EP2940586 - Method and system for testing control software of a controlled system [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 05.01.2024 Database last updated on 14.06.2024 | |
Former | The patent has been granted Status updated on 27.01.2023 | ||
Former | Grant of patent is intended Status updated on 19.10.2022 | ||
Former | Examination is in progress Status updated on 29.06.2018 | Most recent event Tooltip | 24.05.2024 | Lapse of the patent in a contracting state New state(s): IT | published on 26.06.2024 [2024/26] | Applicant(s) | For all designated states Hitachi, Ltd. 6-6 Marunouchi 1-chome Chiyoda-ku Tokyo 100-8280 / JP | [2023/09] |
Former [2015/45] | For all designated states Hitachi, Ltd. 6-6 Marunouchi 1-chome Chiyoda-ku Tokyo 100-8280 / JP | Inventor(s) | 01 /
Ishigooka, Tasuku Otl-Aicher-Str. 48 80807 Munich / DE | 02 /
Narisawa, Fumio c/o Hitachi Research Laboratory 1-1, Omika-cho 7-chome Hitachi-shi Ibaraki-ken / JP | 03 /
Sakurai, Kohei c/o Hitachi Research Laboratory 1-1, Omika-cho 7-chome Hitachi-shi Ibaraki-ken / JP | 04 /
Suri, Neeraj c/o Technical University of Darmstadt Hochschulstr. 10 64289 Darmstadt / DE | 05 /
Saissi, Habib c/o Technical University of Darmstadt Hochschulstr. 10 64289 Darmstadt / DE | 06 /
Piper, Thorsten c/o Technical University of Darmstadt Hochschulstr. 10 64289 Darmstadt / DE | 07 /
Winter, Stefan c/o Technical University of Darmstadt Hochschulstr. 10 64289 Darmstadt / DE | [2015/45] | Representative(s) | MERH-IP Matias Erny Reichl Hoffmann Patentanwälte PartG mbB Paul-Heyse-Strasse 29 80336 München / DE | [2023/09] |
Former [2015/45] | MERH-IP Matias Erny Reichl Hoffmann Paul-Heyse-Strasse 29 80336 München / DE | Application number, filing date | 14166398.9 | 29.04.2014 | [2015/45] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP2940586 | Date: | 04.11.2015 | Language: | EN | [2015/45] | Type: | B1 Patent specification | No.: | EP2940586 | Date: | 01.03.2023 | Language: | EN | [2023/09] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 23.10.2014 | Classification | IPC: | G06F11/36, G06F9/44, G05B17/02 | [2022/43] | CPC: |
G06F11/3688 (EP,US);
G06F11/3608 (EP,US);
G06F2117/08 (EP,US);
G06F30/20 (EP,US)
|
Former IPC [2015/45] | G06F11/36, G06F9/44, G06F17/50, G05B17/02 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2015/45] | Title | German: | Verfahren und System zum Testen von Steuerungssoftware eines gesteuerten Systems | [2015/45] | English: | Method and system for testing control software of a controlled system | [2015/45] | French: | Procédé et système pour tester un logiciel de commande d'un système contrôlé | [2015/45] | Examination procedure | 16.05.2014 | Examination requested [2015/45] | 12.06.2015 | Amendment by applicant (claims and/or description) | 28.06.2018 | Despatch of a communication from the examining division (Time limit: M04) | 15.10.2018 | Reply to a communication from the examining division | 24.06.2019 | Despatch of a communication from the examining division (Time limit: M02) | 13.08.2019 | Reply