EP2875877 - Method for producing a profile having varying a cross-section [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 01.03.2019 Database last updated on 26.07.2024 | |
Former | The patent has been granted Status updated on 23.03.2018 | ||
Former | Grant of patent is intended Status updated on 15.01.2018 | Most recent event Tooltip | 10.07.2020 | Lapse of the patent in a contracting state New state(s): IS | published on 12.08.2020 [2020/33] | Applicant(s) | For all designated states Welser Profile Austria GmbH Prochenberg 24 3341 Ybbsitz / AT | [2015/22] | Inventor(s) | 01 /
Aigner, Kurt Oberamt 25 3341 Ybbsitz / AT | 02 /
Pfisterer, Edwin Lindenhofstraße 2 3340 Waidhofen/Ybbs / AT | 03 /
Schreivogl, Martin Schwaighof 18 3242 Texingtal / AT | 04 /
Schachinger, Harald Möhringerstraße 26/2 3340 Waidhofen/Ybbs / AT | 05 /
Spreitzer, Erich Grestner Strasse 7 3341 Ybbsitz / AT | [2015/22] | Representative(s) | Grünecker Patent- und Rechtsanwälte PartG mbB Leopoldstraße 4 80802 München / DE | [2015/22] | Application number, filing date | 14003646.8 | 28.10.2014 | [2015/22] | Priority number, date | DE20131018581 | 05.11.2013 Original published format: DE102013018581 | [2015/22] | Filing language | DE | Procedural language | DE | Publication | Type: | A1 Application with search report | No.: | EP2875877 | Date: | 27.05.2015 | Language: | DE | [2015/22] | Type: | B1 Patent specification | No.: | EP2875877 | Date: | 25.04.2018 | Language: | DE | [2018/17] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 23.04.2015 | Classification | IPC: | B21D5/06, B21D22/02 | [2015/22] | CPC: |
B21D5/06 (EP);
B21D22/02 (EP);
B21D5/083 (EP);
B21D53/00 (EP);
B21D22/20 (EP)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2015/38] |
Former [2015/22] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | Verfahren zur Herstellung eines Profils mit variierendem Querschnitt | [2015/22] | English: | Method for producing a profile having varying a cross-section | [2015/22] | French: | Procédé de fabrication d'un profilé à section variable | [2015/22] | Examination procedure | 05.08.2015 | Amendment by applicant (claims and/or description) | 05.08.2015 | Examination requested [2015/38] | 16.01.2018 | Communication of intention to grant the patent | 16.03.2018 | Fee for grant paid | 16.03.2018 | Fee for publishing/printing paid | 16.03.2018 | Receipt of the translation of the claim(s) | Divisional application(s) | EP17198635.9 / EP3299090 | Opposition(s) | 28.01.2019 | No opposition filed within time limit [2019/14] | Fees paid | Renewal fee | 27.10.2016 | Renewal fee patent year 03 | 27.10.2017 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 28.10.2014 | AL | 25.04.2018 | CY | 25.04.2018 | CZ | 25.04.2018 | EE | 25.04.2018 | FI | 25.04.2018 | HR | 25.04.2018 | LT | 25.04.2018 | LV | 25.04.2018 | MC | 25.04.2018 | MK | 25.04.2018 | MT | 25.04.2018 | PL | 25.04.2018 | RO | 25.04.2018 | RS | 25.04.2018 | SI | 25.04.2018 | SK | 25.04.2018 | SM | 25.04.2018 | TR | 25.04.2018 | BG | 25.07.2018 | NO | 25.07.2018 | GR | 26.07.2018 | IS | 25.08.2018 | PT | 27.08.2018 | IE | 28.10.2018 | LU | 28.10.2018 | CH | 31.10.2018 | LI | 31.10.2018 | [2020/32] |
