EP2922785 - METHOD FOR PREPARING IMIDE SALTS CONTAINING A FLUOROSULPHONYL GROUP [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 03.05.2019 Database last updated on 05.07.2024 | |
Former | The patent has been granted Status updated on 25.05.2018 | ||
Former | Grant of patent is intended Status updated on 14.03.2018 | ||
Former | Examination is in progress Status updated on 11.08.2017 | Most recent event Tooltip | 03.07.2020 | Lapse of the patent in a contracting state New state(s): CY, MK | published on 05.08.2020 [2020/32] | Applicant(s) | For all designated states Arkema France 420, rue d'Estienne d'Orves 92700 Colombes / FR | [2018/26] |
Former [2015/40] | For all designated states Arkema France 420, rue d'Estienne d'Orves 92700 Colombes / FR | Inventor(s) | 01 /
AUDUREAU, Sophie 2 Impasse de Vilnius 69320 Feyzin / FR | 02 /
SCHMIDT, Grégory 17 rue Waldwisse 69440 Mornant / FR | [2015/40] | Representative(s) | Chahine, Audrey Claire, et al ARKEMA France Département Propriété Industrielle 420, rue d'Estienne d'Orves 92705 Colombes Cedex / FR | [2018/26] |
Former [2015/40] | Albani, Dalila Arkema France Département Propriété Industrielle 420, rue d'Estienne d'Orves 92705 Colombes Cedex / FR | Application number, filing date | 13815036.2 | 19.11.2013 | [2015/40] | WO2013FR52785 | Priority number, date | FR20120061127 | 22.11.2012 Original published format: FR 1261127 | [2015/40] | Filing language | FR | Procedural language | FR | Publication | Type: | A1 Application with search report | No.: | WO2014080120 | Date: | 30.05.2014 | Language: | FR | [2014/22] | Type: | A1 Application with search report | No.: | EP2922785 | Date: | 30.09.2015 | Language: | FR | The application published by WIPO in one of the EPO official languages on 30.05.2014 takes the place of the publication of the European patent application. | [2015/40] | Type: | B1 Patent specification | No.: | EP2922785 | Date: | 27.06.2018 | Language: | FR | [2018/26] | Search report(s) | International search report - published on: | EP | 30.05.2014 | Classification | IPC: | C01B21/093, C07C303/40 | [2015/40] | CPC: |
C01B21/086 (EP,US);
C01B21/0935 (EP,US);
C07C303/40 (EP,US)
| C-Set: |
C07C303/40, C07C311/48 (EP,US)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2015/40] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | VERFAHREN ZUR HERSTELLUNG VON IMIDSALZEN MIT EINER FLUORSULFONYLGRUPPE | [2015/40] | English: | METHOD FOR PREPARING IMIDE SALTS CONTAINING A FLUOROSULPHONYL GROUP | [2015/40] | French: | PROCEDE DE PREPARATION DE SEL D'IMIDES CONTENANT UN GROUPEMENT FLUOROSULFONYLE | [2015/40] | Entry into regional phase | 26.03.2015 | National basic fee paid | 26.03.2015 | Designation fee(s) paid | 26.03.2015 | Examination fee paid | Examination procedure | 26.03.2015 | Examination requested [2015/40] | 09.07.2015 | Amendment by applicant (claims and/or