blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP2977691

EP2977691 - COOLING SYSTEM AND HEATING SYSTEM [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  15.07.2022
Database last updated on 11.05.2024
FormerThe patent has been granted
Status updated on  06.08.2021
FormerGrant of patent is intended
Status updated on  13.06.2021
FormerExamination is in progress
Status updated on  31.08.2018
Most recent event   Tooltip27.04.2024Lapse of the patent in a contracting state
New state(s): MK
published on 29.05.2024 [2024/22]
Applicant(s)For all designated states
Guangdong Meizhi Compressor Co., Ltd.
Shunfengshan Industrial Development Zone
Shunde
Foshan, Guangdong 528333 / CN
[2021/36]
Former [2016/04]For all designated states
Guangdong Meizhi Compressor Co., Ltd.
Shunfengshan Industrial Development Zone
Shunde
Foshan, Guangdong 528333 / CN
Inventor(s)01 / GAO, Bin
Shunfengshan Industrial Development Zone
Shunde
Foshan Guangdong 528333 / CN
02 / XIANG, Weimin
Shunfengshan Industrial Development Zone
Shunde
Foshan Guangdong 528333 / CN
03 / YU, Jijiang
Shunfengshan Industrial Development Zone
Shunde
Foshan Guangdong 528333 / CN
04 / GUO, Hong
Shunfengshan Industrial Development Zone
Shunde
Foshan Guangdong 528333 / CN
05 / YANG, Jingtao
Shunfengshan Industrial Development Zone
Shunde
Foshan Guangdong 528333 / CN
06 / ZHANG, Cheng
Shunfengshan Industrial Development Zone
Shunde
Foshan Guangdong 528333 / CN
 [2016/04]
Representative(s)Lam, Alvin, et al
Maucher Jenkins
Seventh Floor Offices
Artillery House
11-19 Artillery Row
London SW1P 1RT / GB
[N/P]
Former [2021/36]Lam, Alvin, et al
Maucher Jenkins
26 Caxton Street
London SW1H 0RJ / GB
Former [2016/04]2K Patentanwälte Blasberg Kewitz & Reichel
Partnerschaft mbB
Schumannstrasse 27
60325 Frankfurt am Main / DE
Application number, filing date13881452.030.09.2013
[2016/04]
WO2013CN84749
Filing languageZH
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2015042970
Date:02.04.2015
Language:ZH
[2015/13]
Type: A1 Application with search report 
No.:EP2977691
Date:27.01.2016
Language:EN
[2016/04]
Type: B1 Patent specification 
No.:EP2977691
Date:08.09.2021
Language:EN
[2021/36]
Search report(s)International search report - published on:CN02.04.2015
(Supplementary) European search report - dispatched on:EP06.05.2016
ClassificationIPC:F25B41/20, F04C29/04, F25B31/00, F25B13/00, F25B1/04
[2021/26]
CPC:
F25B31/006 (EP,US); F25B1/04 (EP); F25B13/00 (EP);
F25B41/20 (EP,US)
Former IPC [2016/23]F25B41/04, F04C29/04, F25B31/00, F25B13/00, F25B1/04
Former IPC [2016/04]F25B41/04, F04C29/04
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2016/04]
Extension statesBANot yet paid
MENot yet paid
TitleGerman:KÄLTEANLAGE UND HEIZSYSTEM[2016/04]
English:COOLING SYSTEM AND HEATING SYSTEM[2016/04]
French:SYSTÈME DE REFROIDISSEMENT ET SYSTÈME DE CHAUFFAGE[2016/04]
Entry into regional phase13.10.2014Translation filed 
21.04.2015National basic fee paid 
21.04.2015Search fee paid 
21.04.2015Designation fee(s) paid 
21.04.2015Examination fee paid 
Examination procedure21.04.2015Examination requested  [2016/04]
22.11.2016Amendment by applicant (claims and/or description)
03.09.2018Despatch of a communication from the examining division (Time limit: M06)
01.03.2019Reply to a communication from the examining division
18.06.2020Despatch of a communication from the examining division (Time limit: M06)
11.11.2020Reply to a communication from the examining division