Former [2020/31] | HU | 28.10.2014 | |
AL | 25.04.2018 | ||
CY | 25.04.2018 | ||
CZ | 25.04.2018 | ||
EE | 25.04.2018 | ||
FI | 25.04.2018 | ||
HR | 25.04.2018 | ||
LT | 25.04.2018 | ||
LV | 25.04.2018 | ||
MC | 25.04.2018 | ||
MK | 25.04.2018 | ||
MT | 25.04.2018 | ||
PL | 25.04.2018 | ||
RO | 25.04.2018 | ||
RS | 25.04.2018 | ||
SI | 25.04.2018 | ||
SK | 25.04.2018 | ||
SM | 25.04.2018 | ||
TR | 25.04.2018 | ||
BG | 25.07.2018 | ||
NO | 25.07.2018 | ||
GR | 26.07.2018 | ||
PT | 27.08.2018 | ||
IE | 28.10.2018 | ||
LU | 28.10.2018 | ||
CH | 31.10.2018 | ||
LI | 31.10.2018 | ||
Former [2020/16] | AL | 25.04.2018 | |
CZ | 25.04.2018 | ||
EE | 25.04.2018 | ||
FI | 25.04.2018 | ||
HR | 25.04.2018 | ||
LT | 25.04.2018 | ||
LV | 25.04.2018 | ||
MC | 25.04.2018 | ||
MT | 25.04.2018 | ||
PL | 25.04.2018 | ||
RO | 25.04.2018 | ||
RS | 25.04.2018 | ||
SI | 25.04.2018 | ||
SK | 25.04.2018 | ||
SM | 25.04.2018 | ||
TR | 25.04.2018 | ||
BG | 25.07.2018 | ||
NO | 25.07.2018 | ||
GR | 26.07.2018 | ||
PT | 27.08.2018 | ||
IE | 28.10.2018 | ||
LU | 28.10.2018 | ||
CH | 31.10.2018 | ||
LI | 31.10.2018 | ||
Former [2020/08] | AL | 25.04.2018 | |
CZ | 25.04.2018 | ||
EE | 25.04.2018 | ||
FI | 25.04.2018 | ||
HR | 25.04.2018 | ||
LT | 25.04.2018 | ||
LV | 25.04.2018 | ||
MC | 25.04.2018 | ||
MT | 25.04.2018 | ||
PL | 25.04.2018 | ||
RO | 25.04.2018 | ||
RS | 25.04.2018 | ||
SI | 25.04.2018 | ||
SK | 25.04.2018 | ||
SM | 25.04.2018 | ||
BG | 25.07.2018 | ||
NO | 25.07.2018 | ||
GR | 26.07.2018 | ||
PT | 27.08.2018 | ||
IE | 28.10.2018 | ||
LU | 28.10.2018 | ||
CH | 31.10.2018 | ||
LI | 31.10.2018 | ||
Former [2019/51] | AL | 25.04.2018 | |
CZ | 25.04.2018 | ||
EE | 25.04.2018 | ||
FI | 25.04.2018 | ||
HR | 25.04.2018 | ||
LT | 25.04.2018 | ||
LV | 25.04.2018 | ||
MC | 25.04.2018 | ||
PL | 25.04.2018 | ||
RO | 25.04.2018 | ||
RS | 25.04.2018 | ||
SI | 25.04.2018 | ||
SK | 25.04.2018 | ||
SM | 25.04.2018 | ||
BG | 25.07.2018 | ||
NO | 25.07.2018 | ||
GR | 26.07.2018 | ||
PT | 27.08.2018 | ||
IE | 28.10.2018 | ||
LU | 28.10.2018 | ||
CH | 31.10.2018 | ||
LI | 31.10.2018 | ||
Former [2019/48] | CZ | 25.04.2018 | |
EE | 25.04.2018 | ||
FI | 25.04.2018 | ||
HR | 25.04.2018 | ||
LT | 25.04.2018 | ||
LV | 25.04.2018 | ||
MC | 25.04.2018 | ||
PL | 25.04.2018 | ||
RO | 25.04.2018 | ||
RS | 25.04.2018 | ||
SI | 25.04.2018 | ||
SK | 25.04.2018 | ||
SM | 25.04.2018 | ||
BG | 25.07.2018 | ||
NO | 25.07.2018 | ||
GR | 26.07.2018 | ||
PT | 27.08.2018 | ||
IE | 28.10.2018 | ||
LU | 28.10.2018 | ||
CH | 31.10.2018 | ||
LI | 31.10.2018 | ||
Former [2019/40] | CZ | 25.04.2018 | |
EE | 25.04.2018 | ||
FI | 25.04.2018 | ||
HR | 25.04.2018 | ||
LT | 25.04.2018 | ||
LV | 25.04.2018 | ||
MC | 25.04.2018 | ||
PL | 25.04.2018 | ||
RO | 25.04.2018 | ||
RS | 25.04.2018 | ||
SI | 25.04.2018 | ||
SK | 25.04.2018 | ||
SM | 25.04.2018 | ||
BG | 25.07.2018 | ||
NO | 25.07.2018 | ||
GR | 26.07.2018 | ||
PT | 27.08.2018 | ||
LU | 28.10.2018 | ||
CH | 31.10.2018 | ||
LI | 31.10.2018 | ||
Former [2019/30] | CZ | 25.04.2018 | |
EE | 25.04.2018 | ||
FI | 25.04.2018 | ||
HR | 25.04.2018 | ||
LT | 25.04.2018 | ||
