blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP2951786

EP2951786 - VISUAL DISTORTION EFFECTS THROUGH TRANSLUCENT STRUCTURES IN DESIGN SOFTWARE [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  23.04.2021
Database last updated on 03.06.2024
FormerThe patent has been granted
Status updated on  15.05.2020
FormerGrant of patent is intended
Status updated on  10.02.2020
Most recent event   Tooltip27.04.2024Lapse of the patent in a contracting state
New state(s): MK
published on 29.05.2024  [2024/22]
Applicant(s)For all designated states
DIRTT ENVIRONMENTAL SOLUTIONS, LTD.
7303 30th Street, SE
Calgary, AB T2C 1N6 / CA
[2015/50]
Inventor(s)01 / HOWELL, Joseph, S.
6756 South 1750 East
Uintah, UT 84405 / US
 [2015/50]
Representative(s)Schröer, Gernot H., et al
Meissner Bolte Patentanwälte
Rechtsanwälte Partnerschaft mbB
Bankgasse 3
90402 Nürnberg / DE
[2020/25]
Former [2015/50]Schröer, Gernot H., et al
Meissner, Bolte & Partner GbR
Bankgasse 3
90402 Nürnberg / DE
Application number, filing date13873685.531.01.2013
[2015/50]
WO2013US24063
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2014120185
Date:07.08.2014
Language:EN
[2014/32]
Type: A1 Application with search report 
No.:EP2951786
Date:09.12.2015
Language:EN
The application published by WIPO in one of the EPO official languages on 07.08.2014 takes the place of the publication of the European patent application.
[2015/50]
Type: B1 Patent specification 
No.:EP2951786
Date:17.06.2020
Language:EN
[2020/25]
Search report(s)International search report - published on:KR07.08.2014
(Supplementary) European search report - dispatched on:EP26.08.2016
ClassificationIPC:G06T19/20, G06T15/50
[2016/39]
CPC:
G06T19/20 (EP,US); G06T17/00 (US); G06T15/503 (EP,US);
G06T2210/04 (EP,US); G06T2210/62 (EP,US); G06T2219/2012 (EP,US)
Former IPC [2015/50]G06T17/00
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2015/50]
Extension statesBANot yet paid
MENot yet paid
TitleGerman:VISUELLE VERZERRUNGSEFFEKTE DURCH DURCHSCHEINENDE STRUKTUREN IN EINER DESIGN-SOFTWARE[2015/50]
English:VISUAL DISTORTION EFFECTS THROUGH TRANSLUCENT STRUCTURES IN DESIGN SOFTWARE[2015/50]
French:EFFETS DE DÉFORMATION VISUELLE À TRAVERS DES STRUCTURES TRANSLUCIDES DANS UN LOGICIEL DE CONCEPTION[2015/50]
Entry into regional phase02.06.2015National basic fee paid 
02.06.2015Search fee paid 
02.06.2015Designation fee(s) paid 
02.06.2015Examination fee paid 
Examination procedure02.06.2015Examination requested  [2015/50]
27.01.2017Amendment by applicant (claims and/or description)
11.02.2020Communication of intention to grant the patent
12.05.2020Fee for grant paid
12.05.2020Fee for publishing/printing paid
12.05.2020Receipt of the translation of the claim(s)
Divisional application(s)The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  11.02.2020
Opposition(s)18.03.2021No opposition filed within time limit [2021/21]
Fees paidRenewal fee
02.06.2015Renewal fee patent year 03
11.01.2016Renewal fee patent year 04
11.01.2017Renewal fee patent year 05
15.01.2018Renewal fee patent year 06
