
LT | 04.11.2020 | ||
LV | 04.11.2020 | ||
MC | 04.11.2020 | ||
MT | 04.11.2020 | ||
NL | 04.11.2020 | ||
PL | 04.11.2020 | ||
RO | 04.11.2020 | ||
RS | 04.11.2020 | ||
SE | 04.11.2020 | ||
SI | 04.11.2020 | ||
SK | 04.11.2020 | ||
SM | 04.11.2020 | ||
TR | 04.11.2020 | ||
IE | 05.12.2020 | ||
LU | 05.12.2020 | ||
CH | 31.12.2020 | ||
LI | 31.12.2020 | ||
BG | 04.02.2021 | ||
NO | 04.02.2021 | ||
GR | 05.02.2021 | ||
IS | 04.03.2021 | ||
PT | 04.03.2021 | ||
Former [2022/26] | AL | 04.11.2020 | |
AT | 04.11.2020 | ||
CZ | 04.11.2020 | ||
DK | 04.11.2020 | ||
EE | 04.11.2020 | ||
ES | 04.11.2020 | ||
FI | 04.11.2020 | ||
HR | 04.11.2020 | ||
IT | 04.11.2020 | ||
LT | 04.11.2020 | ||
LV | 04.11.2020 | ||
MC | 04.11.2020 | ||
NL | 04.11.2020 | ||
PL | 04.11.2020 | ||
RO | 04.11.2020 | ||
RS | 04.11.2020 | ||
SE | 04.11.2020 | ||
SI | 04.11.2020 | ||
SK | 04.11.2020 | ||
SM | 04.11.2020 | ||
TR | 04.11.2020 | ||
IE | 05.12.2020 | ||
LU | 05.12.2020 | ||
CH | 31.12.2020 | ||
LI | 31.12.2020 | ||
BG | 04.02.2021 | ||
NO | 04.02.2021 | ||
GR | 05.02.2021 | ||
IS | 04.03.2021 | ||
PT | 04.03.2021 | ||
Former [2022/23] | AL | 04.11.2020 | |
AT | 04.11.2020 | ||
CZ | 04.11.2020 | ||
DK | 04.11.2020 | ||
EE | 04.11.2020 | ||
ES | 04.11.2020 | ||
FI | 04.11.2020 | ||
HR | 04.11.2020 | ||
IT | 04.11.2020 | ||
LT | 04.11.2020 | ||
LV | 04.11.2020 | ||
MC | 04.11.2020 | ||
NL | 04.11.2020 | ||
PL | 04.11.2020 | ||
RO | 04.11.2020 | ||
RS | 04.11.2020 | ||
SE | 04.11.2020 | ||
SI | 04.11.2020 | ||
SK | 04.11.2020 | ||
SM | 04.11.2020 | ||
IE | 05.12.2020 | ||
LU | 05.12.2020 | ||
CH | 31.12.2020 | ||
LI | 31.12.2020 | ||
BG | 04.02.2021 | ||
NO | 04.02.2021 | ||
GR | 05.02.2021 | ||
IS | 04.03.2021 | ||
PT | 04.03.2021 | ||
Former [2022/10] | AL | 04.11.2020 | |
AT | 04.11.2020 | ||
CZ | 04.11.2020 | ||
DK | 04.11.2020 | ||
EE | 04.11.2020 | ||
ES | 04.11.2020 | ||
FI | 04.11.2020 | ||
HR | 04.11.2020 | ||
IT | 04.11.2020 | ||
LT | 04.11.2020 | ||
LV | 04.11.2020 | ||
MC | 04.11.2020 | ||
NL | 04.11.2020 | ||
PL | 04.11.2020 | ||
RO | 04.11.2020 | ||
RS | 04.11.2020 | ||
SE | 04.11.2020 | ||
SI | 04.11.2020 | ||
SK | 04.11.2020 | ||
SM | 04.11.2020 | ||
IE | 05.12.2020 | ||
LU | 05.12.2020 | ||
CH | 31.12.2020 | ||
LI | 31.12.2020 | ||
BG | 04.02.2021 | ||
NO | 04.02.2021 | ||
GR | 05.02.2021 | ||
PT | 04.03.2021 | ||
Former [2021/52] | AL | 04.11.2020 | |
AT | 04.11.2020 | ||
CZ | 04.11.2020 | ||
DK | 04.11.2020 | ||
EE | 04.11.2020 | ||
ES | 04.11.2020 | ||
FI | 04.11.2020 | ||
HR | 04.11.2020 | ||
IT | 04.11.2020 | ||
LT | 04.11.2020 | ||
