EP2977691 - COOLING SYSTEM AND HEATING SYSTEM [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 15.07.2022 Database last updated on 11.05.2024 | |
Former | The patent has been granted Status updated on 06.08.2021 | ||
Former | Grant of patent is intended Status updated on 13.06.2021 | ||
Former | Examination is in progress Status updated on 31.08.2018 | Most recent event Tooltip | 27.04.2024 | Lapse of the patent in a contracting state New state(s): MK | published on 29.05.2024 [2024/22] | Applicant(s) | For all designated states Guangdong Meizhi Compressor Co., Ltd. Shunfengshan Industrial Development Zone Shunde Foshan, Guangdong 528333 / CN | [2021/36] |
Former [2016/04] | For all designated states Guangdong Meizhi Compressor Co., Ltd. Shunfengshan Industrial Development Zone Shunde Foshan, Guangdong 528333 / CN | Inventor(s) | 01 /
GAO, Bin Shunfengshan Industrial Development Zone Shunde Foshan Guangdong 528333 / CN | 02 /
XIANG, Weimin Shunfengshan Industrial Development Zone Shunde Foshan Guangdong 528333 / CN | 03 /
YU, Jijiang Shunfengshan Industrial Development Zone Shunde Foshan Guangdong 528333 / CN | 04 /
GUO, Hong Shunfengshan Industrial Development Zone Shunde Foshan Guangdong 528333 / CN | 05 /
YANG, Jingtao Shunfengshan Industrial Development Zone Shunde Foshan Guangdong 528333 / CN | 06 /
ZHANG, Cheng Shunfengshan Industrial Development Zone Shunde Foshan Guangdong 528333 / CN | [2016/04] | Representative(s) | Lam, Alvin, et al Maucher Jenkins Seventh Floor Offices Artillery House 11-19 Artillery Row London SW1P 1RT / GB | [N/P] |
Former [2021/36] | Lam, Alvin, et al Maucher Jenkins 26 Caxton Street London SW1H 0RJ / GB | ||
Former [2016/04] | 2K Patentanwälte Blasberg Kewitz & Reichel Partnerschaft mbB Schumannstrasse 27 60325 Frankfurt am Main / DE | Application number, filing date | 13881452.0 | 30.09.2013 | [2016/04] | WO2013CN84749 | Filing language | ZH | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2015042970 | Date: | 02.04.2015 | Language: | ZH | [2015/13] | Type: | A1 Application with search report | No.: | EP2977691 | Date: | 27.01.2016 | Language: | EN | [2016/04] | Type: | B1 Patent specification | No.: | EP2977691 | Date: | 08.09.2021 | Language: | EN | [2021/36] | Search report(s) | International search report - published on: | CN | 02.04.2015 | (Supplementary) European search report - dispatched on: | EP | 06.05.2016 | Classification | IPC: | F25B41/20, F04C29/04, F25B31/00, F25B13/00, F25B1/04 | [2021/26] | CPC: |
F25B31/006 (EP,US);
F25B1/04 (EP);
F25B13/00 (EP);
F25B41/20 (EP,US)
|
Former IPC [2016/23] | F25B41/04, F04C29/04, F25B31/00, F25B13/00, F25B1/04 | ||