to a communication from the examining division | 20.10.2021 | Despatch of a communication from the examining division (Time limit: M06) | 28.04.2022 | Reply to a communication from the examining division | 19.10.2022 | Communication of intention to grant the patent | 20.01.2023 | Fee for grant paid | 20.01.2023 | Fee for publishing/printing paid | 20.01.2023 | Receipt of the translation of the claim(s) | Opposition(s) | 04.12.2023 | No opposition filed within time limit [2024/06] | Fees paid | Renewal fee | 30.03.2016 | Renewal fee patent year 03 | 02.05.2017 | Renewal fee patent year 04 | 30.04.2018 | Renewal fee patent year 05 | 30.04.2019 | Renewal fee patent year 06 | 31.03.2020 | Renewal fee patent year 07 | 30.04.2021 | Renewal fee patent year 08 | 22.03.2022 | Renewal fee patent year 09 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | AT | 01.03.2023 | CZ | 01.03.2023 | DK | 01.03.2023 | EE | 01.03.2023 | ES | 01.03.2023 | FI | 01.03.2023 | HR | 01.03.2023 | IT | 01.03.2023 | LT | 01.03.2023 | LV | 01.03.2023 | MC | 01.03.2023 | NL | 01.03.2023 | PL | 01.03.2023 | RO | 01.03.2023 | RS | 01.03.2023 | SE | 01.03.2023 | SI | 01.03.2023 | SK | 01.03.2023 | SM | 01.03.2023 | IE | 29.04.2023 | LU | 29.04.2023 | BE | 30.04.2023 | CH | 30.04.2023 | LI | 30.04.2023 | FR | 01.05.2023 | GB | 01.06.2023 | NO | 01.06.2023 | GR | 02.06.2023 | IS | 01.07.2023 | PT | 03.07.2023 | [2024/26] |
Former [2024/24] | AT | 01.03.2023 | |
CZ | 01.03.2023 | ||
DK | 01.03.2023 | ||
EE | 01.03.2023 | ||
ES | 01.03.2023 | ||
FI | 01.03.2023 | ||
HR | 01.03.2023 | ||
LT | 01.03.2023 | ||
LV | 01.03.2023 | ||
MC | 01.03.2023 | ||
NL | 01.03.2023 | ||
PL | 01.03.2023 | ||
RO | 01.03.2023 | ||
RS | 01.03.2023 | ||
SE | 01.03.2023 | ||
SI | 01.03.2023 | ||
SK | 01.03.2023 | ||
SM | 01.03.2023 | ||
IE | 29.04.2023 | ||
LU | 29.04.2023 | ||
BE | 30.04.2023 | ||
CH | 30.04.2023 | ||
LI | 30.04.2023 | ||
FR | 01.05.2023 | ||
GB | 01.06.2023 | ||
NO | 01.06.2023 | ||
GR | 02.06.2023 | ||
IS | 01.07.2023 | ||
PT | 03.07.2023 | ||
Former [2024/21] | AT | 01.03.2023 | |
CZ | 01.03.2023 | ||
DK | 01.03.2023 | ||
EE | 01.03.2023 | ||
ES | 01.03.2023 | ||
FI | 01.03.2023 | ||
HR | 01.03.2023 | ||
LT | 01.03.2023 | ||
LV | 01.03.2023 | ||
MC | 01.03.2023 | ||
NL | 01.03.2023 | ||
PL | 01.03.2023 | ||
RO | 01.03.2023 | ||
RS | 01.03.2023 | ||
SE | 01.03.2023 | ||
SI | 01.03.2023 | ||
SK | 01.03.2023 | ||
SM | 01.03.2023 | ||
IE | 29.04.2023 | ||
LU | 29.04.2023 | ||
BE | 30.04.2023 | ||
CH | 30.04.2023 | ||
LI | 30.04.2023 | ||
FR | 01.05.2023 | ||
NO | 01.06.2023 | ||
GR | 02.06.2023 | ||
IS | 01.07.2023 | ||
PT | 03.07.2023 | ||
Former [2024/10] | AT | 01.03.2023 | |
CZ | 01.03.2023 | ||
DK | 01.03.2023 | ||
EE | 01.03.2023 | ||
ES | 01.03.2023 | ||
FI | 01.03.2023 | ||
HR | 01.03.2023 | ||
LT | 01.03.2023 | ||
LV | 01.03.2023 | ||
MC | 01.03.2023 | ||
NL | 01.03.2023 | ||
PL | 01.03.2023 | ||
RO | 01.03.2023 | ||
RS | 01.03.2023 | ||
SE | 01.03.2023 | ||
SI | 01.03.2023 | ||
SK | 01.03.2023 | ||
SM | 01.03.2023 | ||
