EP2929558 - SEMICONDUCTOR INSPECTION AND METROLOGY SYSTEM USING LASER PULSE MULTIPLIER [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 21.07.2023 Database last updated on 26.06.2024 | |
Former | The patent has been granted Status updated on 12.08.2022 | ||
Former | Grant of patent is intended Status updated on 07.04.2022 | ||
Former | Examination is in progress Status updated on 08.05.2019 | Most recent event Tooltip | 14.06.2024 | Lapse of the patent in a contracting state New state(s): MC, TR | published on 17.07.2024 [2024/29] | Applicant(s) | For all designated states Kla-Tencor Corporation One Technology Drive Milpitas, California 95035 / US | [2015/42] | Inventor(s) | 01 /
CHUANG, Yung-Ho Alex 10678 Farallone Drive Cupertino, California 95014 / US | 02 /
LIOU, Justin Dianhuan 3491 Flora Vista Avenue Santa Clara, California 95051 / US | 03 /
ARMSTRONG, J., Joseph 43141 Gallegos Avenue Fremont, California 94539 / US | 04 /
DENG, Yujun 1712 Fan Street San Jose, California 95131 / US | [2015/42] | Representative(s) | FRKelly Waterways House Grand Canal Quay Dublin D02 PD39 / IE | [N/P] |
Former [2022/37] | FRKelly 27 Clyde Road Dublin D04 F838 / IE | ||
Former [2015/42] | Keane, Paul Fachtna FRKelly 27 Clyde Road Dublin 4 / IE | Application number, filing date | 13860524.1 | 03.12.2013 | [2015/42] | WO2013US72774 | Priority number, date | US201261733858P | 05.12.2012 Original published format: US 201261733858 P | US201213711593 | 11.12.2012 Original published format: US201213711593 | [2015/42] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2014089020 | Date: | 12.06.2014 | Language: | EN | [2014/24] | Type: | A1 Application with search report | No.: | EP2929558 | Date: | 14.10.2015 | Language: | EN | The application published by WIPO in one of the EPO official languages on 12.06.2014 takes the place of the publication of the European patent application. | [2015/42] | Type: | B1 Patent specification | No.: | EP2929558 | Date: | 14.09.2022 | Language: | EN | [2022/37] | Search report(s) | International search report - published on: | KR | 12.06.2014 | (Supplementary) European search report - dispatched on: | EP | 04.07.2016 | Classification | IPC: | H01S3/00, G01N21/88, G02B27/10, // G01N21/95 | [2022/11] | CPC: |
H01S3/005 (EP,CN,KR,US);
C23C16/00 (KR,US);
G01N21/8806 (EP,KR);
G01N21/9501 (EP,KR);
G02B17/00 (US);
G02B17/0848 (KR,US);
G02B27/00 (KR,US);
G02B27/108 (EP,US);
H01L22/12 (KR);
|