15.01.2019Renewal fee patent year 07
27.01.2020Renewal fee patent year 08
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU31.01.2013
AL17.06.2020
AT17.06.2020
CY17.06.2020
CZ17.06.2020
DK17.06.2020
EE17.06.2020
ES17.06.2020
FI17.06.2020
HR17.06.2020
IT17.06.2020
LT17.06.2020
LV17.06.2020
MC17.06.2020
MK17.06.2020
NL17.06.2020
PL17.06.2020
RO17.06.2020
RS17.06.2020
SE17.06.2020
SI17.06.2020
SK17.06.2020
SM17.06.2020
BG17.09.2020
NO17.09.2020
GR18.09.2020
IS17.10.2020
PT19.10.2020
BE31.01.2021
CH31.01.2021
IE31.01.2021
LI31.01.2021
LU31.01.2021
[2024/22]
Former [2023/30]HU31.01.2013
AL17.06.2020
AT17.06.2020
CY17.06.2020
CZ17.06.2020
DK17.06.2020
EE17.06.2020
ES17.06.2020
FI17.06.2020
HR17.06.2020
IT17.06.2020
LT17.06.2020
LV17.06.2020
MC17.06.2020
NL17.06.2020
PL17.06.2020
RO17.06.2020
RS17.06.2020
SE17.06.2020
SI17.06.2020
SK17.06.2020
SM17.06.2020
BG17.09.2020
NO17.09.2020
GR18.09.2020
IS17.10.2020
PT19.10.2020
BE31.01.2021
CH31.01.2021
IE31.01.2021
LI31.01.2021
LU31.01.2021
Former [2023/27]HU31.01.2013
AL17.06.2020
AT17.06.2020
CZ17.06.2020
DK17.06.2020
EE17.06.2020
ES17.06.2020
FI17.06.2020
HR17.06.2020
IT17.06.2020
LT17.06.2020
LV17.06.2020
MC17.06.2020
NL17.06.2020
PL17.06.2020
RO17.06.2020
RS17.06.2020
SE17.06.2020
SI17.06.2020
SK17.06.2020
SM17.06.2020
BG17.09.2020
NO17.09.2020
GR18.09.2020
IS17.10.2020
PT19.10.2020
BE31.01.2021
CH31.01.2021
IE31.01.2021
LI31.01.2021
LU31.01.2021
Former [2022/33]AL17.06.2020
AT17.06.2020
CZ17.06.2020
DK17.06.2020
EE17.06.2020
ES17.06.2020
FI17.06.2020
HR17.06.2020
IT17.06.2020
LT17.06.2020
LV17.06.2020
MC17.06.2020
NL17.06.2020
PL17.06.2020
RO17.06.2020
RS17.06.2020
SE17.06.2020
SI17.06.2020
SK17.06.2020
SM17.06.2020
BG17.09.2020
NO17.09.2020
GR18.09.2020
IS17.10.2020
PT19.10.2020
BE31.01.2021
CH31.01.2021
IE31.01.2021
LI31.01.2021
LU31.01.2021
Former [2022/07]AL17.06.2020
AT17.06.2020
CZ17.06.2020
DK17.06.2020
EE17.06.2020
ES17.06.2020
FI17.06.2020
HR17.06.2020
IT17.06.2020
LT17.06.2020
LV17.06.2020
MC17.06.2020
NL17.06.2020
PL17.06.2020
RO17.06.2020
RS17.06.2020
SE17.06.2020
SI17.06.2020
SK17.06.2020
SM17.06.2020
BG17.09.2020
NO17.09.2020
GR18.09.2020
IS17.10.2020
PT19.10.2020
CH31.01.2021
IE31.01.2021
LI31.01.2021
LU31.01.2021
Former [2021/52]AL17.06.2020
AT17.06.2020
CZ17.06.2020
DK17.06.2020
EE17.06.2020
ES17.06.2020
FI17.06.2020
HR17.06.2020
IT17.06.2020
LT17.06.2020
LV17.06.2020
MC17.06.2020
NL17.06.2020
PL17.06.2020
RO17.06.2020
RS17.06.2020
SE17.06.2020
SI17.06.2020
SK17.06.2020
SM17.06.2020
BG17.09.2020
NO17.09.2020
GR18.09.2020
IS17.10.2020
PT19.10.2020
CH31.01.2021
LI31.01.2021
LU31.01.2021
Former [2021/43]AL17.06.2020
AT17.06.2020
CZ17.06.2020
DK17.06.2020
EE17.06.2020
ES17.06.2020
FI17.06.2020
HR17.06.2020
IT17.06.2020
LT17.06.2020
LV17.06.2020
MC17.06.2020
NL17.06.2020
PL17.06.2020
RO17.06.2020
RS17.06.2020
SE17.06.2020
SI17.06.2020
SK17.06.2020
SM17.06.2020
BG17.09.2020
NO17.09.2020
GR18.09.2020
IS17.10.2020
PT19.10.2020
LU31.01.2021
Former [2021/40]AL17.06.2020
AT17.06.2020
CZ17.06.2020
DK17.06.2020
EE17.06.2020
ES17.06.2020
FI17.06.2020
