| EP2935918 - METHOD FOR MANUFACTURING A BUTTERFLY VALVE IN AN AERONAUTICAL ENVIRONMENT [Right-click to bookmark this link] | |||
| Former [2015/44] | A METHOD FOR MANUFACTURING A BALL BEARING, NOTABLY FOR A BUTTERFLY VALVE IN AN AERONAUTICAL ENVIRONMENT | ||
| [2024/32] | Status | Patent maintained as amended Status updated on 11.10.2024 Database last updated on 11.04.2026 | |
| Former | The patent has been granted Status updated on 29.03.2019 | ||
| Former | Grant of patent is intended Status updated on 29.11.2018 | ||
| Former | Examination is in progress Status updated on 03.03.2017 | Most recent event Tooltip | 11.10.2024 | Patent maintained (B2 publication) | published on 13.11.2024 [2024/46] | Applicant(s) | For all designated states SKF Aerospace France 1 avenue Marc Seguin 26240 Saint-Vallier / FR | For all designated states Liebherr-Aerospace Toulouse SAS 408 avenue des Etats-Unis 31200 Toulouse / FR | [2024/46] |
| Former [2015/44] | For all designated states SKF Aerospace France 1 avenue Marc Seguin 26240 Saint-Vallier / FR | ||
| For all designated states Liebherr-Aerospace Toulouse SAS 408 avenue des Etats-Unis 31200 Toulouse / FR | Inventor(s) | 01 /
LE JEUNE, Gwénolé 165 rue des Tilleuls F-26210 Saint Sorlin en Valloire / FR | 02 /
MAHEO, Yves 7 clos de la Mady F-26140 Anneyron / FR | 03 /
ROCCHI, Jérôme Les Ennaudets route de Saint-Sulpice F-31380 Roqueseriere / FR | [2015/44] | Representative(s) | Lavoix 62, rue de Bonnel 69448 Lyon Cedex 03 / FR | [2019/18] |
| Former [2015/44] | Myon, Gérard Jean-Pierre, et al Cabinet Lavoix 62, rue de Bonnel 69003 Lyon / FR | Application number, filing date | 13818724.0 | 18.12.2013 | [2015/44] | WO2013EP77160 | Priority number, date | FR20120062632 | 21.12.2012 Original published format: FR 1262632 | [2015/44] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2014096047 | Date: | 26.06.2014 | Language: | EN | [2014/26] | Type: | A1 Application with search report | No.: | EP2935918 | Date: | 28.10.2015 | Language: | EN | The application published by WIPO in one of the EPO official languages on 26.06.2014 takes the place of the publication of the European patent application. | [2015/44] | Type: | B1 Patent specification | No.: | EP2935918 | Date: | 01.05.2019 | Language: | EN | [2019/18] | Type: | B2 New European patent specification | No.: | EP2935918 | Date: | 13.11.2024 | Language: | EN | [2024/46] | Search report(s) | International search report - published on: | EP | 26.06.2014 | Classification | IPC: | F16C33/62, F16C33/64, B22F3/10, B22F3/24, B22F5/00, C22C38/22, C22C38/24, C22C38/30, C22C38/36, F16K1/22 | [2024/33] | CPC: |
F16C33/62 (EP,US);
B22F3/10 (US);
B22F3/24 (US);
B22F5/00 (US);
C22C38/22 (EP,US);
C22C38/24 (EP,US);
C22C38/30 (EP,US);
