blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3080865

EP3080865 - POWER DIVIDER AND POWER COMBINER [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  02.07.2021
Database last updated on 24.08.2024
FormerThe patent has been granted
Status updated on  24.07.2020
FormerGrant of patent is intended
Status updated on  05.03.2020
FormerExamination is in progress
Status updated on  15.07.2019
Most recent event   Tooltip22.07.2022Lapse of the patent in a contracting state
New state(s): BE
published on 24.08.2022  [2022/34]
Applicant(s)For all designated states
Saab AB
581 88 Linköping / SE
[2016/42]
Inventor(s)01 / VICKES, Hans-Olof
Annelundsvägen 18 A
S-429 42 Särö / SE
 [2016/42]
Representative(s)Zacco Sweden AB
P.O. Box 5581
Löjtnantsgatan 21
114 85 Stockholm / SE
[N/P]
Former [2016/42]Zacco Sweden AB
P.O. Box 5581
114 85 Stockholm / SE
Application number, filing date13899198.913.12.2013
[2016/42]
WO2013SE51511
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2015088413
Date:18.06.2015
Language:EN
[2015/24]
Type: A1 Application with search report 
No.:EP3080865
Date:19.10.2016
Language:EN
The application published by WIPO in one of the EPO official languages on 18.06.2015 takes the place of the publication of the European patent application.
[2016/42]
Type: B1 Patent specification 
No.:EP3080865
Date:26.08.2020
Language:EN
[2020/35]
Search report(s)International search report - published on:SE18.06.2015
(Supplementary) European search report - dispatched on:EP21.07.2017
ClassificationIPC:H01P5/16, H01P5/12, H03H7/48
[2017/32]
CPC:
H01P5/12 (EP,IL,KR,US); H01P5/16 (EP,IL,US); H01Q1/24 (IL,US);
H01Q1/38 (IL,US); H03H11/02 (IL,KR); H03H7/46 (IL,US);
H03H7/48 (EP,IL,KR,US) (-)
Former IPC [2016/42]H01P5/16, H01P5/12, H03H7/48, H01Q21/00
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2016/42]
Extension statesBANot yet paid
MENot yet paid
TitleGerman:LEISTUNGSTEILER UND LEISTUNGSKOMBINIERER[2016/42]
English:POWER DIVIDER AND POWER COMBINER[2016/42]
French:DIVISEUR DE PUISSANCE ET COMBINEUR DE PUISSANCE[2016/42]
Entry into regional phase17.05.2016National basic fee paid 
17.05.2016Search fee paid 
17.05.2016Designation fee(s) paid 
17.05.2016Examination fee paid 
Examination procedure13.10.2015Request for preliminary examination filed
International Preliminary Examining Authority: SE
17.05.2016Examination requested  [2016/42]
24.01.2018Amendment by applicant (claims and/or description)
18.07.2019Despatch of a communication from the examining division (Time limit: M06)
20.01.2020Reply to a communication from the examining division
06.03.2020Communication of intention to grant the patent
14.07.2020Fee for grant paid
14.07.2020Fee for publishing/printing paid
14.07.2020Receipt of the translation of the claim(s)
Divisional application(s)The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  18.07.2019
Opposition(s)27.05.2021No opposition filed within time limit [2021/31]
Fees paidRenewal fee
17.05.2016Renewal fee patent year 03
15.12.2016Renewal fee patent year 04
29.12.2017Renewal fee patent year 05
18.12.2018Renewal fee patent year 06
18.12.2019Renewal fee patent year 07
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU13.12.2013
AL26.08.2020
AT26.08.2020
CY26.08.2020
CZ26.08.2020
DK26.08.2020
EE26.08.2020
FI26.08.2020
HR26.08.2020
LT26.08.2020
LV26.08.2020
MC26.08.2020
MK26.08.2020
MT26.08.2020
PL26.08.2020
RO26.08.2020
RS26.08.2020
SE26.08.2020
SI26.08.2020
SK26.08.2020
