EP2870821 - Mobile user equipment apparatus and method for operating a relay cell [Right-click to bookmark this link] | |||
Former [2015/20] | COMMUNICATION SYSTEM | ||
[2019/43] | Status | No opposition filed within time limit Status updated on 23.07.2021 Database last updated on 08.06.2024 | |
Former | The patent has been granted Status updated on 14.08.2020 | ||
Former | Grant of patent is intended Status updated on 07.04.2020 | ||
Former | Examination is in progress Status updated on 02.03.2020 | ||
Former | Grant of patent is intended Status updated on 28.10.2019 | ||
Former | Examination is in progress Status updated on 31.03.2017 | Most recent event Tooltip | 22.07.2022 | Lapse of the patent in a contracting state New state(s): BE | published on 24.08.2022 [2022/34] | Applicant(s) | For all designated states NEC Corporation 7-1, Shiba 5-chome Minato-ku Tokyo 108-8001 / JP | [2020/38] |
Former [2015/20] | For all designated states NEC Corporation 7-1 Shiba 5-chome Minato-ku Tokyo 108-8001 / JP | Inventor(s) | 01 /
DELSOL, Thomas c/o NEC Technologies (UK) Ltd. The Imperium Imperial Way Reading Berkshire RG2 0TD / GB | 02 /
PANAITOPOL, Dorin c/o NEC Technologies (UK) Ltd. The Imperium Imperial Way Reading Berkshire RG2 0TD / GB | [2015/20] | Representative(s) | MacDougall, Alan John Shaw Mathys & Squire The Shard 32 London Bridge Street London SE1 9SG / GB | [N/P] |
Former [2015/20] | MacDougall, Alan John Shaw Mathys & Squire LLP The Shard 32 London Bridge Street London SE1 9SG / GB | Application number, filing date | 13870975.3 | 21.11.2013 | [2020/38] | WO2013JP81985 | Priority number, date | GB20130000534 | 11.01.2013 Original published format: GB 201300534 | [2015/20] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2014109142 | Date: | 17.07.2014 | Language: | EN | [2014/29] | Type: | A1 Application with search report | No.: | EP2870821 | Date: | 13.05.2015 | Language: | EN | The application published by WIPO in one of the EPO official languages on 17.07.2014 takes the place of the publication of the European patent application. | [2015/20] | Type: | B1 Patent specification | No.: | EP2870821 | Date: | 16.09.2020 | Language: | EN | [2020/38] | Search report(s) | International search report - published on: | JP | 17.07.2014 | (Supplementary) European search report - dispatched on: | EP | 09.02.2016 | Classification | IPC: | H04W84/04, H04W24/10 | [2019/45] | CPC: |
H04W24/10 (EP,GB,US);
H04W84/047 (EP,US)
|
Former IPC [2015/20] | H04W88/04, H04W36/30 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2015/20] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | Mobiles Benutzerendgerät und Verfahren zum Betrieb einer Relaiszelle | [2019/43] | English: | Mobile user equipment apparatus and method for operating a relay cell | [2019/43] | French: | Équipement d'utilisateur mobile et procédé de fonctionnement de cellule de relais | [2019/43] |
Former [2015/20] | KOMMUNIKATIONSSYSTEM | ||
Former [2015/20] | COMMUNICATION SYSTEM | ||