C22C38/36 (EP,US);
F16C33/303 (EP,US);
F16C33/32 (EP,US);
F16C33/64 (EP,US);
F16K1/224 (EP,US);
B22F2003/247 (US);
B22F2003/248 (US);
F16C2204/66 (EP,US);
|
| Former IPC [2018/48] | F16C33/62, F16C33/64, B22F3/10, B22F3/24, B22F5/00, C22C38/22, C22C38/24, C22C38/30, C22C38/36 | ||
| Former IPC [2015/44] | F16C33/62, F16C33/64 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2015/44] | Title | German: | VERFAHREN ZUR HERSTELLUNG EINES LUFTFAHRTDROSSELVENTILS | [2024/32] | English: | METHOD FOR MANUFACTURING A BUTTERFLY VALVE IN AN AERONAUTICAL ENVIRONMENT | [2024/32] | French: | MÉTHODE DE FABRICATION D'UNE VANNE PAPILLON EN ENVIRONNEMENT AÉRONAUTIQUE | [2024/32] |
| Former [2015/44] | VERFAHREN ZUR HERSTELLUNG EINES KUGELLAGERS, INSBESONDERE FÜR EINE DROSSELKLAPPE IN EINER AERONAUTISCHEN UMGEBUNG | ||
| Former [2015/44] | A METHOD FOR MANUFACTURING A BALL BEARING, NOTABLY FOR A BUTTERFLY VALVE IN AN AERONAUTICAL ENVIRONMENT | ||
| Former [2015/44] | PROCÉDÉ DE FABRICATION D'UN ROULEMENT À BILLES, NOTAMMENT POUR UNE VANNE À PAPILLON DANS UN ENVIRONNEMENT AÉRONAUTIQUE | Entry into regional phase | 17.06.2015 | National basic fee paid | 17.06.2015 | Designation fee(s) paid | 17.06.2015 | Examination fee paid | Examination procedure | 17.06.2015 | Examination requested [2015/44] | 27.01.2016 | Amendment by applicant (claims and/or description) | 28.11.2016 | Observations by third parties | 06.03.2017 | Despatch of a communication from the examining division (Time limit: M04) | 05.07.2017 | Reply to a communication from the examining division | 27.02.2018 | Despatch of a communication from the examining division (Time limit: M04) | 26.06.2018 | Reply to a communication from the examining division | 06.07.2018 | Observations by third parties | 13.07.2018 | Observations by third parties | 30.11.2018 | Communication of intention to grant the patent | 21.03.2019 | Fee for grant paid | 21.03.2019 | Fee for publishing/printing paid | 21.03.2019 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 06.03.2017 | Opposition(s) | Opponent(s) | 01
29.01.2020
31.01.2020
ADMISSIBLE MinebeaMitsumi Technology Center Europe GmbH Minebea-Weg 1 78052 Villingen-Schwenningen / DE Opponent's representative Riebling, Peter Patentanwalt Postfach 31 60 88113 Lindau / DE | [N/P] |
| Former [2020/11] | |||
| Opponent(s) | 01
29.01.2020
31.01.2020
ADMISSIBLE MinebeaMitsumi Technology Center Europe GmbH Minebea-Weg 1 78052 Villingen-Schwenningen / DE Opponent's representative Riebling, Peter Patentanwalt Postfach 31 60 88113 Lindau / DE | ||
| Former [2020/10] | |||
| Opponent(s) | 01
29.01.2020
