EP2816840 - ADAPTIVE TRANSMISSION SCHEME WITH TWO MODES OF OPERATION [Right-click to bookmark this link] | |||
Former [2014/52] | DATA TRANSMISSION METHOD, BASE STATION, AND USER EQUIPMENT | ||
[2016/32] | Status | No opposition filed within time limit Status updated on 10.11.2017 Database last updated on 12.07.2024 | |
Former | The patent has been granted Status updated on 02.12.2016 | ||
Former | Grant of patent is intended Status updated on 02.11.2016 | Most recent event Tooltip | 17.07.2020 | Lapse of the patent in a contracting state New state(s): AL | published on 19.08.2020 [2020/34] | Applicant(s) | For all designated states Huawei Device Co., Ltd. Building 2, Zone B Huawei Industrial Base Bantian, Longgang District Shenzhen, Guangdong 518129 / CN | [2014/52] | Inventor(s) | 01 /
WANG, Jian Huawei Device Co., Ltd. Building 2, Zone B, Huawei Industrial Base Bantian, Longgang District Shenzhen Guangdong 518129 / CN | [2017/01] |
Former [2014/52] | 01 /
WANG, Jian Huawei Device Co., Ltd. Building 2, Zone B, Huawei Industrial Base Bantian, Longgang District Shenzen Quangdong 518129 / CN | Representative(s) | Epping - Hermann - Fischer Patentanwaltsgesellschaft mbH Schloßschmidstraße 5 80639 München / DE | [2014/52] | Application number, filing date | 13866478.4 | 21.03.2013 | [2017/01] | WO2013CN72999 | Filing language | ZH | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2014146277 | Date: | 25.09.2014 | Language: | ZH | [2014/39] | Type: | A1 Application with search report | No.: | EP2816840 | Date: | 24.12.2014 | Language: | EN | [2014/52] | Type: | B1 Patent specification | No.: | EP2816840 | Date: | 04.01.2017 | Language: | EN | [2017/01] | Search report(s) | International search report - published on: | CN | 25.09.2014 | (Supplementary) European search report - dispatched on: | EP | 24.03.2015 | Classification | IPC: | H04L1/00, H04L5/00 | [2015/17] | CPC: |
H04L5/0046 (EP,US);
H04L5/0005 (KR);
H04L1/0003 (EP,US);
H04L1/0007 (EP,US);
H04L1/0009 (EP,US);
H04L1/0015 (EP,US);
H04L5/003 (EP,KR,US)
(-)
|
Former IPC [2014/52] | H04W36/08 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2014/52] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | ADAPTIVES ÜBERTRAGUNGSVERFAHREN MIT ZWEI BETRIEBSMODI | [2016/32] | English: | ADAPTIVE TRANSMISSION SCHEME WITH TWO MODES OF OPERATION | [2016/32] | French: | PROCÉDÉ ADAPTIVE DE TRANSMISSION AVEC DEUX MODES D'OPÉRATION | [2016/32] |
Former [2014/52] | DATENÜBERTRAGUNGSVERFAHREN, BASISSTATION UND BENUTZERVORRICHTUNG DAFÜR | ||
Former [2014/52] | DATA TRANSMISSION METHOD, BASE STATION, AND USER EQUIPMENT | ||
