blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP2899525

EP2899525 - LEAKAGE ANALYSIS SYSTEM, LEAKAGE ANALYSIS APPARATUS, AND LEAKAGE DETECTION METHOD [Right-click to bookmark this link]
Former [2015/31]LEAKAGE ANALYSIS SYSTEM, MEASUREMENT TERMINAL, LEAKAGE ANALYSIS APPARATUS, AND LEAKAGE DETECTION METHOD
[2019/32]
StatusNo opposition filed within time limit
Status updated on  15.01.2021
Database last updated on 25.09.2024
FormerThe patent has been granted
Status updated on  07.02.2020
FormerGrant of patent is intended
Status updated on  04.02.2020
FormerRequest for examination was made
Status updated on  14.12.2019
FormerGrant of patent is intended
Status updated on  18.08.2019
Most recent event   Tooltip08.07.2022Lapse of the patent in a contracting state
New state(s): MK
published on 10.08.2022  [2022/32]
Applicant(s)For all designated states
NEC Corporation
7-1, Shiba 5-chome Minato-ku
Tokyo 108-8001 / JP
[2015/31]
Inventor(s)01 / HOSHUYAMA Osamu
c/o NEC Corporation
7-1 Shiba 5-chome
Minato-ku
Tokyo 108-8001 / JP
02 / ONO Yumi
c/o NEC Corporation
7-1 Shiba 5-chome
Minato-ku
Tokyo 108-8001 / JP
 [2015/31]
Representative(s)Vossius & Partner Patentanwälte Rechtsanwälte mbB
Siebertstrasse 3
81675 München / DE
[2015/31]
Application number, filing date13838384.918.09.2013
[2020/11]
WO2013JP75141
Priority number, dateJP2012020491618.09.2012         Original published format: JP 2012204916
[2015/31]
Filing languageJA
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2014046122
Date:27.03.2014
Language:JA
[2014/13]
Type: A1 Application with search report 
No.:EP2899525
Date:29.07.2015
Language:EN
[2015/31]
Type: B1 Patent specification 
No.:EP2899525
Date:11.03.2020
Language:EN
[2020/11]
Search report(s)International search report - published on:JP27.03.2014
(Supplementary) European search report - dispatched on:EP14.10.2016
ClassificationIPC:G01M3/24, G01C21/34, G06Q10/04
[2016/46]
CPC:
F17D5/06 (EP,US); G01M3/00 (US); G01B21/16 (US);
G01C21/3407 (EP,US); G01M3/243 (EP,US)
Former IPC [2015/31]G01M3/24
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2015/31]
Extension statesBANot yet paid
MENot yet paid
TitleGerman:LECKANALYSESYSTEM, LECKANALYSEVORRICHTUNG UND LECKDETEKTIONSVERFAHREN[2019/32]
English:LEAKAGE ANALYSIS SYSTEM, LEAKAGE ANALYSIS APPARATUS, AND LEAKAGE DETECTION METHOD[2019/32]
French:SYSTÈME D'ANALYSE DE FUITE, APPAREIL D'ANALYSE DE FUITE ET PROCÉDÉ DE DÉTECTION DE FUITE[2019/32]
Former [2015/31]LECKANALYSESYSTEM, MESSENDGERÄT, LECKANALYSEVORRICHTUNG UND LECKDETEKTIONSVERFAHREN
Former [2015/31]LEAKAGE ANALYSIS SYSTEM, MEASUREMENT TERMINAL, LEAKAGE ANALYSIS APPARATUS, AND LEAKAGE DETECTION METHOD
