EP2728588 - SHIELDED ELECTRICAL CABLE [Right-click to bookmark this link] | |||
Former [2014/19] | Shielded electrical cable and method of making | ||
[2019/35] | Status | No opposition filed within time limit Status updated on 18.12.2020 Database last updated on 19.10.2024 | |
Former | The patent has been granted Status updated on 10.01.2020 | ||
Former | Grant of patent is intended Status updated on 12.08.2019 | ||
Former | Examination is in progress Status updated on 29.09.2017 | Most recent event Tooltip | 08.07.2022 | Lapse of the patent in a contracting state New state(s): AL, MK | published on 10.08.2022 [2022/32] | Applicant(s) | For all designated states 3M Innovative Properties Company 3M Center P.O. Box 33427 St. Paul, MN 55133-3427 / US | [N/P] |
Former [2020/07] | For all designated states 3M Innovative Properties Company 3M Center P.O.Box 33427 St. Paul, MN 55133-3427 / US | ||
Former [2014/19] | For all designated states 3M Innovative Properties Company 3M Center Post Office Box 33427 Saint Paul, MN 55133-3427 / US | Inventor(s) | 01 /
Gundel, Douglas c/o 3M Center, Post Office Box 33427 Saint Paul, MN 55133-3427 / US | [2014/19] | Representative(s) | Isarpatent Patent- und Rechtsanwälte Barth Charles Hassa Peckmann & Partner mbB Friedrichstrasse 31 80801 München / DE | [N/P] |
Former [2020/07] | Isarpatent Patent- und Rechtsanwälte Behnisch Barth Charles Hassa Peckmann & Partner mbB Friedrichstrasse 31 80801 München / DE | ||
Former [2014/19] | Isarpatent Patent- und Rechtsanwälte Friedrichstrasse 31 80801 München / DE | Application number, filing date | 14153148.3 | 17.06.2010 | [2014/19] | Priority number, date | US20090218739P | 19.06.2009 Original published format: US 218739 P | US20090260881P | 13.11.2009 Original published format: US 260881 P | US20100348800P | 27.05.2010 Original published format: US 348800 P | US20100352473P | 08.06.2010 Original published format: US 352473 P | [2014/19] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP2728588 | Date: | 07.05.2014 | Language: | EN | [2014/19] | Type: | B1 Patent specification | No.: | EP2728588 | Date: | 12.02.2020 | Language: | EN | [2020/07] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 03.04.2014 | Classification | IPC: | H01B11/20, // H01B7/08 | [2014/19] | CPC: |
H01B11/203 (EP,US);
H05K9/0098 (US);
H01B11/00 (US);
H01B11/04 (US);
H01B11/10 (US);
H01B11/1091 (US);
H01B11/1891 (US);
H01B11/1895 (US);
H01B7/0823 (US);
H01B7/0838 (EP,US);
H01B7/0861 (EP,US);
H01B7/0876 (US);
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, SE, SI, SK, SM, TR [2020/07] |
Former [2014/19] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, SE, SI, SK, SM, TR | Title | German: | ABGESCHIRMTES STROMKABEL | [2019/35] | English: | SHIELDED ELECTRICAL CABLE | [2019/37] | French: | CÂBLE ÉLECTRIQUE BLINDÉ | [2019/37] |
