EP2905909 - METHOD AND APPARATUS FOR TRANSRECEIVING DOWNLINK SIGNAL BY CONSIDERING ANTENNA PORT RELATIONSHIP IN WIRELESS COMMUNICATION SYSTEM [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 21.06.2019 Database last updated on 22.05.2024 | |
Former | The patent has been granted Status updated on 13.07.2018 | ||
Former | Grant of patent is intended Status updated on 04.03.2018 | Most recent event Tooltip | 03.07.2020 | Lapse of the patent in a contracting state New state(s): CY, HU, MK | published on 05.08.2020 [2020/32] | Applicant(s) | For all designated states LG Electronics Inc. 20, Yeouido-dong Yeongdeungpo-gu Seoul 150-721 / KR | [2015/33] | Inventor(s) | 01 /
PARK, Jonghyun LG Institute 533 Hogye 1(il)-dong Dongan-gu Anyang-si Gyeonggi-do 431-080 / KR | 02 /
SEO, Inkwon LG Institute 533 Hogye 1(il)-dong Dongan-gu Anyang-si Gyeonggi-do 431-080 / KR | 03 /
SEO, Hanbyul LG Institute 533 Hogye 1(il)-dong Dongan-gu Anyang-si Gyeonggi-do 431-080 / KR | 04 /
KIM, Kijun LG Institute 533 Hogye 1(il)-dong Dongan-gu Anyang-si Gyeonggi-do 431-080 / KR | 05 /
YANG, Suckchel LG Institute 533 Hogye 1(il)-dong Dongan-gu Anyang-si Gyeonggi-do 431-080 / KR | [2015/33] | Representative(s) | Frenkel, Matthias Alexander Wuesthoff & Wuesthoff Patentanwälte und Rechtsanwalt PartG mbB Schweigerstraße 2 81541 München / DE | [N/P] |
Former [2015/33] | Frenkel, Matthias Alexander Wuesthoff & Wuesthoff Patentanwälte PartG mbB Schweigerstrasse 2 81541 München / DE | Application number, filing date | 13844260.3 | 04.10.2013 | [2015/33] | WO2013KR08872 | Priority number, date | US201261709975P | 04.10.2012 Original published format: US 201261709975 P | US201261713616P | 14.10.2012 Original published format: US 201261713616 P | US201261714729P | 16.10.2012 Original published format: US 201261714729 P | US201261724304P | 09.11.2012 Original published format: US 201261724304 P | US201261729301P | 21.11.2012 Original published format: US 201261729301 P | [2015/33] | Filing language | KO | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2014054901 | Date: | 10.04.2014 | Language: | KO | [2014/15] | Type: | A1 Application with search report | No.: | EP2905909 | Date: | 12.08.2015 | Language: | EN | [2015/33] | Type: | B1 Patent specification | No.: | EP2905909 | Date: | 15.08.2018 | Language: | EN | [2018/33] | Search report(s) | International search report - published on: | KR | 10.04.2014 | (Supplementary) European search report - dispatched on: | EP | 24.03.2016 | Classification | IPC: | H04B7/26, H04B7/04, H04L5/00 | [2016/17] | CPC: |
H04B7/0473 (EP,CN,US);
H04W72/23 (US);