Former [2015/20] | SYSTÈME DE COMMUNICATION | Entry into regional phase | 06.02.2015 | National basic fee paid | 06.02.2015 | Search fee paid | 06.02.2015 | Designation fee(s) paid | 06.02.2015 | Examination fee paid | Examination procedure | 06.02.2015 | Examination requested [2015/20] | 07.09.2016 | Amendment by applicant (claims and/or description) | 30.03.2017 | Despatch of a communication from the examining division (Time limit: M04) | 13.07.2017 | Reply to a communication from the examining division | 10.10.2017 | Despatch of a communication from the examining division (Time limit: M04) | 31.01.2018 | Reply to a communication from the examining division | 06.06.2018 | Despatch of a communication from the examining division (Time limit: M04) | 16.10.2018 | Reply to a communication from the examining division | 22.01.2019 | Despatch of a communication from the examining division (Time limit: M04) | 22.05.2019 | Reply to a communication from the examining division | 29.10.2019 | Communication of intention to grant the patent | 28.02.2020 | Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO | 08.04.2020 | Communication of intention to grant the patent | 07.08.2020 | Fee for grant paid | 07.08.2020 | Fee for publishing/printing paid | 07.08.2020 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 30.03.2017 | Opposition(s) | 17.06.2021 | No opposition filed within time limit [2021/34] | Fees paid | Renewal fee | 27.11.2015 | Renewal fee patent year 03 | 24.11.2016 | Renewal fee patent year 04 | 13.11.2017 | Renewal fee patent year 05 | 14.11.2018 | Renewal fee patent year 06 | 14.11.2019 | Renewal fee patent year 07 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 21.11.2013 | AL | 16.09.2020 | AT | 16.09.2020 | CY | 16.09.2020 | CZ | 16.09.2020 | DK | 16.09.2020 | EE | 16.09.2020 | ES | 16.09.2020 | FI | 16.09.2020 | HR | 16.09.2020 | IT | 16.09.2020 | LT | 16.09.2020 | LV | 16.09.2020 | MC | 16.09.2020 | MK | 16.09.2020 | MT | 16.09.2020 | NL | 16.09.2020 | PL | 16.09.2020 | RO | 16.09.2020 | RS | 16.09.2020 | SE | 16.09.2020 | SI | 16.09.2020 | SK | 16.09.2020 | SM | 16.09.2020 | TR | 16.09.2020 | IE | 21.11.2020 | LU | 21.11.2020 | BE | 30.11.2020 | CH | 30.11.2020 | LI | 30.11.2020 | BG | 16.12.2020 | NO | 16.12.2020 | GR | 17.12.2020 | IS | 16.01.2021 | PT | 18.01.2021 | [2022/34] |
Former [2022/32] | HU | 21.11.2013 | |
AL | 16.09.2020 | ||
AT | 16.09.2020 | ||
CY | 16.09.2020 | ||
CZ | 16.09.2020 | ||
DK | 16.09.2020 | ||
EE | 16.09.2020 | ||
ES | 16.09.2020 | ||
FI | 16.09.2020 | ||
HR | 16.09.2020 | ||
IT | 16.09.2020 | ||
LT | 16.09.2020 | ||
LV | 16.09.2020 | ||
MC | 16.09.2020 | ||
MK | 16.09.2020 | ||
MT | 16.09.2020 | ||
NL | 16.09.2020 | ||
PL | 16.09.2020 | ||
RO | 16.09.2020 | ||
RS | 16.09.2020 | ||
SE | 16.09.2020 | ||
SI | 16.09.2020 | ||
SK | 16.09.2020 | ||
SM | 16.09.2020 | ||
TR | 16.09.2020 | ||
IE | 21.11.2020 | ||
LU | 21.11.2020 | ||
CH | 30.11.2020 | ||
LI | 30.11.2020 | ||