Former [2014/52] | PROCÉDÉ DE TRANSMISSION DE DONNÉES, STATION DE BASE, ET ÉQUIPEMENT D'UTILISATEUR | Entry into regional phase | 27.06.2014 | Translation filed | 27.06.2014 | National basic fee paid | 27.06.2014 | Search fee paid | 27.06.2014 | Designation fee(s) paid | 27.06.2014 | Examination fee paid | Examination procedure | 27.06.2014 | Examination requested [2014/52] | 10.08.2015 | Amendment by applicant (claims and/or description) | 10.09.2015 | Despatch of a communication from the examining division (Time limit: M04) | 04.01.2016 | Reply to a communication from the examining division | 05.02.2016 | Despatch of a communication from the examining division (Time limit: M04) | 10.06.2016 | Reply to a communication from the examining division | 18.07.2016 | Communication of intention to grant the patent | 28.10.2016 | Fee for grant paid | 28.10.2016 | Fee for publishing/printing paid | 22.11.2016 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 10.09.2015 | Opposition(s) | 05.10.2017 | No opposition filed within time limit [2017/50] | Fees paid | Renewal fee | 24.03.2015 | Renewal fee patent year 03 | 22.03.2016 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 21.03.2013 | AL | 04.01.2017 | AT | 04.01.2017 | CY | 04.01.2017 | CZ | 04.01.2017 | DK | 04.01.2017 | EE | 04.01.2017 | ES | 04.01.2017 | FI | 04.01.2017 | HR | 04.01.2017 | IT | 04.01.2017 | LT | 04.01.2017 | LV | 04.01.2017 | MC | 04.01.2017 | MK | 04.01.2017 | NL | 04.01.2017 | PL | 04.01.2017 | RO | 04.01.2017 | RS | 04.01.2017 | SE | 04.01.2017 | SI | 04.01.2017 | SK | 04.01.2017 | SM | 04.01.2017 | TR | 04.01.2017 | IE | 21.03.2017 | LU | 21.03.2017 | MT | 21.03.2017 | BE | 31.03.2017 | CH | 31.03.2017 | LI | 31.03.2017 | BG | 04.04.2017 | NO | 04.04.2017 | GR | 05.04.2017 | IS | 04.05.2017 | PT | 04.05.2017 | [2020/34] |
Former [2020/15] | HU | 21.03.2013 | |
AT | 04.01.2017 | ||
CY | 04.01.2017 | ||
CZ | 04.01.2017 | ||
DK | 04.01.2017 | ||
EE | 04.01.2017 | ||
ES | 04.01.2017 | ||
FI | 04.01.2017 | ||
HR | 04.01.2017 | ||
IT | 04.01.2017 | ||
LT | 04.01.2017 | ||
LV | 04.01.2017 | ||
MC | 04.01.2017 | ||
MK | 04.01.2017 | ||
NL | 04.01.2017 | ||
PL | 04.01.2017 | ||
RO | 04.01.2017 | ||
RS | 04.01.2017 | ||
SE | 04.01.2017 | ||
SI | 04.01.2017 | ||
SK | 04.01.2017 | ||
SM | 04.01.2017 | ||
TR | 04.01.2017 | ||
IE | 21.03.2017 | ||
LU | 21.03.2017 | ||
MT | 21.03.2017 | ||
BE | 31.03.2017 | ||
CH | 31.03.2017 | ||
LI | 31.03.2017 | ||
BG | 04.04.2017 | ||
NO | 04.04.2017 | ||
GR | 05.04.2017 | ||
IS | 04.05.2017 | ||
PT | 04.05.2017 | ||
