blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3054559

EP3054559 - POWER TRANSMISSION APPARATUS [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  18.09.2020
Database last updated on 26.06.2024
FormerThe patent has been granted
Status updated on  11.10.2019
FormerGrant of patent is intended
Status updated on  13.06.2019
Most recent event   Tooltip08.07.2022Lapse of the patent in a contracting state
New state(s): MK
published on 10.08.2022  [2022/32]
Applicant(s)For all designated states
Fujitsu Limited
1-1, Kamikodanaka 4-chome Nakahara-ku
Kawasaki-shi, Kanagawa 211-8588 / JP
[2016/32]
Inventor(s)01 / UCHIDA, Akiyoshi
c/o FUJITSU LIMITED
1-1 Kamikodanaka 4-chome
Nakahara-ku
Kawasaki-shi Kanagawa 211-8588 / JP
02 / SHIMOKAWA, Satoshi
c/o FUJITSU LIMITED
1-1 Kamikodanaka 4-chome
Nakahara-ku
Kawasaki-shi Kanagawa 211-8588 / JP
 [2016/32]
Representative(s)Haseltine Lake Kempner LLP
Cheapside House
138 Cheapside
London EC2V 6BJ / GB
[N/P]
Former [2019/46]Haseltine Lake Kempner LLP
Lincoln House, 5th Floor
300 High Holborn
London WC1V 7JH / GB
Former [2016/32]Lewin, David Nicholas
Haseltine Lake LLP Lincoln House, 5th Floor 300 High Holborn
London WC1V 7JH / GB
Application number, filing date13894808.830.09.2013
[2016/32]
WO2013JP76564
Filing languageJA
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2015045160
Date:02.04.2015
Language:JA
[2015/13]
Type: A1 Application with search report 
No.:EP3054559
Date:10.08.2016
Language:EN
[2016/32]
Type: B1 Patent specification 
No.:EP3054559
Date:13.11.2019
Language:EN
[2019/46]
Search report(s)International search report - published on:JP02.04.2015
(Supplementary) European search report - dispatched on:EP14.09.2016
ClassificationIPC:H02J50/12, H02J50/40
[2019/26]
CPC:
H02J50/12 (EP,KR,US); H01F38/14 (KR,US); H02J50/005 (KR);
H02J50/40 (KR); H02J50/402 (EP,US); H02J50/90 (KR,US);
H04B5/79 (KR) (-)
Former IPC [2016/41]H02J50/00, H02J50/40, H02J50/12
Former IPC [2016/32]H02J50/00
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2016/32]
Extension statesBANot yet paid
MENot yet paid
TitleGerman:STROMÜBERTRAGUNGSVORRICHTUNG[2016/32]
English:POWER TRANSMISSION APPARATUS[2016/32]
French:APPAREIL DE TRANSMISSION D'ÉNERGIE[2016/32]
Entry into regional phase29.03.2016Translation filed 
29.03.2016National basic fee paid 
29.03.2016Search fee paid 
29.03.2016Designation fee(s) paid 
29.03.2016Examination fee paid 
Examination procedure29.03.2016Examination requested  [2016/32]
24.02.2017Amendment by applicant (claims and/or description)
14.06.2019Communication of intention to grant the patent
02.10.2019Fee for grant paid
02.10.2019Fee for publishing/printing paid
02.10.2019Receipt of the translation of the claim(s)
Divisional application(s)The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  14.06.2019
Opposition(s)14.08.2020No opposition filed within time limit [2020/43]
Fees paidRenewal fee
29.03.2016Renewal fee patent year 03
05.07.2016Renewal fee patent year 04
06.07.2017Renewal fee patent year 05
03.07.2018Renewal fee patent year 06
04.07.2019Renewal fee patent year 07
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU30.09.2013
AL13.11.2019
AT13.11.2019
CY13.11.2019
CZ13.11.2019
DK13.11.2019
EE13.11.2019
ES13.11.2019
FI13.11.2019
HR13.11.2019
IT13.11.2019
LT13.11.2019
LV13.11.2019
MC13.11.2019
MK13.11.2019
MT13.11.2019
NL13.11.2019
PL13.11.2019
RO13.11.2019
RS13.11.2019
SE13.11.2019
SI13.11.2019
SK13.11.2019
SM13.11.2019
TR13.11.2019
BG13.02.2020
NO13.02.2020
GR14.02.2020
IS13.03.2020
PT13.03.2020
[2022/32]
Former [2022/27]HU30.09.2013
AL13.11.2019
AT13.11.2019
CY13.11.2019
CZ13.11.2019