H04L5/0048 (EP,US);
H04L5/0053 (EP,US);
H04W24/00 (EP,US);
H04W28/18 (EP,CN,US);
|
Former IPC [2015/33] | H04B7/26, H04B7/04 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2015/33] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | VERFAHREN UND VORRICHTUNG ZUM SENDEN/EMPFANGEN EINES DOWNLINK-SIGNALS UNTER BERÜCKSICHTIGUNG DER ANTENNENANSCHLUSSBEZIEHUNG IN EINEM DRAHTLOSEN KOMMUNIKATIONSSYSTEM | [2015/33] | English: | METHOD AND APPARATUS FOR TRANSRECEIVING DOWNLINK SIGNAL BY CONSIDERING ANTENNA PORT RELATIONSHIP IN WIRELESS COMMUNICATION SYSTEM | [2015/33] | French: | PROCÉDÉ ET APPAREIL CONÇUS POUR L'ÉMISSION/RÉCEPTION D'UN SIGNAL DESCENDANT PAR PRISE EN COMPTE DE LA RELATION DES PORTS D'ANTENNE DANS UN SYSTÈME DE COMMUNICATION SANS FIL | [2015/33] | Entry into regional phase | 10.02.2015 | Translation filed | 10.02.2015 | National basic fee paid | 10.02.2015 | Search fee paid | 10.02.2015 | Designation fee(s) paid | 10.02.2015 | Examination fee paid | Examination procedure | 10.02.2015 | Examination requested [2015/33] | 28.07.2016 | Amendment by applicant (claims and/or description) | 05.03.2018 | Communication of intention to grant the patent | 03.07.2018 | Fee for grant paid | 03.07.2018 | Fee for publishing/printing paid | 03.07.2018 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 05.03.2018 | Opposition(s) | 16.05.2019 | No opposition filed within time limit [2019/30] | Fees paid | Renewal fee | 26.10.2015 | Renewal fee patent year 03 | 21.10.2016 | Renewal fee patent year 04 | 25.10.2017 | Renewal fee patent year 05 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 04.10.2013 | AL | 15.08.2018 | AT | 15.08.2018 | CY | 15.08.2018 | CZ | 15.08.2018 | DK | 15.08.2018 | EE | 15.08.2018 | ES | 15.08.2018 | FI | 15.08.2018 | HR | 15.08.2018 | IT | 15.08.2018 | LT | 15.08.2018 | LV | 15.08.2018 | MC | 15.08.2018 | MK | 15.08.2018 | PL | 15.08.2018 | PT | 15.08.2018 | RO | 15.08.2018 | RS | 15.08.2018 | SE | 15.08.2018 | SI | 15.08.2018 | SK | 15.08.2018 | SM | 15.08.2018 | TR | 15.08.2018 | IE | 04.10.2018 | LU | 04.10.2018 | MT | 04.10.2018 | BE | 31.10.2018 | CH | 31.10.2018 | LI | 31.10.2018 | BG | 15.11.2018 | NO | 15.11.2018 | GR | 16.11.2018 | IS | 15.12.2018 | [2020/31] |
Former [2020/28] | AL | 15.08.2018 | |
AT | 15.08.2018 | ||
CZ | 15.08.2018 | ||
DK | 15.08.2018 | ||
EE | 15.08.2018 | ||
ES | 15.08.2018 | ||
FI | 15.08.2018 | ||
HR | 15.08.2018 | ||
IT | 15.08.2018 | ||
LT | 15.08.2018 | ||
LV | 15.08.2018 | ||
MC | 15.08.2018 | ||
PL | 15.08.2018 | ||
PT | 15.08.2018 | ||
RO | 15.08.2018 | ||
RS | 15.08.2018 | ||