HR17.06.2020
IT17.06.2020
LT17.06.2020
LV17.06.2020
MC17.06.2020
NL17.06.2020
PL17.06.2020
RO17.06.2020
RS17.06.2020
SE17.06.2020
SI17.06.2020
SK17.06.2020
SM17.06.2020
BG17.09.2020
NO17.09.2020
GR18.09.2020
IS17.10.2020
PT19.10.2020
Former [2021/24]AL17.06.2020
AT17.06.2020
CZ17.06.2020
DK17.06.2020
EE17.06.2020
ES17.06.2020
FI17.06.2020
HR17.06.2020
IT17.06.2020
LT17.06.2020
LV17.06.2020
NL17.06.2020
PL17.06.2020
RO17.06.2020
RS17.06.2020
SE17.06.2020
SI17.06.2020
SK17.06.2020
SM17.06.2020
BG17.09.2020
NO17.09.2020
GR18.09.2020
IS17.10.2020
PT19.10.2020
Former [2021/20]AL17.06.2020
AT17.06.2020
CZ17.06.2020
DK17.06.2020
EE17.06.2020
ES17.06.2020
FI17.06.2020
HR17.06.2020
IT17.06.2020
LT17.06.2020
LV17.06.2020
NL17.06.2020
PL17.06.2020
RO17.06.2020
RS17.06.2020
SE17.06.2020
SK17.06.2020
SM17.06.2020
BG17.09.2020
NO17.09.2020
GR18.09.2020
IS17.10.2020
PT19.10.2020
Former [2021/10]AL17.06.2020
AT17.06.2020
CZ17.06.2020
EE17.06.2020
ES17.06.2020
FI17.06.2020
HR17.06.2020
IT17.06.2020
LT17.06.2020
LV17.06.2020
NL17.06.2020
PL17.06.2020
RO17.06.2020
RS17.06.2020
SE17.06.2020
SK17.06.2020
SM17.06.2020
BG17.09.2020
NO17.09.2020
GR18.09.2020
IS17.10.2020
PT19.10.2020
Former [2021/09]AL17.06.2020
AT17.06.2020
CZ17.06.2020
EE17.06.2020
ES17.06.2020
FI17.06.2020
HR17.06.2020
IT17.06.2020
LT17.06.2020
LV17.06.2020
NL17.06.2020
RO17.06.2020
RS17.06.2020
SE17.06.2020
SM17.06.2020
BG17.09.2020
NO17.09.2020
GR18.09.2020
PT19.10.2020
Former [2021/04]AL17.06.2020
FI17.06.2020
HR17.06.2020
LT17.06.2020
LV17.06.2020
NL17.06.2020
RS17.06.2020
SE17.06.2020
BG17.09.2020
NO17.09.2020
GR18.09.2020
Former [2021/01]FI17.06.2020
HR17.06.2020
LT17.06.2020
LV17.06.2020
RS17.06.2020
SE17.06.2020
BG17.09.2020
NO17.09.2020
GR18.09.2020
Former [2020/51]FI17.06.2020
HR17.06.2020
LT17.06.2020
LV17.06.2020
RS17.06.2020
SE17.06.2020
NO17.09.2020
GR18.09.2020
Former [2020/50]FI17.06.2020
HR17.06.2020
LT17.06.2020
LV17.06.2020
SE17.06.2020
NO17.09.2020
GR18.09.2020
Former [2020/48]FI17.06.2020
LT17.06.2020
SE17.06.2020
NO17.09.2020
Former [2020/47]LT17.06.2020
NO17.09.2020
Documents cited:Search[I]EP2207140  (NAVTEQ NORTH AMERICA LLC [US]) [I] 1-15 * abstract * * figures 3-5 * * paragraph [0044] - paragraph [0046] *;
 [I]  - John Chapman, "john-chapman.net - Deferred Rendering, Transparency & Alpha Blending", (20110801), pages 1 - 7, URL: http://www.john-chapman.net/content.php?id=13, (20160817), XP055295927 [I] 1-15 * abstract * * pages 3-6 and the respective figures (including stencil buffer as "masking" buffer) *
 [I]  - Anonymous, "OpenGL FAQ / 15 Transparency, Translucency, and Using Blending", (19991230), URL: https://www.opengl.org/archives/resources/faq/technical/transparency.htm, (20160519), XP055273530 [I] 1-15 * the whole document *
International search[A]JPH0239377  (NIPPON SHEET GLASS CO LTD);
 [A]JP2000132706  (SONY COMPUTER ENTERTAINMENT INC);
 [A]US2007098290  (WELLS BARTON S [US]);
 [A]JP2007264707  (SAMY KK);
 [A]US7623137  (MILLER GAVIN S P [US])
by applicantEP2207140
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.