Former IPC [2016/04] | F25B41/04, F04C29/04 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2016/04] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | KÄLTEANLAGE UND HEIZSYSTEM | [2016/04] | English: | COOLING SYSTEM AND HEATING SYSTEM | [2016/04] | French: | SYSTÈME DE REFROIDISSEMENT ET SYSTÈME DE CHAUFFAGE | [2016/04] | Entry into regional phase | 13.10.2014 | Translation filed | 21.04.2015 | National basic fee paid | 21.04.2015 | Search fee paid | 21.04.2015 | Designation fee(s) paid | 21.04.2015 | Examination fee paid | Examination procedure | 21.04.2015 | Examination requested [2016/04] | 22.11.2016 | Amendment by applicant (claims and/or description) | 03.09.2018 | Despatch of a communication from the examining division (Time limit: M06) | 01.03.2019 | Reply to a communication from the examining division | 18.06.2020 | Despatch of a communication from the examining division (Time limit: M06) | 11.11.2020 | Reply to a communication from the examining division | 14.06.2021 | Communication of intention to grant the patent | 28.07.2021 | Fee for grant paid | 28.07.2021 | Fee for publishing/printing paid | 28.07.2021 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 03.09.2018 | Opposition(s) | 09.06.2022 | No opposition filed within time limit [2022/33] | Fees paid | Renewal fee | 28.09.2015 | Renewal fee patent year 03 | 25.08.2016 | Renewal fee patent year 04 | 30.08.2017 | Renewal fee patent year 05 | 30.08.2018 | Renewal fee patent year 06 | 22.08.2019 | Renewal fee patent year 07 | 21.09.2020 | Renewal fee patent year 08 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 30.09.2013 | AL | 08.09.2021 | AT | 08.09.2021 | CY | 08.09.2021 | CZ | 08.09.2021 | DK | 08.09.2021 | EE | 08.09.2021 | ES | 08.09.2021 | FI | 08.09.2021 | HR | 08.09.2021 | IT | 08.09.2021 | LT | 08.09.2021 | LV | 08.09.2021 | MC | 08.09.2021 | MK | 08.09.2021 | NL | 08.09.2021 | PL | 08.09.2021 | RO | 08.09.2021 | RS | 08.09.2021 | SE | 08.09.2021 | SI | 08.09.2021 | SK | 08.09.2021 | SM | 08.09.2021 | BE | 30.09.2021 | CH | 30.09.2021 | IE | 30.09.2021 | LI | 30.09.2021 | LU | 30.09.2021 | BG | 08.12.2021 | GB | 08.12.2021 | NO | 08.12.2021 | GR | 09.12.2021 | IS | 08.01.2022 | PT | 10.01.2022 | [2024/22] |
Former [2023/30] | HU | 30.09.2013 | |
AL | 08.09.2021 | ||
AT | 08.09.2021 | ||
CY | 08.09.2021 | ||
CZ | 08.09.2021 | ||
DK | 08.09.2021 | ||
EE | 08.09.2021 | ||
ES | 08.09.2021 | ||
FI | 08.09.2021 | ||
HR | 08.09.2021 | ||
IT | 08.09.2021 | ||
LT | 08.09.2021 | ||
LV | 08.09.2021 | ||
MC | 08.09.2021 | ||
NL | 08.09.2021 | ||
PL | 08.09.2021 | ||
RO | 08.09.2021 | ||
RS | 08.09.2021 | ||
SE | 08.09.2021 | ||
SI | 08.09.2021 | ||
SK | 08.09.2021 | ||
SM | 08.09.2021 | ||
BE | 30.09.2021 | ||
CH | 30.09.2021 | ||
IE | 30.09.2021 | ||
LI | 30.09.2021 | ||
LU | 30.09.2021 | ||