Former [2015/31]SYSTÈME D'ANALYSE DE FUITE, TERMINAL DE MESURE, APPAREIL D'ANALYSE DE FUITE ET PROCÉDÉ DE DÉTECTION DE FUITE
Entry into regional phase17.03.2015Translation filed 
17.04.2015National basic fee paid 
17.04.2015Search fee paid 
17.04.2015Designation fee(s) paid 
17.04.2015Examination fee paid 
Examination procedure17.04.2015Examination requested  [2015/31]
08.05.2017Amendment by applicant (claims and/or description)
19.08.2019Communication of intention to grant the patent
12.12.2019Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO
12.12.2019Fee for grant paid
12.12.2019Fee for publishing/printing paid
04.02.2020Information about intention to grant a patent
04.02.2020Receipt of the translation of the claim(s)
Divisional application(s)The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  19.08.2019
Opposition(s)14.12.2020No opposition filed within time limit [2021/07]
Fees paidRenewal fee
23.09.2015Renewal fee patent year 03
23.09.2016Renewal fee patent year 04
12.09.2017Renewal fee patent year 05
11.09.2018Renewal fee patent year 06
13.09.2019Renewal fee patent year 07
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU18.09.2013
AL11.03.2020
AT11.03.2020
CY11.03.2020
CZ11.03.2020
DK11.03.2020
EE11.03.2020
ES11.03.2020
FI11.03.2020
HR11.03.2020
IT11.03.2020
LT11.03.2020
LV11.03.2020
MC11.03.2020
MK11.03.2020
MT11.03.2020
NL11.03.2020
PL11.03.2020
RO11.03.2020
RS11.03.2020
SE11.03.2020
SI11.03.2020
SK11.03.2020
SM11.03.2020
TR11.03.2020
BG11.06.2020
NO11.06.2020
GR12.06.2020
IS11.07.2020
PT05.08.2020
IE18.09.2020
LU18.09.2020
BE30.09.2020
CH30.09.2020
FR30.09.2020
LI30.09.2020
[2022/31]
Former [2022/30]HU18.09.2013
AL11.03.2020
AT11.03.2020
CY11.03.2020
CZ11.03.2020
DK11.03.2020
EE11.03.2020
ES11.03.2020
FI11.03.2020
HR11.03.2020
IT11.03.2020
LT11.03.2020
LV11.03.2020
MC11.03.2020
MT11.03.2020
NL11.03.2020
PL11.03.2020
RO11.03.2020
RS11.03.2020
SE11.03.2020
SI11.03.2020
SK11.03.2020
SM11.03.2020
TR11.03.2020
BG11.06.2020
NO11.06.2020
GR12.06.2020
IS11.07.2020
PT05.08.2020
IE18.09.2020
LU18.09.2020
BE30.09.2020
CH30.09.2020
FR30.09.2020
LI30.09.2020
Former [2022/27]HU18.09.2013
AT11.03.2020
CY11.03.2020
CZ11.03.2020
DK11.03.2020
EE11.03.2020
ES11.03.2020
FI11.03.2020
HR11.03.2020
IT11.03.2020
LT11.03.2020
LV11.03.2020
MC11.03.2020
MT11.03.2020
NL11.03.2020
PL11.03.2020
RO11.03.2020
RS11.03.2020
SE11.03.2020
SI11.03.2020
SK11.03.2020
SM11.03.2020
TR11.03.2020
BG11.06.2020
NO11.06.2020
GR12.06.2020
IS11.07.2020
PT05.08.2020
IE18.09.2020
LU18.09.2020
BE30.09.2020
CH30.09.2020
FR30.09.2020
LI30.09.2020