MinebeaMitsumi Technology Center Europe GmbH Minebea-Weg 1 78052 Villingen-Schwenningen / DE Opponent's representative Riebling, Peter Patentanwalt, Rennerle 10 88131 Lindau / DE | 14.02.2020 | Invitation to proprietor to file observations on the notice of opposition | 12.06.2020 | Reply of patent proprietor to notice(s) of opposition | 30.09.2021 | Date of oral proceedings | 27.01.2022 | Despatch of interlocutory decision in opposition | 27.01.2022 | Despatch of minutes of oral proceedings | 15.05.2024 | Legal effect of interlocutory decision in opposition | 11.07.2024 | Despatch of communication that the patent will be maintained as amended | Appeal following opposition | 21.02.2022 | Appeal received No. T0471/22 | 21.02.2022 | Payment of appeal fee | 08.04.2022 | Statement of grounds filed | 15.05.2024 | Result of appeal procedure: appeal of the opponent was rejected | 03.07.2024 | Despatch of the decision of the Board of Appeal | 15.05.2024 | Date of oral proceedings | Fees paid | Renewal fee | 30.12.2015 | Renewal fee patent year 03 | 30.12.2016 | Renewal fee patent year 04 | 28.12.2017 | Renewal fee patent year 05 | 31.12.2018 | Renewal fee patent year 06 |
| Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
| Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 18.12.2013 | AL | 01.05.2019 | AT | 01.05.2019 | CY | 01.05.2019 | CZ | 01.05.2019 | DK | 01.05.2019 | EE | 01.05.2019 | ES | 01.05.2019 | FI | 01.05.2019 | HR | 01.05.2019 | LT | 01.05.2019 | LV | 01.05.2019 | MC | 01.05.2019 | MK | 01.05.2019 | MT | 01.05.2019 | NL | 01.05.2019 | PL | 01.05.2019 | RO | 01.05.2019 | RS | 01.05.2019 | SE | 01.05.2019 | SI | 01.05.2019 | SK | 01.05.2019 | SM | 01.05.2019 | TR | 01.05.2019 | BG | 01.08.2019 | NO | 01.08.2019 | GR | 02.08.2019 | IS | 01.09.2019 | PT | 01.09.2019 | IE | 18.12.2019 | LU | 18.12.2019 | BE | 31.12.2019 | CH | 31.12.2019 | LI | 31.12.2019 | [2022/31] |
| Former [2021/34] | HU | 18.12.2013 | |
| AL | 01.05.2019 | ||
| AT | 01.05.2019 | ||
| CY | 01.05.2019 | ||
| CZ | 01.05.2019 | ||
| DK | 01.05.2019 | ||
| EE | 01.05.2019 | ||
| ES | 01.05.2019 | ||
| FI | 01.05.2019 | ||
| HR | 01.05.2019 | ||
| LT | 01.05.2019 | ||
| LV | 01.05.2019 | ||
| MC | 01.05.2019 | ||
| MT | 01.05.2019 | ||
| NL | 01.05.2019 | ||
| PL | 01.05.2019 | ||
| RO | 01.05.2019 | ||
| RS | 01.05.2019 | ||
| SE | 01.05.2019 | ||
| SI | 01.05.2019 | ||
| SK | 01.05.2019 | ||
| SM | 01.05.2019 | ||
| TR | 01.05.2019 | ||
| BG | 01.08.2019 | ||
| NO | 01.08.2019 | ||
| GR | 02.08.2019 | ||
| IS | 01.09.2019 | ||
| PT | 01.09.2019 | ||
| IE | 18.12.2019 | ||
| LU | 18.12.2019 | ||
| BE | 31.12.2019 | ||
| CH | 31.12.2019 | ||
| LI | 31.12.2019 | ||
| Former [2021/33] | HU | 18.12.2013 | |
| AL | 01.05.2019 | ||
| AT | 01.05.2019 | ||
| CY | 01.05.2019 | ||
| CZ | 01.05.2019 | ||
| DK | 01.05.2019 | ||
| EE | 01.05.2019 | ||
| ES | 01.05.2019 | ||
| FI | 01.05.2019 | ||