BG | 08.12.2021 | ||
GB | 08.12.2021 | ||
NO | 08.12.2021 | ||
GR | 09.12.2021 | ||
IS | 08.01.2022 | ||
PT | 10.01.2022 | ||
Former [2023/29] | HU | 30.09.2013 | |
AL | 08.09.2021 | ||
AT | 08.09.2021 | ||
CZ | 08.09.2021 | ||
DK | 08.09.2021 | ||
EE | 08.09.2021 | ||
ES | 08.09.2021 | ||
FI | 08.09.2021 | ||
HR | 08.09.2021 | ||
IT | 08.09.2021 | ||
LT | 08.09.2021 | ||
LV | 08.09.2021 | ||
MC | 08.09.2021 | ||
NL | 08.09.2021 | ||
PL | 08.09.2021 | ||
RO | 08.09.2021 | ||
RS | 08.09.2021 | ||
SE | 08.09.2021 | ||
SI | 08.09.2021 | ||
SK | 08.09.2021 | ||
SM | 08.09.2021 | ||
BE | 30.09.2021 | ||
CH | 30.09.2021 | ||
IE | 30.09.2021 | ||
LI | 30.09.2021 | ||
LU | 30.09.2021 | ||
BG | 08.12.2021 | ||
GB | 08.12.2021 | ||
NO | 08.12.2021 | ||
GR | 09.12.2021 | ||
IS | 08.01.2022 | ||
PT | 10.01.2022 | ||
Former [2023/10] | AL | 08.09.2021 | |
AT | 08.09.2021 | ||
CZ | 08.09.2021 | ||
DK | 08.09.2021 | ||
EE | 08.09.2021 | ||
ES | 08.09.2021 | ||
FI | 08.09.2021 | ||
HR | 08.09.2021 | ||
IT | 08.09.2021 | ||
LT | 08.09.2021 | ||
LV | 08.09.2021 | ||
MC | 08.09.2021 | ||
NL | 08.09.2021 | ||
PL | 08.09.2021 | ||
RO | 08.09.2021 | ||
RS | 08.09.2021 | ||
SE | 08.09.2021 | ||
SI | 08.09.2021 | ||
SK | 08.09.2021 | ||
SM | 08.09.2021 | ||
BE | 30.09.2021 | ||
CH | 30.09.2021 | ||
IE | 30.09.2021 | ||
LI | 30.09.2021 | ||
LU | 30.09.2021 | ||
BG | 08.12.2021 | ||
GB | 08.12.2021 | ||
NO | 08.12.2021 | ||
GR | 09.12.2021 | ||
IS | 08.01.2022 | ||
PT | 10.01.2022 | ||
Former [2022/47] | AL | 08.09.2021 | |
AT | 08.09.2021 | ||
CZ | 08.09.2021 | ||
DK | 08.09.2021 | ||
EE | 08.09.2021 | ||
ES | 08.09.2021 | ||
FI | 08.09.2021 | ||
HR | 08.09.2021 | ||
LT | 08.09.2021 | ||
LV | 08.09.2021 | ||
MC | 08.09.2021 | ||
NL | 08.09.2021 | ||
PL | 08.09.2021 | ||
RO | 08.09.2021 | ||
RS | 08.09.2021 | ||
SE | 08.09.2021 | ||
SI | 08.09.2021 | ||
SK | 08.09.2021 | ||
SM | 08.09.2021 | ||
BE | 30.09.2021 | ||
CH | 30.09.2021 | ||
IE | 30.09.2021 | ||
LI | 30.09.2021 | ||
LU | 30.09.2021 | ||
BG | 08.12.2021 | ||
GB | 08.12.2021 | ||
NO | 08.12.2021 | ||
GR | 09.12.2021 | ||
IS | 08.01.2022 | ||
PT | 10.01.2022 | ||
Former [2022/37] | AL | 08.09.2021 | |
AT | 08.09.2021 | ||
CZ | 08.09.2021 | ||
DK | 08.09.2021 | ||
EE | 08.09.2021 | ||
ES | 08.09.2021 | ||
FI | 08.09.2021 | ||
HR | 08.09.2021 | ||
LT | 08.09.2021 | ||
LV | 08.09.2021 | ||
MC | 08.09.2021 | ||
NL | 08.09.2021 | ||
PL | 08.09.2021 | ||
RO | 08.09.2021 | ||
RS | 08.09.2021 | ||
SE | 08.09.2021 | ||
SI | 08.09.2021 | ||
SK | 08.09.2021 | ||
SM | 08.09.2021 | ||
BE | 30.09.2021 | ||
CH | 30.09.2021 | ||
IE | 30.09.2021 | ||
LI | 30.09.2021 | ||
LU | 30.09.2021 | ||
BG | 08.12.2021 | ||
NO | 08.12.2021 | ||
GR | 09.12.2021 | ||
IS | 08.01.2022 | ||