Former IPC [2015/42] | H01L21/66 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2015/42] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | HALBLEITERPRÜFUNGS- UND -METROLOGIESYSTEM MIT EINEM LASERPULSVERVIELFACHER | [2015/42] | English: | SEMICONDUCTOR INSPECTION AND METROLOGY SYSTEM USING LASER PULSE MULTIPLIER | [2015/42] | French: | SYSTÈME DE MÉTROLOGIE ET D'INSPECTION DE SEMI-CONDUCTEUR À L'AIDE D'UN MULTIPLICATEUR D'IMPULSION LASER | [2015/42] | Entry into regional phase | 06.07.2015 | National basic fee paid | 06.07.2015 | Search fee paid | 06.07.2015 | Designation fee(s) paid | 06.07.2015 | Examination fee paid | Examination procedure | 06.07.2015 | Examination requested [2015/42] | 16.01.2017 | Amendment by applicant (claims and/or description) | 13.05.2019 | Despatch of a communication from the examining division (Time limit: M04) | 23.09.2019 | Reply to a communication from the examining division | 21.06.2021 | Despatch of a communication from the examining division (Time limit: M04) | 11.10.2021 | Reply to a communication from the examining division | 08.04.2022 | Communication of intention to grant the patent | 05.08.2022 | Fee for grant paid | 05.08.2022 | Fee for publishing/printing paid | 05.08.2022 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 13.05.2019 | Opposition(s) | 15.06.2023 | No opposition filed within time limit [2023/34] | Fees paid | Renewal fee | 28.12.2015 | Renewal fee patent year 03 | 27.12.2016 | Renewal fee patent year 04 | 27.12.2017 | Renewal fee patent year 05 | 31.12.2018 | Renewal fee patent year 06 | 27.12.2019 | Renewal fee patent year 07 | 28.12.2020 | Renewal fee patent year 08 | 27.12.2021 | Renewal fee patent year 09 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 03.12.2013 | AL | 14.09.2022 | AT | 14.09.2022 | CY | 14.09.2022 | CZ | 14.09.2022 | DK | 14.09.2022 | EE | 14.09.2022 | ES | 14.09.2022 | FI | 14.09.2022 | HR | 14.09.2022 | IT | 14.09.2022 | LT | 14.09.2022 | LV | 14.09.2022 | MC | 14.09.2022 | MK | 14.09.2022 | PL | 14.09.2022 | RO | 14.09.2022 | RS | 14.09.2022 | SE | 14.09.2022 | SI | 14.09.2022 | SK | 14.09.2022 | SM | 14.09.2022 | TR | 14.09.2022 | IE | 03.12.2022 | LU | 03.12.2022 | GB | 14.12.2022 | NO | 14.12.2022 | GR | 15.12.2022 | BE | 31.12.2022 | CH | 31.12.2022 | FR | 31.12.2022 | LI | 31.12.2022 | IS | 14.01.2023 | PT | 16.01.2023 | [2024/29] |
Former [2024/27] | HU | 03.12.2013 | |
AL | 14.09.2022 | ||
AT | 14.09.2022 | ||
CY | 14.09.2022 | ||
CZ | 14.09.2022 | ||
DK | 14.09.2022 | ||
EE | 14.09.2022 | ||
ES | 14.09.2022 | ||
FI | 14.09.2022 | ||
HR | 14.09.2022 | ||
IT | 14.09.2022 | ||
LT | 14.09.2022 | ||
LV | 14.09.2022 | ||
MK | 14.09.2022 | ||
PL | 14.09.2022 | ||
RO | 14.09.2022 | ||
RS | 14.09.2022 | ||
SE | 14.09.2022 | ||
SI | 14.09.2022 | ||
SK | 14.09.2022 | ||
SM | 14.09.2022 | ||
IE | 03.12.2022 | ||
LU | 03.12.2022 | ||
GB | 14.12.2022 | ||
NO | 14.12.2022 | ||
GR | 15.12.2022 | ||
BE | 31.12.2022 | ||
CH | 31.12.2022 | ||
FR | 31.12.2022 | ||
LI | 31.12.2022 | ||
IS | 14.01.2023 | ||
PT | 16.01.2023 | ||
Former [2024/26] | HU | 03.12.2013 | |
AL | 14.09.2022 | ||
AT | 14.09.2022 | ||
