| EP2928671 - METHOD OF REINFORCEMENT FOR ADDITIVE MANUFACTURING [Right-click to bookmark this link] | Status | Patent maintained as amended Status updated on 27.04.2024 Database last updated on 18.03.2026 | |
| Former | The patent has been granted Status updated on 23.08.2019 | ||
| Former | Grant of patent is intended Status updated on 14.04.2019 | ||
| Former | Examination is in progress Status updated on 16.06.2017 | Most recent event Tooltip | 27.04.2024 | Patent maintained (B2 publication) | published on 29.05.2024 [2024/22] | Applicant(s) | For all designated states The Boeing Company 929 Long Bridge Drive Arlington, VA 22202 / US | [2023/12] |
| Former [2019/39] | For all designated states The Boeing Company 100 North Riverside Plaza Chicago, IL 60606-1596 / US | ||
| Former [2015/42] | For all designated states The Boeing Company 100 North Riverside Plaza Chicago, IL 60606-2016 / US | Inventor(s) | 01 /
LYONS, Brett I. 100 N. Riverside Plaza Chicago, Illinois 60606 / US | 02 /
HUSKAMP, Christopher S. 100 N. Riverside Plaza Chicago, Illinois 60606 / US | [2015/42] | Representative(s) | Howson, Richard Giles Bentham, et al Kilburn & Strode LLP Lacon London 84 Theobalds Road London WC1X 8NL / GB | [2019/39] |
| Former [2015/42] | McGeough, Gemma Ann, et al Kilburn & Strode LLP 20 Red Lion Street London WC1R 4PJ / GB | Application number, filing date | 13844550.7 | 11.11.2013 | [2015/42] | WO2013US69403 | Priority number, date | US201213707793 | 07.12.2012 Original published format: US201213707793 | [2015/42] | Filing language | EN | Procedural language | EN | Publication | Type: | A2 Application without search report | No.: | WO2014088762 | Date: | 12.06.2014 | Language: | EN | [2014/24] | Type: | A2 Application without search report | No.: | EP2928671 | Date: | 14.10.2015 | Language: | EN | The application published by WIPO in one of the EPO official languages on 12.06.2014 takes the place of the publication of the European patent application. | [2015/42] | Type: | B1 Patent specification | No.: | EP2928671 | Date: | 25.09.2019 | Language: | EN | [2019/39] | Type: | B2 New European patent specification | No.: | EP2928671 | Date: | 29.05.2024 | Language: | EN | [2024/22] | Search report(s) | International search report - published on: | EP | 21.08.2014 | Classification | IPC: | B22F10/20, B29C64/135, B29C64/371, B33Y70/00, C22C1/10, C22C47/14, B29C64/153 | [2022/18] | CPC: |
B22F10/28 (EP,US);
B22F10/34 (EP,US);
B22F12/30 (EP,US);
B29C64/135 (EP,US);
B29C64/153 (EP,US);
B29C64/371 (EP,US);
B32B5/16 (US);
B33Y70/10 (EP,US);
C22C47/14 (EP,US);
B22F10/18 (EP,US);
B33Y10/00 (EP,US);
Y02P10/25 (EP,US);
|