PT | 10.01.2022 | ||
Former [2022/36] | AL | 08.09.2021 | |
AT | 08.09.2021 | ||
CZ | 08.09.2021 | ||
DK | 08.09.2021 | ||
EE | 08.09.2021 | ||
ES | 08.09.2021 | ||
FI | 08.09.2021 | ||
HR | 08.09.2021 | ||
LT | 08.09.2021 | ||
LV | 08.09.2021 | ||
MC | 08.09.2021 | ||
NL | 08.09.2021 | ||
PL | 08.09.2021 | ||
RO | 08.09.2021 | ||
RS | 08.09.2021 | ||
SE | 08.09.2021 | ||
SI | 08.09.2021 | ||
SK | 08.09.2021 | ||
SM | 08.09.2021 | ||
BE | 30.09.2021 | ||
IE | 30.09.2021 | ||
LU | 30.09.2021 | ||
BG | 08.12.2021 | ||
NO | 08.12.2021 | ||
GR | 09.12.2021 | ||
IS | 08.01.2022 | ||
PT | 10.01.2022 | ||
Former [2022/35] | AL | 08.09.2021 | |
AT | 08.09.2021 | ||
CZ | 08.09.2021 | ||
DK | 08.09.2021 | ||
EE | 08.09.2021 | ||
ES | 08.09.2021 | ||
FI | 08.09.2021 | ||
HR | 08.09.2021 | ||
LT | 08.09.2021 | ||
LV | 08.09.2021 | ||
MC | 08.09.2021 | ||
NL | 08.09.2021 | ||
PL | 08.09.2021 | ||
RO | 08.09.2021 | ||
RS | 08.09.2021 | ||
SE | 08.09.2021 | ||
SK | 08.09.2021 | ||
SM | 08.09.2021 | ||
BE | 30.09.2021 | ||
IE | 30.09.2021 | ||
LU | 30.09.2021 | ||
BG | 08.12.2021 | ||
NO | 08.12.2021 | ||
GR | 09.12.2021 | ||
IS | 08.01.2022 | ||
PT | 10.01.2022 | ||
Former [2022/34] | AL | 08.09.2021 | |
AT | 08.09.2021 | ||
CZ | 08.09.2021 | ||
EE | 08.09.2021 | ||
ES | 08.09.2021 | ||
FI | 08.09.2021 | ||
HR | 08.09.2021 | ||
LT | 08.09.2021 | ||
LV | 08.09.2021 | ||
MC | 08.09.2021 | ||
NL | 08.09.2021 | ||
PL | 08.09.2021 | ||
RO | 08.09.2021 | ||
RS | 08.09.2021 | ||
SE | 08.09.2021 | ||
SK | 08.09.2021 | ||
SM | 08.09.2021 | ||
BE | 30.09.2021 | ||
LU | 30.09.2021 | ||
BG | 08.12.2021 | ||
NO | 08.12.2021 | ||
GR | 09.12.2021 | ||
IS | 08.01.2022 | ||
PT | 10.01.2022 | ||
Former [2022/33] | AL | 08.09.2021 | |
AT | 08.09.2021 | ||
CZ | 08.09.2021 | ||
EE | 08.09.2021 | ||
ES | 08.09.2021 | ||
FI | 08.09.2021 | ||
HR | 08.09.2021 | ||
LT | 08.09.2021 | ||
LV | 08.09.2021 | ||
MC | 08.09.2021 | ||
NL | 08.09.2021 | ||
PL | 08.09.2021 | ||
RO | 08.09.2021 | ||
RS | 08.09.2021 | ||
SE | 08.09.2021 | ||
SK | 08.09.2021 | ||
SM | 08.09.2021 | ||
BE | 30.09.2021 | ||
BG | 08.12.2021 | ||
NO | 08.12.2021 | ||
GR | 09.12.2021 | ||
IS | 08.01.2022 | ||
PT | 10.01.2022 | ||
Former [2022/29] | AL | 08.09.2021 | |
AT | 08.09.2021 | ||
CZ | 08.09.2021 | ||
EE | 08.09.2021 | ||
ES | 08.09.2021 | ||
FI | 08.09.2021 | ||
HR | 08.09.2021 | ||
LT | 08.09.2021 | ||
LV | 08.09.2021 | ||
NL | 08.09.2021 | ||
PL | 08.09.2021 | ||
RO | 08.09.2021 | ||
RS | 08.09.2021 | ||
SE | 08.09.2021 | ||
SK | 08.09.2021 | ||
SM | 08.09.2021 | ||
BG | 08.12.2021 | ||
NO | 08.12.2021 | ||
GR | 09.12.2021 | ||
IS | 08.01.2022 | ||
PT | 10.01.2022 | ||
Former [2022/25] | AT | 08.09.2021 | |
CZ | 08.09.2021 | ||
EE | 08.09.2021 | ||