SE | 15.08.2018 | ||
SI | 15.08.2018 | ||
SK | 15.08.2018 | ||
SM | 15.08.2018 | ||
TR | 15.08.2018 | ||
IE | 04.10.2018 | ||
LU | 04.10.2018 | ||
MT | 04.10.2018 | ||
BE | 31.10.2018 | ||
CH | 31.10.2018 | ||
LI | 31.10.2018 | ||
BG | 15.11.2018 | ||
NO | 15.11.2018 | ||
GR | 16.11.2018 | ||
IS | 15.12.2018 | ||
Former [2020/16] | AL | 15.08.2018 | |
AT | 15.08.2018 | ||
CZ | 15.08.2018 | ||
DK | 15.08.2018 | ||
EE | 15.08.2018 | ||
ES | 15.08.2018 | ||
FI | 15.08.2018 | ||
HR | 15.08.2018 | ||
IT | 15.08.2018 | ||
LT | 15.08.2018 | ||
LV | 15.08.2018 | ||
MC | 15.08.2018 | ||
PL | 15.08.2018 | ||
RO | 15.08.2018 | ||
RS | 15.08.2018 | ||
SE | 15.08.2018 | ||
SI | 15.08.2018 | ||
SK | 15.08.2018 | ||
SM | 15.08.2018 | ||
TR | 15.08.2018 | ||
IE | 04.10.2018 | ||
LU | 04.10.2018 | ||
MT | 04.10.2018 | ||
BE | 31.10.2018 | ||
CH | 31.10.2018 | ||
LI | 31.10.2018 | ||
BG | 15.11.2018 | ||
NO | 15.11.2018 | ||
GR | 16.11.2018 | ||
IS | 15.12.2018 | ||
Former [2020/08] | AL | 15.08.2018 | |
AT | 15.08.2018 | ||
CZ | 15.08.2018 | ||
DK | 15.08.2018 | ||
EE | 15.08.2018 | ||
ES | 15.08.2018 | ||
FI | 15.08.2018 | ||
HR | 15.08.2018 | ||
IT | 15.08.2018 | ||
LT | 15.08.2018 | ||
LV | 15.08.2018 | ||
MC | 15.08.2018 | ||
PL | 15.08.2018 | ||
RO | 15.08.2018 | ||
RS | 15.08.2018 | ||
SE | 15.08.2018 | ||
SI | 15.08.2018 | ||
SK | 15.08.2018 | ||
SM | 15.08.2018 | ||
IE | 04.10.2018 | ||
LU | 04.10.2018 | ||
MT | 04.10.2018 | ||
BE | 31.10.2018 | ||
CH | 31.10.2018 | ||
LI | 31.10.2018 | ||
BG | 15.11.2018 | ||
NO | 15.11.2018 | ||
GR | 16.11.2018 | ||
IS | 15.12.2018 | ||
Former [2019/48] | AL | 15.08.2018 | |
AT | 15.08.2018 | ||
CZ | 15.08.2018 | ||
DK | 15.08.2018 | ||
EE | 15.08.2018 | ||
ES | 15.08.2018 | ||
FI | 15.08.2018 | ||
HR | 15.08.2018 | ||
IT | 15.08.2018 | ||
LT | 15.08.2018 | ||
LV | 15.08.2018 | ||
MC | 15.08.2018 | ||
PL | 15.08.2018 | ||
RO | 15.08.2018 | ||
RS | 15.08.2018 | ||
SE | 15.08.2018 | ||
SI | 15.08.2018 | ||
SK | 15.08.2018 | ||
SM | 15.08.2018 | ||
IE | 04.10.2018 | ||
LU | 04.10.2018 | ||
BE | 31.10.2018 | ||
CH | 31.10.2018 | ||
LI | 31.10.2018 | ||
BG | 15.11.2018 | ||
NO | 15.11.2018 | ||
GR | 16.11.2018 | ||
IS | 15.12.2018 | ||
Former [2019/40] | AL | 15.08.2018 | |
AT | 15.08.2018 | ||
CZ | 15.08.2018 | ||
DK | 15.08.2018 | ||
EE | 15.08.2018 | ||
ES | 15.08.2018 | ||
FI | 15.08.2018 | ||
HR | 15.08.2018 | ||
IT | 15.08.2018 | ||
LT | 15.08.2018 | ||
LV | 15.08.2018 | ||
MC | 15.08.2018 | ||
PL | 15.08.2018 | ||
RO | 15.08.2018 | ||
RS | 15.08.2018 | ||
SE | 15.08.2018 | ||
SI | 15.08.2018 | ||
SK | 15.08.2018 | ||
SM | 15.08.2018 | ||