CY | 14.09.2022 | ||
CZ | 14.09.2022 | ||
DK | 14.09.2022 | ||
EE | 14.09.2022 | ||
ES | 14.09.2022 | ||
FI | 14.09.2022 | ||
HR | 14.09.2022 | ||
IT | 14.09.2022 | ||
LT | 14.09.2022 | ||
LV | 14.09.2022 | ||
PL | 14.09.2022 | ||
RO | 14.09.2022 | ||
RS | 14.09.2022 | ||
SE | 14.09.2022 | ||
SI | 14.09.2022 | ||
SK | 14.09.2022 | ||
SM | 14.09.2022 | ||
IE | 03.12.2022 | ||
LU | 03.12.2022 | ||
GB | 14.12.2022 | ||
NO | 14.12.2022 | ||
GR | 15.12.2022 | ||
BE | 31.12.2022 | ||
CH | 31.12.2022 | ||
FR | 31.12.2022 | ||
LI | 31.12.2022 | ||
IS | 14.01.2023 | ||
PT | 16.01.2023 | ||
Former [2024/21] | HU | 03.12.2013 | |
AL | 14.09.2022 | ||
AT | 14.09.2022 | ||
CY | 14.09.2022 | ||
CZ | 14.09.2022 | ||
DK | 14.09.2022 | ||
EE | 14.09.2022 | ||
ES | 14.09.2022 | ||
FI | 14.09.2022 | ||
HR | 14.09.2022 | ||
LT | 14.09.2022 | ||
LV | 14.09.2022 | ||
PL | 14.09.2022 | ||
RO | 14.09.2022 | ||
RS | 14.09.2022 | ||
SE | 14.09.2022 | ||
SI | 14.09.2022 | ||
SK | 14.09.2022 | ||
SM | 14.09.2022 | ||
IE | 03.12.2022 | ||
LU | 03.12.2022 | ||
GB | 14.12.2022 | ||
NO | 14.12.2022 | ||
GR | 15.12.2022 | ||
BE | 31.12.2022 | ||
CH | 31.12.2022 | ||
FR | 31.12.2022 | ||
LI | 31.12.2022 | ||
IS | 14.01.2023 | ||
PT | 16.01.2023 | ||
Former [2024/18] | HU | 03.12.2013 | |
AL | 14.09.2022 | ||
AT | 14.09.2022 | ||
CZ | 14.09.2022 | ||
DK | 14.09.2022 | ||
EE | 14.09.2022 | ||
ES | 14.09.2022 | ||
FI | 14.09.2022 | ||
HR | 14.09.2022 | ||
LT | 14.09.2022 | ||
LV | 14.09.2022 | ||
PL | 14.09.2022 | ||
RO | 14.09.2022 | ||
RS | 14.09.2022 | ||
SE | 14.09.2022 | ||
SI | 14.09.2022 | ||
SK | 14.09.2022 | ||
SM | 14.09.2022 | ||
IE | 03.12.2022 | ||
LU | 03.12.2022 | ||
GB | 14.12.2022 | ||
NO | 14.12.2022 | ||
GR | 15.12.2022 | ||
BE | 31.12.2022 | ||
CH | 31.12.2022 | ||
FR | 31.12.2022 | ||
LI | 31.12.2022 | ||
IS | 14.01.2023 | ||
PT | 16.01.2023 | ||
Former [2023/52] | AL | 14.09.2022 | |
AT | 14.09.2022 | ||
CZ | 14.09.2022 | ||
DK | 14.09.2022 | ||
EE | 14.09.2022 | ||
ES | 14.09.2022 | ||
FI | 14.09.2022 | ||
HR | 14.09.2022 | ||
LT | 14.09.2022 | ||
LV | 14.09.2022 | ||
PL | 14.09.2022 | ||
RO | 14.09.2022 | ||
RS | 14.09.2022 | ||
SE | 14.09.2022 | ||
SI | 14.09.2022 | ||
SK | 14.09.2022 | ||
SM | 14.09.2022 | ||
IE | 03.12.2022 | ||
LU | 03.12.2022 | ||
GB | 14.12.2022 | ||
NO | 14.12.2022 | ||
GR | 15.12.2022 | ||
BE | 31.12.2022 | ||
CH | 31.12.2022 | ||
FR | 31.12.2022 | ||
LI | 31.12.2022 | ||
IS | 14.01.2023 | ||
PT | 16.01.2023 | ||
Former [2023/49] | AL | 14.09.2022 | |
AT | 14.09.2022 | ||
CZ | 14.09.2022 | ||
DK | 14.09.2022 | ||
EE | 14.09.2022 | ||
ES | 14.09.2022 | ||
FI | 14.09.2022 | ||
HR | 14.09.2022 | ||
LT | 14.09.2022 | ||
LV | 14.09.2022 | ||
PL | 14.09.2022 | ||
RO | 14.09.2022 | ||
RS | 14.09.2022 | ||
SE | 14.09.2022 | ||
SI | 14.09.2022 | ||