| HR | 01.05.2019 | ||
| LT | 01.05.2019 | ||
| LV | 01.05.2019 | ||
| MC | 01.05.2019 | ||
| NL | 01.05.2019 | ||
| PL | 01.05.2019 | ||
| RO | 01.05.2019 | ||
| RS | 01.05.2019 | ||
| SE | 01.05.2019 | ||
| SI | 01.05.2019 | ||
| SK | 01.05.2019 | ||
| SM | 01.05.2019 | ||
| TR | 01.05.2019 | ||
| BG | 01.08.2019 | ||
| NO | 01.08.2019 | ||
| GR | 02.08.2019 | ||
| IS | 01.09.2019 | ||
| PT | 01.09.2019 | ||
| IE | 18.12.2019 | ||
| LU | 18.12.2019 | ||
| BE | 31.12.2019 | ||
| CH | 31.12.2019 | ||
| LI | 31.12.2019 | ||
| Former [2021/26] | AL | 01.05.2019 | |
| AT | 01.05.2019 | ||
| CY | 01.05.2019 | ||
| CZ | 01.05.2019 | ||
| DK | 01.05.2019 | ||
| EE | 01.05.2019 | ||
| ES | 01.05.2019 | ||
| FI | 01.05.2019 | ||
| HR | 01.05.2019 | ||
| LT | 01.05.2019 | ||
| LV | 01.05.2019 | ||
| MC | 01.05.2019 | ||
| NL | 01.05.2019 | ||
| PL | 01.05.2019 | ||
| RO | 01.05.2019 | ||
| RS | 01.05.2019 | ||
| SE | 01.05.2019 | ||
| SI | 01.05.2019 | ||
| SK | 01.05.2019 | ||
| SM | 01.05.2019 | ||
| TR | 01.05.2019 | ||
| BG | 01.08.2019 | ||
| NO | 01.08.2019 | ||
| GR | 02.08.2019 | ||
| IS | 01.09.2019 | ||
| PT | 01.09.2019 | ||
| IE | 18.12.2019 | ||
| LU | 18.12.2019 | ||
| BE | 31.12.2019 | ||
| CH | 31.12.2019 | ||
| LI | 31.12.2019 | ||
| Former [2020/51] | AL | 01.05.2019 | |
| AT | 01.05.2019 | ||
| CZ | 01.05.2019 | ||
| DK | 01.05.2019 | ||
| EE | 01.05.2019 | ||
| ES | 01.05.2019 | ||
| FI | 01.05.2019 | ||
| HR | 01.05.2019 | ||
| LT | 01.05.2019 | ||
| LV | 01.05.2019 | ||
| MC | 01.05.2019 | ||
| NL | 01.05.2019 | ||
| PL | 01.05.2019 | ||
| RO | 01.05.2019 | ||
| RS | 01.05.2019 | ||
| SE | 01.05.2019 | ||
| SI | 01.05.2019 | ||
| SK | 01.05.2019 | ||
| SM | 01.05.2019 | ||
| TR | 01.05.2019 | ||
| BG | 01.08.2019 | ||
| NO | 01.08.2019 | ||
| GR | 02.08.2019 | ||
| IS | 01.09.2019 | ||
| PT | 01.09.2019 | ||
| IE | 18.12.2019 | ||
| LU | 18.12.2019 | ||
| BE | 31.12.2019 | ||
| CH | 31.12.2019 | ||
| LI | 31.12.2019 | ||
| Former [2020/46] | AL | 01.05.2019 | |
| AT | 01.05.2019 | ||
| CZ | 01.05.2019 | ||
| DK | 01.05.2019 | ||
| EE | 01.05.2019 | ||
| ES | 01.05.2019 | ||
| FI | 01.05.2019 | ||
| HR | 01.05.2019 | ||
| LT | 01.05.2019 | ||
| LV | 01.05.2019 | ||
| MC | 01.05.2019 | ||
| NL | 01.05.2019 | ||
| PL | 01.05.2019 | ||
| RO | 01.05.2019 | ||
| RS | 01.05.2019 | ||
| SE | 01.05.2019 | ||
| SI | 01.05.2019 | ||
| SK | 01.05.2019 | ||
| SM | 01.05.2019 | ||
| TR | 01.05.2019 | ||
| BG | 01.08.2019 | ||
| NO | 01.08.2019 | ||
| GR | 02.08.2019 | ||
| IS | 01.09.2019 | ||
| PT | 01.09.2019 | ||
| IE | 18.12.2019 | ||
| LU | 18.12.2019 | ||
| Former [2020/39] | AL | 01.05.2019 | |
| AT | 01.05.2019 | ||
| CZ | 01.05.2019 | ||
| DK | 01.05.2019 | ||
| EE | 01.05.2019 | ||
| ES | 01.05.2019 | ||