Former [2019/52] | HU | 21.03.2013 | |
AT | 04.01.2017 | ||
CY | 04.01.2017 | ||
CZ | 04.01.2017 | ||
DK | 04.01.2017 | ||
EE | 04.01.2017 | ||
ES | 04.01.2017 | ||
FI | 04.01.2017 | ||
HR | 04.01.2017 | ||
IT | 04.01.2017 | ||
LT | 04.01.2017 | ||
LV | 04.01.2017 | ||
MC | 04.01.2017 | ||
MK | 04.01.2017 | ||
NL | 04.01.2017 | ||
PL | 04.01.2017 | ||
RO | 04.01.2017 | ||
RS | 04.01.2017 | ||
SE | 04.01.2017 | ||
SI | 04.01.2017 | ||
SK | 04.01.2017 | ||
SM | 04.01.2017 | ||
IE | 21.03.2017 | ||
LU | 21.03.2017 | ||
MT | 21.03.2017 | ||
BE | 31.03.2017 | ||
CH | 31.03.2017 | ||
LI | 31.03.2017 | ||
BG | 04.04.2017 | ||
NO | 04.04.2017 | ||
GR | 05.04.2017 | ||
IS | 04.05.2017 | ||
PT | 04.05.2017 | ||
Former [2019/47] | HU | 21.03.2013 | |
AT | 04.01.2017 | ||
CY | 04.01.2017 | ||
CZ | 04.01.2017 | ||
DK | 04.01.2017 | ||
EE | 04.01.2017 | ||
ES | 04.01.2017 | ||
FI | 04.01.2017 | ||
HR | 04.01.2017 | ||
IT | 04.01.2017 | ||
LT | 04.01.2017 | ||
LV | 04.01.2017 | ||
MC | 04.01.2017 | ||
NL | 04.01.2017 | ||
PL | 04.01.2017 | ||
RO | 04.01.2017 | ||
RS | 04.01.2017 | ||
SE | 04.01.2017 | ||
SI | 04.01.2017 | ||
SK | 04.01.2017 | ||
SM | 04.01.2017 | ||
IE | 21.03.2017 | ||
LU | 21.03.2017 | ||
MT | 21.03.2017 | ||
BE | 31.03.2017 | ||
CH | 31.03.2017 | ||
LI | 31.03.2017 | ||
BG | 04.04.2017 | ||
NO | 04.04.2017 | ||
GR | 05.04.2017 | ||
IS | 04.05.2017 | ||
PT | 04.05.2017 | ||
Former [2019/31] | HU | 21.03.2013 | |
AT | 04.01.2017 | ||
CZ | 04.01.2017 | ||
DK | 04.01.2017 | ||
EE | 04.01.2017 | ||
ES | 04.01.2017 | ||
FI | 04.01.2017 | ||
HR | 04.01.2017 | ||
IT | 04.01.2017 | ||
LT | 04.01.2017 | ||
LV | 04.01.2017 | ||
MC | 04.01.2017 | ||
NL | 04.01.2017 | ||
PL | 04.01.2017 | ||
RO | 04.01.2017 | ||
RS | 04.01.2017 | ||
SE | 04.01.2017 | ||
SI | 04.01.2017 | ||
SK | 04.01.2017 | ||
SM | 04.01.2017 | ||
IE | 21.03.2017 | ||
LU | 21.03.2017 | ||
MT | 21.03.2017 | ||
BE | 31.03.2017 | ||
CH | 31.03.2017 | ||
LI | 31.03.2017 | ||
BG | 04.04.2017 | ||
NO | 04.04.2017 | ||
GR | 05.04.2017 | ||
IS | 04.05.2017 | ||
PT | 04.05.2017 | ||
Former [2018/43] | AT | 04.01.2017 | |
CZ | 04.01.2017 | ||
DK | 04.01.2017 | ||
EE | 04.01.2017 | ||
ES | 04.01.2017 | ||
FI | 04.01.2017 | ||
HR | 04.01.2017 | ||
IT | 04.01.2017 | ||
LT | 04.01.2017 | ||
LV | 04.01.2017 | ||
MC | 04.01.2017 | ||
NL | 04.01.2017 | ||
PL | 04.01.2017 | ||
RO | 04.01.2017 | ||
RS | 04.01.2017 | ||
SE | 04.01.2017 | ||
SI | 04.01.2017 | ||
SK | 04.01.2017 | ||
SM | 04.01.2017 | ||
IE | 21.03.2017 | ||
LU | 21.03.2017 | ||
MT | 21.03.2017 | ||
BE | 31.03.2017 | ||
