blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP2779428

EP2779428 - VARIABLE SPEED CONSTANT FREQUENCY SYSTEM WITH GENERATOR AND ROTATING POWER CONVERTER [Right-click to bookmark this link]
Former [2014/38]Variable speed constant frequency system with generator and rotating power converter
[2019/16]
StatusNo opposition filed within time limit
Status updated on  10.07.2020
Database last updated on 03.09.2024
FormerThe patent has been granted
Status updated on  02.08.2019
FormerGrant of patent is intended
Status updated on  21.03.2019
FormerRequest for examination was made
Status updated on  07.07.2017
Most recent event   Tooltip08.07.2022Lapse of the patent in a contracting state
New state(s): MK
published on 10.08.2022  [2022/32]
Applicant(s)For all designated states
Hamilton Sundstrand Corporation
Four Coliseum Centre
2730 West Tyvola Road
Charlotte, NC 28217 / US
[2019/19]
Former [2014/38]For all designated states
Hamilton Sundstrand Corporation
One Hamilton Road
Windsor Locks, CT 06096-1010 / US
Inventor(s)01 / MOSS, Steven J.
3381 Fawnridge Drive
Rockford, IL Illinois 61114 / US
02 / ROZMAN, Gregory I.
6428 Sawgrass Drive
Rockford, IL Illinois 61114 / US
03 / GIERAS, Jacek F.
315 Strickland Street
Glastonbury, CT Connecticut 06033 / US
 [2014/38]
Representative(s)Dehns
St. Bride's House
10 Salisbury Square
London EC4Y 8JD / GB
[2019/36]
Former [2014/38]Hughes, Andrea Michelle
Dehns
St Bride's House
10 Salisbury Square
London EC4Y 8JD / GB
Application number, filing date14159222.012.03.2014
[2014/38]
Priority number, dateUS20131383508915.03.2013         Original published format: US201313835089
[2014/38]
Filing languageEN
Procedural languageEN
PublicationType: A2 Application without search report 
No.:EP2779428
Date:17.09.2014
Language:EN
[2014/38]
Type: A3 Search report 
No.:EP2779428
Date:04.01.2017
Language:EN
[2017/01]
Type: B1 Patent specification 
No.:EP2779428
Date:04.09.2019
Language:EN
[2019/36]
Search report(s)(Supplementary) European search report - dispatched on:EP06.12.2016
ClassificationIPC:H02P9/30, H02P9/48
[2019/10]
CPC:
H02P9/48 (EP,US); H02P9/305 (US)
Former IPC [2014/38]H02P9/48
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2017/32]
Former [2014/38]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:SYSTEM MIT VERÄNDERLICHER GESCHWINDIGKEIT UND KONSTANTER FREQUENZ MIT GENERATOR UND ROTIERENDEM LEISTUNGSWANDLER[2019/16]
English:VARIABLE SPEED CONSTANT FREQUENCY SYSTEM WITH GENERATOR AND ROTATING POWER CONVERTER[2019/16]
French:SYSTÈME DE FRÉQUENCE CONSTANTE À VITESSE VARIABLE AVEC GÉNÉRATEUR ET CONVERTISSEUR DE PUISSANCE ROTATIF[2019/16]
Former [2014/38]System mit veränderlicher Geschwindigkeit und konstanter Frequenz mit Generator und rotierendem Leistungswandler
Former [2014/38]Variable speed constant frequency system with generator and rotating power converter
Former [2014/38]Système de fréquence constante à vitesse variable avec générateur et convertisseur de puissance rotatif
