EP2783271 - SUSPENSION ELEMENT HAVING INTEGRATED PIEZO MATERIAL FOR PROVIDING HAPTIC EFFECTS TO A TOUCH SCREEN [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 14.06.2019 Database last updated on 08.06.2024 | |
Former | The patent has been granted Status updated on 06.07.2018 | ||
Former | Grant of patent is intended Status updated on 08.01.2018 | ||
Former | Examination is in progress Status updated on 07.04.2017 | Most recent event Tooltip | 01.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 03.08.2022 [2022/31] | Applicant(s) | For all designated states Immersion Corporation 50 Rio Robles San Jose, CA 95134 / US | [2015/36] |
Former [2014/40] | For all designated states Immersion Corporation 30 Rio Robles San Jose, CA 95134 / US | Inventor(s) | 01 /
OLIEN, Neil 4455 Madison Ave. Montreal, QC H4B 2V3 / CA | 02 /
PARKER, Daniel 1044 Sunset Drive San Carlos, CA 94070 / US | 03 /
VISITACION, Allan 41555 Carol Common Fremont, CA 94538 / US | 04 /
JONES, Trevor 1166 El Solyo Ave Campbell, CA 95008 / US | 05 /
YE, Frank 139 Gerbera St Danville, CA 94056 / US | [2014/40] | Representative(s) | Hofstetter, Schurack & Partner Patent- und Rechtsanwaltskanzlei PartG mbB Balanstrasse 57 81541 München / DE | [2014/40] | Application number, filing date | 13822307.8 | 26.06.2013 | [2018/32] | WO2013US47893 | Priority number, date | US201213558475 | 26.07.2012 Original published format: US201213558475 | [2014/40] | Filing language | EN | Procedural language | EN | Publication | Type: | A2 Application without search report | No.: | WO2014018211 | Date: | 30.01.2014 | Language: | EN | [2014/05] | Type: | A2 Application without search report | No.: | EP2783271 | Date: | 01.10.2014 | Language: | EN | The application published by WIPO in one of the EPO official languages on 30.01.2014 takes the place of the publication of the European patent application. | [2014/40] | Type: | B1 Patent specification | No.: | EP2783271 | Date: | 08.08.2018 | Language: | EN | [2018/32] | Search report(s) | International search report - published on: | US | 13.03.2014 | (Supplementary) European search report - dispatched on: | EP | 24.09.2015 | Classification | IPC: | G06F3/041, G06F3/01, G06F3/048, H01L41/25, H01L41/311 | [2018/02] | CPC: |
G06F3/016 (EP,KR,US);
G06F3/041 (EP,KR,US);
G06F3/048 (US);
H10N30/03 (US);
H10N30/071 (US);
H10N30/09 (KR,US);
|
Former IPC [2015/43] | G06F3/041, G06F3/01 | ||
