blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP2923755

EP2923755 - USE OF ZEOLITE COMPOSITE CONTAINING IODINE OR BROMINE CONFINED PORES [Right-click to bookmark this link]
Former [2015/40]ZEOLITE COMPOSITE CONTAINING IODINE OR BROMINE CONFINED PORES, AND USE THEREOF
[2020/29]
StatusNo opposition filed within time limit
Status updated on  10.09.2021
Database last updated on 02.08.2024
FormerThe patent has been granted
Status updated on  02.10.2020
FormerGrant of patent is intended
Status updated on  06.07.2020
FormerExamination is in progress
Status updated on  15.12.2017
Most recent event   Tooltip22.07.2022Lapse of the patent in a contracting state
New state(s): BE
published on 24.08.2022  [2022/34]
Applicant(s)For all designated states
Sogang University Research Foundation
(Sinsu-dong Sogang University)
35 Baekbeom-ro
Mapo-gu, Seoul 121-742 / KR
[2015/40]
Inventor(s)01 / YOON, Kyung Byung
345-123 Pyeongchang-dong
Jongno-gu
Seoul 110-847 / KR
02 / PHAM, Cao Than Tung
6th Floor
Seogang Bldg.
1-3 Sinsu-dong
Mapo-gu
Seoul 121-854 / KR
03 / PARK, Yong Su
A-201
36-2 Hwaseo-dong
Paldal-gu
Suwon-si Gyeonggi-do 442-150 / KR
 [2015/40]
Representative(s)Zwicker, Jörk
ZSP Patentanwälte PartG mbB
Hansastraße 32
80686 München / DE
[2020/45]
Former [2015/40]Zwicker, Jörk
ZSP Patentanwälte
Partnerschaftsgesellschaft
Radlkoferstrasse 2
81373 München / DE
Application number, filing date13857140.125.11.2013
[2015/40]
WO2013KR10735
Priority number, dateKR2012013407823.11.2012         Original published format: KR 20120134078
[2015/40]
Filing languageKO
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2014081259
Date:30.05.2014
Language:KO
[2014/22]
Type: A1 Application with search report 
No.:EP2923755
Date:30.09.2015
Language:EN
[2015/40]
Type: B1 Patent specification 
No.:EP2923755
Date:04.11.2020
Language:EN
[2020/45]
Search report(s)International search report - published on:KR30.05.2014
(Supplementary) European search report - dispatched on:EP22.06.2016
ClassificationIPC:C01B7/14, C01B7/09, B01J20/18, H01B1/04, B01J20/34
[2020/28]
CPC:
B01J20/18 (EP,KR,US); B01D53/02 (US); B01J20/3408 (EP,US);
B01J20/3475 (EP,US); C01B7/09 (KR); C01B7/096 (EP,US);
C01B7/14 (EP,KR,US); C01G5/02 (US); C02F1/00 (US);
C02F1/281 (US); H01B1/04 (EP,US); C02F2101/006 (US);
C02F2101/10 (US); C02F2101/12 (US); C02F2303/16 (US);
G21F9/04 (US); G21F9/12 (US) (-)
Former IPC [2015/40]B01J20/18, C01B7/14, C01B7/09
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2015/40]
Extension statesBANot yet paid
MENot yet paid
TitleGerman:VERWENDUNG VON ZEOLITHVERBUND MIT JOD- ODER BROMBEGRENZTEN POREN[2020/29]
English:USE OF ZEOLITE COMPOSITE CONTAINING IODINE OR BROMINE CONFINED PORES[2020/29]
French:UTILISATION D'UN COMPOSITE DE ZÉOLITHE CONTENANT DE L'IODE OU DU BORE CONFINÉ DANS LES PORES[2020/29]
Former [2015/40]ZEOLITHVERBUND MIT JOD- ODER BROMBEGRENZTEN POREN UND IHRE VERWENDUNG