BG | 16.12.2020 | ||
NO | 16.12.2020 | ||
GR | 17.12.2020 | ||
IS | 16.01.2021 | ||
PT | 18.01.2021 | ||
Former [2022/27] | HU | 21.11.2013 | |
AL | 16.09.2020 | ||
AT | 16.09.2020 | ||
CY | 16.09.2020 | ||
CZ | 16.09.2020 | ||
DK | 16.09.2020 | ||
EE | 16.09.2020 | ||
ES | 16.09.2020 | ||
FI | 16.09.2020 | ||
HR | 16.09.2020 | ||
IT | 16.09.2020 | ||
LT | 16.09.2020 | ||
LV | 16.09.2020 | ||
MC | 16.09.2020 | ||
MT | 16.09.2020 | ||
NL | 16.09.2020 | ||
PL | 16.09.2020 | ||
RO | 16.09.2020 | ||
RS | 16.09.2020 | ||
SE | 16.09.2020 | ||
SI | 16.09.2020 | ||
SK | 16.09.2020 | ||
SM | 16.09.2020 | ||
TR | 16.09.2020 | ||
IE | 21.11.2020 | ||
LU | 21.11.2020 | ||
CH | 30.11.2020 | ||
LI | 30.11.2020 | ||
BG | 16.12.2020 | ||
NO | 16.12.2020 | ||
GR | 17.12.2020 | ||
IS | 16.01.2021 | ||
PT | 18.01.2021 | ||
Former [2022/26] | AL | 16.09.2020 | |
AT | 16.09.2020 | ||
CZ | 16.09.2020 | ||
DK | 16.09.2020 | ||
EE | 16.09.2020 | ||
ES | 16.09.2020 | ||
FI | 16.09.2020 | ||
HR | 16.09.2020 | ||
IT | 16.09.2020 | ||
LT | 16.09.2020 | ||
LV | 16.09.2020 | ||
MC | 16.09.2020 | ||
NL | 16.09.2020 | ||
PL | 16.09.2020 | ||
RO | 16.09.2020 | ||
RS | 16.09.2020 | ||
SE | 16.09.2020 | ||
SI | 16.09.2020 | ||
SK | 16.09.2020 | ||
SM | 16.09.2020 | ||
TR | 16.09.2020 | ||
IE | 21.11.2020 | ||
LU | 21.11.2020 | ||
CH | 30.11.2020 | ||
LI | 30.11.2020 | ||
BG | 16.12.2020 | ||
NO | 16.12.2020 | ||
GR | 17.12.2020 | ||
IS | 16.01.2021 | ||
PT | 18.01.2021 | ||
Former [2021/48] | AL | 16.09.2020 | |
AT | 16.09.2020 | ||
CZ | 16.09.2020 | ||
DK | 16.09.2020 | ||
EE | 16.09.2020 | ||
ES | 16.09.2020 | ||
FI | 16.09.2020 | ||
HR | 16.09.2020 | ||
IT | 16.09.2020 | ||
LT | 16.09.2020 | ||
LV | 16.09.2020 | ||
MC | 16.09.2020 | ||
NL | 16.09.2020 | ||
PL | 16.09.2020 | ||
RO | 16.09.2020 | ||
RS | 16.09.2020 | ||
SE | 16.09.2020 | ||
SI | 16.09.2020 | ||
SK | 16.09.2020 | ||
SM | 16.09.2020 | ||
IE | 21.11.2020 | ||
LU | 21.11.2020 | ||
CH | 30.11.2020 | ||
LI | 30.11.2020 | ||
BG | 16.12.2020 | ||
NO | 16.12.2020 | ||
GR | 17.12.2020 | ||
IS | 16.01.2021 | ||
PT | 18.01.2021 | ||
Former [2021/46] | AL | 16.09.2020 | |
AT | 16.09.2020 | ||
CZ | 16.09.2020 | ||
DK | 16.09.2020 | ||
EE | 16.09.2020 | ||
ES | 16.09.2020 | ||
FI | 16.09.2020 | ||
HR | 16.09.2020 | ||
LT | 16.09.2020 | ||
LV | 16.09.2020 | ||
MC | 16.09.2020 | ||
NL | 16.09.2020 | ||
PL | 16.09.2020 | ||
RO | 16.09.2020 | ||
RS | 16.09.2020 | ||
SE | 16.09.2020 | ||
SI | 16.09.2020 | ||
SK | 16.09.2020 | ||
SM | 16.09.2020 | ||
IE | 21.11.2020 | ||
LU | 21.11.2020 | ||
CH | 30.11.2020 | ||
LI | 30.11.2020 | ||
BG | 16.12.2020 | ||
NO | 16.12.2020 | ||
GR | 17.12.2020 | ||
IS | 16.01.2021 | ||
PT | 18.01.2021 | ||
Former [2021/37] | AL | 16.09.2020 | |
AT | 16.09.2020 | ||
CZ | 16.09.2020 | ||
DK | 16.09.2020 | ||
EE | 16.09.2020 | ||
ES | 16.09.2020 | ||
FI | 16.09.2020 | ||
HR | 16.09.2020 | ||
LT | 16.09.2020 | ||
LV | 16.09.2020 | ||
MC | 16.09.2020 | ||
NL | 16.09.2020 | ||
PL | 16.09.2020 | ||