Former IPC [2014/40] | G06F3/041 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2014/40] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | AUFHÄNGUNGSELEMENT MIT INTEGRIERTEM PIEZOMATERIAL ZUR BEREITSTELLUNG HAPTISCHER EFFEKTE AUF EINEM BERÜHRUNGSBILDSCHIRM | [2014/40] | English: | SUSPENSION ELEMENT HAVING INTEGRATED PIEZO MATERIAL FOR PROVIDING HAPTIC EFFECTS TO A TOUCH SCREEN | [2014/40] | French: | ÉLÉMENT DE SUSPENSION COMPORTANT UN MATÉRIAU PIÉZOÉLECTRIQUE INTÉGRÉ POUR FOURNIR DES EFFETS HAPTIQUES À UN ÉCRAN TACTILE | [2014/40] | Entry into regional phase | 23.06.2014 | National basic fee paid | 23.06.2014 | Search fee paid | 23.06.2014 | Designation fee(s) paid | 23.06.2014 | Examination fee paid | Examination procedure | 23.06.2014 | Examination requested [2014/40] | 13.04.2016 | Amendment by applicant (claims and/or description) | 11.04.2017 | Despatch of a communication from the examining division (Time limit: M04) | 21.08.2017 | Reply to a communication from the examining division | 09.01.2018 | Communication of intention to grant the patent | 18.05.2018 | Fee for grant paid | 18.05.2018 | Fee for publishing/printing paid | 18.05.2018 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 11.04.2017 | Opposition(s) | 09.05.2019 | No opposition filed within time limit [2019/29] | Fees paid | Renewal fee | 29.06.2015 | Renewal fee patent year 03 | 27.06.2016 | Renewal fee patent year 04 | 27.06.2017 | Renewal fee patent year 05 | 27.06.2018 | Renewal fee patent year 06 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 26.06.2013 | AL | 08.08.2018 | AT | 08.08.2018 | CY | 08.08.2018 | CZ | 08.08.2018 | DK | 08.08.2018 | EE | 08.08.2018 | ES | 08.08.2018 | FI | 08.08.2018 | HR | 08.08.2018 | IT | 08.08.2018 | LT | 08.08.2018 | LV | 08.08.2018 | MC | 08.08.2018 | MK | 08.08.2018 | MT | 08.08.2018 | NL | 08.08.2018 | PL | 08.08.2018 | RO | 08.08.2018 | RS | 08.08.2018 | SE | 08.08.2018 | SI | 08.08.2018 | SK | 08.08.2018 | SM | 08.08.2018 | TR | 08.08.2018 | BG | 08.11.2018 | NO | 08.11.2018 | GR | 09.11.2018 | IS | 08.12.2018 | PT | 08.12.2018 | [2022/31] |
Former [2021/34] | HU | 26.06.2013 | |
AL | 08.08.2018 | ||
AT | 08.08.2018 | ||
CY | 08.08.2018 | ||
CZ | 08.08.2018 | ||
DK | 08.08.2018 | ||
EE | 08.08.2018 | ||
ES | 08.08.2018 | ||
FI | 08.08.2018 | ||
HR | 08.08.2018 | ||
IT | 08.08.2018 | ||
LT | 08.08.2018 | ||
LV | 08.08.2018 | ||
MC | 08.08.2018 | ||
MT | 08.08.2018 | ||
NL | 08.08.2018 | ||
PL | 08.08.2018 | ||
RO | 08.08.2018 | ||
RS | 08.08.2018 | ||
SE | 08.08.2018 | ||
SI | 08.08.2018 | ||
SK | 08.08.2018 | ||
SM | 08.08.2018 | ||
TR | 08.08.2018 | ||
BG | 08.11.2018 | ||
NO | 08.11.2018 | ||