Examination procedure03.07.2017Amendment by applicant (claims and/or description)
03.07.2017Examination requested  [2017/32]
22.03.2019Communication of intention to grant the patent
25.07.2019Fee for grant paid
25.07.2019Fee for publishing/printing paid
25.07.2019Receipt of the translation of the claim(s)
Divisional application(s)The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  22.03.2019
Opposition(s)05.06.2020No opposition filed within time limit [2020/33]
Fees paidRenewal fee
23.03.2016Renewal fee patent year 03
23.03.2017Renewal fee patent year 04
23.03.2018Renewal fee patent year 05
22.03.2019Renewal fee patent year 06
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU12.03.2014
AL04.09.2019
AT04.09.2019
CY04.09.2019
CZ04.09.2019
DK04.09.2019
EE04.09.2019
ES04.09.2019
FI04.09.2019
HR04.09.2019
IT04.09.2019
LT04.09.2019
LV04.09.2019
MC04.09.2019
MK04.09.2019
MT04.09.2019
NL04.09.2019
PL04.09.2019
RO04.09.2019
RS04.09.2019
SE04.09.2019
SI04.09.2019
SK04.09.2019
SM04.09.2019
TR04.09.2019
BG04.12.2019
NO04.12.2019
GR05.12.2019
IS05.01.2020
PT06.01.2020
IE12.03.2020
LU12.03.2020
BE31.03.2020
CH31.03.2020
LI31.03.2020
[2022/32]
Former [2022/27]HU12.03.2014
AL04.09.2019
AT04.09.2019
CY04.09.2019
CZ04.09.2019
DK04.09.2019
EE04.09.2019
ES04.09.2019
FI04.09.2019
HR04.09.2019
IT04.09.2019
LT04.09.2019
LV04.09.2019
MC04.09.2019
MT04.09.2019
NL04.09.2019
PL04.09.2019
RO04.09.2019
RS04.09.2019
SE04.09.2019
SI04.09.2019
SK04.09.2019
SM04.09.2019
TR04.09.2019
BG04.12.2019
NO04.12.2019
GR05.12.2019
IS05.01.2020
PT06.01.2020
IE12.03.2020
LU12.03.2020
BE31.03.2020
CH31.03.2020
LI31.03.2020
Former [2021/12]AL04.09.2019
AT04.09.2019
CZ04.09.2019
DK04.09.2019
EE04.09.2019
ES04.09.2019
FI04.09.2019
HR04.09.2019
IT04.09.2019
LT04.09.2019
LV04.09.2019
MC04.09.2019
NL04.09.2019
PL04.09.2019
RO04.09.2019
RS04.09.2019
SE04.09.2019
SI04.09.2019
SK04.09.2019
SM04.09.2019
BG04.12.2019
NO04.12.2019
GR05.12.2019
IS05.01.2020
PT06.01.2020
IE12.03.2020
LU12.03.2020
BE31.03.2020
CH31.03.2020
LI31.03.2020
Former [2021/07]AL04.09.2019
AT04.09.2019
CZ04.09.2019
DK04.09.2019
EE04.09.2019
ES04.09.2019
FI04.09.2019
HR04.09.2019
IT04.09.2019
LT04.09.2019
LV04.09.2019
MC04.09.2019
NL04.09.2019
PL04.09.2019
RO04.09.2019
RS04.09.2019
SE04.09.2019
SI04.09.2019
SK04.09.2019
SM04.09.2019
BG04.12.2019
NO04.12.2019
GR05.12.2019
IS05.01.2020
PT06.01.2020
IE12.03.2020
LU12.03.2020
CH31.03.2020
LI31.03.2020
Former [2021/04]AL04.09.2019
AT04.09.2019
CZ04.09.2019
DK04.09.2019
EE04.09.2019
ES04.09.2019
FI04.09.2019
HR04.09.2019
IT04.09.2019
LT04.09.2019
LV04.09.2019
MC04.09.2019
NL04.09.2019
PL04.09.2019
RO04.09.2019
RS04.09.2019
SE04.09.2019
SI04.09.2019
SK04.09.2019
SM04.09.2019
BG04.12.2019
NO04.12.2019
GR05.12.2019
IS05.01.2020
PT06.01.2020
LU12.03.2020
Former [2020/49]AL04.09.2019
AT04.09.2019
CZ04.09.2019
DK04.09.2019
EE04.09.2019
ES04.09.2019
FI04.09.2019
HR04.09.2019
IT04.09.2019
LT04.09.2019
LV04.09.2019
MC04.09.2019
NL04.09.2019
PL04.09.2019