LV | 04.11.2020 | ||
MC | 04.11.2020 | ||
NL | 04.11.2020 | ||
PL | 04.11.2020 | ||
RO | 04.11.2020 | ||
RS | 04.11.2020 | ||
SE | 04.11.2020 | ||
SI | 04.11.2020 | ||
SK | 04.11.2020 | ||
SM | 04.11.2020 | ||
IE | 05.12.2020 | ||
LU | 05.12.2020 | ||
CH | 31.12.2020 | ||
LI | 31.12.2020 | ||
BG | 04.02.2021 | ||
NO | 04.02.2021 | ||
GR | 05.02.2021 | ||
IS | 04.03.2021 | ||
PT | 04.03.2021 | ||
Former [2021/50] | AL | 04.11.2020 | |
AT | 04.11.2020 | ||
CZ | 04.11.2020 | ||
DK | 04.11.2020 | ||
EE | 04.11.2020 | ||
ES | 04.11.2020 | ||
FI | 04.11.2020 | ||
HR | 04.11.2020 | ||
IT | 04.11.2020 | ||
LT | 04.11.2020 | ||
LV | 04.11.2020 | ||
MC | 04.11.2020 | ||
NL | 04.11.2020 | ||
PL | 04.11.2020 | ||
RO | 04.11.2020 | ||
RS | 04.11.2020 | ||
SE | 04.11.2020 | ||
SI | 04.11.2020 | ||
SK | 04.11.2020 | ||
SM | 04.11.2020 | ||
IE | 05.12.2020 | ||
LU | 05.12.2020 | ||
BG | 04.02.2021 | ||
NO | 04.02.2021 | ||
GR | 05.02.2021 | ||
IS | 04.03.2021 | ||
PT | 04.03.2021 | ||
Former [2021/48] | AL | 04.11.2020 | |
AT | 04.11.2020 | ||
CZ | 04.11.2020 | ||
DK | 04.11.2020 | ||
EE | 04.11.2020 | ||
ES | 04.11.2020 | ||
FI | 04.11.2020 | ||
HR | 04.11.2020 | ||
IT | 04.11.2020 | ||
LT | 04.11.2020 | ||
LV | 04.11.2020 | ||
MC | 04.11.2020 | ||
NL | 04.11.2020 | ||
PL | 04.11.2020 | ||
RO | 04.11.2020 | ||
RS | 04.11.2020 | ||
SE | 04.11.2020 | ||
SK | 04.11.2020 | ||
SM | 04.11.2020 | ||
IE | 05.12.2020 | ||
LU | 05.12.2020 | ||
BG | 04.02.2021 | ||
NO | 04.02.2021 | ||
GR | 05.02.2021 | ||
IS | 04.03.2021 | ||
PT | 04.03.2021 | ||
Former [2021/47] | AL | 04.11.2020 | |
AT | 04.11.2020 | ||
CZ | 04.11.2020 | ||
DK | 04.11.2020 | ||
EE | 04.11.2020 | ||
ES | 04.11.2020 | ||
FI | 04.11.2020 | ||
HR | 04.11.2020 | ||
LT | 04.11.2020 | ||
LV | 04.11.2020 | ||
MC | 04.11.2020 | ||
NL | 04.11.2020 | ||
PL | 04.11.2020 | ||
RO | 04.11.2020 | ||
RS | 04.11.2020 | ||
SE | 04.11.2020 | ||
SK | 04.11.2020 | ||
SM | 04.11.2020 | ||
IE | 05.12.2020 | ||
LU | 05.12.2020 | ||
BG | 04.02.2021 | ||
NO | 04.02.2021 | ||
GR | 05.02.2021 | ||
IS | 04.03.2021 | ||
PT | 04.03.2021 | ||
Former [2021/46] | AL | 04.11.2020 | |
AT | 04.11.2020 | ||
CZ | 04.11.2020 | ||
DK | 04.11.2020 | ||
EE | 04.11.2020 | ||
ES | 04.11.2020 | ||
FI | 04.11.2020 | ||
HR | 04.11.2020 | ||
LT | 04.11.2020 | ||
LV | 04.11.2020 | ||
MC | 04.11.2020 | ||
NL | 04.11.2020 | ||
PL | 04.11.2020 | ||
RO | 04.11.2020 | ||
RS | 04.11.2020 | ||
SE | 04.11.2020 | ||
SK | 04.11.2020 | ||
SM | 04.11.2020 | ||
IE | 05.12.2020 | ||
BG | 04.02.2021 | ||
NO | 04.02.2021 | ||
GR | 05.02.2021 | ||