GR | 09.11.2018 | ||
IS | 08.12.2018 | ||
PT | 08.12.2018 | ||
Former [2021/32] | HU | 26.06.2013 | |
AL | 08.08.2018 | ||
AT | 08.08.2018 | ||
CY | 08.08.2018 | ||
CZ | 08.08.2018 | ||
DK | 08.08.2018 | ||
EE | 08.08.2018 | ||
ES | 08.08.2018 | ||
FI | 08.08.2018 | ||
HR | 08.08.2018 | ||
IT | 08.08.2018 | ||
LT | 08.08.2018 | ||
LV | 08.08.2018 | ||
MC | 08.08.2018 | ||
NL | 08.08.2018 | ||
PL | 08.08.2018 | ||
RO | 08.08.2018 | ||
RS | 08.08.2018 | ||
SE | 08.08.2018 | ||
SI | 08.08.2018 | ||
SK | 08.08.2018 | ||
SM | 08.08.2018 | ||
TR | 08.08.2018 | ||
BG | 08.11.2018 | ||
NO | 08.11.2018 | ||
GR | 09.11.2018 | ||
IS | 08.12.2018 | ||
PT | 08.12.2018 | ||
Former [2021/26] | AL | 08.08.2018 | |
AT | 08.08.2018 | ||
CY | 08.08.2018 | ||
CZ | 08.08.2018 | ||
DK | 08.08.2018 | ||
EE | 08.08.2018 | ||
ES | 08.08.2018 | ||
FI | 08.08.2018 | ||
HR | 08.08.2018 | ||
IT | 08.08.2018 | ||
LT | 08.08.2018 | ||
LV | 08.08.2018 | ||
MC | 08.08.2018 | ||
NL | 08.08.2018 | ||
PL | 08.08.2018 | ||
RO | 08.08.2018 | ||
RS | 08.08.2018 | ||
SE | 08.08.2018 | ||
SI | 08.08.2018 | ||
SK | 08.08.2018 | ||
SM | 08.08.2018 | ||
TR | 08.08.2018 | ||
BG | 08.11.2018 | ||
NO | 08.11.2018 | ||
GR | 09.11.2018 | ||
IS | 08.12.2018 | ||
PT | 08.12.2018 | ||
Former [2020/29] | AL | 08.08.2018 | |
AT | 08.08.2018 | ||
CZ | 08.08.2018 | ||
DK | 08.08.2018 | ||
EE | 08.08.2018 | ||
ES | 08.08.2018 | ||
FI | 08.08.2018 | ||
HR | 08.08.2018 | ||
IT | 08.08.2018 | ||
LT | 08.08.2018 | ||
LV | 08.08.2018 | ||
MC | 08.08.2018 | ||
NL | 08.08.2018 | ||
PL | 08.08.2018 | ||
RO | 08.08.2018 | ||
RS | 08.08.2018 | ||
SE | 08.08.2018 | ||
SI | 08.08.2018 | ||
SK | 08.08.2018 | ||
SM | 08.08.2018 | ||
TR | 08.08.2018 | ||
BG | 08.11.2018 | ||
NO | 08.11.2018 | ||
GR | 09.11.2018 | ||
IS | 08.12.2018 | ||
PT | 08.12.2018 | ||
Former [2020/16] | AL | 08.08.2018 | |
AT | 08.08.2018 | ||
CZ | 08.08.2018 | ||
DK | 08.08.2018 | ||
EE | 08.08.2018 | ||
ES | 08.08.2018 | ||
FI | 08.08.2018 | ||
HR | 08.08.2018 | ||
IT | 08.08.2018 | ||
LT | 08.08.2018 | ||
LV | 08.08.2018 | ||
MC | 08.08.2018 | ||
NL | 08.08.2018 | ||
PL | 08.08.2018 | ||
RO | 08.08.2018 | ||
RS | 08.08.2018 | ||
SE | 08.08.2018 | ||
SI | 08.08.2018 | ||
SK | 08.08.2018 | ||
SM | 08.08.2018 | ||
TR | 08.08.2018 | ||
BG | 08.11.2018 | ||
NO | 08.11.2018 | ||
GR | 09.11.2018 | ||
IS | 08.12.2018 | ||
Former [2020/08] | AL | 08.08.2018 | |
AT | 08.08.2018 | ||
CZ | 08.08.2018 | ||
DK | 08.08.2018 | ||
EE | 08.08.2018 | ||
ES | 08.08.2018 | ||
FI | 08.08.2018 | ||
HR | 08.08.2018 | ||