RO | 16.09.2020 | ||
RS | 16.09.2020 | ||
SE | 16.09.2020 | ||
SI | 16.09.2020 | ||
SK | 16.09.2020 | ||
SM | 16.09.2020 | ||
LU | 21.11.2020 | ||
CH | 30.11.2020 | ||
LI | 30.11.2020 | ||
BG | 16.12.2020 | ||
NO | 16.12.2020 | ||
GR | 17.12.2020 | ||
IS | 16.01.2021 | ||
PT | 18.01.2021 | ||
Former [2021/36] | AL | 16.09.2020 | |
AT | 16.09.2020 | ||
CZ | 16.09.2020 | ||
EE | 16.09.2020 | ||
ES | 16.09.2020 | ||
FI | 16.09.2020 | ||
HR | 16.09.2020 | ||
LT | 16.09.2020 | ||
LV | 16.09.2020 | ||
MC | 16.09.2020 | ||
NL | 16.09.2020 | ||
PL | 16.09.2020 | ||
RO | 16.09.2020 | ||
RS | 16.09.2020 | ||
SE | 16.09.2020 | ||
SI | 16.09.2020 | ||
SK | 16.09.2020 | ||
SM | 16.09.2020 | ||
LU | 21.11.2020 | ||
BG | 16.12.2020 | ||
NO | 16.12.2020 | ||
GR | 17.12.2020 | ||
IS | 16.01.2021 | ||
PT | 18.01.2021 | ||
Former [2021/33] | AL | 16.09.2020 | |
AT | 16.09.2020 | ||
CZ | 16.09.2020 | ||
EE | 16.09.2020 | ||
ES | 16.09.2020 | ||
FI | 16.09.2020 | ||
HR | 16.09.2020 | ||
LT | 16.09.2020 | ||
LV | 16.09.2020 | ||
MC | 16.09.2020 | ||
NL | 16.09.2020 | ||
PL | 16.09.2020 | ||
RO | 16.09.2020 | ||
RS | 16.09.2020 | ||
SE | 16.09.2020 | ||
SK | 16.09.2020 | ||
SM | 16.09.2020 | ||
LU | 21.11.2020 | ||
BG | 16.12.2020 | ||
NO | 16.12.2020 | ||
GR | 17.12.2020 | ||
IS | 16.01.2021 | ||
PT | 18.01.2021 | ||
Former [2021/31] | AL | 16.09.2020 | |
AT | 16.09.2020 | ||
CZ | 16.09.2020 | ||
EE | 16.09.2020 | ||
ES | 16.09.2020 | ||
FI | 16.09.2020 | ||
HR | 16.09.2020 | ||
LT | 16.09.2020 | ||
LV | 16.09.2020 | ||
MC | 16.09.2020 | ||
NL | 16.09.2020 | ||
PL | 16.09.2020 | ||
RO | 16.09.2020 | ||
RS | 16.09.2020 | ||
SE | 16.09.2020 | ||
SK | 16.09.2020 | ||
SM | 16.09.2020 | ||
BG | 16.12.2020 | ||
NO | 16.12.2020 | ||
GR | 17.12.2020 | ||
IS | 16.01.2021 | ||
PT | 18.01.2021 | ||
Former [2021/28] | AL | 16.09.2020 | |
AT | 16.09.2020 | ||
CZ | 16.09.2020 | ||
EE | 16.09.2020 | ||
ES | 16.09.2020 | ||
FI | 16.09.2020 | ||
HR | 16.09.2020 | ||
LT | 16.09.2020 | ||
LV | 16.09.2020 | ||
NL | 16.09.2020 | ||
PL | 16.09.2020 | ||
RO | 16.09.2020 | ||
RS | 16.09.2020 | ||
SE | 16.09.2020 | ||
SK | 16.09.2020 | ||
SM | 16.09.2020 | ||
BG | 16.12.2020 | ||
NO | 16.12.2020 | ||
GR | 17.12.2020 | ||
IS | 16.01.2021 | ||
PT | 18.01.2021 | ||
Former [2021/25] | AL | 16.09.2020 | |
AT | 16.09.2020 | ||
CZ | 16.09.2020 | ||
EE | 16.09.2020 | ||
ES | 16.09.2020 | ||
FI | 16.09.2020 | ||
HR | 16.09.2020 | ||
LT | 16.09.2020 | ||
LV | 16.09.2020 | ||
NL | 16.09.2020 | ||
PL | 16.09.2020 | ||
RO | 16.09.2020 | ||
RS | 16.09.2020 | ||
SE | 16.09.2020 | ||
SM | 16.09.2020 | ||
BG | 16.12.2020 | ||
NO | 16.12.2020 | ||
GR | 17.12.2020 | ||
IS | 16.01.2021 | ||
PT | 18.01.2021 | ||
Former [2021/24] | AT | 16.09.2020 | |
CZ | 16.09.2020 | ||
EE | 16.09.2020 | ||
FI | 16.09.2020 | ||
HR | 16.09.2020 | ||
LT | 16.09.2020 | ||
LV | 16.09.2020 | ||
NL | 16.09.2020 | ||
RO | 16.09.2020 | ||
RS | 16.09.2020 | ||
SE | 16.09.2020 | ||
SM | 16.09.2020 | ||
BG | 16.12.2020 | ||