Former [2022/26]AT11.03.2020
CZ11.03.2020
DK11.03.2020
EE11.03.2020
ES11.03.2020
FI11.03.2020
HR11.03.2020
IT11.03.2020
LT11.03.2020
LV11.03.2020
MC11.03.2020
NL11.03.2020
PL11.03.2020
RO11.03.2020
RS11.03.2020
SE11.03.2020
SI11.03.2020
SK11.03.2020
SM11.03.2020
TR11.03.2020
BG11.06.2020
NO11.06.2020
GR12.06.2020
IS11.07.2020
PT05.08.2020
IE18.09.2020
LU18.09.2020
BE30.09.2020
CH30.09.2020
FR30.09.2020
LI30.09.2020
Former [2021/37]AT11.03.2020
CZ11.03.2020
DK11.03.2020
EE11.03.2020
ES11.03.2020
FI11.03.2020
HR11.03.2020
IT11.03.2020
LT11.03.2020
LV11.03.2020
MC11.03.2020
NL11.03.2020
PL11.03.2020
RO11.03.2020
RS11.03.2020
SE11.03.2020
SI11.03.2020
SK11.03.2020
SM11.03.2020
BG11.06.2020
NO11.06.2020
GR12.06.2020
IS11.07.2020
PT05.08.2020
IE18.09.2020
LU18.09.2020
BE30.09.2020
CH30.09.2020
FR30.09.2020
LI30.09.2020
Former [2021/36]AT11.03.2020
CZ11.03.2020
DK11.03.2020
EE11.03.2020
ES11.03.2020
FI11.03.2020
HR11.03.2020
IT11.03.2020
LT11.03.2020
LV11.03.2020
MC11.03.2020
NL11.03.2020
PL11.03.2020
RO11.03.2020
RS11.03.2020
SE11.03.2020
SI11.03.2020
SK11.03.2020
SM11.03.2020
BG11.06.2020
NO11.06.2020
GR12.06.2020
IS11.07.2020
PT05.08.2020
LU18.09.2020
BE30.09.2020
FR30.09.2020
Former [2021/35]AT11.03.2020
CZ11.03.2020
DK11.03.2020
EE11.03.2020
ES11.03.2020
FI11.03.2020
HR11.03.2020
IT11.03.2020
LT11.03.2020
LV11.03.2020
MC11.03.2020
NL11.03.2020
PL11.03.2020
RO11.03.2020
RS11.03.2020
SE11.03.2020
SI11.03.2020
SK11.03.2020
SM11.03.2020
BG11.06.2020
NO11.06.2020
GR12.06.2020
IS11.07.2020
PT05.08.2020
LU18.09.2020
FR30.09.2020
Former [2021/27]AT11.03.2020
CZ11.03.2020
DK11.03.2020
EE11.03.2020
ES11.03.2020
FI11.03.2020
HR11.03.2020
IT11.03.2020
LT11.03.2020
LV11.03.2020
MC11.03.2020
NL11.03.2020
PL11.03.2020
RO11.03.2020
RS11.03.2020
SE11.03.2020
SI11.03.2020
SK11.03.2020
SM11.03.2020
BG11.06.2020
NO11.06.2020
GR12.06.2020
IS11.07.2020
PT05.08.2020
LU18.09.2020
Former [2021/23]AT11.03.2020
CZ11.03.2020
DK11.03.2020
EE11.03.2020
ES11.03.2020
FI11.03.2020
HR11.03.2020
IT11.03.2020
LT11.03.2020
LV11.03.2020
MC11.03.2020
NL11.03.2020
PL11.03.2020
RO11.03.2020
RS11.03.2020
SE11.03.2020
SI11.03.2020
SK11.03.2020
SM11.03.2020
BG11.06.2020
NO11.06.2020
GR12.06.2020
IS11.07.2020
PT05.08.2020
Former [2021/10]AT11.03.2020
CZ11.03.2020
DK11.03.2020
EE11.03.2020
ES11.03.2020
FI11.03.2020
HR11.03.2020
IT11.03.2020
LT11.03.2020
LV11.03.2020
NL11.03.2020
PL11.03.2020
RO11.03.2020
RS11.03.2020
SE11.03.2020
SI11.03.2020
SK11.03.2020
SM11.03.2020
BG11.06.2020
NO11.06.2020
GR12.06.2020
IS11.07.2020
PT05.08.2020
Former [2021/09]AT11.03.2020
CZ11.03.2020
DK11.03.2020
EE11.03.2020
ES11.03.2020
FI11.03.2020
HR11.03.2020