IS | 04.03.2021 | ||
PT | 04.03.2021 | ||
Former [2021/45] | AL | 04.11.2020 | |
AT | 04.11.2020 | ||
CZ | 04.11.2020 | ||
DK | 04.11.2020 | ||
EE | 04.11.2020 | ||
ES | 04.11.2020 | ||
FI | 04.11.2020 | ||
HR | 04.11.2020 | ||
LT | 04.11.2020 | ||
LV | 04.11.2020 | ||
MC | 04.11.2020 | ||
PL | 04.11.2020 | ||
RO | 04.11.2020 | ||
RS | 04.11.2020 | ||
SE | 04.11.2020 | ||
SK | 04.11.2020 | ||
SM | 04.11.2020 | ||
BG | 04.02.2021 | ||
NO | 04.02.2021 | ||
GR | 05.02.2021 | ||
IS | 04.03.2021 | ||
PT | 04.03.2021 | ||
Former [2021/40] | AT | 04.11.2020 | |
CZ | 04.11.2020 | ||
DK | 04.11.2020 | ||
EE | 04.11.2020 | ||
ES | 04.11.2020 | ||
FI | 04.11.2020 | ||
HR | 04.11.2020 | ||
LT | 04.11.2020 | ||
LV | 04.11.2020 | ||
MC | 04.11.2020 | ||
PL | 04.11.2020 | ||
RO | 04.11.2020 | ||
RS | 04.11.2020 | ||
SE | 04.11.2020 | ||
SK | 04.11.2020 | ||
SM | 04.11.2020 | ||
BG | 04.02.2021 | ||
NO | 04.02.2021 | ||
GR | 05.02.2021 | ||
IS | 04.03.2021 | ||
PT | 04.03.2021 | ||
Former [2021/37] | AT | 04.11.2020 | |
CZ | 04.11.2020 | ||
DK | 04.11.2020 | ||
EE | 04.11.2020 | ||
ES | 04.11.2020 | ||
FI | 04.11.2020 | ||
HR | 04.11.2020 | ||
LT | 04.11.2020 | ||
LV | 04.11.2020 | ||
PL | 04.11.2020 | ||
RO | 04.11.2020 | ||
RS | 04.11.2020 | ||
SE | 04.11.2020 | ||
SK | 04.11.2020 | ||
SM | 04.11.2020 | ||
BG | 04.02.2021 | ||
NO | 04.02.2021 | ||
GR | 05.02.2021 | ||
IS | 04.03.2021 | ||
PT | 04.03.2021 | ||
Former [2021/36] | AT | 04.11.2020 | |
CZ | 04.11.2020 | ||
EE | 04.11.2020 | ||
ES | 04.11.2020 | ||
FI | 04.11.2020 | ||
HR | 04.11.2020 | ||
LT | 04.11.2020 | ||
LV | 04.11.2020 | ||
PL | 04.11.2020 | ||
RO | 04.11.2020 | ||
RS | 04.11.2020 | ||
SE | 04.11.2020 | ||
SK | 04.11.2020 | ||
SM | 04.11.2020 | ||
BG | 04.02.2021 | ||
NO | 04.02.2021 | ||
GR | 05.02.2021 | ||
IS | 04.03.2021 | ||
PT | 04.03.2021 | ||
Former [2021/35] | AT | 04.11.2020 | |
CZ | 04.11.2020 | ||
ES | 04.11.2020 | ||
FI | 04.11.2020 | ||
HR | 04.11.2020 | ||
LT | 04.11.2020 | ||
LV | 04.11.2020 | ||
PL | 04.11.2020 | ||
RO | 04.11.2020 | ||
RS | 04.11.2020 | ||
SE | 04.11.2020 | ||
SK | 04.11.2020 | ||
SM | 04.11.2020 | ||
BG | 04.02.2021 | ||
NO | 04.02.2021 | ||
GR | 05.02.2021 | ||
IS | 04.03.2021 | ||
PT | 04.03.2021 | ||
Former [2021/34] | AT | 04.11.2020 | |
CZ | 04.11.2020 | ||
ES | 04.11.2020 | ||
FI | 04.11.2020 | ||
HR | 04.11.2020 | ||
LT | 04.11.2020 | ||
LV | 04.11.2020 | ||
PL | 04.11.2020 | ||
RS | 04.11.2020 | ||
SE | 04.11.2020 | ||
SM | 04.11.2020 | ||
BG | 04.02.2021 | ||
NO | 04.02.2021 | ||
GR | 05.02.2021 | ||
IS | 04.03.2021 | ||