RO04.09.2019
RS04.09.2019
SE04.09.2019
SI04.09.2019
SK04.09.2019
SM04.09.2019
BG04.12.2019
NO04.12.2019
GR05.12.2019
IS05.01.2020
PT06.01.2020
Former [2020/37]AL04.09.2019
AT04.09.2019
CZ04.09.2019
DK04.09.2019
EE04.09.2019
ES04.09.2019
FI04.09.2019
HR04.09.2019
IT04.09.2019
LT04.09.2019
LV04.09.2019
NL04.09.2019
PL04.09.2019
RO04.09.2019
RS04.09.2019
SE04.09.2019
SI04.09.2019
SK04.09.2019
SM04.09.2019
BG04.12.2019
NO04.12.2019
GR05.12.2019
IS05.01.2020
PT06.01.2020
Former [2020/36]AL04.09.2019
AT04.09.2019
CZ04.09.2019
DK04.09.2019
EE04.09.2019
ES04.09.2019
FI04.09.2019
HR04.09.2019
IT04.09.2019
LT04.09.2019
LV04.09.2019
NL04.09.2019
PL04.09.2019
RO04.09.2019
RS04.09.2019
SE04.09.2019
SK04.09.2019
SM04.09.2019
BG04.12.2019
NO04.12.2019
GR05.12.2019
IS05.01.2020
PT06.01.2020
Former [2020/27]AL04.09.2019
AT04.09.2019
CZ04.09.2019
EE04.09.2019
ES04.09.2019
FI04.09.2019
HR04.09.2019
IT04.09.2019
LT04.09.2019
LV04.09.2019
NL04.09.2019
PL04.09.2019
RO04.09.2019
RS04.09.2019
SE04.09.2019
SK04.09.2019
SM04.09.2019
BG04.12.2019
NO04.12.2019
GR05.12.2019
PT06.01.2020
IS24.02.2020
Former [2020/25]AL04.09.2019
AT04.09.2019
CZ04.09.2019
EE04.09.2019
ES04.09.2019
FI04.09.2019
HR04.09.2019
IT04.09.2019
LT04.09.2019
LV04.09.2019
NL04.09.2019
PL04.09.2019
RO04.09.2019
RS04.09.2019
SE04.09.2019
SK04.09.2019
BG04.12.2019
NO04.12.2019
GR05.12.2019
PT06.01.2020
IS24.02.2020
Former [2020/24]AL04.09.2019
AT04.09.2019
EE04.09.2019
ES04.09.2019
FI04.09.2019
HR04.09.2019
IT04.09.2019
LT04.09.2019
LV04.09.2019
NL04.09.2019
PL04.09.2019
RO04.09.2019
RS04.09.2019
SE04.09.2019
BG04.12.2019
NO04.12.2019
GR05.12.2019
PT06.01.2020
IS24.02.2020
Former [2020/23]AL04.09.2019
AT04.09.2019
EE04.09.2019
ES04.09.2019
FI04.09.2019
HR04.09.2019
IT04.09.2019
LT04.09.2019
LV04.09.2019
NL04.09.2019
PL04.09.2019
RO04.09.2019
RS04.09.2019
SE04.09.2019
BG04.12.2019
NO04.12.2019
GR05.12.2019
PT06.01.2020
Former [2020/22]AL04.09.2019
EE04.09.2019
ES04.09.2019
FI04.09.2019
HR04.09.2019
LT04.09.2019
LV04.09.2019
NL04.09.2019
RS04.09.2019
SE04.09.2019
BG04.12.2019
NO04.12.2019
GR05.12.2019
PT06.01.2020
Former [2020/20]AL04.09.2019
ES04.09.2019
FI04.09.2019
HR04.09.2019
LT04.09.2019
LV04.09.2019
NL04.09.2019
RS04.09.2019
SE04.09.2019
BG04.12.2019
NO04.12.2019
GR05.12.2019
Former [2020/15]AL04.09.2019
ES04.09.2019
FI04.09.2019
HR04.09.2019
LT04.09.2019
LV04.09.2019
RS04.09.2019
SE04.09.2019
BG04.12.2019
NO04.12.2019
GR05.12.2019
Former [2020/11]ES04.09.2019
FI04.09.2019
HR04.09.2019
LT04.09.2019
LV04.09.2019
RS04.09.2019
SE04.09.2019
BG04.12.2019
NO04.12.2019
GR05.12.2019
Former [2020/10]FI04.09.2019
LT04.09.2019
SE04.09.2019
BG04.12.2019
NO04.12.2019
Former [2020/09]FI04.09.2019
LT04.09.2019
NO04.12.2019
Former [2020/08]LT04.09.2019
NO04.12.2019
Documents cited:Search[A]US3671850  (MEHNERT WALTER E, et al) [A] 1-9* column 2; figure 1 *;
 [A]US5764036  (VAIDYA JAYANT G [US], et al) [A] 1-9 * column 3; figures 1-4 *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.