IT11.03.2020
LT11.03.2020
LV11.03.2020
NL11.03.2020
RO11.03.2020
RS11.03.2020
SE11.03.2020
SK11.03.2020
SM11.03.2020
BG11.06.2020
NO11.06.2020
GR12.06.2020
IS11.07.2020
PT05.08.2020
Former [2021/08]CZ11.03.2020
DK11.03.2020
EE11.03.2020
ES11.03.2020
FI11.03.2020
HR11.03.2020
LT11.03.2020
LV11.03.2020
NL11.03.2020
RO11.03.2020
RS11.03.2020
SE11.03.2020
SK11.03.2020
SM11.03.2020
BG11.06.2020
NO11.06.2020
GR12.06.2020
IS11.07.2020
PT05.08.2020
Former [2020/50]CZ11.03.2020
EE11.03.2020
FI11.03.2020
HR11.03.2020
LT11.03.2020
LV11.03.2020
NL11.03.2020
RO11.03.2020
RS11.03.2020
SE11.03.2020
SK11.03.2020
SM11.03.2020
BG11.06.2020
NO11.06.2020
GR12.06.2020
IS11.07.2020
PT05.08.2020
Former [2020/49]CZ11.03.2020
FI11.03.2020
HR11.03.2020
LT11.03.2020
LV11.03.2020
NL11.03.2020
RO11.03.2020
RS11.03.2020
SE11.03.2020
SK11.03.2020
SM11.03.2020
BG11.06.2020
NO11.06.2020
GR12.06.2020
IS11.07.2020
PT05.08.2020
Former [2020/48]FI11.03.2020
HR11.03.2020
LT11.03.2020
LV11.03.2020
NL11.03.2020
RO11.03.2020
RS11.03.2020
SE11.03.2020
SM11.03.2020
BG11.06.2020
NO11.06.2020
GR12.06.2020
IS11.07.2020
PT05.08.2020
Former [2020/47]FI11.03.2020
HR11.03.2020
LT11.03.2020
LV11.03.2020
NL11.03.2020
RS11.03.2020
SE11.03.2020
BG11.06.2020
NO11.06.2020
GR12.06.2020
IS11.07.2020
Former [2020/46]FI11.03.2020
HR11.03.2020
LV11.03.2020
NL11.03.2020
RS11.03.2020
SE11.03.2020
BG11.06.2020
NO11.06.2020
GR12.06.2020
IS11.07.2020
Former [2020/45]FI11.03.2020
HR11.03.2020
LV11.03.2020
NL11.03.2020
RS11.03.2020
SE11.03.2020
BG11.06.2020
NO11.06.2020
GR12.06.2020
Former [2020/39]FI11.03.2020
HR11.03.2020
LV11.03.2020
RS11.03.2020
SE11.03.2020
BG11.06.2020
NO11.06.2020
GR12.06.2020
Former [2020/38]FI11.03.2020
HR11.03.2020
LV11.03.2020
RS11.03.2020
SE11.03.2020
NO11.06.2020
GR12.06.2020
Former [2020/37]FI11.03.2020
HR11.03.2020
LV11.03.2020
RS11.03.2020
SE11.03.2020
NO11.06.2020
Former [2020/35]FI11.03.2020
NO11.06.2020
Documents cited:Search[A]US6567006  (LANDER PAUL [US], et al) [A] 1-13* column 9, line 58 - column 10, line 10; figure 9; claims 1,6 *;
 [A]EP1371962  (TLV CO LTD [JP]) [A] 1-13 * paragraphs [0073] - [0075]; claims 1,3 *;
 [XA]WO2012059108  (NKT CABLES GROUP AS [DK], et al) [X] 1,7,10,11 * claim 1 * [A] 2-6,8,9,12,13;
 [XAI]WO2012101646  (AQUARIUS SPECTRUM LTD [IL], et al) [X] 1,2,7,8,10-12 * page 7, line 30 - page 8, line 7; figure 2; claims 1,2 * [A] 4,6 [I] 3,5,9,13
International search[A]JPH1114492  (MITSUI SHIPBUILDING ENG);
 [A]JP2005043321  (HOSONO KAZUE, et al);
 [A]JP2008051776  (TOSHIBA CORP)
ExaminationWO2007100191
by applicantJP2008051776
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.