| Former IPC [2015/42] | B29C67/00 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2015/42] | Title | German: | VERSTÄRKUNGSVERFAHREN ZUR HERSTELLUNG VON ZUSATZSTOFFEN | [2015/42] | English: | METHOD OF REINFORCEMENT FOR ADDITIVE MANUFACTURING | [2015/42] | French: | PROCÉDÉ DE RENFORT POUR FABRICATION ADDITIVE | [2015/42] | Entry into regional phase | 07.07.2015 | National basic fee paid | 07.07.2015 | Designation fee(s) paid | 07.07.2015 | Examination fee paid | Examination procedure | 07.07.2015 | Examination requested [2015/42] | 19.01.2016 | Amendment by applicant (claims and/or description) | 14.06.2017 | Despatch of a communication from the examining division (Time limit: M04) | 23.10.2017 | Reply to a communication from the examining division | 18.03.2019 | Cancellation of oral proceeding that was planned for 09.04.2019 | 09.04.2019 | Date of oral proceedings (cancelled) | 15.04.2019 | Communication of intention to grant the patent | 15.08.2019 | Fee for grant paid | 15.08.2019 | Fee for publishing/printing paid | 15.08.2019 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 14.06.2017 | Opposition(s) | Opponent(s) | 01
24.06.2020
ADMISSIBLE EOS GmbH Electro Optical Systems Robert-Stirling-Ring 1 82152 Krailling / DE Opponent's representative Beckord & Niedlich Patentanwälte PartG mbB Marktplatz 17 83607 Holzkirchen / DE | [2020/32] | 13.07.2020 | Invitation to proprietor to file observations on the notice of opposition | 23.11.2020 | Reply of patent proprietor to notice(s) of opposition | 21.07.2022 | Despatch of interlocutory decision in opposition | 12.01.2024 | Legal effect of interlocutory decision in opposition | 19.01.2024 | Despatch of communication that the patent will be maintained as amended | 05.02.2024 | Fee for printing new specification paid | Appeal following opposition | 08.09.2022 | Appeal received No. T2095/22 | 08.09.2022 | Payment of appeal fee | 10.11.2022 | Statement of grounds filed | 12.01.2024 | Result of appeal procedure: appeal of the opponent withdrawn | Fees paid | Renewal fee | 30.11.2015 | Renewal fee patent year 03 | 28.11.2016 | Renewal fee patent year 04 | 27.11.2017 | Renewal fee patent year 05 | 27.11.2018 | Renewal fee patent year 06 |
| Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
| Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 11.11.2013 | AL | 25.09.2019 | AT | 25.09.2019 | CY | 25.09.2019 | CZ | 25.09.2019 | DK | 25.09.2019 | EE | 25.09.2019 | ES | 25.09.2019 | FI | 25.09.2019 | HR | 25.09.2019 | IT | 25.09.2019 | LT | 25.09.2019 | LV | 25.09.2019 | MC | 25.09.2019 | MK | 25.09.2019 | MT | 25.09.2019 | NL | 25.09.2019 | PL | 25.09.2019 | RO | 25.09.2019 | RS | 25.09.2019 | SE | 25.09.2019 | SI | 25.09.2019 | SK | 25.09.2019 | SM | 25.09.2019 | TR | 25.09.2019 | IE | 11.11.2019 | LU | 11.11.2019 | BE | 30.11.2019 | CH | 30.11.2019 | LI | 30.11.2019 | BG | 25.12.2019 | NO | 25.12.2019 | GR | 26.12.2019 | IS | 26.01.2020 | PT | 27.01.2020 | [2022/31] |