SM26.08.2020
TR26.08.2020
BG26.11.2020
NO26.11.2020
GR27.11.2020
IE13.12.2020
LU13.12.2020
IS26.12.2020
PT28.12.2020
BE31.12.2020
CH31.12.2020
LI31.12.2020
[2022/34]
Former [2022/32]HU13.12.2013
AL26.08.2020
AT26.08.2020
CY26.08.2020
CZ26.08.2020
DK26.08.2020
EE26.08.2020
FI26.08.2020
HR26.08.2020
LT26.08.2020
LV26.08.2020
MC26.08.2020
MK26.08.2020
MT26.08.2020
PL26.08.2020
RO26.08.2020
RS26.08.2020
SE26.08.2020
SI26.08.2020
SK26.08.2020
SM26.08.2020
TR26.08.2020
BG26.11.2020
NO26.11.2020
GR27.11.2020
IE13.12.2020
LU13.12.2020
IS26.12.2020
PT28.12.2020
CH31.12.2020
LI31.12.2020
Former [2022/27]HU13.12.2013
AL26.08.2020
AT26.08.2020
CY26.08.2020
CZ26.08.2020
DK26.08.2020
EE26.08.2020
FI26.08.2020
HR26.08.2020
LT26.08.2020
LV26.08.2020
MC26.08.2020
MT26.08.2020
PL26.08.2020
RO26.08.2020
RS26.08.2020
SE26.08.2020
SI26.08.2020
SK26.08.2020
SM26.08.2020
TR26.08.2020
BG26.11.2020
NO26.11.2020
GR27.11.2020
IE13.12.2020
LU13.12.2020
IS26.12.2020
PT28.12.2020
CH31.12.2020
LI31.12.2020
Former [2021/52]AL26.08.2020
AT26.08.2020
CZ26.08.2020
DK26.08.2020
EE26.08.2020
FI26.08.2020
HR26.08.2020
LT26.08.2020
LV26.08.2020
MC26.08.2020
PL26.08.2020
RO26.08.2020
RS26.08.2020
SE26.08.2020
SI26.08.2020
SK26.08.2020
SM26.08.2020
BG26.11.2020
NO26.11.2020
GR27.11.2020
IE13.12.2020
LU13.12.2020
IS26.12.2020
PT28.12.2020
CH31.12.2020
LI31.12.2020
Former [2021/47]AL26.08.2020
AT26.08.2020
CZ26.08.2020
DK26.08.2020
EE26.08.2020
FI26.08.2020
HR26.08.2020
LT26.08.2020
LV26.08.2020
MC26.08.2020
PL26.08.2020
RO26.08.2020
RS26.08.2020
SE26.08.2020
SI26.08.2020
SK26.08.2020
SM26.08.2020
BG26.11.2020
NO26.11.2020
GR27.11.2020
IE13.12.2020
LU13.12.2020
IS26.12.2020
PT28.12.2020
Former [2021/46]AL26.08.2020
AT26.08.2020
CZ26.08.2020
DK26.08.2020
EE26.08.2020
FI26.08.2020
HR26.08.2020
LT26.08.2020
LV26.08.2020
MC26.08.2020
PL26.08.2020
RO26.08.2020
RS26.08.2020
SE26.08.2020
SI26.08.2020
SK26.08.2020
SM26.08.2020
BG26.11.2020
NO26.11.2020
GR27.11.2020
IE13.12.2020
IS26.12.2020
PT28.12.2020
Former [2021/40]AL26.08.2020
AT26.08.2020
CZ26.08.2020
DK26.08.2020
EE26.08.2020
FI26.08.2020
HR26.08.2020
LT26.08.2020
LV26.08.2020
MC26.08.2020
PL26.08.2020
RO26.08.2020
RS26.08.2020
SE26.08.2020
SI26.08.2020
SK26.08.2020
SM26.08.2020
BG26.11.2020
NO26.11.2020
GR27.11.2020
IS26.12.2020
PT28.12.2020
Former [2021/36]AL26.08.2020
AT26.08.2020
CZ26.08.2020
DK26.08.2020
EE26.08.2020
FI26.08.2020
HR26.08.2020
LT26.08.2020
LV26.08.2020
PL26.08.2020
RO26.08.2020
RS26.08.2020
SE26.08.2020
SI26.08.2020
SK26.08.2020
SM26.08.2020
BG26.11.2020
NO26.11.2020
GR27.11.2020
IS26.12.2020
PT28.12.2020
Former [2021/28]AL26.08.2020
AT26.08.2020
CZ26.08.2020
DK26.08.2020
EE26.08.2020
FI26.08.2020
HR26.08.2020
LT26.08.2020
LV26.08.2020
PL26.08.2020
RO26.08.2020
RS26.08.2020
SE26.08.2020
SK26.08.2020
SM26.08.2020
BG26.11.2020
NO26.11.2020
GR27.11.2020
IS26.12.2020
PT28.12.2020
Former [2021/25]AL26.08.2020
AT26.08.2020
CZ26.08.2020
DK26.08.2020
EE26.08.2020
FI26.08.2020
HR26.08.2020
LT26.08.2020
LV26.08.2020
PL26.08.2020
RO26.08.2020
RS26.08.2020
SE26.08.2020
SM26.08.2020
BG26.11.2020
NO26.11.2020
GR27.11.2020
IS26.12.2020
PT28.12.2020
Former [2021/24]AT26.08.2020
CZ26.08.2020
DK26.08.2020
EE26.08.2020
FI26.08.2020
HR26.08.2020
LT26.08.2020
LV26.08.2020
PL26.08.2020
RO26.08.2020
RS26.08.2020
SE26.08.2020
SM26.08.2020
BG26.11.2020
NO26.11.2020
GR27.11.2020
IS26.12.2020
PT28.12.2020
Former [2021/23]CZ26.08.2020
DK26.08.2020
EE26.08.2020
FI26.08.2020
