| EP2787144 - Lower profile for balcony railing [Right-click to bookmark this link] | Status | Patent revoked Status updated on 04.04.2025 Database last updated on 07.03.2026 | |
| Former | The patent has been granted Status updated on 04.05.2018 | ||
| Former | Grant of patent is intended Status updated on 07.11.2017 | ||
| Former | Examination is in progress Status updated on 02.12.2016 | Most recent event Tooltip | 04.04.2025 | Revocation of patent | published on 07.05.2025 [2025/19] | Applicant(s) | For all designated states Alutec Oy Alumiinikatu 5 84100 Ylivieska / FI | [2020/40] |
| Former [2018/17] | For all designated states ALUTEC Oy Savontie 349 84100 Ylivieska / FI | ||
| Former [2014/41] | For all designated states Alutec Oy Savontie 349 84100 Ylivieska / FI | Inventor(s) | 01 /
Salonsaari, Kari ALUTEC Oy Savontie 349 84100 Ylivieska / FI | [2014/41] | Representative(s) | Kolster Oy Ab (Salmisaarenaukio 1) P.O. Box 204 00181 Helsinki / FI | [2018/23] |
| Former [2014/41] | Kolster Oy Ab Iso Roobertinkatu 23 PO Box 148 00121 Helsinki / FI | Application number, filing date | 14163023.6 | 01.04.2014 | [2014/41] | Priority number, date | FI20130005312 | 02.04.2013 Original published format: FI 20135312 | [2014/41] | Filing language | FI | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP2787144 | Date: | 08.10.2014 | Language: | EN | [2014/41] | Type: | B1 Patent specification | No.: | EP2787144 | Date: | 06.06.2018 | Language: | EN | [2018/23] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 18.07.2014 | Classification | IPC: | E04F11/18 | [2014/41] | CPC: |
E04F11/1812 (EP);
E04F11/1846 (FI);
E01B11/54 (FI);
E04B1/003 (FI);
E04F11/1853 (EP);
E04F2011/1819 (EP)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2015/20] |
| Former [2014/41] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | Untere Profil für Balkongeländer | [2014/41] | English: | Lower profile for balcony railing | [2014/41] | French: | Profilé inférieur pour garde-corps pour balcon | [2014/41] | Examination procedure | 02.04.2015 | Examination requested [2015/20] | 08.04.2015 | Amendment by applicant (claims and/or description) | 01.12.2016 | Despatch of a communication from the examining division (Time limit: M06) | 12.06.2017 | Reply to a communication from the examining division | 08.11.2017 | Communication of intention to grant the patent | 15.03.2018 | Fee for grant paid | 15.03.2018 | Fee for publishing/printing paid | 15.03.2018 | Receipt of the translation of the claim(s) | Opposition(s) | Opponent(s) | 01
05.03.2019
ADMISSIBLE Lumon Invest Oy Kaitilankatu 11 45130 Kouvola / FI Opponent's representative Berggren Oy P.O. Box 16 Fabianinkatu 21 00101 Helsinki / FI | [N/P] |
