Extract from the Register of European Patents

EP About this file: EP2829778

EP2829778 - Multiple parts reed valve and method of manufacturing [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  23.10.2020
Database last updated on 21.03.2026
FormerThe patent has been granted
Status updated on  15.11.2019
FormerGrant of patent is intended
Status updated on  03.07.2019
FormerExamination is in progress
Status updated on  06.01.2017
Most recent event   Tooltip08.07.2022Lapse of the patent in a contracting state
New state(s): MK
published on 10.08.2022  [2022/32]
Applicant(s)For all designated states
BARNES GROUP INC.
123 Main Street
Bristol, CT 06010 / US
[2015/05]
Inventor(s)01 / Ubaldino Rosa, Jose
Av. Dr. Jesuino Marcondez Machado 2201
Campinas
Sao Paulo 13090-723 / BR
 [2015/05]
Representative(s)Grosse Schumacher Knauer von Hirschhausen
Patent- und Rechtsanwälte
Schloss Schellenberg - Backhaus
Renteilichtung 1
45134 Essen / DE
[N/P]
Former [2019/51]Grosse Schumacher Knauer von Hirschhausen
Patent- und Rechtsanwälte
Frühlingstrasse 43A
45133 Essen / DE
Former [2015/05]Grosse Schumacher Knauer von Hirschhausen
Frühlingstrasse 43A
45133 Essen / DE
Application number, filing date14002588.325.07.2014
[2015/05]
Priority number, dateUS201361858728P26.07.2013         Original published format: US 201361858728 P
[2015/05]
Filing languageEN
Procedural languageEN
PublicationType: A2 Application without search report 
No.:EP2829778
Date:28.01.2015
Language:EN
[2015/05]
Type: A3 Search report 
No.:EP2829778
Date:27.05.2015
Language:EN
[2015/22]
Type: B1 Patent specification 
No.:EP2829778
Date:18.12.2019
Language:EN
[2019/51]
Search report(s)(Supplementary) European search report - dispatched on:EP24.04.2015
ClassificationIPC:F04B39/10, B23P15/00, F16K15/16, F16K15/14
[2019/29]
CPC:
F04B39/1073 (EP,KR,US); F16K15/16 (EP,KR,US); F16K15/144 (US);
B23P15/001 (KR); B23P15/002 (US); F16K7/12 (KR);
Y10T137/7891 (EP,US); Y10T29/49416 (EP,US) (-)
Former IPC [2015/22]F04B39/10, F16K15/16, F16K15/14
Former IPC [2015/05]F16K15/16, F04B39/10
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2016/01]
Former [2015/05]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:Mehrteiliges Lamellenventil und Herstellungsverfahren[2015/05]
English:Multiple parts reed valve and method of manufacturing[2015/05]
French:Clapet à lamelle multipièce et procédé de fabrication[2015/05]
Examination procedure27.11.2015Amendment by applicant (claims and/or description)
27.11.2015Examination requested  [2016/01]
23.12.2015Despatch of a communication from the examining division (Time limit: M04)
28.04.2016Reply to a communication from the examining division
03.01.2017Despatch of a communication from the examining division (Time limit: M06)
04.07.2017Reply to a communication from the examining division
22.12.2017Despatch of a communication from the examining division (Time limit: M06)
29.06.2018Reply to a communication from the examining division
04.07.2019Communication of intention to grant the patent
05.11.2019Fee for grant paid
05.11.2019Fee for publishing/printing paid
05.11.2019Receipt of the translation of the claim(s)