IT | 08.08.2018 | ||
LT | 08.08.2018 | ||
LV | 08.08.2018 | ||
MC | 08.08.2018 | ||
NL | 08.08.2018 | ||
PL | 08.08.2018 | ||
RO | 08.08.2018 | ||
RS | 08.08.2018 | ||
SE | 08.08.2018 | ||
SI | 08.08.2018 | ||
SK | 08.08.2018 | ||
SM | 08.08.2018 | ||
BG | 08.11.2018 | ||
NO | 08.11.2018 | ||
GR | 09.11.2018 | ||
IS | 08.12.2018 | ||
Former [2019/37] | AL | 08.08.2018 | |
AT | 08.08.2018 | ||
CZ | 08.08.2018 | ||
DK | 08.08.2018 | ||
EE | 08.08.2018 | ||
ES | 08.08.2018 | ||
FI | 08.08.2018 | ||
HR | 08.08.2018 | ||
IT | 08.08.2018 | ||
LT | 08.08.2018 | ||
LV | 08.08.2018 | ||
NL | 08.08.2018 | ||
PL | 08.08.2018 | ||
RO | 08.08.2018 | ||
RS | 08.08.2018 | ||
SE | 08.08.2018 | ||
SI | 08.08.2018 | ||
SK | 08.08.2018 | ||
SM | 08.08.2018 | ||
BG | 08.11.2018 | ||
NO | 08.11.2018 | ||
GR | 09.11.2018 | ||
IS | 08.12.2018 | ||
Former [2019/26] | AL | 08.08.2018 | |
AT | 08.08.2018 | ||
CZ | 08.08.2018 | ||
DK | 08.08.2018 | ||
EE | 08.08.2018 | ||
ES | 08.08.2018 | ||
FI | 08.08.2018 | ||
HR | 08.08.2018 | ||
IT | 08.08.2018 | ||
LT | 08.08.2018 | ||
LV | 08.08.2018 | ||
NL | 08.08.2018 | ||
PL | 08.08.2018 | ||
RO | 08.08.2018 | ||
RS | 08.08.2018 | ||
SE | 08.08.2018 | ||
SK | 08.08.2018 | ||
SM | 08.08.2018 | ||
BG | 08.11.2018 | ||
NO | 08.11.2018 | ||
GR | 09.11.2018 | ||
IS | 08.12.2018 | ||
Former [2019/23] | AL | 08.08.2018 | |
AT | 08.08.2018 | ||
CZ | 08.08.2018 | ||
EE | 08.08.2018 | ||
ES | 08.08.2018 | ||
FI | 08.08.2018 | ||
HR | 08.08.2018 | ||
IT | 08.08.2018 | ||
LT | 08.08.2018 | ||
LV | 08.08.2018 | ||
NL | 08.08.2018 | ||
PL | 08.08.2018 | ||
RO | 08.08.2018 | ||
RS | 08.08.2018 | ||
SE | 08.08.2018 | ||
SK | 08.08.2018 | ||
BG | 08.11.2018 | ||
NO | 08.11.2018 | ||
GR | 09.11.2018 | ||
IS | 08.12.2018 | ||
Former [2019/22] | AL | 08.08.2018 | |
AT | 08.08.2018 | ||
CZ | 08.08.2018 | ||
FI | 08.08.2018 | ||
HR | 08.08.2018 | ||
IT | 08.08.2018 | ||
LT | 08.08.2018 | ||
LV | 08.08.2018 | ||
NL | 08.08.2018 | ||
PL | 08.08.2018 | ||
RO | 08.08.2018 | ||
RS | 08.08.2018 | ||
SE | 08.08.2018 | ||
BG | 08.11.2018 | ||
NO | 08.11.2018 | ||
GR | 09.11.2018 | ||
IS | 08.12.2018 | ||
Former [2019/21] | AL | 08.08.2018 | |
AT | 08.08.2018 | ||
FI | 08.08.2018 | ||
HR | 08.08.2018 | ||
IT | 08.08.2018 | ||
LT | 08.08.2018 | ||
LV | 08.08.2018 | ||
NL | 08.08.2018 | ||
PL | 08.08.2018 | ||
RS | 08.08.2018 | ||
SE | 08.08.2018 | ||
BG | 08.11.2018 | ||
NO | 08.11.2018 | ||
GR | 09.11.2018 | ||
IS | 08.12.2018 | ||
Former [2019/12] | AL | 08.08.2018 | |
AT | 08.08.2018 | ||
FI | 08.08.2018 | ||