SK | 14.09.2022 | ||
SM | 14.09.2022 | ||
IE | 03.12.2022 | ||
LU | 03.12.2022 | ||
GB | 14.12.2022 | ||
NO | 14.12.2022 | ||
GR | 15.12.2022 | ||
BE | 31.12.2022 | ||
CH | 31.12.2022 | ||
LI | 31.12.2022 | ||
IS | 14.01.2023 | ||
PT | 16.01.2023 | ||
Former [2023/48] | AL | 14.09.2022 | |
AT | 14.09.2022 | ||
CZ | 14.09.2022 | ||
DK | 14.09.2022 | ||
EE | 14.09.2022 | ||
ES | 14.09.2022 | ||
FI | 14.09.2022 | ||
HR | 14.09.2022 | ||
LT | 14.09.2022 | ||
LV | 14.09.2022 | ||
PL | 14.09.2022 | ||
RO | 14.09.2022 | ||
RS | 14.09.2022 | ||
SE | 14.09.2022 | ||
SI | 14.09.2022 | ||
SK | 14.09.2022 | ||
SM | 14.09.2022 | ||
IE | 03.12.2022 | ||
LU | 03.12.2022 | ||
GB | 14.12.2022 | ||
NO | 14.12.2022 | ||
GR | 15.12.2022 | ||
CH | 31.12.2022 | ||
LI | 31.12.2022 | ||
IS | 14.01.2023 | ||
PT | 16.01.2023 | ||
Former [2023/47] | AL | 14.09.2022 | |
AT | 14.09.2022 | ||
CZ | 14.09.2022 | ||
DK | 14.09.2022 | ||
EE | 14.09.2022 | ||
ES | 14.09.2022 | ||
FI | 14.09.2022 | ||
HR | 14.09.2022 | ||
LT | 14.09.2022 | ||
LV | 14.09.2022 | ||
PL | 14.09.2022 | ||
RO | 14.09.2022 | ||
RS | 14.09.2022 | ||
SE | 14.09.2022 | ||
SI | 14.09.2022 | ||
SK | 14.09.2022 | ||
SM | 14.09.2022 | ||
LU | 03.12.2022 | ||
GB | 14.12.2022 | ||
NO | 14.12.2022 | ||
GR | 15.12.2022 | ||
CH | 31.12.2022 | ||
LI | 31.12.2022 | ||
IS | 14.01.2023 | ||
PT | 16.01.2023 | ||
Former [2023/38] | AL | 14.09.2022 | |
AT | 14.09.2022 | ||
CZ | 14.09.2022 | ||
DK | 14.09.2022 | ||
EE | 14.09.2022 | ||
ES | 14.09.2022 | ||
FI | 14.09.2022 | ||
HR | 14.09.2022 | ||
LT | 14.09.2022 | ||
LV | 14.09.2022 | ||
PL | 14.09.2022 | ||
RO | 14.09.2022 | ||
RS | 14.09.2022 | ||
SE | 14.09.2022 | ||
SI | 14.09.2022 | ||
SK | 14.09.2022 | ||
SM | 14.09.2022 | ||
LU | 03.12.2022 | ||
NO | 14.12.2022 | ||
GR | 15.12.2022 | ||
IS | 14.01.2023 | ||
PT | 16.01.2023 | ||
Former [2023/37] | AL | 14.09.2022 | |
AT | 14.09.2022 | ||
CZ | 14.09.2022 | ||
DK | 14.09.2022 | ||
EE | 14.09.2022 | ||
ES | 14.09.2022 | ||
FI | 14.09.2022 | ||
HR | 14.09.2022 | ||
LT | 14.09.2022 | ||
LV | 14.09.2022 | ||
PL | 14.09.2022 | ||
RO | 14.09.2022 | ||
RS | 14.09.2022 | ||
SE | 14.09.2022 | ||
SI | 14.09.2022 | ||
SK | 14.09.2022 | ||
SM | 14.09.2022 | ||
NO | 14.12.2022 | ||
GR | 15.12.2022 | ||
IS | 14.01.2023 | ||
PT | 16.01.2023 | ||
Former [2023/33] | AL | 14.09.2022 | |
AT | 14.09.2022 | ||
CZ | 14.09.2022 | ||
DK | 14.09.2022 | ||
EE | 14.09.2022 | ||
ES | 14.09.2022 | ||
FI | 14.09.2022 | ||
HR | 14.09.2022 | ||
LT | 14.09.2022 | ||
LV | 14.09.2022 | ||
PL | 14.09.2022 | ||
RO | 14.09.2022 | ||
RS | 14.09.2022 | ||
SE | 14.09.2022 | ||
SK | 14.09.2022 | ||
SM | 14.09.2022 | ||
NO | 14.12.2022 | ||
GR | 15.12.2022 | ||
IS | 14.01.2023 | ||
PT | 16.01.2023 | ||
Former [2023/29] | AL | 14.09.2022 | |
AT | 14.09.2022 | ||