LU | 04.10.2018 | ||
BE | 31.10.2018 | ||
CH | 31.10.2018 | ||
LI | 31.10.2018 | ||
BG | 15.11.2018 | ||
NO | 15.11.2018 | ||
GR | 16.11.2018 | ||
IS | 15.12.2018 | ||
Former [2019/38] | AL | 15.08.2018 | |
AT | 15.08.2018 | ||
CZ | 15.08.2018 | ||
DK | 15.08.2018 | ||
EE | 15.08.2018 | ||
ES | 15.08.2018 | ||
FI | 15.08.2018 | ||
HR | 15.08.2018 | ||
IT | 15.08.2018 | ||
LT | 15.08.2018 | ||
LV | 15.08.2018 | ||
MC | 15.08.2018 | ||
PL | 15.08.2018 | ||
RO | 15.08.2018 | ||
RS | 15.08.2018 | ||
SE | 15.08.2018 | ||
SI | 15.08.2018 | ||
SK | 15.08.2018 | ||
SM | 15.08.2018 | ||
LU | 04.10.2018 | ||
BE | 31.10.2018 | ||
BG | 15.11.2018 | ||
NO | 15.11.2018 | ||
GR | 16.11.2018 | ||
IS | 15.12.2018 | ||
Former [2019/37] | AL | 15.08.2018 | |
AT | 15.08.2018 | ||
CZ | 15.08.2018 | ||
DK | 15.08.2018 | ||
EE | 15.08.2018 | ||
ES | 15.08.2018 | ||
FI | 15.08.2018 | ||
HR | 15.08.2018 | ||
IT | 15.08.2018 | ||
LT | 15.08.2018 | ||
LV | 15.08.2018 | ||
MC | 15.08.2018 | ||
PL | 15.08.2018 | ||
RO | 15.08.2018 | ||
RS | 15.08.2018 | ||
SE | 15.08.2018 | ||
SI | 15.08.2018 | ||
SK | 15.08.2018 | ||
SM | 15.08.2018 | ||
LU | 04.10.2018 | ||
BG | 15.11.2018 | ||
NO | 15.11.2018 | ||
GR | 16.11.2018 | ||
IS | 15.12.2018 | ||
Former [2019/30] | AL | 15.08.2018 | |
AT | 15.08.2018 | ||
CZ | 15.08.2018 | ||
DK | 15.08.2018 | ||
EE | 15.08.2018 | ||
ES | 15.08.2018 | ||
FI | 15.08.2018 | ||
HR | 15.08.2018 | ||
IT | 15.08.2018 | ||
LT | 15.08.2018 | ||
LV | 15.08.2018 | ||
MC | 15.08.2018 | ||
PL | 15.08.2018 | ||
RO | 15.08.2018 | ||
RS | 15.08.2018 | ||
SE | 15.08.2018 | ||
SK | 15.08.2018 | ||
SM | 15.08.2018 | ||
LU | 04.10.2018 | ||
BG | 15.11.2018 | ||
NO | 15.11.2018 | ||
GR | 16.11.2018 | ||
IS | 15.12.2018 | ||
Former [2019/28] | AL | 15.08.2018 | |
AT | 15.08.2018 | ||
CZ | 15.08.2018 | ||
DK | 15.08.2018 | ||
EE | 15.08.2018 | ||
ES | 15.08.2018 | ||
FI | 15.08.2018 | ||
HR | 15.08.2018 | ||
IT | 15.08.2018 | ||
LT | 15.08.2018 | ||
LV | 15.08.2018 | ||
MC | 15.08.2018 | ||
PL | 15.08.2018 | ||
RO | 15.08.2018 | ||
RS | 15.08.2018 | ||
SE | 15.08.2018 | ||
SK | 15.08.2018 | ||
SM | 15.08.2018 | ||
BG | 15.11.2018 | ||
NO | 15.11.2018 | ||
GR | 16.11.2018 | ||
IS | 15.12.2018 | ||
Former [2019/26] | AL | 15.08.2018 | |
AT | 15.08.2018 | ||
CZ | 15.08.2018 | ||
DK | 15.08.2018 | ||
EE | 15.08.2018 | ||
ES | 15.08.2018 | ||
FI | 15.08.2018 | ||
HR | 15.08.2018 | ||
IT | 15.08.2018 | ||
LT | 15.08.2018 | ||
LV | 15.08.2018 | ||
PL | 15.08.2018 | ||
RO | 15.08.2018 | ||
RS | 15.08.2018 | ||
SE | 15.08.2018 | ||
SK | 15.08.2018 | ||
SM | 15.08.2018 | ||