14.06.2021Communication of intention to grant the patent
28.07.2021Fee for grant paid
28.07.2021Fee for publishing/printing paid
28.07.2021Receipt of the translation of the claim(s)
Divisional application(s)The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  03.09.2018
Opposition(s)09.06.2022No opposition filed within time limit [2022/33]
Fees paidRenewal fee
28.09.2015Renewal fee patent year 03
25.08.2016Renewal fee patent year 04
30.08.2017Renewal fee patent year 05
30.08.2018Renewal fee patent year 06
22.08.2019Renewal fee patent year 07
21.09.2020Renewal fee patent year 08
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU30.09.2013
AL08.09.2021
AT08.09.2021
CY08.09.2021
CZ08.09.2021
DK08.09.2021
EE08.09.2021
ES08.09.2021
FI08.09.2021
HR08.09.2021
IT08.09.2021
LT08.09.2021
LV08.09.2021
MC08.09.2021
MK08.09.2021
NL08.09.2021
PL08.09.2021
RO08.09.2021
RS08.09.2021
SE08.09.2021
SI08.09.2021
SK08.09.2021
SM08.09.2021
BE30.09.2021
CH30.09.2021
IE30.09.2021
LI30.09.2021
LU30.09.2021
BG08.12.2021
GB08.12.2021
NO08.12.2021
GR09.12.2021
IS08.01.2022
PT10.01.2022
[2024/22]
Former [2023/30]HU30.09.2013
AL08.09.2021
AT08.09.2021
CY08.09.2021
CZ08.09.2021
DK08.09.2021
EE08.09.2021
ES08.09.2021
FI08.09.2021
HR08.09.2021
IT08.09.2021
LT08.09.2021
LV08.09.2021
MC08.09.2021
NL08.09.2021
PL08.09.2021
RO08.09.2021
RS08.09.2021
SE08.09.2021
SI08.09.2021
SK08.09.2021
SM08.09.2021
BE30.09.2021
CH30.09.2021
IE30.09.2021
LI30.09.2021
LU30.09.2021
BG08.12.2021
GB08.12.2021
NO08.12.2021
GR09.12.2021
IS08.01.2022
PT10.01.2022
Former [2023/29]HU30.09.2013
AL08.09.2021
AT08.09.2021
CZ08.09.2021
DK08.09.2021
EE08.09.2021
ES08.09.2021
FI08.09.2021
HR08.09.2021
IT08.09.2021
LT08.09.2021
LV08.09.2021
MC08.09.2021
NL08.09.2021
PL08.09.2021
RO08.09.2021
RS08.09.2021
SE08.09.2021
SI08.09.2021
SK08.09.2021
SM08.09.2021
BE30.09.2021
CH30.09.2021
IE30.09.2021
LI30.09.2021
LU30.09.2021
BG08.12.2021
GB08.12.2021
NO08.12.2021
GR09.12.2021
IS08.01.2022
PT10.01.2022
Former [2023/10]AL08.09.2021
AT08.09.2021
CZ08.09.2021
DK08.09.2021
EE08.09.2021
ES08.09.2021
FI08.09.2021
HR08.09.2021
IT08.09.2021
LT08.09.2021
LV08.09.2021
MC08.09.2021
NL08.09.2021
PL08.09.2021
RO08.09.2021
RS08.09.2021
SE08.09.2021
SI08.09.2021
SK08.09.2021
SM08.09.2021
BE30.09.2021
CH30.09.2021
IE30.09.2021
LI30.09.2021
LU30.09.2021
BG08.12.2021
GB08.12.2021
NO08.12.2021
GR09.12.2021
IS08.01.2022
PT10.01.2022
Former [2022/47]AL08.09.2021
AT08.09.2021
CZ08.09.2021
DK08.09.2021
EE08.09.2021
ES08.09.2021
FI08.09.2021
HR08.09.2021
LT08.09.2021
LV08.09.2021
MC08.09.2021
NL08.09.2021
PL08.09.2021
RO08.09.2021
RS08.09.2021
SE08.09.2021
SI08.09.2021
SK08.09.2021
SM08.09.2021
BE30.09.2021
CH30.09.2021
IE30.09.2021
LI30.09.2021
LU30.09.2021
BG08.12.2021
GB08.12.2021
NO08.12.2021
GR09.12.2021
IS08.01.2022
PT10.01.2022
Former [2022/37]AL08.09.2021
AT08.09.2021
CZ08.09.2021
DK08.09.2021
EE08.09.2021
ES08.09.2021
FI08.09.2021
HR08.09.2021
LT08.09.2021
LV08.09.2021
MC08.09.2021
NL08.09.2021
PL08.09.2021
RO08.09.2021
RS08.09.2021
SE08.09.2021
SI08.09.2021
SK08.09.2021
SM08.09.2021
BE30.09.2021
CH30.09.2021
IE30.09.2021
LI30.09.2021
LU30.09.2021
BG08.12.2021
NO08.12.2021
GR09.12.2021
IS08.01.2022
PT10.01.2022
Former [2022/36]AL08.09.2021
AT08.09.2021
CZ08.09.2021
DK08.09.2021
EE08.09.2021
ES08.09.2021
FI08.09.2021
HR08.09.2021
LT08.09.2021
LV08.09.2021
MC08.09.2021
NL08.09.2021
PL08.09.2021
RO08.09.2021
RS08.09.2021
SE08.09.2021
SI08.09.2021
SK08.09.2021
SM08.09.2021
BE30.09.2021
IE30.09.2021
LU30.09.2021
BG08.12.2021