CZ | 14.09.2022 | ||
EE | 14.09.2022 | ||
ES | 14.09.2022 | ||
FI | 14.09.2022 | ||
HR | 14.09.2022 | ||
LT | 14.09.2022 | ||
LV | 14.09.2022 | ||
PL | 14.09.2022 | ||
RO | 14.09.2022 | ||
RS | 14.09.2022 | ||
SE | 14.09.2022 | ||
SK | 14.09.2022 | ||
SM | 14.09.2022 | ||
NO | 14.12.2022 | ||
GR | 15.12.2022 | ||
IS | 14.01.2023 | ||
PT | 16.01.2023 | ||
Former [2023/26] | AT | 14.09.2022 | |
CZ | 14.09.2022 | ||
EE | 14.09.2022 | ||
ES | 14.09.2022 | ||
FI | 14.09.2022 | ||
HR | 14.09.2022 | ||
LT | 14.09.2022 | ||
LV | 14.09.2022 | ||
PL | 14.09.2022 | ||
RO | 14.09.2022 | ||
RS | 14.09.2022 | ||
SE | 14.09.2022 | ||
SK | 14.09.2022 | ||
SM | 14.09.2022 | ||
NO | 14.12.2022 | ||
GR | 15.12.2022 | ||
IS | 14.01.2023 | ||
PT | 16.01.2023 | ||
Former [2023/23] | AT | 14.09.2022 | |
CZ | 14.09.2022 | ||
EE | 14.09.2022 | ||
ES | 14.09.2022 | ||
FI | 14.09.2022 | ||
HR | 14.09.2022 | ||
LT | 14.09.2022 | ||
LV | 14.09.2022 | ||
RO | 14.09.2022 | ||
RS | 14.09.2022 | ||
SE | 14.09.2022 | ||
SK | 14.09.2022 | ||
SM | 14.09.2022 | ||
NO | 14.12.2022 | ||
GR | 15.12.2022 | ||
PT | 16.01.2023 | ||
Former [2023/22] | AT | 14.09.2022 | |
CZ | 14.09.2022 | ||
ES | 14.09.2022 | ||
FI | 14.09.2022 | ||
HR | 14.09.2022 | ||
LT | 14.09.2022 | ||
LV | 14.09.2022 | ||
RO | 14.09.2022 | ||
RS | 14.09.2022 | ||
SE | 14.09.2022 | ||
SM | 14.09.2022 | ||
NO | 14.12.2022 | ||
GR | 15.12.2022 | ||
PT | 16.01.2023 | ||
Former [2023/20] | FI | 14.09.2022 | |
HR | 14.09.2022 | ||
LT | 14.09.2022 | ||
LV | 14.09.2022 | ||
RS | 14.09.2022 | ||
SE | 14.09.2022 | ||
SM | 14.09.2022 | ||
NO | 14.12.2022 | ||
GR | 15.12.2022 | ||
Former [2023/10] | FI | 14.09.2022 | |
HR | 14.09.2022 | ||
LT | 14.09.2022 | ||
LV | 14.09.2022 | ||
RS | 14.09.2022 | ||
SE | 14.09.2022 | ||
NO | 14.12.2022 | ||
GR | 15.12.2022 | ||
Former [2023/09] | FI | 14.09.2022 | |
LT | 14.09.2022 | ||
LV | 14.09.2022 | ||
RS | 14.09.2022 | ||
SE | 14.09.2022 | ||
NO | 14.12.2022 | ||
Former [2023/08] | FI | 14.09.2022 | |
LT | 14.09.2022 | ||
RS | 14.09.2022 | ||
SE | 14.09.2022 | ||
NO | 14.12.2022 | Documents cited: | Search | [X]US2003043876 (LUBLIN LEONARD [US], et al) [X] 1-15* paragraph [0031] - paragraph [0032]; figure 2 *; | [X]US2005190452 (GOVORKOV SERGEI V [US], et al) [X] 1-15 * abstract *; | [X]DE102009047098 (ZEISS CARL SMT GMBH [DE]) [X] 1-15 * abstract * * paragraph [0002]; figure 5 * * paragraph [0038] - paragraph [0042] * | International search | [A]KR20000034461 (DAEWOO ELECTRONICS CO LTD); | [Y]JP2006186046 (KOMATSU MFG CO LTD, et al); | [A]US2006171036 (GOVORKOV SERGEI V [US], et al); | [X]WO2011064059 (ZEISS CARL SMT GMBH [DE], et al); | [A]JP2012098103 (HITACHI HIGH TECH CORP) | Examination | US2001021206 | by applicant | US2001021206 | US2003043876 | US2005190452 | JP2006186046 | WO2011064059 |