Former [2014/19] | ABGESCHIRMTES STROMKABEL UND VERFAHREN ZU SEINER HERSTELLUNG | ||
Former [2014/19] | Shielded electrical cable and method of making | ||
Former [2014/19] | Câble électrique blindé et son procédé de fabrication | Examination procedure | 06.11.2014 | Amendment by applicant (claims and/or description) | 06.11.2014 | Examination requested [2014/51] | 28.09.2017 | Despatch of a communication from the examining division (Time limit: M06) | 05.04.2018 | Reply to a communication from the examining division | 13.08.2019 | Communication of intention to grant the patent | 17.12.2019 | Fee for grant paid | 17.12.2019 | Fee for publishing/printing paid | 17.12.2019 | Receipt of the translation of the claim(s) | Parent application(s) Tooltip | EP10728508.2 / EP2443633 | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued (EP20100728508) is 14.06.2013 | Opposition(s) | 13.11.2020 | No opposition filed within time limit [2021/03] | Fees paid | Renewal fee | 30.01.2014 | Renewal fee patent year 03 | 30.01.2014 | Renewal fee patent year 04 | 31.03.2014 | Renewal fee patent year 05 | 10.06.2015 | Renewal fee patent year 06 | 10.06.2016 | Renewal fee patent year 07 | 16.06.2017 | Renewal fee patent year 08 | 11.06.2018 | Renewal fee patent year 09 | 13.06.2019 | Renewal fee patent year 10 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 17.06.2010 | AL | 12.02.2020 | AT | 12.02.2020 | CY | 12.02.2020 | CZ | 12.02.2020 | DK | 12.02.2020 | EE | 12.02.2020 | ES | 12.02.2020 | FI | 12.02.2020 | HR | 12.02.2020 | IT | 12.02.2020 | LT | 12.02.2020 | LV | 12.02.2020 | MC | 12.02.2020 | MK | 12.02.2020 | MT | 12.02.2020 | NL | 12.02.2020 | PL | 12.02.2020 | RO | 12.02.2020 | SE | 12.02.2020 | SI | 12.02.2020 | SK | 12.02.2020 | SM | 12.02.2020 | TR | 12.02.2020 | BG | 12.05.2020 | NO | 12.05.2020 | GR | 13.05.2020 | IS | 12.06.2020 | GB | 17.06.2020 | IE | 17.06.2020 | LU | 17.06.2020 | BE | 30.06.2020 | CH | 30.06.2020 | FR | 30.06.2020 | LI | 30.06.2020 | PT | 05.07.2020 | [2022/31] |
Former [2022/27] | HU | 17.06.2010 | |
AT | 12.02.2020 | ||
CY | 12.02.2020 | ||
CZ | 12.02.2020 | ||
DK | 12.02.2020 | ||
EE | 12.02.2020 | ||
ES | 12.02.2020 | ||
FI | 12.02.2020 | ||
HR | 12.02.2020 | ||
IT | 12.02.2020 | ||
LT | 12.02.2020 | ||
LV | 12.02.2020 | ||
MC | 12.02.2020 | ||
MT | 12.02.2020 | ||
NL | 12.02.2020 | ||
PL | 12.02.2020 | ||
RO | 12.02.2020 | ||
SE | 12.02.2020 | ||
SI | 12.02.2020 | ||
SK | 12.02.2020 | ||
SM | 12.02.2020 | ||
TR | 12.02.2020 | ||
BG | 12.05.2020 | ||
NO | 12.05.2020 | ||
GR | 13.05.2020 | ||
IS | 12.06.2020 | ||
GB | 17.06.2020 | ||
IE | 17.06.2020 | ||
LU | 17.06.2020 | ||
BE | 30.06.2020 | ||
CH | 30.06.2020 | ||
FR | 30.06.2020 | ||
LI | 30.06.2020 | ||
PT | 05.07.2020 | ||
Former [2021/23] | AT | 12.02.2020 | |
CZ | 12.02.2020 | ||