| Former [2022/26] | HU | 11.11.2013 | |
| AL | 25.09.2019 | ||
| AT | 25.09.2019 | ||
| CY | 25.09.2019 | ||
| CZ | 25.09.2019 | ||
| DK | 25.09.2019 | ||
| EE | 25.09.2019 | ||
| ES | 25.09.2019 | ||
| FI | 25.09.2019 | ||
| HR | 25.09.2019 | ||
| IT | 25.09.2019 | ||
| LT | 25.09.2019 | ||
| LV | 25.09.2019 | ||
| MC | 25.09.2019 | ||
| MT | 25.09.2019 | ||
| NL | 25.09.2019 | ||
| PL | 25.09.2019 | ||
| RO | 25.09.2019 | ||
| RS | 25.09.2019 | ||
| SE | 25.09.2019 | ||
| SI | 25.09.2019 | ||
| SK | 25.09.2019 | ||
| SM | 25.09.2019 | ||
| TR | 25.09.2019 | ||
| IE | 11.11.2019 | ||
| LU | 11.11.2019 | ||
| BE | 30.11.2019 | ||
| CH | 30.11.2019 | ||
| LI | 30.11.2019 | ||
| BG | 25.12.2019 | ||
| NO | 25.12.2019 | ||
| GR | 26.12.2019 | ||
| IS | 26.01.2020 | ||
| PT | 27.01.2020 | ||
| Former [2021/34] | HU | 11.11.2013 | |
| AL | 25.09.2019 | ||
| AT | 25.09.2019 | ||
| CY | 25.09.2019 | ||
| CZ | 25.09.2019 | ||
| DK | 25.09.2019 | ||
| EE | 25.09.2019 | ||
| ES | 25.09.2019 | ||
| FI | 25.09.2019 | ||
| HR | 25.09.2019 | ||
| IT | 25.09.2019 | ||
| LT | 25.09.2019 | ||
| LV | 25.09.2019 | ||
| MC | 25.09.2019 | ||
| MT | 25.09.2019 | ||
| NL | 25.09.2019 | ||
| PL | 25.09.2019 | ||
| RO | 25.09.2019 | ||
| RS | 25.09.2019 | ||
| SE | 25.09.2019 | ||
| SI | 25.09.2019 | ||
| SK | 25.09.2019 | ||
| SM | 25.09.2019 | ||
| IE | 11.11.2019 | ||
| LU | 11.11.2019 | ||
| BE | 30.11.2019 | ||
| CH | 30.11.2019 | ||
| LI | 30.11.2019 | ||
| BG | 25.12.2019 | ||
| NO | 25.12.2019 | ||
| GR | 26.12.2019 | ||
| IS | 26.01.2020 | ||
| PT | 27.01.2020 | ||
| Former [2021/32] | HU | 11.11.2013 | |
| AL | 25.09.2019 | ||
| AT | 25.09.2019 | ||
| CY | 25.09.2019 | ||
| CZ | 25.09.2019 | ||
| DK | 25.09.2019 | ||
| EE | 25.09.2019 | ||
| ES | 25.09.2019 | ||
| FI | 25.09.2019 | ||
| HR | 25.09.2019 | ||
| IT | 25.09.2019 | ||
| LT | 25.09.2019 | ||
| LV | 25.09.2019 | ||
| MC | 25.09.2019 | ||
| NL | 25.09.2019 | ||
| PL | 25.09.2019 | ||
| RO | 25.09.2019 | ||
| RS | 25.09.2019 | ||
| SE | 25.09.2019 | ||
| SI | 25.09.2019 | ||
| SK | 25.09.2019 | ||
| SM | 25.09.2019 | ||
| IE | 11.11.2019 | ||
| LU | 11.11.2019 | ||
| BE | 30.11.2019 | ||
| CH | 30.11.2019 | ||
| LI | 30.11.2019 | ||
| BG | 25.12.2019 | ||
| NO | 25.12.2019 | ||
| GR | 26.12.2019 | ||
| IS | 26.01.2020 | ||
| PT | 27.01.2020 | ||
| Former [2021/26] | AL | 25.09.2019 | |
| AT | 25.09.2019 | ||
| CY | 25.09.2019 | ||
| CZ | 25.09.2019 | ||
| DK | 25.09.2019 | ||
| EE | 25.09.2019 | ||
| ES | 25.09.2019 | ||
| FI | 25.09.2019 | ||
| HR | 25.09.2019 | ||