| FI | 01.05.2019 | ||
| HR | 01.05.2019 | ||
| LT | 01.05.2019 | ||
| LV | 01.05.2019 | ||
| MC | 01.05.2019 | ||
| NL | 01.05.2019 | ||
| PL | 01.05.2019 | ||
| RO | 01.05.2019 | ||
| RS | 01.05.2019 | ||
| SE | 01.05.2019 | ||
| SI | 01.05.2019 | ||
| SK | 01.05.2019 | ||
| SM | 01.05.2019 | ||
| TR | 01.05.2019 | ||
| BG | 01.08.2019 | ||
| NO | 01.08.2019 | ||
| GR | 02.08.2019 | ||
| IS | 01.09.2019 | ||
| PT | 01.09.2019 | ||
| Former [2020/25] | AL | 01.05.2019 | |
| AT | 01.05.2019 | ||
| CZ | 01.05.2019 | ||
| DK | 01.05.2019 | ||
| EE | 01.05.2019 | ||
| ES | 01.05.2019 | ||
| FI | 01.05.2019 | ||
| HR | 01.05.2019 | ||
| LT | 01.05.2019 | ||
| LV | 01.05.2019 | ||
| NL | 01.05.2019 | ||
| PL | 01.05.2019 | ||
| RO | 01.05.2019 | ||
| RS | 01.05.2019 | ||
| SE | 01.05.2019 | ||
| SI | 01.05.2019 | ||
| SK | 01.05.2019 | ||
| SM | 01.05.2019 | ||
| TR | 01.05.2019 | ||
| BG | 01.08.2019 | ||
| NO | 01.08.2019 | ||
| GR | 02.08.2019 | ||
| IS | 01.09.2019 | ||
| PT | 01.09.2019 | ||
| Former [2020/17] | AL | 01.05.2019 | |
| AT | 01.05.2019 | ||
| CZ | 01.05.2019 | ||
| DK | 01.05.2019 | ||
| EE | 01.05.2019 | ||
| ES | 01.05.2019 | ||
| FI | 01.05.2019 | ||
| HR | 01.05.2019 | ||
| LT | 01.05.2019 | ||
| LV | 01.05.2019 | ||
| NL | 01.05.2019 | ||
| RO | 01.05.2019 | ||
| RS | 01.05.2019 | ||
| SE | 01.05.2019 | ||
| SK | 01.05.2019 | ||
| SM | 01.05.2019 | ||
| TR | 01.05.2019 | ||
| BG | 01.08.2019 | ||
| NO | 01.08.2019 | ||
| GR | 02.08.2019 | ||
| IS | 01.09.2019 | ||
| PT | 01.09.2019 | ||
| Former [2020/14] | AL | 01.05.2019 | |
| AT | 01.05.2019 | ||
| CZ | 01.05.2019 | ||
| DK | 01.05.2019 | ||
| EE | 01.05.2019 | ||
| ES | 01.05.2019 | ||
| FI | 01.05.2019 | ||
| HR | 01.05.2019 | ||
| LT | 01.05.2019 | ||
| LV | 01.05.2019 | ||
| NL | 01.05.2019 | ||
| RO | 01.05.2019 | ||
| RS | 01.05.2019 | ||
| SE | 01.05.2019 | ||
| SK | 01.05.2019 | ||
| SM | 01.05.2019 | ||
| BG | 01.08.2019 | ||
| NO | 01.08.2019 | ||
| GR | 02.08.2019 | ||
| IS | 01.09.2019 | ||
| PT | 01.09.2019 | ||
| Former [2020/11] | AL | 01.05.2019 | |
| AT | 01.05.2019 | ||
| CZ | 01.05.2019 | ||
| DK | 01.05.2019 | ||
| EE | 01.05.2019 | ||
| ES | 01.05.2019 | ||
| FI | 01.05.2019 | ||
| HR | 01.05.2019 | ||
| LT | 01.05.2019 | ||
| LV | 01.05.2019 | ||
| NL | 01.05.2019 | ||
| RO | 01.05.2019 | ||
| RS | 01.05.2019 | ||
| SE | 01.05.2019 | ||
| SK | 01.05.2019 | ||
| BG | 01.08.2019 | ||
| NO | 01.08.2019 | ||
| GR | 02.08.2019 | ||
| IS | 01.09.2019 | ||
| PT | 01.09.2019 | ||
| Former [2020/10] | AL | 01.05.2019 | |
| AT | 01.05.2019 | ||
| CZ | 01.05.2019 | ||
| DK | 01.05.2019 | ||
| ES | 01.05.2019 | ||
| FI | 01.05.2019 | ||
| HR | 01.05.2019 | ||
| LT | 01.05.2019 | ||
| LV | 01.05.2019 | ||
| NL | 01.05.2019 | ||