| Former [2019/15] | |||
| Opponent(s) | 01
05.03.2019
ADMISSIBLE Lumon Invest Oy Kaitilankatu 11 45130 Kouvola / FI Opponent's representative Berggren Oy, Tampere Visiokatu 1 33720 Tampere / FI | 19.03.2019 | Invitation to proprietor to file observations on the notice of opposition | 19.07.2019 | Reply of patent proprietor to notice(s) of opposition | 11.12.2024 | Cancellation of oral proceeding that was planned for 04.02.2025 | 03.01.2025 | Legal effect of revocation of patent [2025/19] | 03.01.2025 | Despatch of communication that the patent will be revoked | 04.02.2025 | Date of oral proceedings | Appeal following opposition | 19.08.2020 | Appeal received No. T1743/20 | 20.10.2020 | Statement of grounds filed | 25.04.2023 | Result of appeal procedure: continuation of opposition procedure | 31.05.2023 | Despatch of the decision of the Board of Appeal | Fees paid | Renewal fee | 31.03.2016 | Renewal fee patent year 03 | 21.04.2017 | Renewal fee patent year 04 | 25.04.2018 | Renewal fee patent year 05 |
| Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
| Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 01.04.2014 | AL | 06.06.2018 | AT | 06.06.2018 | CY | 06.06.2018 | CZ | 06.06.2018 | DK | 06.06.2018 | EE | 06.06.2018 | HR | 06.06.2018 | IT | 06.06.2018 | LT | 06.06.2018 | LV | 06.06.2018 | MC | 06.06.2018 | MK | 06.06.2018 | MT | 06.06.2018 | NL | 06.06.2018 | RO | 06.06.2018 | RS | 06.06.2018 | SI | 06.06.2018 | SK | 06.06.2018 | SM | 06.06.2018 | TR | 06.06.2018 | BG | 06.09.2018 | GR | 07.09.2018 | IS | 06.10.2018 | PT | 08.10.2018 | IE | 01.04.2019 | LU | 01.04.2019 | BE | 30.04.2019 | CH | 30.04.2019 | FR | 30.04.2019 | LI | 30.04.2019 | GB | 01.04.2020 | [2022/31] |
| Former [2021/34] | HU | 01.04.2014 | |
| AL | 06.06.2018 | ||
| AT | 06.06.2018 | ||
| CY | 06.06.2018 | ||
| CZ | 06.06.2018 | ||
| DK | 06.06.2018 | ||
| EE | 06.06.2018 | ||
| HR | 06.06.2018 | ||
| IT | 06.06.2018 | ||
| LT | 06.06.2018 | ||
| LV | 06.06.2018 | ||
| MC | 06.06.2018 | ||
| MT | 06.06.2018 | ||
| NL | 06.06.2018 | ||
| RO | 06.06.2018 | ||
| RS | 06.06.2018 | ||
| SI | 06.06.2018 | ||
| SK | 06.06.2018 | ||
| SM | 06.06.2018 | ||
| TR | 06.06.2018 | ||
| BG | 06.09.2018 | ||
| GR | 07.09.2018 | ||
| IS | 06.10.2018 | ||
| PT | 08.10.2018 | ||
| IE | 01.04.2019 | ||
| LU | 01.04.2019 | ||
| BE | 30.04.2019 | ||
| CH | 30.04.2019 | ||
| FR | 30.04.2019 | ||
| LI | 30.04.2019 | ||
| GB | 01.04.2020 | ||
| Former [2021/32] | HU | 01.04.2014 | |
| AL | 06.06.2018 | ||
| AT | 06.06.2018 | ||
| CY | 06.06.2018 | ||
| CZ | 06.06.2018 | ||
| DK | 06.06.2018 | ||