BG | 15.11.2018 | ||
NO | 15.11.2018 | ||
GR | 16.11.2018 | ||
IS | 15.12.2018 | ||
Former [2019/23] | AL | 15.08.2018 | |
AT | 15.08.2018 | ||
CZ | 15.08.2018 | ||
EE | 15.08.2018 | ||
ES | 15.08.2018 | ||
FI | 15.08.2018 | ||
HR | 15.08.2018 | ||
IT | 15.08.2018 | ||
LT | 15.08.2018 | ||
LV | 15.08.2018 | ||
PL | 15.08.2018 | ||
RO | 15.08.2018 | ||
RS | 15.08.2018 | ||
SE | 15.08.2018 | ||
SK | 15.08.2018 | ||
BG | 15.11.2018 | ||
NO | 15.11.2018 | ||
GR | 16.11.2018 | ||
IS | 15.12.2018 | ||
Former [2019/22] | AL | 15.08.2018 | |
AT | 15.08.2018 | ||
CZ | 15.08.2018 | ||
FI | 15.08.2018 | ||
HR | 15.08.2018 | ||
IT | 15.08.2018 | ||
LT | 15.08.2018 | ||
LV | 15.08.2018 | ||
PL | 15.08.2018 | ||
RO | 15.08.2018 | ||
RS | 15.08.2018 | ||
SE | 15.08.2018 | ||
BG | 15.11.2018 | ||
NO | 15.11.2018 | ||
GR | 16.11.2018 | ||
IS | 15.12.2018 | ||
Former [2019/21] | AL | 15.08.2018 | |
AT | 15.08.2018 | ||
FI | 15.08.2018 | ||
HR | 15.08.2018 | ||
IT | 15.08.2018 | ||
LT | 15.08.2018 | ||
LV | 15.08.2018 | ||
RS | 15.08.2018 | ||
SE | 15.08.2018 | ||
BG | 15.11.2018 | ||
NO | 15.11.2018 | ||
GR | 16.11.2018 | ||
IS | 15.12.2018 | ||
Former [2019/12] | AL | 15.08.2018 | |
AT | 15.08.2018 | ||
FI | 15.08.2018 | ||
HR | 15.08.2018 | ||
LT | 15.08.2018 | ||
LV | 15.08.2018 | ||
RS | 15.08.2018 | ||
SE | 15.08.2018 | ||
BG | 15.11.2018 | ||
NO | 15.11.2018 | ||
GR | 16.11.2018 | ||
IS | 15.12.2018 | ||
Former [2019/11] | AT | 15.08.2018 | |
FI | 15.08.2018 | ||
HR | 15.08.2018 | ||
LT | 15.08.2018 | ||
RS | 15.08.2018 | ||
SE | 15.08.2018 | ||
BG | 15.11.2018 | ||
NO | 15.11.2018 | ||
GR | 16.11.2018 | ||
IS | 15.12.2018 | ||
Former [2019/10] | AT | 15.08.2018 | |
FI | 15.08.2018 | ||
LT | 15.08.2018 | ||
RS | 15.08.2018 | ||
SE | 15.08.2018 | ||
BG | 15.11.2018 | ||
NO | 15.11.2018 | ||
GR | 16.11.2018 | ||
IS | 15.12.2018 | ||
Former [2019/08] | FI | 15.08.2018 | |
LT | 15.08.2018 | ||
NO | 15.11.2018 | ||
IS | 15.12.2018 | ||
Former [2019/07] | LT | 15.08.2018 | Documents cited: | Search | [X] - LG ELECTRONICS, "Signaling for quasi co-location assumptions and PDSCH rate matching", vol. RAN WG1, no. San Diego, USA; 20121008 - 20121012, (20120929), 3GPP DRAFT; R1-124316, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: http://www.3gpp.org/ftp/tsg_ran/WG1_RL1/TSGR1_70b/Docs/, (20120929), XP050662216 [X] 1-10 * Sections 2-3 * | [X] - ALCATEL-LUCENT SHANGHAI BELL ET AL, "Handling of RE Mapping for ePDCCH in Presence of Legacy Signals", 3GPP DRAFT; R1-122496 HANDLING OF RE MAPPING FOR EPDCCH IN PRESENCE OF LEGACY SIGNALS, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20120512), vol. RAN