NO | 16.12.2020 | ||
GR | 17.12.2020 | ||
PT | 18.01.2021 | ||
Former [2021/23] | CZ | 16.09.2020 | |
EE | 16.09.2020 | ||
FI | 16.09.2020 | ||
HR | 16.09.2020 | ||
LT | 16.09.2020 | ||
LV | 16.09.2020 | ||
NL | 16.09.2020 | ||
RO | 16.09.2020 | ||
RS | 16.09.2020 | ||
SE | 16.09.2020 | ||
SM | 16.09.2020 | ||
BG | 16.12.2020 | ||
NO | 16.12.2020 | ||
GR | 17.12.2020 | ||
PT | 18.01.2021 | ||
Former [2021/22] | CZ | 16.09.2020 | |
EE | 16.09.2020 | ||
FI | 16.09.2020 | ||
HR | 16.09.2020 | ||
LT | 16.09.2020 | ||
LV | 16.09.2020 | ||
NL | 16.09.2020 | ||
RO | 16.09.2020 | ||
RS | 16.09.2020 | ||
SE | 16.09.2020 | ||
BG | 16.12.2020 | ||
NO | 16.12.2020 | ||
GR | 17.12.2020 | ||
PT | 18.01.2021 | ||
Former [2021/21] | FI | 16.09.2020 | |
HR | 16.09.2020 | ||
LT | 16.09.2020 | ||
LV | 16.09.2020 | ||
NL | 16.09.2020 | ||
RS | 16.09.2020 | ||
SE | 16.09.2020 | ||
BG | 16.12.2020 | ||
NO | 16.12.2020 | ||
GR | 17.12.2020 | ||
PT | 18.01.2021 | ||
Former [2021/20] | FI | 16.09.2020 | |
HR | 16.09.2020 | ||
LT | 16.09.2020 | ||
LV | 16.09.2020 | ||
NL | 16.09.2020 | ||
RS | 16.09.2020 | ||
SE | 16.09.2020 | ||
BG | 16.12.2020 | ||
NO | 16.12.2020 | ||
GR | 17.12.2020 | ||
Former [2021/18] | FI | 16.09.2020 | |
HR | 16.09.2020 | ||
LV | 16.09.2020 | ||
NL | 16.09.2020 | ||
RS | 16.09.2020 | ||
SE | 16.09.2020 | ||
BG | 16.12.2020 | ||
NO | 16.12.2020 | ||
GR | 17.12.2020 | ||
Former [2021/10] | FI | 16.09.2020 | |
HR | 16.09.2020 | ||
LV | 16.09.2020 | ||
RS | 16.09.2020 | ||
SE | 16.09.2020 | ||
BG | 16.12.2020 | ||
NO | 16.12.2020 | ||
GR | 17.12.2020 | ||
Former [2021/09] | FI | 16.09.2020 | |
SE | 16.09.2020 | ||
BG | 16.12.2020 | ||
NO | 16.12.2020 | ||
GR | 17.12.2020 | ||
Former [2021/08] | FI | 16.09.2020 | |
SE | 16.09.2020 | ||
BG | 16.12.2020 | ||
NO | 16.12.2020 | ||
Former [2021/07] | FI | 16.09.2020 | |
NO | 16.12.2020 | Documents cited: | Search | [E]WO2014069064 (NEC CORP [JP]) [E] 1-15 * paragraph [0049] * * paragraphs [0050] - [0059] * * paragraphs [0060] , [0069] * * paragraph [0077] * * paragraph [0123] *; | [I]WO2011094644 (QUALCOMM INC [US], et al) [I] 1-15 * paragraph [0028] * * paragraph [0066] *; | [A]WO2012158085 (ERICSSON TELEFON AB L M [SE], et al) [A] 1-15 * abstract * | International search | [Y]WO2011109027 (NOKIA CORP [FI], et al); | [A]WO2007119168 (NOKIA CORP [FI], et al) | [Y] - ERICSSON, "E-UTRA Intra-frequency Measurement Configuration and Control", R2-063228, 3GPP, XP050132724 | [Y] - INSTITUTE FOR INFORMATION INDUSTRY (III), NEW POSTCOM, "Alt.2 with Relay GW and PGW collocated with initial DeNB solution for mobile relay scenario", R3-120810, 3GPP, (20120330), XP050669160 | [Y] - HUAWEI, "Detailed description of MRO problem cases", R3-091108, 3GPP, (20090508), XP050341481 | [A] - QUALCOMM EUROPE, "Relay call flows", R3-091534, 3GPP, (20090828), XP050352954 | Examination | WO2011094644 | US2012282961 | by applicant | WO2014069064 | - "Feasibility Study for Proximity Services", 3GPP DOCUMENT NO. SI-113344 |