CH | 31.03.2017 | ||
LI | 31.03.2017 | ||
BG | 04.04.2017 | ||
NO | 04.04.2017 | ||
GR | 05.04.2017 | ||
IS | 04.05.2017 | ||
PT | 04.05.2017 | ||
Former [2018/24] | AT | 04.01.2017 | |
CZ | 04.01.2017 | ||
DK | 04.01.2017 | ||
EE | 04.01.2017 | ||
ES | 04.01.2017 | ||
FI | 04.01.2017 | ||
HR | 04.01.2017 | ||
IT | 04.01.2017 | ||
LT | 04.01.2017 | ||
LV | 04.01.2017 | ||
MC | 04.01.2017 | ||
NL | 04.01.2017 | ||
PL | 04.01.2017 | ||
RO | 04.01.2017 | ||
RS | 04.01.2017 | ||
SE | 04.01.2017 | ||
SI | 04.01.2017 | ||
SK | 04.01.2017 | ||
SM | 04.01.2017 | ||
IE | 21.03.2017 | ||
LU | 21.03.2017 | ||
BE | 31.03.2017 | ||
CH | 31.03.2017 | ||
LI | 31.03.2017 | ||
BG | 04.04.2017 | ||
NO | 04.04.2017 | ||
GR | 05.04.2017 | ||
IS | 04.05.2017 | ||
PT | 04.05.2017 | ||
Former [2018/13] | AT | 04.01.2017 | |
CZ | 04.01.2017 | ||
DK | 04.01.2017 | ||
EE | 04.01.2017 | ||
ES | 04.01.2017 | ||
FI | 04.01.2017 | ||
HR | 04.01.2017 | ||
IT | 04.01.2017 | ||
LT | 04.01.2017 | ||
LV | 04.01.2017 | ||
MC | 04.01.2017 | ||
NL | 04.01.2017 | ||
PL | 04.01.2017 | ||
RO | 04.01.2017 | ||
RS | 04.01.2017 | ||
SE | 04.01.2017 | ||
SI | 04.01.2017 | ||
SK | 04.01.2017 | ||
SM | 04.01.2017 | ||
IE | 21.03.2017 | ||
LU | 21.03.2017 | ||
CH | 31.03.2017 | ||
LI | 31.03.2017 | ||
BG | 04.04.2017 | ||
NO | 04.04.2017 | ||
GR | 05.04.2017 | ||
IS | 04.05.2017 | ||
PT | 04.05.2017 | ||
Former [2018/10] | AT | 04.01.2017 | |
CZ | 04.01.2017 | ||
DK | 04.01.2017 | ||
EE | 04.01.2017 | ||
ES | 04.01.2017 | ||
FI | 04.01.2017 | ||
HR | 04.01.2017 | ||
IT | 04.01.2017 | ||
LT | 04.01.2017 | ||
LV | 04.01.2017 | ||
MC | 04.01.2017 | ||
NL | 04.01.2017 | ||
PL | 04.01.2017 | ||
RO | 04.01.2017 | ||
RS | 04.01.2017 | ||
SE | 04.01.2017 | ||
SK | 04.01.2017 | ||
SM | 04.01.2017 | ||
LU | 21.03.2017 | ||
BG | 04.04.2017 | ||
NO | 04.04.2017 | ||
GR | 05.04.2017 | ||
IS | 04.05.2017 | ||
PT | 04.05.2017 | ||
Former [2017/51] | AT | 04.01.2017 | |
CZ | 04.01.2017 | ||
DK | 04.01.2017 | ||
EE | 04.01.2017 | ||
ES | 04.01.2017 | ||
FI | 04.01.2017 | ||
HR | 04.01.2017 | ||
IT | 04.01.2017 | ||
LT | 04.01.2017 | ||
LV | 04.01.2017 | ||
MC | 04.01.2017 | ||
NL | 04.01.2017 | ||
PL | 04.01.2017 | ||
RO | 04.01.2017 | ||
RS | 04.01.2017 | ||
SE | 04.01.2017 | ||
SK | 04.01.2017 | ||
SM | 04.01.2017 | ||
BG | 04.04.2017 | ||
NO | 04.04.2017 | ||
GR | 05.04.2017 | ||
IS | 04.05.2017 | ||
PT | 04.05.2017 | ||
Former [2017/50] | AT | 04.01.2017 | |
CZ | 04.01.2017 | ||
DK | 04.01.2017 | ||
EE | 04.01.2017 | ||
ES | 04.01.2017 | ||
FI | 04.01.2017 | ||
HR | 04.01.2017 | ||
IT | 04.01.2017 | ||