| RO | 01.05.2019 | ||
| RS | 01.05.2019 | ||
| SE | 01.05.2019 | ||
| BG | 01.08.2019 | ||
| NO | 01.08.2019 | ||
| GR | 02.08.2019 | ||
| IS | 01.09.2019 | ||
| PT | 01.09.2019 | ||
| Former [2020/09] | AL | 01.05.2019 | |
| CZ | 01.05.2019 | ||
| DK | 01.05.2019 | ||
| ES | 01.05.2019 | ||
| FI | 01.05.2019 | ||
| HR | 01.05.2019 | ||
| LT | 01.05.2019 | ||
| LV | 01.05.2019 | ||
| NL | 01.05.2019 | ||
| RS | 01.05.2019 | ||
| SE | 01.05.2019 | ||
| BG | 01.08.2019 | ||
| NO | 01.08.2019 | ||
| GR | 02.08.2019 | ||
| IS | 01.09.2019 | ||
| PT | 01.09.2019 | ||
| Former [2020/04] | AL | 01.05.2019 | |
| ES | 01.05.2019 | ||
| FI | 01.05.2019 | ||
| HR | 01.05.2019 | ||
| LT | 01.05.2019 | ||
| LV | 01.05.2019 | ||
| NL | 01.05.2019 | ||
| RS | 01.05.2019 | ||
| SE | 01.05.2019 | ||
| BG | 01.08.2019 | ||
| NO | 01.08.2019 | ||
| GR | 02.08.2019 | ||
| IS | 01.09.2019 | ||
| PT | 01.09.2019 | ||
| Former [2019/51] | AL | 01.05.2019 | |
| ES | 01.05.2019 | ||
| FI | 01.05.2019 | ||
| HR | 01.05.2019 | ||
| LT | 01.05.2019 | ||
| LV | 01.05.2019 | ||
| NL | 01.05.2019 | ||
| RS | 01.05.2019 | ||
| SE | 01.05.2019 | ||
| BG | 01.08.2019 | ||
| NO | 01.08.2019 | ||
| GR | 02.08.2019 | ||
| PT | 01.09.2019 | ||
| Former [2019/50] | AL | 01.05.2019 | |
| ES | 01.05.2019 | ||
| FI | 01.05.2019 | ||
| HR | 01.05.2019 | ||
| LT | 01.05.2019 | ||
| LV | 01.05.2019 | ||
| NL | 01.05.2019 | ||
| RS | 01.05.2019 | ||
| SE | 01.05.2019 | ||
| NO | 01.08.2019 | ||
| GR | 02.08.2019 | ||
| PT | 01.09.2019 | ||
| Former [2019/49] | AL | 01.05.2019 | |
| ES | 01.05.2019 | ||
| FI | 01.05.2019 | ||
| HR | 01.05.2019 | ||
| LT | 01.05.2019 | ||
| NL | 01.05.2019 | ||
| SE | 01.05.2019 | ||
| NO | 01.08.2019 | ||
| PT | 01.09.2019 | ||
| Former [2019/48] | ES | 01.05.2019 | |
| FI | 01.05.2019 | ||
| LT | 01.05.2019 | ||
| SE | 01.05.2019 | ||
| NO | 01.08.2019 | ||
| PT | 01.09.2019 | ||
| Former [2019/47] | ES | 01.05.2019 | |
| FI | 01.05.2019 | ||
| LT | 01.05.2019 | ||
| NO | 01.08.2019 | Cited in | International search | [I] DE102005022730 (SCHAEFFLER KG et al.) [I] 1-5 * paragraph [0028] - paragraph [0033]; figures 1-7 * | [IA] DE102010019587 (SCHAEFFLER TECHNOLOGIES GMBH et al.) [I] 5-7 * paragraph [0010] - paragraph [0018] *[A] 1-4 | [A] US5108491 (MATSUMOTO YOICHI et al.) [A] 1-7 * column 3, line 16 - column 12, line 57; figures 1-9 * | Examination | EP2517805 | US7571742 | ERASTEEL: "Powder metallurgy HSS ASP@2060", N.N., 31 December 2012 (2012-12-31), pages 1 - 2, XP055329973 [P] | EUROPEAN POWDER METALLURGY ASSOCIATION: "Introduction to Powder Metallurgy The Process and Its Production", 1 January 1992 (1992-01-01), XP055330191, Retrieved from the Internet | SCHAEFFLER GROUP: "A Brief Introduction to Rolling Bearings", 1 January 