description) | 11.08.2017 | Despatch of a communication from the examining division (Time limit: M04) | 15.11.2017 | Reply to a communication from the examining division | 15.03.2018 | Communication of intention to grant the patent | 11.05.2018 | Fee for grant paid | 11.05.2018 | Fee for publishing/printing paid | 11.05.2018 | Receipt of the translation of the claim(s) | Divisional application(s) | EP18172111.9 / EP3381889 | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 11.08.2017 | Opposition(s) | 28.03.2019 | No opposition filed within time limit [2019/23] | Fees paid | Renewal fee | 10.11.2015 | Renewal fee patent year 03 | 10.11.2016 | Renewal fee patent year 04 | 13.11.2017 | Renewal fee patent year 05 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | AL | 27.06.2018 | AT | 27.06.2018 | CY | 27.06.2018 | CZ | 27.06.2018 | DK | 27.06.2018 | EE | 27.06.2018 | ES | 27.06.2018 | FI | 27.06.2018 | HR | 27.06.2018 | LT | 27.06.2018 | LV | 27.06.2018 | MC | 27.06.2018 | MK | 27.06.2018 | MT | 27.06.2018 | PT | 27.06.2018 | RO | 27.06.2018 | RS | 27.06.2018 | SI | 27.06.2018 | SK | 27.06.2018 | SM | 27.06.2018 | TR | 27.06.2018 | BG | 27.09.2018 | NO | 27.09.2018 | GR | 28.09.2018 | IS | 27.10.2018 | IE | 19.11.2018 | LU | 19.11.2018 | BE | 30.11.2018 | CH | 30.11.2018 | LI | 30.11.2018 | [2020/31] |
Former [2020/28] | AL | 27.06.2018 | |
AT | 27.06.2018 | ||
CZ | 27.06.2018 | ||
DK | 27.06.2018 | ||
EE | 27.06.2018 | ||
ES | 27.06.2018 | ||
FI | 27.06.2018 | ||
HR | 27.06.2018 | ||
LT | 27.06.2018 | ||
LV | 27.06.2018 | ||
MC | 27.06.2018 | ||
MT | 27.06.2018 | ||
PT | 27.06.2018 | ||
RO | 27.06.2018 | ||
RS | 27.06.2018 | ||
SI | 27.06.2018 | ||
SK | 27.06.2018 | ||
SM | 27.06.2018 | ||
TR | 27.06.2018 | ||
BG | 27.09.2018 | ||
NO | 27.09.2018 | ||
GR | 28.09.2018 | ||
IS | 27.10.2018 | ||
IE | 19.11.2018 | ||
LU | 19.11.2018 | ||
BE | 30.11.2018 | ||
CH | 30.11.2018 | ||
LI | 30.11.2018 | ||
Former [2020/16] | AL | 27.06.2018 | |
AT | 27.06.2018 | ||
CZ | 27.06.2018 | ||
DK | 27.06.2018 | ||
EE | 27.06.2018 | ||
ES | 27.06.2018 | ||
FI | 27.06.2018 | ||
HR | 27.06.2018 | ||
LT | 27.06.2018 | ||
LV | 27.06.2018 | ||
MC | 27.06.2018 | ||
MT | 27.06.2018 | ||
RO | 27.06.2018 | ||
RS | 27.06.2018 | ||
SI | 27.06.2018 | ||
SK | 27.06.2018 | ||
SM | 27.06.2018 | ||
TR | 27.06.2018 | ||
BG | 27.09.2018 | ||
NO | 27.09.2018 | ||
GR | 28.09.2018 | ||
IS | 27.10.2018 | ||
IE | 19.11.2018 | ||
LU | 19.11.2018 | ||
BE | 30.11.2018 | ||
CH | 30.11.2018 | ||
LI | 30.11.2018 | ||
Former [2020/08] | AL | 27.06.2018 | |
AT | 27.06.2018 | ||
CZ | 27.06.2018 | ||
DK | 27.06.2018 | ||
EE | 27.06.2018 | ||
ES | 27.06.2018 | ||
FI | 27.06.2018 | ||
HR | 27.06.2018 | ||
LT | 27.06.2018 | ||
LV | 27.06.2018 | ||
MC | 27.06.2018 | ||
MT | 27.06.2018 | ||
RO | 27.06.2018 | ||
RS | 27.06.2018 | ||
SI | 27.06.2018 | ||
SK | 27.06.2018 | ||