| EE | 06.06.2018 | ||
| HR | 06.06.2018 | ||
| IT | 06.06.2018 | ||
| LT | 06.06.2018 | ||
| LV | 06.06.2018 | ||
| MC | 06.06.2018 | ||
| NL | 06.06.2018 | ||
| RO | 06.06.2018 | ||
| RS | 06.06.2018 | ||
| SI | 06.06.2018 | ||
| SK | 06.06.2018 | ||
| SM | 06.06.2018 | ||
| TR | 06.06.2018 | ||
| BG | 06.09.2018 | ||
| GR | 07.09.2018 | ||
| IS | 06.10.2018 | ||
| PT | 08.10.2018 | ||
| IE | 01.04.2019 | ||
| LU | 01.04.2019 | ||
| BE | 30.04.2019 | ||
| CH | 30.04.2019 | ||
| FR | 30.04.2019 | ||
| LI | 30.04.2019 | ||
| GB | 01.04.2020 | ||
| Former [2021/22] | AL | 06.06.2018 | |
| AT | 06.06.2018 | ||
| CY | 06.06.2018 | ||
| CZ | 06.06.2018 | ||
| DK | 06.06.2018 | ||
| EE | 06.06.2018 | ||
| HR | 06.06.2018 | ||
| IT | 06.06.2018 | ||
| LT | 06.06.2018 | ||
| LV | 06.06.2018 | ||
| MC | 06.06.2018 | ||
| NL | 06.06.2018 | ||
| RO | 06.06.2018 | ||
| RS | 06.06.2018 | ||
| SI | 06.06.2018 | ||
| SK | 06.06.2018 | ||
| SM | 06.06.2018 | ||
| TR | 06.06.2018 | ||
| BG | 06.09.2018 | ||
| GR | 07.09.2018 | ||
| IS | 06.10.2018 | ||
| PT | 08.10.2018 | ||
| IE | 01.04.2019 | ||
| LU | 01.04.2019 | ||
| BE | 30.04.2019 | ||
| CH | 30.04.2019 | ||
| FR | 30.04.2019 | ||
| LI | 30.04.2019 | ||
| GB | 01.04.2020 | ||
| Former [2020/29] | AL | 06.06.2018 | |
| AT | 06.06.2018 | ||
| CY | 06.06.2018 | ||
| CZ | 06.06.2018 | ||
| DK | 06.06.2018 | ||
| EE | 06.06.2018 | ||
| HR | 06.06.2018 | ||
| IT | 06.06.2018 | ||
| LT | 06.06.2018 | ||
| LV | 06.06.2018 | ||
| MC | 06.06.2018 | ||
| NL | 06.06.2018 | ||
| RO | 06.06.2018 | ||
| RS | 06.06.2018 | ||
| SI | 06.06.2018 | ||
| SK | 06.06.2018 | ||
| SM | 06.06.2018 | ||
| TR | 06.06.2018 | ||
| BG | 06.09.2018 | ||
| GR | 07.09.2018 | ||
| IS | 06.10.2018 | ||
| PT | 08.10.2018 | ||
| IE | 01.04.2019 | ||
| LU | 01.04.2019 | ||
| BE | 30.04.2019 | ||
| CH | 30.04.2019 | ||
| FR | 30.04.2019 | ||
| LI | 30.04.2019 | ||
| Former [2020/21] | AL | 06.06.2018 | |
| AT | 06.06.2018 | ||
| CY | 06.06.2018 | ||
| CZ | 06.06.2018 | ||
| DK | 06.06.2018 | ||
| EE | 06.06.2018 | ||
| HR | 06.06.2018 | ||
| IT | 06.06.2018 | ||
| LT | 06.06.2018 | ||
| LV | 06.06.2018 | ||
| MC | 06.06.2018 | ||
| NL | 06.06.2018 | ||
| RO | 06.06.2018 | ||
| RS | 06.06.2018 | ||
| SI | 06.06.2018 | ||
| SK | 06.06.2018 | ||
| SM | 06.06.2018 | ||
| TR | 06.06.2018 | ||
| BG | 06.09.2018 | ||
| GR | 07.09.2018 | ||
| IS | 06.10.2018 | ||
| IE | 01.04.2019 | ||
| LU | 01.04.2019 | ||
| BE | 30.04.2019 | ||
| CH | 30.04.2019 | ||
| FR | 30.04.2019 | ||
| LI | 30.04.2019 | ||
| Former [2020/16] | AL | 06.06.2018 | |
| AT | 06.06.2018 | ||
| CY | 06.06.2018 | ||
| CZ | 06.06.2018 | ||