LV | 25.04.2018 | ||
MC | 25.04.2018 | ||
PL | 25.04.2018 | ||
RO | 25.04.2018 | ||
RS | 25.04.2018 | ||
SI | 25.04.2018 | ||
SK | 25.04.2018 | ||
SM | 25.04.2018 | ||
BG | 25.07.2018 | ||
NO | 25.07.2018 | ||
GR | 26.07.2018 | ||
PT | 27.08.2018 | ||
LU | 28.10.2018 | ||
Former [2019/28] | CZ | 25.04.2018 | |
EE | 25.04.2018 | ||
FI | 25.04.2018 | ||
HR | 25.04.2018 | ||
LT | 25.04.2018 | ||
LV | 25.04.2018 | ||
MC | 25.04.2018 | ||
PL | 25.04.2018 | ||
RO | 25.04.2018 | ||
RS | 25.04.2018 | ||
SI | 25.04.2018 | ||
SK | 25.04.2018 | ||
SM | 25.04.2018 | ||
BG | 25.07.2018 | ||
NO | 25.07.2018 | ||
GR | 26.07.2018 | ||
PT | 27.08.2018 | ||
Former [2019/26] | CZ | 25.04.2018 | |
EE | 25.04.2018 | ||
FI | 25.04.2018 | ||
HR | 25.04.2018 | ||
LT | 25.04.2018 | ||
LV | 25.04.2018 | ||
PL | 25.04.2018 | ||
RO | 25.04.2018 | ||
RS | 25.04.2018 | ||
SI | 25.04.2018 | ||
SK | 25.04.2018 | ||
SM | 25.04.2018 | ||
BG | 25.07.2018 | ||
NO | 25.07.2018 | ||
GR | 26.07.2018 | ||
PT | 27.08.2018 | ||
Former [2019/11] | CZ | 25.04.2018 | |
EE | 25.04.2018 | ||
FI | 25.04.2018 | ||
HR | 25.04.2018 | ||
LT | 25.04.2018 | ||
LV | 25.04.2018 | ||
PL | 25.04.2018 | ||
RO | 25.04.2018 | ||
RS | 25.04.2018 | ||
SK | 25.04.2018 | ||
SM | 25.04.2018 | ||
BG | 25.07.2018 | ||
NO | 25.07.2018 | ||
GR | 26.07.2018 | ||
PT | 27.08.2018 | ||
Former [2019/10] | CZ | 25.04.2018 | |
EE | 25.04.2018 | ||
FI | 25.04.2018 | ||
HR | 25.04.2018 | ||
LT | 25.04.2018 | ||
LV | 25.04.2018 | ||
PL | 25.04.2018 | ||
RO | 25.04.2018 | ||
RS | 25.04.2018 | ||
SK | 25.04.2018 | ||
BG | 25.07.2018 | ||
NO | 25.07.2018 | ||
GR | 26.07.2018 | ||
PT | 27.08.2018 | ||
Former [2019/09] | EE | 25.04.2018 | |
FI | 25.04.2018 | ||
HR | 25.04.2018 | ||
LT | 25.04.2018 | ||
LV | 25.04.2018 | ||
PL | 25.04.2018 | ||
RS | 25.04.2018 | ||
BG | 25.07.2018 | ||
NO | 25.07.2018 | ||
GR | 26.07.2018 | ||
PT | 27.08.2018 | ||
Former [2019/03] | FI | 25.04.2018 | |
HR | 25.04.2018 | ||
LT | 25.04.2018 | ||
LV | 25.04.2018 | ||
PL | 25.04.2018 | ||
RS | 25.04.2018 | ||
BG | 25.07.2018 | ||
NO | 25.07.2018 | ||
GR | 26.07.2018 | ||
PT | 27.08.2018 | ||
Former [2018/52] | FI | 25.04.2018 | |
HR | 25.04.2018 | ||
LT | 25.04.2018 | ||
LV | 25.04.2018 | ||
PL | 25.04.2018 | ||
RS | 25.04.2018 | ||
BG | 25.07.2018 | ||
NO | 25.07.2018 | ||
GR | 26.07.2018 | ||
Former [2018/51] | FI | 25.04.2018 | |
HR | 25.04.2018 | ||
LT | 25.04.2018 | ||
LV | 25.04.2018 | ||
PL | 25.04.2018 | ||
RS | 25.04.2018 | ||
BG | 25.07.2018 | ||
NO | 25.07.2018 | ||
Former [2018/50] | FI | 25.04.2018 | |
HR | 25.04.2018 | ||
LT | 25.04.2018 | ||
PL | 25.04.2018 | ||
BG | 25.07.2018 | ||
NO | 25.07.2018 | ||
Former [2018/47] | FI | 25.04.2018 | |
LT | 25.04.2018 | ||
NO | 25.07.2018 | Documents cited: | Search | [A]JPS6233019 (NISSAN MOTOR) [A] 1* abstract *; | [Y]EP0363232 (TECPHY [FR]) [Y] 1-10 * figures 1,2; claim 1 *; | [YD]EP1344583 (KRONENBERG PROFIL GMBH [DE]) [YD] 1-10 * the whole document *; | [YD]EP1537922 (HONDA MOTOR CO LTD [JP]) [YD] 1-10 * paragraph [0053]; figure 1 *; | [A]EP1997570 (NISSAN MOTOR [JP]) [A] 1 * the whole document * | by applicant | EP1344583 | EP1547922 |