2009 (2009-01-01), pages 1 - 16, XP055330175, Retrieved from the Internet | CAROL DAVIS: "MRC Bearing Services Hybrid Ceramic Ball Bearings Extended Service Life Extended Grease Life", 31 December 2002 (2002-12-31), www.bartlettbearing.com, pages 1 - 4, XP055094781, Retrieved from the Internet | EUROPEAN POWDER METALLURGY ASSOCIATION: "Powder Metallurgy Components: Production Cycle", 1 January 1990 (1990-01-01), pages 1, XP055330184, Retrieved from the Internet | other | WO2007021243 | US5525140 | US5578773 | EP2517805 | US7571742 | J.R. DAVIS: "Alloying: Understanding the Basics", 1 December 2001, ASM INTERNATIONAL, article "Tool Steels", pages: 210 - 233, XP055498750 DOI: http://dx.doi.org/10.1361/autb2001p210 | OLLE GRINDER: "The HIP way to make cleaner, better steels", METAL.POWDER.NET, October 2007 (2007-10-01), pages 16 - 22, XP022295091 DOI: http://dx.doi.org/10.1016/S0026-0657(07)70190-X | ANDERS THUVANDER ET AL.: "Material property database for heat treatment simulation of tool materials", STEEL RESEARCH, vol. 68, no. 3, 1997, pages 125 - 131, XP055498767 | Y. BIENVENU ET AL.: "Aciers rapides produits par metallurgie des poudres. Etat de I'art et perspectives", LA REVUE DE METALLURGIE-CIT/SCIENCE ET GENIE DES MATERIAUX, 4 April 1994 (1994-04-04), pages 693 - 706, XP055498771 | M. A. GOMES, A.S. WRONSKI, C.S. WRIGHT: "Fracture Behaviour of a Highly Alloyed High Speed Steel", FATIGUE & FRACTURE OF ENGINEERING MATERIALS & STRUCTURES, vol. 18, no. 1, 1 January 1995 (1995-01-01), pages 1 - 18, XP055501309 | Y.WENG ET AL.,: "Advanced Steels", 2011, SPRINGER-VERLAG BERLIN HEIDELBERG AND METALLURGICAL INDUSTRY PRESS, article LIZHI WU: "Developments and Challenges of China High-Speed Steel Industry over last Decade", pages: 453 - 461, XP055501313 [A] 1-4 | ERASTEEL: "Powder metallurgy HSS ASP@2060", 2012, pages 1 - 2, XP055329973 | EUROPEAN POWDER METALLURGY ASSOCIATION: "Introduction to Powder Metallurgy The Process and Its Production", 1992, XP055330191, Retrieved from the Internet | SCHAEFFLER GROUP: "A Brief Introduction to Rolling Bearings", 2009, pages 1 - 16, XP055330175, Retrieved from the Internet | CAROL DAVIS: "MRC Bearing Services Hybrid Ceramic Ball Bearings Extended Service Life Extended Grease Life", 2002, pages 1 - 4, XP055094781, Retrieved from the Internet | EUROPEAN POWDER METALLURGY ASSOCIATION: "Powder Metallurgy Components Production Cycle", 1990, XP055330184, Retrieved from the Internet | Opposition | EP2517805 | US7571742 | WO2007021243 | US5525140 | US5578773 | ERASTEEL: "Powder metallurgy HSS ASP@2060", 1 January 2012 (2012-01-01), pages 1 - 2, XP055329973 | INTRODUCTION TO POWDER METALLURGY, 1992, XP055330191 | A BRIEF INTRODUCTION TO ROLLING BEARINGS, 2009, XP055330175 | MRC HYBRID CERAMIC