SM | 27.06.2018 | ||
BG | 27.09.2018 | ||
NO | 27.09.2018 | ||
GR | 28.09.2018 | ||
IS | 27.10.2018 | ||
IE | 19.11.2018 | ||
LU | 19.11.2018 | ||
BE | 30.11.2018 | ||
CH | 30.11.2018 | ||
LI | 30.11.2018 | ||
Former [2019/51] | AL | 27.06.2018 | |
AT | 27.06.2018 | ||
CZ | 27.06.2018 | ||
DK | 27.06.2018 | ||
EE | 27.06.2018 | ||
ES | 27.06.2018 | ||
FI | 27.06.2018 | ||
HR | 27.06.2018 | ||
LT | 27.06.2018 | ||
LV | 27.06.2018 | ||
MC | 27.06.2018 | ||
RO | 27.06.2018 | ||
RS | 27.06.2018 | ||
SI | 27.06.2018 | ||
SK | 27.06.2018 | ||
SM | 27.06.2018 | ||
BG | 27.09.2018 | ||
NO | 27.09.2018 | ||
GR | 28.09.2018 | ||
IS | 27.10.2018 | ||
IE | 19.11.2018 | ||
LU | 19.11.2018 | ||
BE | 30.11.2018 | ||
CH | 30.11.2018 | ||
LI | 30.11.2018 | ||
Former [2019/48] | AT | 27.06.2018 | |
CZ | 27.06.2018 | ||
DK | 27.06.2018 | ||
EE | 27.06.2018 | ||
ES | 27.06.2018 | ||
FI | 27.06.2018 | ||
HR | 27.06.2018 | ||
LT | 27.06.2018 | ||
LV | 27.06.2018 | ||
MC | 27.06.2018 | ||
RO | 27.06.2018 | ||
RS | 27.06.2018 | ||
SI | 27.06.2018 | ||
SK | 27.06.2018 | ||
SM | 27.06.2018 | ||
BG | 27.09.2018 | ||
NO | 27.09.2018 | ||
GR | 28.09.2018 | ||
IS | 27.10.2018 | ||
IE | 19.11.2018 | ||
LU | 19.11.2018 | ||
CH | 30.11.2018 | ||
LI | 30.11.2018 | ||
Former [2019/40] | AT | 27.06.2018 | |
CZ | 27.06.2018 | ||
DK | 27.06.2018 | ||
EE | 27.06.2018 | ||
ES | 27.06.2018 | ||
FI | 27.06.2018 | ||
HR | 27.06.2018 | ||
LT | 27.06.2018 | ||
LV | 27.06.2018 | ||
MC | 27.06.2018 | ||
RO | 27.06.2018 | ||
RS | 27.06.2018 | ||
SI | 27.06.2018 | ||
SK | 27.06.2018 | ||
SM | 27.06.2018 | ||
BG | 27.09.2018 | ||
NO | 27.09.2018 | ||
GR | 28.09.2018 | ||
IS | 27.10.2018 | ||
LU | 19.11.2018 | ||
CH | 30.11.2018 | ||
LI | 30.11.2018 | ||
Former [2019/37] | AT | 27.06.2018 | |
CZ | 27.06.2018 | ||
DK | 27.06.2018 | ||
EE | 27.06.2018 | ||
ES | 27.06.2018 | ||
FI | 27.06.2018 | ||
HR | 27.06.2018 | ||
LT | 27.06.2018 | ||
LV | 27.06.2018 | ||
MC | 27.06.2018 | ||
RO | 27.06.2018 | ||
RS | 27.06.2018 | ||
SI | 27.06.2018 | ||
SK | 27.06.2018 | ||
SM | 27.06.2018 | ||
BG | 27.09.2018 | ||
NO | 27.09.2018 | ||
GR | 28.09.2018 | ||
IS | 27.10.2018 | ||
LU | 19.11.2018 | ||
Former [2019/34] | AT | 27.06.2018 | |
CZ | 27.06.2018 | ||
DK | 27.06.2018 | ||
EE | 27.06.2018 | ||
ES | 27.06.2018 | ||
FI | 27.06.2018 | ||
HR | 27.06.2018 | ||
LT | 27.06.2018 | ||
LV | 27.06.2018 | ||
MC | 27.06.2018 | ||
RO | 27.06.2018 | ||
RS | 27.06.2018 | ||
SK | 27.06.2018 | ||
SM | 27.06.2018 | ||
BG | 27.09.2018 | ||
NO | 27.09.2018 | ||
GR | 28.09.2018 | ||
IS | 27.10.2018 | ||
LU | 19.11.2018 | ||
Former [2019/33] | AT | 27.06.2018 | |
CZ | 27.06.2018 | ||
DK | 27.06.2018 | ||
EE | 27.06.2018 | ||
ES | 27.06.2018 | ||
FI | 27.06.2018 | ||
HR | 27.06.2018 | ||
LT | 27.06.2018 | ||
LV | 27.06.2018 | ||
MC | 27.06.2018 | ||
RO | 27.06.2018 | ||
RS | 27.06.2018 | ||
SK | 27.06.2018 | ||