Former [2015/40]ZEOLITE COMPOSITE CONTAINING IODINE OR BROMINE CONFINED PORES, AND USE THEREOF
Former [2015/40]COMPOSITE DE ZÉOLITHE CONTENANT DE L'IODE OU DU BORE CONFINÉ DANS LES PORES, ET SON UTILISATION
Entry into regional phase23.06.2015Translation filed 
23.06.2015National basic fee paid 
23.06.2015Search fee paid 
23.06.2015Designation fee(s) paid 
23.06.2015Examination fee paid 
Examination procedure23.06.2015Examination requested  [2015/40]
16.01.2017Amendment by applicant (claims and/or description)
19.12.2017Despatch of a communication from the examining division (Time limit: M04)
16.04.2018Reply to a communication from the examining division
29.05.2020Cancellation of oral proceeding that was planned for 24.06.2020
24.06.2020Date of oral proceedings (cancelled)
07.07.2020Communication of intention to grant the patent
29.09.2020Fee for grant paid
29.09.2020Fee for publishing/printing paid
29.09.2020Receipt of the translation of the claim(s)
Divisional application(s)The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  19.12.2017
Opposition(s)05.08.2021No opposition filed within time limit [2021/41]
Fees paidRenewal fee
27.11.2015Renewal fee patent year 03
29.11.2016Renewal fee patent year 04
30.11.2017Renewal fee patent year 05
30.11.2018Renewal fee patent year 06
28.11.2019Renewal fee patent year 07
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU25.11.2013
AL04.11.2020
AT04.11.2020
CY04.11.2020
CZ04.11.2020
DK04.11.2020
EE04.11.2020
ES04.11.2020
FI04.11.2020
HR04.11.2020
IT04.11.2020
LT04.11.2020
LV04.11.2020
MC04.11.2020
MK04.11.2020
MT04.11.2020
NL04.11.2020
PL04.11.2020
RO04.11.2020
RS04.11.2020
SE04.11.2020
SI04.11.2020
SK04.11.2020
SM04.11.2020
TR04.11.2020
IE25.11.2020
LU25.11.2020
BE30.11.2020
CH30.11.2020
LI30.11.2020
BG04.02.2021
NO04.02.2021
GR05.02.2021
IS04.03.2021
PT04.03.2021
[2022/34]
Former [2022/32]HU25.11.2013
AL04.11.2020
AT04.11.2020
CY04.11.2020
CZ04.11.2020
DK04.11.2020
EE04.11.2020
ES04.11.2020
FI04.11.2020
HR04.11.2020
IT04.11.2020
LT04.11.2020
LV04.11.2020
MC04.11.2020
MK04.11.2020
MT04.11.2020
NL04.11.2020
PL04.11.2020
RO04.11.2020
RS04.11.2020
SE04.11.2020
SI04.11.2020
SK04.11.2020
SM04.11.2020
TR04.11.2020
IE25.11.2020
LU25.11.2020
CH30.11.2020
LI30.11.2020
BG04.02.2021
NO04.02.2021
GR05.02.2021
IS04.03.2021
PT04.03.2021
Former [2022/27]HU25.11.2013
AL04.11.2020
AT04.11.2020
CY04.11.2020
CZ04.11.2020
DK04.11.2020
EE04.11.2020
ES04.11.2020
FI04.11.2020
HR04.11.2020
IT04.11.2020
LT04.11.2020
LV04.11.2020
MC04.11.2020
MT04.11.2020
NL04.11.2020
PL04.11.2020
RO04.11.2020
RS04.11.2020
SE04.11.2020
SI04.11.2020
SK04.11.2020
SM04.11.2020
TR04.11.2020
IE25.11.2020
LU25.11.2020
CH30.11.2020
LI30.11.2020
BG04.02.2021
NO04.02.2021
GR05.02.2021
IS04.03.2021
PT04.03.2021
Former [2022/26]AL04.11.2020
AT04.11.2020
CZ04.11.2020
DK04.11.2020
EE04.11.2020
ES04.11.2020
FI04.11.2020
HR04.11.2020
IT04.11.2020
LT04.11.2020
LV04.11.2020
MC04.11.2020
NL04.11.2020
PL04.11.2020
RO04.11.2020