NO08.12.2021
GR09.12.2021
IS08.01.2022
PT10.01.2022
Former [2022/35]AL08.09.2021
AT08.09.2021
CZ08.09.2021
DK08.09.2021
EE08.09.2021
ES08.09.2021
FI08.09.2021
HR08.09.2021
LT08.09.2021
LV08.09.2021
MC08.09.2021
NL08.09.2021
PL08.09.2021
RO08.09.2021
RS08.09.2021
SE08.09.2021
SK08.09.2021
SM08.09.2021
BE30.09.2021
IE30.09.2021
LU30.09.2021
BG08.12.2021
NO08.12.2021
GR09.12.2021
IS08.01.2022
PT10.01.2022
Former [2022/34]AL08.09.2021
AT08.09.2021
CZ08.09.2021
EE08.09.2021
ES08.09.2021
FI08.09.2021
HR08.09.2021
LT08.09.2021
LV08.09.2021
MC08.09.2021
NL08.09.2021
PL08.09.2021
RO08.09.2021
RS08.09.2021
SE08.09.2021
SK08.09.2021
SM08.09.2021
BE30.09.2021
LU30.09.2021
BG08.12.2021
NO08.12.2021
GR09.12.2021
IS08.01.2022
PT10.01.2022
Former [2022/33]AL08.09.2021
AT08.09.2021
CZ08.09.2021
EE08.09.2021
ES08.09.2021
FI08.09.2021
HR08.09.2021
LT08.09.2021
LV08.09.2021
MC08.09.2021
NL08.09.2021
PL08.09.2021
RO08.09.2021
RS08.09.2021
SE08.09.2021
SK08.09.2021
SM08.09.2021
BE30.09.2021
BG08.12.2021
NO08.12.2021
GR09.12.2021
IS08.01.2022
PT10.01.2022
Former [2022/29]AL08.09.2021
AT08.09.2021
CZ08.09.2021
EE08.09.2021
ES08.09.2021
FI08.09.2021
HR08.09.2021
LT08.09.2021
LV08.09.2021
NL08.09.2021
PL08.09.2021
RO08.09.2021
RS08.09.2021
SE08.09.2021
SK08.09.2021
SM08.09.2021
BG08.12.2021
NO08.12.2021
GR09.12.2021
IS08.01.2022
PT10.01.2022
Former [2022/25]AT08.09.2021
CZ08.09.2021
EE08.09.2021
ES08.09.2021
FI08.09.2021
HR08.09.2021
LT08.09.2021
LV08.09.2021
NL08.09.2021
PL08.09.2021
RO08.09.2021
RS08.09.2021
SE08.09.2021
SK08.09.2021
SM08.09.2021
BG08.12.2021
NO08.12.2021
GR09.12.2021
IS08.01.2022
PT10.01.2022
Former [2022/24]AT08.09.2021
CZ08.09.2021
EE08.09.2021
ES08.09.2021
FI08.09.2021
HR08.09.2021
LT08.09.2021
LV08.09.2021
NL08.09.2021
PL08.09.2021
RO08.09.2021
RS08.09.2021
SE08.09.2021
SK08.09.2021
BG08.12.2021
NO08.12.2021
GR09.12.2021
IS08.01.2022
PT10.01.2022
Former [2022/23]AT08.09.2021
CZ08.09.2021
EE08.09.2021
ES08.09.2021
FI08.09.2021
HR08.09.2021
LT08.09.2021
LV08.09.2021
PL08.09.2021
RS08.09.2021
SE08.09.2021
SK08.09.2021
BG08.12.2021
NO08.12.2021
GR09.12.2021
PT10.01.2022
Former [2022/21]AT08.09.2021
ES08.09.2021
FI08.09.2021
HR08.09.2021
LT08.09.2021
LV08.09.2021
RS08.09.2021
SE08.09.2021
BG08.12.2021
NO08.12.2021
GR09.12.2021
Former [2022/10]ES08.09.2021
FI08.09.2021
HR08.09.2021
LT08.09.2021
LV08.09.2021
RS08.09.2021
SE08.09.2021
BG08.12.2021
NO08.12.2021
GR09.12.2021
Former [2022/09]ES08.09.2021
FI08.09.2021
LT08.09.2021
RS08.09.2021
SE08.09.2021
BG08.12.2021
NO08.12.2021
Former [2022/08]ES08.09.2021
FI08.09.2021
LT08.09.2021
SE08.09.2021
BG08.12.2021
NO08.12.2021
Former [2022/07]LT08.09.2021
NO08.12.2021
Documents cited:Search[XI]WO2007070060  (CARRIER CORP [US], et al) [X] 1,4,5,7,12 * the whole document * [I] 2,3,6,8-11,13-15;
 [XI]EP1553365  (SAMSUNG ELECTRONICS CO LTD [KR]) [X] 1,4,5,7,12 * the whole document * [I] 2,3,6,8-11,13-15;
 [I]US2013098092  (WAKAMOTO SHINICHI [JP], et al) [I] 7-15 * the whole document *;
 [I]CN102678572  (ZHUHAI GREE ELEC APPLIANCES) [I] 7-15 * the whole document *
International search[A]JPH08247060  (TOSHIBA CORP, et al);
 [Y]CN101158352  (MIDEA HOLDING CO LTD [CN]);
 [A]US2012055185  (LUO RAN [US], et al);
 [A]CN202182584U  (DALIAN SANYO COMPRESSOR CO LTD);
 [A]CN202393113U  (GUANGDONG MIDEA TOSHIBA COMPRESSOR CORP);
 [X]CN102678572  (ZHUHAI GREE ELEC APPLIANCES);
 [E]CN103557646  (GUANGDONG MIDEA TOSHIBA COMPRESSOR CORP)
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.