DK13.11.2019
EE13.11.2019
ES13.11.2019
FI13.11.2019
HR13.11.2019
IT13.11.2019
LT13.11.2019
LV13.11.2019
MC13.11.2019
MT13.11.2019
NL13.11.2019
PL13.11.2019
RO13.11.2019
RS13.11.2019
SE13.11.2019
SI13.11.2019
SK13.11.2019
SM13.11.2019
TR13.11.2019
BG13.02.2020
NO13.02.2020
GR14.02.2020
IS13.03.2020
PT13.03.2020
Former [2021/23]AL13.11.2019
AT13.11.2019
CZ13.11.2019
DK13.11.2019
EE13.11.2019
ES13.11.2019
FI13.11.2019
HR13.11.2019
IT13.11.2019
LT13.11.2019
LV13.11.2019
MC13.11.2019
NL13.11.2019
PL13.11.2019
RO13.11.2019
RS13.11.2019
SE13.11.2019
SI13.11.2019
SK13.11.2019
SM13.11.2019
BG13.02.2020
NO13.02.2020
GR14.02.2020
IS13.03.2020
PT13.03.2020
Former [2021/10]AL13.11.2019
AT13.11.2019
CZ13.11.2019
DK13.11.2019
EE13.11.2019
ES13.11.2019
FI13.11.2019
HR13.11.2019
IT13.11.2019
LT13.11.2019
LV13.11.2019
NL13.11.2019
PL13.11.2019
RO13.11.2019
RS13.11.2019
SE13.11.2019
SI13.11.2019
SK13.11.2019
SM13.11.2019
BG13.02.2020
NO13.02.2020
GR14.02.2020
IS13.03.2020
PT13.03.2020
Former [2020/51]AL13.11.2019
AT13.11.2019
CZ13.11.2019
DK13.11.2019
EE13.11.2019
ES13.11.2019
FI13.11.2019
HR13.11.2019
LT13.11.2019
LV13.11.2019
NL13.11.2019
PL13.11.2019
RO13.11.2019
RS13.11.2019
SE13.11.2019
SI13.11.2019
SK13.11.2019
SM13.11.2019
BG13.02.2020
NO13.02.2020
GR14.02.2020
IS13.03.2020
PT13.03.2020
Former [2020/37]AL13.11.2019
CZ13.11.2019
DK13.11.2019
EE13.11.2019
ES13.11.2019
FI13.11.2019
HR13.11.2019
LT13.11.2019
LV13.11.2019
NL13.11.2019
PL13.11.2019
RO13.11.2019
RS13.11.2019
SE13.11.2019
SK13.11.2019
SM13.11.2019
BG13.02.2020
NO13.02.2020
GR14.02.2020
IS13.03.2020
PT13.03.2020
Former [2020/36]AL13.11.2019
CZ13.11.2019
DK13.11.2019
EE13.11.2019
ES13.11.2019
FI13.11.2019
HR13.11.2019
LT13.11.2019
LV13.11.2019
NL13.11.2019
PL13.11.2019
RO13.11.2019
RS13.11.2019
SE13.11.2019
BG13.02.2020
NO13.02.2020
GR14.02.2020
IS13.03.2020
PT13.03.2020
Former [2020/35]AL13.11.2019
CZ13.11.2019
ES13.11.2019
FI13.11.2019
HR13.11.2019
LT13.11.2019
LV13.11.2019
NL13.11.2019
PL13.11.2019
RO13.11.2019
RS13.11.2019
SE13.11.2019
BG13.02.2020
NO13.02.2020
GR14.02.2020
IS13.03.2020
PT13.03.2020
Former [2020/34]AL13.11.2019
ES13.11.2019
FI13.11.2019
HR13.11.2019
LT13.11.2019
LV13.11.2019
NL13.11.2019
PL13.11.2019
RS13.11.2019
SE13.11.2019
BG13.02.2020
NO13.02.2020
GR14.02.2020
IS13.03.2020
PT13.03.2020
Former [2020/32]AL13.11.2019
FI13.11.2019
HR13.11.2019
LT13.11.2019
LV13.11.2019
NL13.11.2019
PL13.11.2019
RS13.11.2019
SE13.11.2019
BG13.02.2020
NO13.02.2020
GR14.02.2020
IS13.03.2020
PT13.03.2020
Former [2020/25]FI13.11.2019
HR13.11.2019
LT13.11.2019
LV13.11.2019
NL13.11.2019
PL13.11.2019
RS13.11.2019
SE13.11.2019
BG13.02.2020
NO13.02.2020
GR14.02.2020
IS13.03.2020
PT13.03.2020
Former [2020/24]FI13.11.2019
LT13.11.2019
LV13.11.2019
NL13.11.2019
PL13.11.2019
SE13.11.2019
BG13.02.2020
NO13.02.2020
GR14.02.2020
IS13.03.2020
PT13.03.2020
Former [2020/23]FI13.11.2019
LT13.11.2019
LV13.11.2019
NL13.11.2019
PL13.11.2019
SE13.11.2019
BG13.02.2020
NO13.02.2020
GR14.02.2020
PT13.03.2020
Former [2020/22]FI13.11.2019
LT13.11.2019
SE13.11.2019
BG13.02.2020
NO13.02.2020
PT13.03.2020
Former [2020/21]NO13.02.2020
Documents cited:Search[A]EP2328252  (TDK CORP [JP]) [A] 1-7* paragraphs [0017] - [0018] *;
 [X]JP2011199975  (NEC CORP) [X] 1-7 * paragraphs [0041] - [0075]; figures 1-15 *;
 [Y]EP2536002  (FUJITSU LTD [JP]) [Y] 1-7 * paragraph [0014] *;
 [Y]WO2013105279  (FUJITSU LTD [JP], et al) [Y] 1-7 * the whole document *
International search[A]WO2011099071  (FUJITSU LTD [JP], et al);
 [A]JP2011199975  (NEC CORP);
 [A]JP2012143131  (TDK CORP)
by applicantJP2008283791
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.