BALL BEARINGS, 2002 XP055094781 | POWDER METALLURGY COMPONENTS PRODUCTION CYCLE, 1990, XP055330184 | "Alloying: Understanding the Basics", 1 January 2001, ASM INTERNATIONAL, article ANONYMOUS: "Tool Steels", pages: 210 - 233, XP055498750, DOI: 10.1361/autb2001p210 DOI: http://dx.doi.org/10.1361/autb2001p210 | OLLE GRINDER: "The HIP way to make cleaner", BETTER STEELS, October 2007 (2007-10-01), pages 16 - 22, XP022295091, DOI: 10.1016/S0026-0657(07)70190-X DOI: http://dx.doi.org/10.1016/S0026-0657(07)70190-X | ANDERS THUVANDER ET AL.: "Material property database for heat treatment simulation of tool materials", STEEL RESEARCH, vol. 68, no. 3, 1997, pages 125 - 131, XP055498767 | Y. BIENVENU ET AL.: "Aciers rapides produits par metallurgie des poudres . Etat de I'art et perspectives", LA REVUE DE METALLURGIE- CIT/ SCIENCE ET GENIE DES MATERIAUX, 4 April 1994 (1994-04-04), pages 693 - 706, XP055498771 | M. A. GOMES, A.S. WRONSKI, C.S. WRIGHT: "Fracture Behaviour of a Highly Alloyed High Speed Steel", FATIGUE & FRACTURE OF ENGINEERING MATERIALS & STRUCTURES, vol. 18, no. 1, 1 January 1995 (1995-01-01), pages 1 - 18, XP055501309 | LIZHI WU ET AL.: "Developments and Challenges of China High-Speed Steel Industry over last Decade", ADVANCED STEELS, 2011, pages 453 - 461, XP055501313 | JOHN P. FRICK ET AL., WOLDMAN'S ENGINEERING ALLOYS, 2000, XP055676753, ISBN: 0-87170-691-1 | "2011 ASTM International Symposium on Rolling Element Bearings, Bearing Technology Exhibit", ASTM COMMITTEE F34 ON ROLLING ELEMENT BEARINGS, 13 April 2011 (2011-04-13), Anaheim, CA | OLIVIER LAURENT: "Updated Materials for Hardened Steel Bearing Components", HANDOUT OF THE PRESENTATION HELD ON 2011 ASTM INTERNATIONAL SYMPOSIUM ON ROLLING ELEMENT BEARINGS, BEARING TECHNOLOGY EXHIBIT, ASTM COMMITTEE F34 ON ROLLING ELEMENT BEARINGS, 13 April 2011 (2011-04-13), Anaheim, CA, XP055676758 | JOSEPH M. CAPUS, METAL POWDERS, A GLOBAL SURVEY OF PRODUCTION, APPLICATIONS AND MARKETS TO 2010, 2005, The Boulevard, Langford Lane, Kidlington, Oxford OX5 1 GB , UK, XP055676769, ISBN: 1856174794 | G. TOTTEN ET AL., HANDBOOK OF RESIDUAL STRESS AND DEFORMATION OF STEEL, Materials Park, XP055676786, ISBN: 0-87170-729-2 | GEORGE ROBERTS ET AL., TOOL STEELS, 1998, XP055676787 | JOO MANUEL GREGORIO MASCARENHAS, SINTERING BEHAVIOUR, MICROSTRUCTURE AND MECHANICAL PROPERTIES OF VANADIUM ENRICHED HIGH SPEED STEELS PROCESSED IN VACUUM AND NITROGEN RICH ATMOSPHERES, 1997, XP055676798 | OLIVIER LAURENT: "Updated Materials for Hardened Steel Bearing Components", HANDOUT OF THE PRESENTATION HELD ON 2011 ASTM INTERNATIONAL SYMPOSIUM ON ROLLING ELEMENT BEARINGS, BEARING TECHNOLOGY EXHIBIT, ASTM COMMITTEE F34 ON ROLLING ELEMENT BEARINGS, 13 April 2011 (2011-04-13), Anaheim, CA [P] |