ES | 08.09.2021 | ||
FI | 08.09.2021 | ||
HR | 08.09.2021 | ||
LT | 08.09.2021 | ||
LV | 08.09.2021 | ||
NL | 08.09.2021 | ||
PL | 08.09.2021 | ||
RO | 08.09.2021 | ||
RS | 08.09.2021 | ||
SE | 08.09.2021 | ||
SK | 08.09.2021 | ||
SM | 08.09.2021 | ||
BG | 08.12.2021 | ||
NO | 08.12.2021 | ||
GR | 09.12.2021 | ||
IS | 08.01.2022 | ||
PT | 10.01.2022 | ||
Former [2022/24] | AT | 08.09.2021 | |
CZ | 08.09.2021 | ||
EE | 08.09.2021 | ||
ES | 08.09.2021 | ||
FI | 08.09.2021 | ||
HR | 08.09.2021 | ||
LT | 08.09.2021 | ||
LV | 08.09.2021 | ||
NL | 08.09.2021 | ||
PL | 08.09.2021 | ||
RO | 08.09.2021 | ||
RS | 08.09.2021 | ||
SE | 08.09.2021 | ||
SK | 08.09.2021 | ||
BG | 08.12.2021 | ||
NO | 08.12.2021 | ||
GR | 09.12.2021 | ||
IS | 08.01.2022 | ||
PT | 10.01.2022 | ||
Former [2022/23] | AT | 08.09.2021 | |
CZ | 08.09.2021 | ||
EE | 08.09.2021 | ||
ES | 08.09.2021 | ||
FI | 08.09.2021 | ||
HR | 08.09.2021 | ||
LT | 08.09.2021 | ||
LV | 08.09.2021 | ||
PL | 08.09.2021 | ||
RS | 08.09.2021 | ||
SE | 08.09.2021 | ||
SK | 08.09.2021 | ||
BG | 08.12.2021 | ||
NO | 08.12.2021 | ||
GR | 09.12.2021 | ||
PT | 10.01.2022 | ||
Former [2022/21] | AT | 08.09.2021 | |
ES | 08.09.2021 | ||
FI | 08.09.2021 | ||
HR | 08.09.2021 | ||
LT | 08.09.2021 | ||
LV | 08.09.2021 | ||
RS | 08.09.2021 | ||
SE | 08.09.2021 | ||
BG | 08.12.2021 | ||
NO | 08.12.2021 | ||
GR | 09.12.2021 | ||
Former [2022/10] | ES | 08.09.2021 | |
FI | 08.09.2021 | ||
HR | 08.09.2021 | ||
LT | 08.09.2021 | ||
LV | 08.09.2021 | ||
RS | 08.09.2021 | ||
SE | 08.09.2021 | ||
BG | 08.12.2021 | ||
NO | 08.12.2021 | ||
GR | 09.12.2021 | ||
Former [2022/09] | ES | 08.09.2021 | |
FI | 08.09.2021 | ||
LT | 08.09.2021 | ||
RS | 08.09.2021 | ||
SE | 08.09.2021 | ||
BG | 08.12.2021 | ||
NO | 08.12.2021 | ||
Former [2022/08] | ES | 08.09.2021 | |
FI | 08.09.2021 | ||
LT | 08.09.2021 | ||
SE | 08.09.2021 | ||
BG | 08.12.2021 | ||
NO | 08.12.2021 | ||
Former [2022/07] | LT | 08.09.2021 | |
NO | 08.12.2021 | Documents cited: | Search | [XI]WO2007070060 (CARRIER CORP [US], et al) [X] 1,4,5,7,12 * the whole document * [I] 2,3,6,8-11,13-15; | [XI]EP1553365 (SAMSUNG ELECTRONICS CO LTD [KR]) [X] 1,4,5,7,12 * the whole document * [I] 2,3,6,8-11,13-15; | [I]US2013098092 (WAKAMOTO SHINICHI [JP], et al) [I] 7-15 * the whole document *; | [I]CN102678572 (ZHUHAI GREE ELEC APPLIANCES) [I] 7-15 * the whole document * | International search | [A]JPH08247060 (TOSHIBA CORP, et al); | [Y]CN101158352 (MIDEA HOLDING CO LTD [CN]); | [A]US2012055185 (LUO RAN [US], et al); | [A]CN202182584U (DALIAN SANYO COMPRESSOR CO LTD); | [A]CN202393113U (GUANGDONG MIDEA TOSHIBA COMPRESSOR CORP); | [X]CN102678572 (ZHUHAI GREE ELEC APPLIANCES); | [E]CN103557646 (GUANGDONG MIDEA TOSHIBA COMPRESSOR CORP) |