Opposition(s)21.09.2020No opposition filed within time limit [2020/48]
Fees paidRenewal fee
11.07.2016Renewal fee patent year 03
10.07.2017Renewal fee patent year 04
10.07.2018Renewal fee patent year 05
09.07.2019Renewal fee patent year 06
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipAL18.12.2019
CY18.12.2019
DK18.12.2019
EE18.12.2019
FI18.12.2019
HR18.12.2019
LT18.12.2019
LV18.12.2019
MC18.12.2019
MK18.12.2019
MT18.12.2019
RO18.12.2019
RS18.12.2019
SI18.12.2019
SM18.12.2019
BG18.03.2020
NO18.03.2020
GR19.03.2020
IS18.04.2020
IE25.07.2020
[2022/32]
Former [2022/27]AL18.12.2019
CY18.12.2019
DK18.12.2019
EE18.12.2019
FI18.12.2019
HR18.12.2019
LT18.12.2019
LV18.12.2019
MC18.12.2019
MT18.12.2019
RO18.12.2019
RS18.12.2019
SI18.12.2019
SM18.12.2019
BG18.03.2020
NO18.03.2020
GR19.03.2020
IS18.04.2020
IE25.07.2020
Former [2021/37]AL18.12.2019
DK18.12.2019
EE18.12.2019
FI18.12.2019
HR18.12.2019
LT18.12.2019
LV18.12.2019
MC18.12.2019
RO18.12.2019
RS18.12.2019
SI18.12.2019
SM18.12.2019
BG18.03.2020
NO18.03.2020
GR19.03.2020
IS18.04.2020
IE25.07.2020
Former [2021/15]AL18.12.2019
DK18.12.2019
EE18.12.2019
FI18.12.2019
HR18.12.2019
LT18.12.2019
LV18.12.2019
MC18.12.2019
RO18.12.2019
RS18.12.2019
SI18.12.2019
SM18.12.2019
BG18.03.2020
NO18.03.2020
GR19.03.2020
IS18.04.2020
Former [2020/51]AL18.12.2019
DK18.12.2019
EE18.12.2019
FI18.12.2019
HR18.12.2019
LT18.12.2019
LV18.12.2019
RO18.12.2019
RS18.12.2019
SI18.12.2019
SM18.12.2019
BG18.03.2020
NO18.03.2020
GR19.03.2020
IS18.04.2020
Former [2020/47]AL18.12.2019
DK18.12.2019
EE18.12.2019
FI18.12.2019
HR18.12.2019
LT18.12.2019
LV18.12.2019
RO18.12.2019
RS18.12.2019
SM18.12.2019
BG18.03.2020
NO18.03.2020
GR19.03.2020
IS18.04.2020
Former [2020/40]AL18.12.2019
EE18.12.2019
FI18.12.2019
HR18.12.2019
LT18.12.2019
LV18.12.2019
RO18.12.2019
RS18.12.2019
SM18.12.2019
BG18.03.2020
NO18.03.2020
GR19.03.2020
IS18.04.2020
Former [2020/37]AL18.12.2019
EE18.12.2019
FI18.12.2019
HR18.12.2019
LT18.12.2019
LV18.12.2019
RO18.12.2019
RS18.12.2019
SM18.12.2019
BG18.03.2020
NO18.03.2020
GR19.03.2020
Former [2020/35]AL18.12.2019
FI18.12.2019
HR18.12.2019
LT18.12.2019
LV18.12.2019
RO18.12.2019
RS18.12.2019
BG18.03.2020
NO18.03.2020
GR19.03.2020
Former [2020/32]AL18.12.2019
FI18.12.2019
HR18.12.2019
LT18.12.2019
LV18.12.2019
RS18.12.2019
BG18.03.2020
NO18.03.2020
GR19.03.2020
Former [2020/25]FI18.12.2019
HR18.12.2019
LT18.12.2019
LV18.12.2019
RS18.12.2019
BG18.03.2020
NO18.03.2020
GR19.03.2020
Former [2020/23]FI18.12.2019
LT18.12.2019
LV18.12.2019
BG18.03.2020
NO18.03.2020
GR19.03.2020
Former [2020/22]FI18.12.2019
LT18.12.2019
BG18.03.2020
NO18.03.2020
Former [2020/21]NO18.03.2020
Documents cited:Search[XI] DE4039786  (DANFOSS FLENSBURG GMBH et al.)
 [IA] DD274649  (DKK SCHARFENSTEIN VEB et al.)
 [XI] EP1691735  (COLOPLAST AS et al.) [X] 1-3,6,8-10,13,15,16 * figures 1-3, 5, 7-9 * * column 1, line 3 - line 54 * * column 1, line 65 - column 4, line 11 * * claims 1-5 *[I] 4,5,7,11,12,14
 [IA] US5140748  (KANDPAL TARA C et al.) [I] 1,2,4-6,8,9,11-13,15,16 * the whole document *[A] 3,7,10,14
by applicantUS6227825
 BRPI9702470
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.