DK | 12.02.2020 | ||
EE | 12.02.2020 | ||
ES | 12.02.2020 | ||
FI | 12.02.2020 | ||
HR | 12.02.2020 | ||
IT | 12.02.2020 | ||
LT | 12.02.2020 | ||
LV | 12.02.2020 | ||
MC | 12.02.2020 | ||
NL | 12.02.2020 | ||
PL | 12.02.2020 | ||
RO | 12.02.2020 | ||
SE | 12.02.2020 | ||
SI | 12.02.2020 | ||
SK | 12.02.2020 | ||
SM | 12.02.2020 | ||
BG | 12.05.2020 | ||
NO | 12.05.2020 | ||
GR | 13.05.2020 | ||
IS | 12.06.2020 | ||
GB | 17.06.2020 | ||
IE | 17.06.2020 | ||
LU | 17.06.2020 | ||
BE | 30.06.2020 | ||
CH | 30.06.2020 | ||
FR | 30.06.2020 | ||
LI | 30.06.2020 | ||
PT | 05.07.2020 | ||
Former [2021/22] | AT | 12.02.2020 | |
CZ | 12.02.2020 | ||
DK | 12.02.2020 | ||
EE | 12.02.2020 | ||
ES | 12.02.2020 | ||
FI | 12.02.2020 | ||
HR | 12.02.2020 | ||
IT | 12.02.2020 | ||
LT | 12.02.2020 | ||
LV | 12.02.2020 | ||
MC | 12.02.2020 | ||
NL | 12.02.2020 | ||
PL | 12.02.2020 | ||
RO | 12.02.2020 | ||
SE | 12.02.2020 | ||
SI | 12.02.2020 | ||
SK | 12.02.2020 | ||
SM | 12.02.2020 | ||
BG | 12.05.2020 | ||
NO | 12.05.2020 | ||
GR | 13.05.2020 | ||
IS | 12.06.2020 | ||
GB | 17.06.2020 | ||
IE | 17.06.2020 | ||
LU | 17.06.2020 | ||
CH | 30.06.2020 | ||
LI | 30.06.2020 | ||
PT | 05.07.2020 | ||
Former [2021/20] | AT | 12.02.2020 | |
CZ | 12.02.2020 | ||
DK | 12.02.2020 | ||
EE | 12.02.2020 | ||
ES | 12.02.2020 | ||
FI | 12.02.2020 | ||
HR | 12.02.2020 | ||
IT | 12.02.2020 | ||
LT | 12.02.2020 | ||
LV | 12.02.2020 | ||
MC | 12.02.2020 | ||
NL | 12.02.2020 | ||
PL | 12.02.2020 | ||
RO | 12.02.2020 | ||
SE | 12.02.2020 | ||
SI | 12.02.2020 | ||
SK | 12.02.2020 | ||
SM | 12.02.2020 | ||
BG | 12.05.2020 | ||
NO | 12.05.2020 | ||
GR | 13.05.2020 | ||
IS | 12.06.2020 | ||
IE | 17.06.2020 | ||
LU | 17.06.2020 | ||
CH | 30.06.2020 | ||
LI | 30.06.2020 | ||
PT | 05.07.2020 | ||
Former [2021/15] | AT | 12.02.2020 | |
CZ | 12.02.2020 | ||
DK | 12.02.2020 | ||
EE | 12.02.2020 | ||
ES | 12.02.2020 | ||
FI | 12.02.2020 | ||
HR | 12.02.2020 | ||
IT | 12.02.2020 | ||
LT | 12.02.2020 | ||
LV | 12.02.2020 | ||
MC | 12.02.2020 | ||
NL | 12.02.2020 | ||
PL | 12.02.2020 | ||
RO | 12.02.2020 | ||
SE | 12.02.2020 | ||
SI | 12.02.2020 | ||
SK | 12.02.2020 | ||
SM | 12.02.2020 | ||
BG | 12.05.2020 | ||
NO | 12.05.2020 | ||
GR | 13.05.2020 | ||
IS | 12.06.2020 | ||
LU | 17.06.2020 | ||
PT | 05.07.2020 | ||
Former [2021/10] | AT | 12.02.2020 | |
CZ | 12.02.2020 | ||
DK | 12.02.2020 | ||
EE | 12.02.2020 | ||
ES | 12.02.2020 | ||
FI | 12.02.2020 | ||
HR | 12.02.2020 | ||
IT | 12.02.2020 | ||
LT | 12.02.2020 | ||
LV | 12.02.2020 | ||
MC | 12.02.2020 | ||
NL | 12.02.2020 | ||
PL | 12.02.2020 | ||
RO | 12.02.2020 | ||
SE | 12.02.2020 | ||
SI | 12.02.2020 | ||
SK | 12.02.2020 | ||
SM | 12.02.2020 | ||
BG | 12.05.2020 | ||
NO | 12.05.2020 | ||
GR | 13.05.2020 | ||
IS | 12.06.2020 | ||
PT | 05.07.2020 | ||