| DK | 06.06.2018 | ||
| EE | 06.06.2018 | ||
| HR | 06.06.2018 | ||
| IT | 06.06.2018 | ||
| LT | 06.06.2018 | ||
| LV | 06.06.2018 | ||
| MC | 06.06.2018 | ||
| NL | 06.06.2018 | ||
| RO | 06.06.2018 | ||
| RS | 06.06.2018 | ||
| SI | 06.06.2018 | ||
| SK | 06.06.2018 | ||
| SM | 06.06.2018 | ||
| TR | 06.06.2018 | ||
| BG | 06.09.2018 | ||
| GR | 07.09.2018 | ||
| IS | 06.10.2018 | ||
| LU | 01.04.2019 | ||
| BE | 30.04.2019 | ||
| CH | 30.04.2019 | ||
| FR | 30.04.2019 | ||
| LI | 30.04.2019 | ||
| Former [2020/11] | AL | 06.06.2018 | |
| AT | 06.06.2018 | ||
| CY | 06.06.2018 | ||
| CZ | 06.06.2018 | ||
| DK | 06.06.2018 | ||
| EE | 06.06.2018 | ||
| HR | 06.06.2018 | ||
| IT | 06.06.2018 | ||
| LT | 06.06.2018 | ||
| LV | 06.06.2018 | ||
| MC | 06.06.2018 | ||
| NL | 06.06.2018 | ||
| RO | 06.06.2018 | ||
| RS | 06.06.2018 | ||
| SI | 06.06.2018 | ||
| SK | 06.06.2018 | ||
| SM | 06.06.2018 | ||
| BG | 06.09.2018 | ||
| GR | 07.09.2018 | ||
| IS | 06.10.2018 | ||
| LU | 01.04.2019 | ||
| BE | 30.04.2019 | ||
| CH | 30.04.2019 | ||
| FR | 30.04.2019 | ||
| LI | 30.04.2019 | ||
| Former [2020/04] | AL | 06.06.2018 | |
| AT | 06.06.2018 | ||
| CY | 06.06.2018 | ||
| CZ | 06.06.2018 | ||
| DK | 06.06.2018 | ||
| EE | 06.06.2018 | ||
| HR | 06.06.2018 | ||
| IT | 06.06.2018 | ||
| LT | 06.06.2018 | ||
| LV | 06.06.2018 | ||
| MC | 06.06.2018 | ||
| NL | 06.06.2018 | ||
| RO | 06.06.2018 | ||
| RS | 06.06.2018 | ||
| SI | 06.06.2018 | ||
| SK | 06.06.2018 | ||
| SM | 06.06.2018 | ||
| BG | 06.09.2018 | ||
| GR | 07.09.2018 | ||
| IS | 06.10.2018 | ||
| LU | 01.04.2019 | ||
| Former [2020/02] | AL | 06.06.2018 | |
| AT | 06.06.2018 | ||
| CY | 06.06.2018 | ||
| CZ | 06.06.2018 | ||
| DK | 06.06.2018 | ||
| EE | 06.06.2018 | ||
| HR | 06.06.2018 | ||
| IT | 06.06.2018 | ||
| LT | 06.06.2018 | ||
| LV | 06.06.2018 | ||
| MC | 06.06.2018 | ||
| NL | 06.06.2018 | ||
| RO | 06.06.2018 | ||
| RS | 06.06.2018 | ||
| SI | 06.06.2018 | ||
| SK | 06.06.2018 | ||
| SM | 06.06.2018 | ||
| BG | 06.09.2018 | ||
| GR | 07.09.2018 | ||
| IS | 06.10.2018 | ||
| Former [2019/51] | AL | 06.06.2018 | |
| AT | 06.06.2018 | ||
| CY | 06.06.2018 | ||
| CZ | 06.06.2018 | ||
| DK | 06.06.2018 | ||
| EE | 06.06.2018 | ||
| HR | 06.06.2018 | ||
| IT | 06.06.2018 | ||
| LT | 06.06.2018 | ||
| LV | 06.06.2018 | ||
| NL | 06.06.2018 | ||
| RO | 06.06.2018 | ||
| RS | 06.06.2018 | ||
| SI | 06.06.2018 | ||
| SK | 06.06.2018 | ||
| SM | 06.06.2018 | ||
| BG | 06.09.2018 | ||
| GR | 07.09.2018 | ||
| IS | 06.10.2018 | ||
| Former [2019/26] | AT | 06.06.2018 | |
| CY | 06.06.2018 | ||
| CZ | 06.06.2018 | ||
| DK | 06.06.2018 | ||
| EE | 06.06.2018 | ||