PT | 04.03.2021 | ||
Former [2021/33] | AT | 04.11.2020 | |
ES | 04.11.2020 | ||
FI | 04.11.2020 | ||
HR | 04.11.2020 | ||
LT | 04.11.2020 | ||
LV | 04.11.2020 | ||
PL | 04.11.2020 | ||
RS | 04.11.2020 | ||
SE | 04.11.2020 | ||
SM | 04.11.2020 | ||
BG | 04.02.2021 | ||
NO | 04.02.2021 | ||
GR | 05.02.2021 | ||
IS | 04.03.2021 | ||
PT | 04.03.2021 | ||
Former [2021/32] | AT | 04.11.2020 | |
ES | 04.11.2020 | ||
FI | 04.11.2020 | ||
HR | 04.11.2020 | ||
LV | 04.11.2020 | ||
PL | 04.11.2020 | ||
RS | 04.11.2020 | ||
SE | 04.11.2020 | ||
SM | 04.11.2020 | ||
BG | 04.02.2021 | ||
NO | 04.02.2021 | ||
GR | 05.02.2021 | ||
IS | 04.03.2021 | ||
PT | 04.03.2021 | ||
Former [2021/28] | AT | 04.11.2020 | |
ES | 04.11.2020 | ||
FI | 04.11.2020 | ||
HR | 04.11.2020 | ||
LV | 04.11.2020 | ||
PL | 04.11.2020 | ||
RS | 04.11.2020 | ||
SE | 04.11.2020 | ||
BG | 04.02.2021 | ||
NO | 04.02.2021 | ||
GR | 05.02.2021 | ||
IS | 04.03.2021 | ||
PT | 04.03.2021 | ||
Former [2021/25] | AT | 04.11.2020 | |
ES | 04.11.2020 | ||
FI | 04.11.2020 | ||
LV | 04.11.2020 | ||
PL | 04.11.2020 | ||
RS | 04.11.2020 | ||
SE | 04.11.2020 | ||
BG | 04.02.2021 | ||
NO | 04.02.2021 | ||
GR | 05.02.2021 | ||
IS | 04.03.2021 | ||
PT | 04.03.2021 | ||
Former [2021/24] | AT | 04.11.2020 | |
FI | 04.11.2020 | ||
LV | 04.11.2020 | ||
RS | 04.11.2020 | ||
SE | 04.11.2020 | ||
BG | 04.02.2021 | ||
NO | 04.02.2021 | ||
GR | 05.02.2021 | ||
PT | 04.03.2021 | ||
Former [2021/23] | FI | 04.11.2020 | |
LV | 04.11.2020 | ||
RS | 04.11.2020 | ||
SE | 04.11.2020 | ||
NO | 04.02.2021 | ||
GR | 05.02.2021 | ||
PT | 04.03.2021 | ||
Former [2021/22] | FI | 04.11.2020 | |
RS | 04.11.2020 | ||
NO | 04.02.2021 | ||
PT | 04.03.2021 | ||
Former [2021/21] | FI | 04.11.2020 | |
PT | 04.03.2021 | ||
Former [2021/20] | FI | 04.11.2020 | Cited in | International search | [X]EP2341093 (DOW GLOBAL TECHNOLOGIES LLC [US], et al) [X] 1,5,6,8,14* paragraph [0044] *; | [X]WO2012030338 (DOW GLOBAL TECHNOLOGIES LLC [US], et al) [X] 1,14,16-19 * page 15; table 1 * * example 1 * | Examination | GB1136112 | US4330644 | by applicant | US2408096 | US3018262 | US3294689 | US4330644 | US4851486 | US5008351 | EP0292731 | US5405688 | US6153719 | US6242083 | JP2001288243 | US6572971 | US6632893 | WO2005023941 | US6887574 | US7001938 | US7037958 | WO2006052727 | US7163973 | US2007221890 | US7655174 | WO2010126962 | US8048819 | - JOURNAL OF THE AMERICAN CHEMICAL SOCIETY, (1944), vol. 66, pages 879 - 81 | - LEE, H.; NEVILLE, K., Handbook of Epoxy Resins, MCGRAW-HILL BOOK COMPANY, (1967), pages 2 - 1,2-27 |