Former [2020/50] | CZ | 12.02.2020 | |
DK | 12.02.2020 | ||
EE | 12.02.2020 | ||
ES | 12.02.2020 | ||
FI | 12.02.2020 | ||
HR | 12.02.2020 | ||
LT | 12.02.2020 | ||
LV | 12.02.2020 | ||
NL | 12.02.2020 | ||
RO | 12.02.2020 | ||
SE | 12.02.2020 | ||
SK | 12.02.2020 | ||
SM | 12.02.2020 | ||
BG | 12.05.2020 | ||
NO | 12.05.2020 | ||
GR | 13.05.2020 | ||
IS | 12.06.2020 | ||
PT | 05.07.2020 | ||
Former [2020/49] | CZ | 12.02.2020 | |
DK | 12.02.2020 | ||
ES | 12.02.2020 | ||
FI | 12.02.2020 | ||
HR | 12.02.2020 | ||
LT | 12.02.2020 | ||
LV | 12.02.2020 | ||
NL | 12.02.2020 | ||
RO | 12.02.2020 | ||
SE | 12.02.2020 | ||
SK | 12.02.2020 | ||
SM | 12.02.2020 | ||
BG | 12.05.2020 | ||
NO | 12.05.2020 | ||
GR | 13.05.2020 | ||
IS | 12.06.2020 | ||
PT | 05.07.2020 | ||
Former [2020/48] | DK | 12.02.2020 | |
ES | 12.02.2020 | ||
FI | 12.02.2020 | ||
HR | 12.02.2020 | ||
LT | 12.02.2020 | ||
LV | 12.02.2020 | ||
NL | 12.02.2020 | ||
RO | 12.02.2020 | ||
SE | 12.02.2020 | ||
SM | 12.02.2020 | ||
BG | 12.05.2020 | ||
NO | 12.05.2020 | ||
GR | 13.05.2020 | ||
IS | 12.06.2020 | ||
PT | 05.07.2020 | ||
Former [2020/47] | DK | 12.02.2020 | |
ES | 12.02.2020 | ||
FI | 12.02.2020 | ||
HR | 12.02.2020 | ||
LT | 12.02.2020 | ||
LV | 12.02.2020 | ||
NL | 12.02.2020 | ||
SE | 12.02.2020 | ||
BG | 12.05.2020 | ||
NO | 12.05.2020 | ||
GR | 13.05.2020 | ||
IS | 12.06.2020 | ||
Former [2020/45] | FI | 12.02.2020 | |
HR | 12.02.2020 | ||
LV | 12.02.2020 | ||
NL | 12.02.2020 | ||
SE | 12.02.2020 | ||
BG | 12.05.2020 | ||
NO | 12.05.2020 | ||
GR | 13.05.2020 | ||
IS | 12.06.2020 | ||
Former [2020/40] | FI | 12.02.2020 | |
HR | 12.02.2020 | ||
LV | 12.02.2020 | ||
SE | 12.02.2020 | ||
BG | 12.05.2020 | ||
NO | 12.05.2020 | ||
GR | 13.05.2020 | ||
IS | 12.06.2020 | ||
Former [2020/39] | FI | 12.02.2020 | |
HR | 12.02.2020 | ||
LV | 12.02.2020 | ||
SE | 12.02.2020 | ||
BG | 12.05.2020 | ||
NO | 12.05.2020 | ||
GR | 13.05.2020 | ||
Former [2020/38] | FI | 12.02.2020 | |
HR | 12.02.2020 | ||
LV | 12.02.2020 | ||
SE | 12.02.2020 | ||
NO | 12.05.2020 | ||
GR | 13.05.2020 | ||
Former [2020/37] | FI | 12.02.2020 | |
HR | 12.02.2020 | ||
LV | 12.02.2020 | ||
SE | 12.02.2020 | ||
NO | 12.05.2020 | ||
Former [2020/35] | FI | 12.02.2020 | |
NO | 12.05.2020 | Documents cited: | Search | [A]DE2547152 (TENGE HANS WERNER) [A] 3 * page 19, paragraph 4; figure 15 *; | [Y]EP0136040 (MINNESOTA MINING & MFG [US]) [Y] 4,5 * page 3, line 23 - line 29 * * page 6, line 15 - page 7, line 6 * * figures 1,4,5 *; | [A]DE3522173 (KABELMETAL ELECTRO GMBH) [A] 1 * column 3, line 58 - column 5, line 20 ** figures 1-3 *; | [A]WO9723883 (AMPHENOL CORP [US]) [A] 1 * page 6, line 25 - line 30; figure 1 *; | [XYI]JP2001135157 (AUTO NETWORK GIJUTSU KENKYUSHO, et al) [X] 1,2 * figures 1,2,8b * * paragraph [0012] * [Y] 4,5 [I] 3 | Examination | JPH08264032 |