| HR | 06.06.2018 | ||
| IT | 06.06.2018 | ||
| LT | 06.06.2018 | ||
| LV | 06.06.2018 | ||
| NL | 06.06.2018 | ||
| RO | 06.06.2018 | ||
| RS | 06.06.2018 | ||
| SI | 06.06.2018 | ||
| SK | 06.06.2018 | ||
| SM | 06.06.2018 | ||
| BG | 06.09.2018 | ||
| GR | 07.09.2018 | ||
| IS | 06.10.2018 | ||
| Former [2019/11] | AT | 06.06.2018 | |
| CY | 06.06.2018 | ||
| CZ | 06.06.2018 | ||
| EE | 06.06.2018 | ||
| HR | 06.06.2018 | ||
| IT | 06.06.2018 | ||
| LT | 06.06.2018 | ||
| LV | 06.06.2018 | ||
| NL | 06.06.2018 | ||
| RO | 06.06.2018 | ||
| RS | 06.06.2018 | ||
| SK | 06.06.2018 | ||
| SM | 06.06.2018 | ||
| BG | 06.09.2018 | ||
| GR | 07.09.2018 | ||
| IS | 06.10.2018 | ||
| Former [2019/10] | AT | 06.06.2018 | |
| CY | 06.06.2018 | ||
| CZ | 06.06.2018 | ||
| EE | 06.06.2018 | ||
| HR | 06.06.2018 | ||
| LT | 06.06.2018 | ||
| LV | 06.06.2018 | ||
| NL | 06.06.2018 | ||
| RO | 06.06.2018 | ||
| RS | 06.06.2018 | ||
| SK | 06.06.2018 | ||
| BG | 06.09.2018 | ||
| GR | 07.09.2018 | ||
| IS | 06.10.2018 | ||
| Former [2019/09] | CY | 06.06.2018 | |
| EE | 06.06.2018 | ||
| HR | 06.06.2018 | ||
| LT | 06.06.2018 | ||
| LV | 06.06.2018 | ||
| NL | 06.06.2018 | ||
| RS | 06.06.2018 | ||
| BG | 06.09.2018 | ||
| GR | 07.09.2018 | ||
| IS | 06.10.2018 | ||
| Former [2019/08] | CY | 06.06.2018 | |
| HR | 06.06.2018 | ||
| LT | 06.06.2018 | ||
| LV | 06.06.2018 | ||
| NL | 06.06.2018 | ||
| RS | 06.06.2018 | ||
| BG | 06.09.2018 | ||
| GR | 07.09.2018 | ||
| IS | 06.10.2018 | ||
| Former [2019/03] | CY | 06.06.2018 | |
| HR | 06.06.2018 | ||
| LT | 06.06.2018 | ||
| LV | 06.06.2018 | ||
| NL | 06.06.2018 | ||
| RS | 06.06.2018 | ||
| BG | 06.09.2018 | ||
| GR | 07.09.2018 | ||
| Former [2018/52] | CY | 06.06.2018 | |
| HR | 06.06.2018 | ||
| LT | 06.06.2018 | ||
| LV | 06.06.2018 | ||
| RS | 06.06.2018 | ||
| BG | 06.09.2018 | ||
| GR | 07.09.2018 | ||
| Former [2018/51] | CY | 06.06.2018 | |
| HR | 06.06.2018 | ||
| LT | 06.06.2018 | ||
| LV | 06.06.2018 | ||
| RS | 06.06.2018 | ||
| BG | 06.09.2018 | ||
| Former [2018/50] | CY | 06.06.2018 | |
| HR | 06.06.2018 | ||
| LT | 06.06.2018 | ||
| BG | 06.09.2018 | ||
| Former [2018/47] | LT | 06.06.2018 | Documents cited: | Search | [XI] DE19714060 (ROESGEN HANS PETER et al.) | [X] CN201486065 (RUIPING HUANG et al.) | [XIA] US5967498 (JUNELL JACK S et al.) | [A] DE202009013777 (WENDLANDT BALKONBAU GMBH et al.) | [A] DE29903644 (SCHUECO INT KG et al.) | [A] CA1307153 (MURDACA DOMENICO et al.) | [A] US7617650 (HANSEN TRACY C et al.) | Opposition | DE19810925 | DE29903644 | WO2007055632 | WO9522664 | JPH10183927 | WO0229177 | WO9905383 | WO03040505 | WO0171145 | EP1947277 |