WG1, no. Prague, Czech Republic; 20120521 - 20120525, XP050601068 [X] 1-10 * Section 2 * | [X] - TEXAS INSTRUMENTS, "Handling of ePDCCH mapping in the presence of other signals", 3GPP DRAFT; R1-122741_EPDCCH_RSHANDLING, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20120512), vol. RAN WG1, no. Prague, Czech; 20120521 - 20120525, XP050600924 [X] 1-10 * Section 2 * | [I] - MEDIATEK INC, "DRS Antenna Port Determination for ePDCCH Decoding", 3GPP DRAFT; R1-122163_DRS PORT DETERMINATION FOR EPDCCH, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20120512), vol. RAN WG1, no. Prague, Czech; 20120521 - 20120525, XP050600428 [I] 1-10 * Section 2 * | [I] - SHARP, "Resource mapping for ePDCCH", 3GPP DRAFT; R1-122388, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20120512), vol. RAN WG1, no. Prague, Czech Republic; 20120521 - 20120525, XP050600645 [I] 1-10 * Section 2 * | [A] - NOKIA ET AL, "On Quasi-co-located Antenna Ports", vol. RAN WG1, no. Qingdao, China; 20120813 - 20120817, (20120805), 3GPP DRAFT; R1-123658, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: http://www.3gpp.org/ftp/tsg_ran/WG1_RL1/TSGR1_70/Docs/, (20120805), XP050661533 [A] 1-10 * the whole document * | [A] - RENESAS MOBILE EUROPE LTD, "Remaining issues on quasi-colocated antenna ports", vol. RAN WG1, no. Qingdao, China; 20120813 - 20120817, (20120805), 3GPP DRAFT; R1-123589, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: http://www.3gpp.org/ftp/tsg_ran/WG1_RL1/TSGR1_70/Docs/, (20120805), XP050661467 [A] 1-10 * the whole document * | International search | [A]WO2012118270 (LG ELECTRONICS INC [KR], et al); | [A] - LG ELECTRONICS, "Discussion on the Detection of EPDCCH PRB pairs", R1-123527, 3GPP TSG RAN WG1 MEETING #70, QINGDAO, CHINA, (20120813), URL: http://www.3gpp.org/ftp/tsgran/VJGlRLl/TSGRl_70/Docs/Rl-123527.zip, XP050661405 | [A] - TEXAS INSTRUMENTS, "Handling of ePDCCH mapping in the presence of other signals", R1-122741, 3GPP TSG RAN WG1 MEETING #69, PRAGUE, CZECH REPUBLIC, (20120521), URL: http://www.3gpp.org/ftp/tsgran/VJGlRLl/TSGRl69/Docs/Rl-122741.zip, XP050600924 | [A] - ALCATEL-LUCENT SHANGHAI BELL ET AL., "Handling of RE Mapping for ePDCCH in Presence of Legacy Signals", R1-122496, 3GPP TSG RAN WG1 MEETING #69, PRAGUE, CZECH REPUBLIC, (20120521), URL: http://www.3gpp.org/ftp/tsgran/VJGlRLl/TSGRl69/Docs/Rl-122496.zip, XP050601068 | [A] - SHARP, "Resource mapping for ePDCCH", R1-122388, 3GPP TSG RAN WG1 MEETING #69, PRAGUE, CZECH REPUBLIC, (20120521), URL: http://www.3gpp.org/ftp/tsgran/VJGlRLl/TSGRl69/Docs/Rl-122388.zip, XP050600645 |