| IT | 25.09.2019 | ||
| LT | 25.09.2019 | ||
| LV | 25.09.2019 | ||
| MC | 25.09.2019 | ||
| NL | 25.09.2019 | ||
| PL | 25.09.2019 | ||
| RO | 25.09.2019 | ||
| RS | 25.09.2019 | ||
| SE | 25.09.2019 | ||
| SI | 25.09.2019 | ||
| SK | 25.09.2019 | ||
| SM | 25.09.2019 | ||
| IE | 11.11.2019 | ||
| LU | 11.11.2019 | ||
| BE | 30.11.2019 | ||
| CH | 30.11.2019 | ||
| LI | 30.11.2019 | ||
| BG | 25.12.2019 | ||
| NO | 25.12.2019 | ||
| GR | 26.12.2019 | ||
| IS | 26.01.2020 | ||
| PT | 27.01.2020 | ||
| Former [2020/51] | AL | 25.09.2019 | |
| AT | 25.09.2019 | ||
| CZ | 25.09.2019 | ||
| DK | 25.09.2019 | ||
| EE | 25.09.2019 | ||
| ES | 25.09.2019 | ||
| FI | 25.09.2019 | ||
| HR | 25.09.2019 | ||
| IT | 25.09.2019 | ||
| LT | 25.09.2019 | ||
| LV | 25.09.2019 | ||
| MC | 25.09.2019 | ||
| NL | 25.09.2019 | ||
| PL | 25.09.2019 | ||
| RO | 25.09.2019 | ||
| RS | 25.09.2019 | ||
| SE | 25.09.2019 | ||
| SI | 25.09.2019 | ||
| SK | 25.09.2019 | ||
| SM | 25.09.2019 | ||
| IE | 11.11.2019 | ||
| LU | 11.11.2019 | ||
| BE | 30.11.2019 | ||
| CH | 30.11.2019 | ||
| LI | 30.11.2019 | ||
| BG | 25.12.2019 | ||
| NO | 25.12.2019 | ||
| GR | 26.12.2019 | ||
| IS | 26.01.2020 | ||
| PT | 27.01.2020 | ||
| Former [2020/46] | AL | 25.09.2019 | |
| AT | 25.09.2019 | ||
| CZ | 25.09.2019 | ||
| DK | 25.09.2019 | ||
| EE | 25.09.2019 | ||
| ES | 25.09.2019 | ||
| FI | 25.09.2019 | ||
| HR | 25.09.2019 | ||
| IT | 25.09.2019 | ||
| LT | 25.09.2019 | ||
| LV | 25.09.2019 | ||
| MC | 25.09.2019 | ||
| NL | 25.09.2019 | ||
| PL | 25.09.2019 | ||
| RO | 25.09.2019 | ||
| RS | 25.09.2019 | ||
| SE | 25.09.2019 | ||
| SK | 25.09.2019 | ||
| SM | 25.09.2019 | ||
| IE | 11.11.2019 | ||
| LU | 11.11.2019 | ||
| CH | 30.11.2019 | ||
| LI | 30.11.2019 | ||
| BG | 25.12.2019 | ||
| NO | 25.12.2019 | ||
| GR | 26.12.2019 | ||
| IS | 26.01.2020 | ||
| PT | 27.01.2020 | ||
| Former [2020/36] | AL | 25.09.2019 | |
| AT | 25.09.2019 | ||
| CZ | 25.09.2019 | ||
| DK | 25.09.2019 | ||
| EE | 25.09.2019 | ||
| ES | 25.09.2019 | ||
| FI | 25.09.2019 | ||
| HR | 25.09.2019 | ||
| IT | 25.09.2019 | ||
| LT | 25.09.2019 | ||
| LV | 25.09.2019 | ||
| MC | 25.09.2019 | ||
| NL | 25.09.2019 | ||
| PL | 25.09.2019 | ||
| RO | 25.09.2019 | ||
| RS | 25.09.2019 | ||
| SE | 25.09.2019 | ||
| SK | 25.09.2019 | ||
| SM | 25.09.2019 | ||
| LU | 11.11.2019 | ||
| CH | 30.11.2019 | ||
| LI | 30.11.2019 | ||
| BG | 25.12.2019 | ||
| NO | 25.12.2019 | ||
| GR | 26.12.2019 | ||
| IS | 26.01.2020 | ||
| PT | 27.01.2020 | ||
| Former [2020/35] | AL | 25.09.2019 | |
| AT | 25.09.2019 | ||
| CZ | 25.09.2019 | ||
| EE | 25.09.2019 | ||
| ES | 25.09.2019 | ||
| FI | 25.09.2019 | ||
| HR | 25.09.2019 | ||
| IT | 25.09.2019 | ||