HR26.08.2020
LT26.08.2020
LV26.08.2020
PL26.08.2020
RO26.08.2020
RS26.08.2020
SE26.08.2020
SM26.08.2020
BG26.11.2020
NO26.11.2020
GR27.11.2020
IS26.12.2020
PT28.12.2020
Former [2021/22]CZ26.08.2020
DK26.08.2020
EE26.08.2020
FI26.08.2020
HR26.08.2020
LT26.08.2020
LV26.08.2020
PL26.08.2020
RO26.08.2020
RS26.08.2020
SE26.08.2020
BG26.11.2020
NO26.11.2020
GR27.11.2020
IS26.12.2020
PT28.12.2020
Former [2021/21]DK26.08.2020
FI26.08.2020
HR26.08.2020
LT26.08.2020
LV26.08.2020
PL26.08.2020
RS26.08.2020
SE26.08.2020
BG26.11.2020
NO26.11.2020
GR27.11.2020
IS26.12.2020
PT28.12.2020
Former [2021/10]FI26.08.2020
HR26.08.2020
LT26.08.2020
LV26.08.2020
PL26.08.2020
RS26.08.2020
SE26.08.2020
BG26.11.2020
NO26.11.2020
GR27.11.2020
IS26.12.2020
PT28.12.2020
Former [2021/09]FI26.08.2020
LT26.08.2020
SE26.08.2020
BG26.11.2020
NO26.11.2020
GR27.11.2020
PT28.12.2020
Former [2021/08]FI26.08.2020
LT26.08.2020
SE26.08.2020
BG26.11.2020
NO26.11.2020
PT28.12.2020
Former [2021/07]FI26.08.2020
LT26.08.2020
NO26.11.2020
Documents cited:Search[Y]CN103259072  (UNIV BEIJING POSTS & TELECOMM) [Y] 1-17 * paragraph [0016] - paragraph [0020]; figures 1, 2 *;
 [Y]  - Robert E. Collin, Foundations for microwave engineering, Singapore, McGraw-Hill, Inc., (19920101), ISBN 0-07-112569-8, XP002771489 [Y] 1-17 * page 348 - page 349; figures 5-36 * * page 370 - page 371; figures 5-51 *
International search[A]US4367445  (DYDYK MICHAEL);
 [A]US4875024  (ROBERTS THOMAS E [US]);
 [A]US2008150832  (INGRAM DAISY L [US], et al);
 [A]US2009295500  (IVES FRED H [US]);
 [Y]  - COHN, SEYMOR B., "A Class of Broadband Three-Port TEM- Mode Hybrids", IEEE TRANSACTIONS ON MICROWAVE THEORY AND TECHNIQUES, (19680201), vol. 16, no. 2, pages 110 - 116, XP001366526
 [Y]  - COHN, SEYMOR B., "Optimum Design of Stepped Transmission- Line Transformers", IRE TRANSACTIONS ON MICROWAVE THEORY AND TECHNIQUES, (19550410), vol. 3, pages 16 - 21, XP055292469

DOI:   http://dx.doi.org/10.1109/TMTT.1955.1124940
 [A]  - YOUNG, L., "Tables for Cascaded Homogeneous Quarter-Wave Transformers", IRE TRANSACTIONS ON MICROWAVE THEORY AND TECHNIQUES, (19590401), vol. 6, no. 2, pages 233 - 237, XP011219146
 [A]  - PARAD, L. I. ET AL., "Split-Tee Power Divider", IEEE TRANSACTIONS ON MICROWAVE THEORY AND TECHNIQUES, (19650101), vol. 13, no. 1, doi:10.1109/TMTT.1965.1125934, pages 91 - 95, XP055000216

DOI:   http://dx.doi.org/10.1109/TMTT.1965.1125934
 [A]  - CHIEH, J. S. ET AL., "Development of a broadband Wilkinson power combiner on Liquid Crystal Polymer", PROCEEDINGS OF MICROWAVE CONFERENCE, 2009 (APMC 2009, SINGAPORE, (20091207), pages 2068 - 2071, XP031614106
ExaminationUS2008150832
    - SEYMOUR B COHN, "A Class of Broadband Three-Port TEM-Mode Hybrids", IEEE TRANSACTIONS ON MICROWAVE THEORY AND TECHNIQUES,, (19680201), vol. MTT-16, no. 2, pages 110 - 116, XP001366526
by applicantUS2008150832
 CN103259072
    - E. WILKINSON, "An N-way Power Divider", IEEE Transactions on Microwave Theory and Techniques, MTT-8, (19600100), doi:doi:10.1109/TMTT.1960.1124668, pages 116 - 118, XP000984078

DOI:   http://dx.doi.org/10.1109/TMTT.1960.1124668
    - ROBERT E. COLLIN, Foundations for microwave engineering, McGraw-Hill, Inc., (19920101), ISBN 0-07-112569-8, XP002771489
    - COHN, SEYMOR B, "A Class of Broadband Three-Port TEM - Mode Hybrids", IEEE Transactions of microwave theory and techniques, (19680201), vol. 16, XP001366526
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.