HR | 08.08.2018 | ||
LT | 08.08.2018 | ||
LV | 08.08.2018 | ||
NL | 08.08.2018 | ||
PL | 08.08.2018 | ||
RS | 08.08.2018 | ||
SE | 08.08.2018 | ||
BG | 08.11.2018 | ||
NO | 08.11.2018 | ||
GR | 09.11.2018 | ||
IS | 08.12.2018 | ||
Former [2019/11] | AT | 08.08.2018 | |
FI | 08.08.2018 | ||
HR | 08.08.2018 | ||
LT | 08.08.2018 | ||
NL | 08.08.2018 | ||
PL | 08.08.2018 | ||
RS | 08.08.2018 | ||
SE | 08.08.2018 | ||
BG | 08.11.2018 | ||
NO | 08.11.2018 | ||
GR | 09.11.2018 | ||
IS | 08.12.2018 | ||
Former [2019/10] | AT | 08.08.2018 | |
FI | 08.08.2018 | ||
LT | 08.08.2018 | ||
NL | 08.08.2018 | ||
PL | 08.08.2018 | ||
RS | 08.08.2018 | ||
SE | 08.08.2018 | ||
BG | 08.11.2018 | ||
NO | 08.11.2018 | ||
GR | 09.11.2018 | ||
IS | 08.12.2018 | ||
Former [2019/09] | FI | 08.08.2018 | |
LT | 08.08.2018 | ||
NL | 08.08.2018 | ||
NO | 08.11.2018 | ||
IS | 08.12.2018 | ||
Former [2019/08] | FI | 08.08.2018 | |
LT | 08.08.2018 | ||
NO | 08.11.2018 | ||
IS | 08.12.2018 | ||
Former [2019/07] | LT | 08.08.2018 | Documents cited: | Search | [A]WO2010116962 (NAMIKI PRECISION JEWEL CO LTD [JP], et al) [A] 1-15 * figures 1-3 * * paragraph [0020] - paragraph [0030] *; | [XI]US2011032091 (PARK DONG SUN [KR], et al) [X] 1-3,6,7,10,12 * figures 1-13 * * paragraph [0007] - paragraph [0011] * * paragraph [0046] - paragraph [0086] * [I] 13,14; | [A]US2011053653 (THO GIHOON [KR], et al) [A] 1-15 * figures 1-12 * * paragraph [0065] ** paragraph [0122] - paragraph [0148] *; | [A]CN102221889 (AAC ACOUSTIC TECH SHENZHEN CO, et al) [A] 1-15 * abstract *; | [A]CN202094851U (AAC PHOTOELECTRIC TECHNOLOGY CHANGZHOU CO LTD, et al) [A] 1-15 * abstract *; | [I]WO2012002664 (HYSONIC CO LTD [KR], et al) [I] 1,2,6-8,11-14 * abstract *; | [X]WO2012067370 (HYSONIC CO LTD [KR], et al) [X] 1-3,6-8,10,12-14 * abstract *; | [XI]JP2012108402 (TDK CORP) [X] 1-3,6-8,10,12-14 * figures 1-6 * * paragraph [0013] - paragraph [0025] * [I] 4,5,9,11,15; | [P]US2012248935 (LIU LIN [CN], et al) [P] * abstract *; | [P]US2012326854 (LIU LIN [CN], et al) [P] * abstract *; | US2013229088 [ ] (JUNG HE WON [KR], et al) [ ] * figures 1-16 * * paragraph [0050] - paragraph [0145] *; | US2013285801 [ ] (JUNG HE WON [KR], et al) [ ] * figures 1-6 * * paragraph [0005] - paragraph [0012] * * paragraph [0035] - paragraph [0093] * | International search | [A]US2010045612 (MOELNE ANDERS [US]); | [A]US2010127140 (SMITH GARY [US]); | [Y]US2011043454 (MODARRES ALI [CA], et al); | [X]US2011227849 (OLIEN NEIL [CA], et al) | by applicant | US2008111788 | US2010245254 | JP2012108402 |