SM | 27.06.2018 | ||
BG | 27.09.2018 | ||
NO | 27.09.2018 | ||
GR | 28.09.2018 | ||
IS | 27.10.2018 | ||
Former [2019/26] | AT | 27.06.2018 | |
CZ | 27.06.2018 | ||
DK | 27.06.2018 | ||
EE | 27.06.2018 | ||
ES | 27.06.2018 | ||
FI | 27.06.2018 | ||
HR | 27.06.2018 | ||
LT | 27.06.2018 | ||
LV | 27.06.2018 | ||
RO | 27.06.2018 | ||
RS | 27.06.2018 | ||
SK | 27.06.2018 | ||
SM | 27.06.2018 | ||
BG | 27.09.2018 | ||
NO | 27.09.2018 | ||
GR | 28.09.2018 | ||
IS | 27.10.2018 | ||
Former [2019/12] | AT | 27.06.2018 | |
CZ | 27.06.2018 | ||
EE | 27.06.2018 | ||
ES | 27.06.2018 | ||
FI | 27.06.2018 | ||
HR | 27.06.2018 | ||
LT | 27.06.2018 | ||
LV | 27.06.2018 | ||
RO | 27.06.2018 | ||
RS | 27.06.2018 | ||
SK | 27.06.2018 | ||
SM | 27.06.2018 | ||
BG | 27.09.2018 | ||
NO | 27.09.2018 | ||
GR | 28.09.2018 | ||
IS | 27.10.2018 | ||
Former [2019/11] | AT | 27.06.2018 | |
CZ | 27.06.2018 | ||
EE | 27.06.2018 | ||
FI | 27.06.2018 | ||
HR | 27.06.2018 | ||
LT | 27.06.2018 | ||
LV | 27.06.2018 | ||
RO | 27.06.2018 | ||
RS | 27.06.2018 | ||
SK | 27.06.2018 | ||
SM | 27.06.2018 | ||
BG | 27.09.2018 | ||
NO | 27.09.2018 | ||
GR | 28.09.2018 | ||
IS | 27.10.2018 | ||
Former [2019/10] | AT | 27.06.2018 | |
CZ | 27.06.2018 | ||
EE | 27.06.2018 | ||
FI | 27.06.2018 | ||
HR | 27.06.2018 | ||
LT | 27.06.2018 | ||
LV | 27.06.2018 | ||
RO | 27.06.2018 | ||
RS | 27.06.2018 | ||
SK | 27.06.2018 | ||
BG | 27.09.2018 | ||
NO | 27.09.2018 | ||
GR | 28.09.2018 | ||
IS | 27.10.2018 | ||
Former [2019/09] | EE | 27.06.2018 | |
FI | 27.06.2018 | ||
HR | 27.06.2018 | ||
LT | 27.06.2018 | ||
LV | 27.06.2018 | ||
RS | 27.06.2018 | ||
BG | 27.09.2018 | ||
NO | 27.09.2018 | ||
GR | 28.09.2018 | ||
IS | 27.10.2018 | ||
Former [2019/08] | FI | 27.06.2018 | |
HR | 27.06.2018 | ||
LT | 27.06.2018 | ||
LV | 27.06.2018 | ||
RS | 27.06.2018 | ||
BG | 27.09.2018 | ||
NO | 27.09.2018 | ||
GR | 28.09.2018 | ||
IS | 27.10.2018 | ||
Former [2018/52] | FI | 27.06.2018 | |
HR | 27.06.2018 | ||
LT | 27.06.2018 | ||
LV | 27.06.2018 | ||
RS | 27.06.2018 | ||
BG | 27.09.2018 | ||
NO | 27.09.2018 | ||
GR | 28.09.2018 | ||
Former [2018/51] | FI | 27.06.2018 | |
HR | 27.06.2018 | ||
LT | 27.06.2018 | ||
LV | 27.06.2018 | ||
RS | 27.06.2018 | ||
BG | 27.09.2018 | ||
NO | 27.09.2018 | ||
Former [2018/50] | FI | 27.06.2018 | |
HR | 27.06.2018 | ||
LT | 27.06.2018 | ||
BG | 27.09.2018 | ||
NO | 27.09.2018 | ||
Former [2018/47] | FI | 27.06.2018 | |
LT | 27.06.2018 | ||
NO | 27.09.2018 | Cited in | International search | [X]WO2012108384 (SHARP KK [JP], et al) [X] 1-10 * paragraph [0035] - paragraph [0039]; example -; claim - *; | [AD]WO02053494 (HYDRO QUEBEC [CA], et al) [AD] 1-10 * example -; claim - *; | [AD]WO2007068822 (PHOSTECH LITHIUM INC [CA], et al) [AD] 1-10 * example 10 *; | [A]CN101654229 (UNIV HUAZHONG SCIENCE TECH) [A] 1-10 * example -; claim - * | Examination | WO2012108284 | EP2674395 |