LT | 04.01.2017 | ||
LV | 04.01.2017 | ||
MC | 04.01.2017 | ||
NL | 04.01.2017 | ||
PL | 04.01.2017 | ||
RO | 04.01.2017 | ||
RS | 04.01.2017 | ||
SE | 04.01.2017 | ||
SK | 04.01.2017 | ||
BG | 04.04.2017 | ||
NO | 04.04.2017 | ||
GR | 05.04.2017 | ||
IS | 04.05.2017 | ||
PT | 04.05.2017 | ||
Former [2017/49] | AT | 04.01.2017 | |
CZ | 04.01.2017 | ||
EE | 04.01.2017 | ||
ES | 04.01.2017 | ||
FI | 04.01.2017 | ||
HR | 04.01.2017 | ||
IT | 04.01.2017 | ||
LT | 04.01.2017 | ||
LV | 04.01.2017 | ||
NL | 04.01.2017 | ||
PL | 04.01.2017 | ||
RO | 04.01.2017 | ||
RS | 04.01.2017 | ||
SE | 04.01.2017 | ||
SK | 04.01.2017 | ||
BG | 04.04.2017 | ||
NO | 04.04.2017 | ||
GR | 05.04.2017 | ||
IS | 04.05.2017 | ||
PT | 04.05.2017 | ||
Former [2017/48] | AT | 04.01.2017 | |
CZ | 04.01.2017 | ||
ES | 04.01.2017 | ||
FI | 04.01.2017 | ||
HR | 04.01.2017 | ||
LT | 04.01.2017 | ||
LV | 04.01.2017 | ||
NL | 04.01.2017 | ||
PL | 04.01.2017 | ||
RS | 04.01.2017 | ||
SE | 04.01.2017 | ||
BG | 04.04.2017 | ||
NO | 04.04.2017 | ||
GR | 05.04.2017 | ||
IS | 04.05.2017 | ||
PT | 04.05.2017 | ||
Former [2017/40] | AT | 04.01.2017 | |
ES | 04.01.2017 | ||
FI | 04.01.2017 | ||
HR | 04.01.2017 | ||
LT | 04.01.2017 | ||
LV | 04.01.2017 | ||
NL | 04.01.2017 | ||
PL | 04.01.2017 | ||
RS | 04.01.2017 | ||
SE | 04.01.2017 | ||
BG | 04.04.2017 | ||
NO | 04.04.2017 | ||
GR | 05.04.2017 | ||
IS | 04.05.2017 | ||
PT | 04.05.2017 | Documents cited: | Search | [X]EP2315369 (DA TANG MOBILE COMM EQUIPMENT [CN]) [X] 1,5,6,8,12,13,15,19,20,22,26,27 * paragraph [0003] * * paragraph [0010] - paragraph [0011] *; | [Y]US2012320805 (YANG SUCKCHEL [KR], et al) [Y] 3,10,17,24 * paragraph [0061] * | [XAY] - ZTE, "DCI format for semi-persistent scheduling", 3GPP DRAFT; R1-083602 DCI FORMAT FOR SEMI-PERSISTENT SCHEDULING, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20080924), vol. RAN WG1, no. Prague, Czech Republic; 20080929 - 20081003, XP050597032 [X] 1,2,4-6,8,9,11-13,15,16,18-20,22,23,25-27 * sections 1-3 * * section 5 * [A] 7,14,21,28 [Y] 3,10,17,24 | [X] - "3rd Generation Partnership Project; Technical Specification Group Radio Access Network; Evolved Universal Terrestrial Radio Access (E-UTRA); Physical layer procedures (Release 8)", 3GPP STANDARD; 3GPP TS 36.213, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20080501), no. V8.3.0, pages 1 - 47, XP050377558 [X] 1,5,6,8,12,13,15,19,20,22,26,27 * section 7.1 and corresponding subsections * | International search | [A]CN102106176 (SAMSUNG ELECTRONICS CO LTD); | [A]CN102577512 (LG ELECTRONICS INC) | Examination | EP2879427 |