RS04.11.2020
SE04.11.2020
SI04.11.2020
SK04.11.2020
SM04.11.2020
TR04.11.2020
IE25.11.2020
LU25.11.2020
CH30.11.2020
LI30.11.2020
BG04.02.2021
NO04.02.2021
GR05.02.2021
IS04.03.2021
PT04.03.2021
Former [2022/23]AL04.11.2020
AT04.11.2020
CZ04.11.2020
DK04.11.2020
EE04.11.2020
ES04.11.2020
FI04.11.2020
HR04.11.2020
IT04.11.2020
LT04.11.2020
LV04.11.2020
MC04.11.2020
NL04.11.2020
PL04.11.2020
RO04.11.2020
RS04.11.2020
SE04.11.2020
SI04.11.2020
SK04.11.2020
SM04.11.2020
IE25.11.2020
LU25.11.2020
CH30.11.2020
LI30.11.2020
BG04.02.2021
NO04.02.2021
GR05.02.2021
IS04.03.2021
PT04.03.2021
Former [2022/10]AL04.11.2020
AT04.11.2020
CZ04.11.2020
DK04.11.2020
EE04.11.2020
ES04.11.2020
FI04.11.2020
HR04.11.2020
IT04.11.2020
LT04.11.2020
LV04.11.2020
MC04.11.2020
NL04.11.2020
PL04.11.2020
RO04.11.2020
RS04.11.2020
SE04.11.2020
SI04.11.2020
SK04.11.2020
SM04.11.2020
IE25.11.2020
LU25.11.2020
CH30.11.2020
LI30.11.2020
BG04.02.2021
NO04.02.2021
GR05.02.2021
PT04.03.2021
Former [2021/50]AL04.11.2020
AT04.11.2020
CZ04.11.2020
DK04.11.2020
EE04.11.2020
ES04.11.2020
FI04.11.2020
HR04.11.2020
IT04.11.2020
LT04.11.2020
LV04.11.2020
MC04.11.2020
NL04.11.2020
PL04.11.2020
RO04.11.2020
RS04.11.2020
SE04.11.2020
SI04.11.2020
SK04.11.2020
SM04.11.2020
IE25.11.2020
LU25.11.2020
CH30.11.2020
LI30.11.2020
BG04.02.2021
NO04.02.2021
GR05.02.2021
IS04.03.2021
PT04.03.2021
Former [2021/48]AL04.11.2020
AT04.11.2020
CZ04.11.2020
DK04.11.2020
EE04.11.2020
ES04.11.2020
FI04.11.2020
HR04.11.2020
IT04.11.2020
LT04.11.2020
LV04.11.2020
MC04.11.2020
NL04.11.2020
PL04.11.2020
RO04.11.2020
RS04.11.2020
SE04.11.2020
SK04.11.2020
SM04.11.2020
IE25.11.2020
LU25.11.2020
CH30.11.2020
LI30.11.2020
BG04.02.2021
NO04.02.2021
GR05.02.2021
IS04.03.2021
PT04.03.2021
Former [2021/46]AL04.11.2020
AT04.11.2020
CZ04.11.2020
DK04.11.2020
EE04.11.2020
ES04.11.2020
FI04.11.2020
HR04.11.2020
LT04.11.2020
LV04.11.2020
MC04.11.2020
NL04.11.2020
PL04.11.2020
RO04.11.2020
RS04.11.2020
SE04.11.2020
SK04.11.2020
SM04.11.2020
IE25.11.2020
LU25.11.2020
CH30.11.2020
LI30.11.2020
BG04.02.2021
NO04.02.2021
GR05.02.2021
IS04.03.2021
PT04.03.2021
Former [2021/45]AL04.11.2020
AT04.11.2020
CZ04.11.2020
DK04.11.2020
EE04.11.2020
ES04.11.2020
FI04.11.2020
HR04.11.2020
LT04.11.2020
LV04.11.2020
MC04.11.2020
PL04.11.2020
RO04.11.2020
RS04.11.2020
SE04.11.2020
SK04.11.2020
SM04.11.2020
LU25.11.2020
CH30.11.2020
LI30.11.2020
BG04.02.2021
NO04.02.2021
GR05.02.2021
IS04.03.2021
PT04.03.2021
Former [2021/40]AT04.11.2020
CZ04.11.2020
DK04.11.2020
EE04.11.2020
ES04.11.2020
FI04.11.2020
HR04.11.2020
LT04.11.2020
LV04.11.2020
MC04.11.2020
PL04.11.2020
RO04.11.2020
RS04.11.2020
SE04.11.2020
SK04.11.2020
SM04.11.2020
LU25.11.2020
CH30.11.2020
LI30.11.2020
BG04.02.2021
NO04.02.2021
GR05.02.2021
IS04.03.2021
PT04.03.2021
Former [2021/37]AT04.11.2020
CZ04.11.2020
DK04.11.2020
EE04.11.2020
ES04.11.2020
FI04.11.2020
HR04.11.2020
LT04.11.2020
LV04.11.2020
PL04.11.2020
RO04.11.2020