| LT | 25.09.2019 | ||
| LV | 25.09.2019 | ||
| NL | 25.09.2019 | ||
| PL | 25.09.2019 | ||
| RO | 25.09.2019 | ||
| RS | 25.09.2019 | ||
| SE | 25.09.2019 | ||
| SK | 25.09.2019 | ||
| SM | 25.09.2019 | ||
| LU | 11.11.2019 | ||
| CH | 30.11.2019 | ||
| LI | 30.11.2019 | ||
| BG | 25.12.2019 | ||
| NO | 25.12.2019 | ||
| GR | 26.12.2019 | ||
| PT | 27.01.2020 | ||
| IS | 24.02.2020 | ||
| Former [2020/34] | AL | 25.09.2019 | |
| AT | 25.09.2019 | ||
| CZ | 25.09.2019 | ||
| EE | 25.09.2019 | ||
| ES | 25.09.2019 | ||
| FI | 25.09.2019 | ||
| HR | 25.09.2019 | ||
| IT | 25.09.2019 | ||
| LT | 25.09.2019 | ||
| LV | 25.09.2019 | ||
| NL | 25.09.2019 | ||
| PL | 25.09.2019 | ||
| RO | 25.09.2019 | ||
| RS | 25.09.2019 | ||
| SE | 25.09.2019 | ||
| SK | 25.09.2019 | ||
| SM | 25.09.2019 | ||
| CH | 30.11.2019 | ||
| LI | 30.11.2019 | ||
| BG | 25.12.2019 | ||
| NO | 25.12.2019 | ||
| GR | 26.12.2019 | ||
| PT | 27.01.2020 | ||
| IS | 24.02.2020 | ||
| Former [2020/27] | AL | 25.09.2019 | |
| AT | 25.09.2019 | ||
| CZ | 25.09.2019 | ||
| EE | 25.09.2019 | ||
| ES | 25.09.2019 | ||
| FI | 25.09.2019 | ||
| HR | 25.09.2019 | ||
| IT | 25.09.2019 | ||
| LT | 25.09.2019 | ||
| LV | 25.09.2019 | ||
| NL | 25.09.2019 | ||
| PL | 25.09.2019 | ||
| RO | 25.09.2019 | ||
| RS | 25.09.2019 | ||
| SE | 25.09.2019 | ||
| SK | 25.09.2019 | ||
| SM | 25.09.2019 | ||
| BG | 25.12.2019 | ||
| NO | 25.12.2019 | ||
| GR | 26.12.2019 | ||
| PT | 27.01.2020 | ||
| IS | 24.02.2020 | ||
| Former [2020/25] | AL | 25.09.2019 | |
| AT | 25.09.2019 | ||
| CZ | 25.09.2019 | ||
| EE | 25.09.2019 | ||
| ES | 25.09.2019 | ||
| FI | 25.09.2019 | ||
| HR | 25.09.2019 | ||
| IT | 25.09.2019 | ||
| LT | 25.09.2019 | ||
| LV | 25.09.2019 | ||
| NL | 25.09.2019 | ||
| PL | 25.09.2019 | ||
| RO | 25.09.2019 | ||
| RS | 25.09.2019 | ||
| SE | 25.09.2019 | ||
| SK | 25.09.2019 | ||
| BG | 25.12.2019 | ||
| NO | 25.12.2019 | ||
| GR | 26.12.2019 | ||
| PT | 27.01.2020 | ||
| IS | 24.02.2020 | ||
| Former [2020/24] | AL | 25.09.2019 | |
| AT | 25.09.2019 | ||
| EE | 25.09.2019 | ||
| ES | 25.09.2019 | ||
| FI | 25.09.2019 | ||
| HR | 25.09.2019 | ||
| IT | 25.09.2019 | ||
| LT | 25.09.2019 | ||
| LV | 25.09.2019 | ||
| NL | 25.09.2019 | ||
| PL | 25.09.2019 | ||
| RO | 25.09.2019 | ||
| RS | 25.09.2019 | ||
| SE | 25.09.2019 | ||
| BG | 25.12.2019 | ||
| NO | 25.12.2019 | ||
| GR | 26.12.2019 | ||
| PT | 27.01.2020 | ||
| IS | 24.02.2020 | ||
| Former [2020/23] | AL | 25.09.2019 | |
| AT | 25.09.2019 | ||
| EE | 25.09.2019 | ||
| ES | 25.09.2019 | ||
| FI | 25.09.2019 | ||
| HR | 25.09.2019 | ||
| IT | 25.09.2019 | ||
| LT | 25.09.2019 | ||
| LV | 25.09.2019 | ||
| NL | 25.09.2019 | ||
| PL | 25.09.2019 | ||
| RO | 25.09.2019 | ||