RS04.11.2020
SE04.11.2020
SK04.11.2020
SM04.11.2020
LU25.11.2020
CH30.11.2020
LI30.11.2020
BG04.02.2021
NO04.02.2021
GR05.02.2021
IS04.03.2021
PT04.03.2021
Former [2021/36]AT04.11.2020
CZ04.11.2020
EE04.11.2020
ES04.11.2020
FI04.11.2020
HR04.11.2020
LT04.11.2020
LV04.11.2020
PL04.11.2020
RO04.11.2020
RS04.11.2020
SE04.11.2020
SK04.11.2020
SM04.11.2020
LU25.11.2020
BG04.02.2021
NO04.02.2021
GR05.02.2021
IS04.03.2021
PT04.03.2021
Former [2021/35]AT04.11.2020
CZ04.11.2020
ES04.11.2020
FI04.11.2020
HR04.11.2020
LT04.11.2020
LV04.11.2020
PL04.11.2020
RO04.11.2020
RS04.11.2020
SE04.11.2020
SK04.11.2020
SM04.11.2020
LU25.11.2020
BG04.02.2021
NO04.02.2021
GR05.02.2021
IS04.03.2021
PT04.03.2021
Former [2021/34]AT04.11.2020
CZ04.11.2020
ES04.11.2020
FI04.11.2020
HR04.11.2020
LT04.11.2020
LV04.11.2020
PL04.11.2020
RS04.11.2020
SE04.11.2020
SM04.11.2020
LU25.11.2020
BG04.02.2021
NO04.02.2021
GR05.02.2021
IS04.03.2021
PT04.03.2021
Former [2021/33]AT04.11.2020
ES04.11.2020
FI04.11.2020
HR04.11.2020
LT04.11.2020
LV04.11.2020
PL04.11.2020
RS04.11.2020
SE04.11.2020
SM04.11.2020
LU25.11.2020
BG04.02.2021
NO04.02.2021
GR05.02.2021
IS04.03.2021
PT04.03.2021
Former [2021/32]AT04.11.2020
ES04.11.2020
FI04.11.2020
HR04.11.2020
LV04.11.2020
PL04.11.2020
RS04.11.2020
SE04.11.2020
SM04.11.2020
BG04.02.2021
NO04.02.2021
GR05.02.2021
IS04.03.2021
PT04.03.2021
Former [2021/28]AT04.11.2020
ES04.11.2020
FI04.11.2020
HR04.11.2020
LV04.11.2020
PL04.11.2020
RS04.11.2020
SE04.11.2020
BG04.02.2021
NO04.02.2021
GR05.02.2021
IS04.03.2021
PT04.03.2021
Former [2021/25]AT04.11.2020
ES04.11.2020
FI04.11.2020
LV04.11.2020
PL04.11.2020
RS04.11.2020
SE04.11.2020
BG04.02.2021
NO04.02.2021
GR05.02.2021
IS04.03.2021
PT04.03.2021
Former [2021/24]AT04.11.2020
FI04.11.2020
LV04.11.2020
RS04.11.2020
SE04.11.2020
BG04.02.2021
NO04.02.2021
GR05.02.2021
PT04.03.2021
Former [2021/23]FI04.11.2020
LV04.11.2020
RS04.11.2020
SE04.11.2020
NO04.02.2021
GR05.02.2021
PT04.03.2021
Former [2021/22]FI04.11.2020
RS04.11.2020
NO04.02.2021
PT04.03.2021
Former [2021/21]FI04.11.2020
PT04.03.2021
Former [2021/20]FI04.11.2020
Documents cited:Search[XAY]US4735786  (INOUE TAKEHISA [JP], et al) [X] 1,3,5-11,14-16 * column 3, line 5 - line 27; examples 1,2; claims 1,3,11 * [A] 17,18 [Y] 12,13,19,20;
 [XAYI]US4748013  (SAITO HIROYUKI [JP], et al) [X] 1,3,5-11,14-16 * figure 1; examples 1-5 * [A] 17,18 [Y] 12,13,19,20 [I] 4;
 [Y]JP2001091694  (MITSUBISHI HEAVY IND LTD) [Y] 12,13,19,20* the whole document *;
 [XAYI]CN101811023  (SHANGHAI FUXU MOLECULAR SIEVE CO LTD) [X] 1-3,5-11,14-16 * claims 1,7 * [A] 17,18 [Y] 12,13,19,20 [I] 4,6
International search[A]KR880010809  (UNION CARBIDE CANADA LIMITED);
 [X]KR0146503B  (KOREA RES INST CHEM TECH [KR]);
 [X]KR20000074883  (UOP LLC);
 [A]JP2005254209  (TOKYO ELECTRIC POWER CO);
 [X]KR20090074422  (KAVO TECH CO LTD [KR])
by applicantKR100392408B
 KR100607013B
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.