| RS | 25.09.2019 | ||
| SE | 25.09.2019 | ||
| BG | 25.12.2019 | ||
| NO | 25.12.2019 | ||
| GR | 26.12.2019 | ||
| PT | 27.01.2020 | ||
| Former [2020/22] | AL | 25.09.2019 | |
| EE | 25.09.2019 | ||
| FI | 25.09.2019 | ||
| HR | 25.09.2019 | ||
| LT | 25.09.2019 | ||
| LV | 25.09.2019 | ||
| NL | 25.09.2019 | ||
| RS | 25.09.2019 | ||
| SE | 25.09.2019 | ||
| BG | 25.12.2019 | ||
| NO | 25.12.2019 | ||
| GR | 26.12.2019 | ||
| PT | 27.01.2020 | ||
| Former [2020/20] | FI | 25.09.2019 | |
| HR | 25.09.2019 | ||
| LT | 25.09.2019 | ||
| LV | 25.09.2019 | ||
| NL | 25.09.2019 | ||
| RS | 25.09.2019 | ||
| SE | 25.09.2019 | ||
| BG | 25.12.2019 | ||
| NO | 25.12.2019 | ||
| GR | 26.12.2019 | ||
| Former [2020/11] | FI | 25.09.2019 | |
| HR | 25.09.2019 | ||
| LT | 25.09.2019 | ||
| LV | 25.09.2019 | ||
| RS | 25.09.2019 | ||
| SE | 25.09.2019 | ||
| BG | 25.12.2019 | ||
| NO | 25.12.2019 | ||
| GR | 26.12.2019 | ||
| Former [2020/10] | FI | 25.09.2019 | |
| LT | 25.09.2019 | ||
| SE | 25.09.2019 | ||
| BG | 25.12.2019 | ||
| NO | 25.12.2019 | ||
| Former [2020/09] | FI | 25.09.2019 | |
| LT | 25.09.2019 | ||
| NO | 25.12.2019 | ||
| Former [2020/08] | LT | 25.09.2019 | |
| NO | 25.12.2019 | Cited in | International search | [XI] WO2005090448 (TOYOTA MOTORSPORT GMBH et al.) | [XI] LUIS FOLGAR: "Developing Nanocomposites for Isotropic Selective Laser Sintering", 12 October 2012 (2012-10-12), XP002724529, Retrieved from the Internet | [XI] R. BRUCE FLOERSHEIM ET AL: "CFPC material characteristics and SLS prototyping process", RAPID PROTOTYPING JOURNAL, 1 January 2009 (2009-01-01), Bradford, pages 339 - 345, XP055118799, Retrieved from the Internet DOI: http://dx.doi.org/10.1108/13552540910993860 | by applicant | US2010255327 | Opposition | WO2014088762 | US201213707793 | US2010255327 | EP1660566 | US5817206 | WO2009022167 | EP2676990 | EP2565022 | EP1988113 | LUIS FOLGAR: "Developing Nanocomposites for Isotropic Selective Laser Sintering", 12 October 2012 (2012-10-12), pages 1 - 9, XP002724529, Retrieved from the Internet | R. BRUCE FLOERSHEIM, GENE HOU, KENT FIRESTONE: "CFPC material characteristics and SLS prototyping process", RAPID PROTOTYPING JOURNAL, EMERALD GROUP PUBLISHING, LIMITED, BRADFORD, 1 January 2009 (2009-01-01), Bradford, pages 339 - 345, XP055118799, Retrieved from the Internet DOI: http://dx.doi.org/10.1108/13552540910993860 | N P KARAPATIS, ET AL: "Optimization of powder layer density in selective laser sintering", DEPARTMENT OF MECHANICAL ENGINEERING, SWISS FEDERAL INSTITUTE OF TECHNOLOGY, UNIVERSITY TEXAS AUSTIN, MECHANICAL ENGINEERING DEPT, AUSTIN, TX 00000 USA, 8 October 2010 (2010-10-08), pages 255 - 264, XP055764587, Retrieved from the Internet |