LU | 29.04.2023 | ||
BE | 30.04.2023 | ||
CH | 30.04.2023 | ||
LI | 30.04.2023 | ||
FR | 01.05.2023 | ||
NO | 01.06.2023 | ||
GR | 02.06.2023 | ||
IS | 01.07.2023 | ||
PT | 03.07.2023 | ||
Former [2024/09] | AT | 01.03.2023 | |
CZ | 01.03.2023 | ||
DK | 01.03.2023 | ||
EE | 01.03.2023 | ||
ES | 01.03.2023 | ||
FI | 01.03.2023 | ||
HR | 01.03.2023 | ||
LT | 01.03.2023 | ||
LV | 01.03.2023 | ||
MC | 01.03.2023 | ||
NL | 01.03.2023 | ||
PL | 01.03.2023 | ||
RO | 01.03.2023 | ||
RS | 01.03.2023 | ||
SE | 01.03.2023 | ||
SK | 01.03.2023 | ||
SM | 01.03.2023 | ||
LU | 29.04.2023 | ||
CH | 30.04.2023 | ||
LI | 30.04.2023 | ||
NO | 01.06.2023 | ||
GR | 02.06.2023 | ||
IS | 01.07.2023 | ||
PT | 03.07.2023 | ||
Former [2024/08] | AT | 01.03.2023 | |
CZ | 01.03.2023 | ||
EE | 01.03.2023 | ||
ES | 01.03.2023 | ||
FI | 01.03.2023 | ||
HR | 01.03.2023 | ||
LT | 01.03.2023 | ||
LV | 01.03.2023 | ||
MC | 01.03.2023 | ||
NL | 01.03.2023 | ||
PL | 01.03.2023 | ||
RO | 01.03.2023 | ||
RS | 01.03.2023 | ||
SE | 01.03.2023 | ||
SK | 01.03.2023 | ||
SM | 01.03.2023 | ||
LU | 29.04.2023 | ||
NO | 01.06.2023 | ||
GR | 02.06.2023 | ||
IS | 01.07.2023 | ||
PT | 03.07.2023 | ||
Former [2024/04] | AT | 01.03.2023 | |
CZ | 01.03.2023 | ||
EE | 01.03.2023 | ||
ES | 01.03.2023 | ||
FI | 01.03.2023 | ||
HR | 01.03.2023 | ||
LT | 01.03.2023 | ||
LV | 01.03.2023 | ||
NL | 01.03.2023 | ||
PL | 01.03.2023 | ||
RO | 01.03.2023 | ||
RS | 01.03.2023 | ||
SE | 01.03.2023 | ||
SK | 01.03.2023 | ||
SM | 01.03.2023 | ||
LU | 29.04.2023 | ||
NO | 01.06.2023 | ||
GR | 02.06.2023 | ||
IS | 01.07.2023 | ||
PT | 03.07.2023 | ||
Former [2023/50] | AT | 01.03.2023 | |
CZ | 01.03.2023 | ||
EE | 01.03.2023 | ||
ES | 01.03.2023 | ||
FI | 01.03.2023 | ||
HR | 01.03.2023 | ||
LT | 01.03.2023 | ||
LV | 01.03.2023 | ||
NL | 01.03.2023 | ||
PL | 01.03.2023 | ||
RO | 01.03.2023 | ||
RS | 01.03.2023 | ||
SE | 01.03.2023 | ||
SK | 01.03.2023 | ||
SM | 01.03.2023 | ||
NO | 01.06.2023 | ||
GR | 02.06.2023 | ||
IS | 01.07.2023 | ||
PT | 03.07.2023 | ||
Former [2023/49] | AT | 01.03.2023 | |
CZ | 01.03.2023 | ||
EE | 01.03.2023 | ||
ES | 01.03.2023 | ||
FI | 01.03.2023 | ||
HR | 01.03.2023 | ||
LT | 01.03.2023 | ||
LV | 01.03.2023 | ||
NL | 01.03.2023 | ||
PL | 01.03.2023 | ||
RO | 01.03.2023 | ||
RS | 01.03.2023 | ||
SE | 01.03.2023 | ||
SM | 01.03.2023 | ||
NO | 01.06.2023 | ||
GR | 02.06.2023 | ||
PT | 03.07.2023 | ||
Former [2023/48] | AT | 01.03.2023 | |
EE | 01.03.2023 | ||
ES | 01.03.2023 | ||
FI | 01.03.2023 | ||
HR | 01.03.2023 | ||
LT | 01.03.2023 | ||
LV | 01.03.2023 | ||
NL | 01.03.2023 | ||
PL | 01.03.2023 | ||
RS | 01.03.2023 | ||
SE | 01.03.2023 | ||
SM | 01.03.2023 | ||
NO | 01.06.2023 | ||
GR | 02.06.2023 | ||
PT | 03.07.2023 | ||
Former [2023/46] | ES | 01.03.2023 | |
FI | 01.03.2023 | ||
HR | 01.03.2023 | ||
LT | 01.03.2023 | ||
LV | 01.03.2023 | ||
NL | 01.03.2023 | ||
PL | 01.03.2023 | ||
RS | 01.03.2023 | ||
SE | 01.03.2023 | ||
SM | 01.03.2023 | ||
NO | 01.06.2023 | ||
GR | 02.06.2023 | ||
PT | 03.07.2023 | ||
Former [2023/38] | ES | 01.03.2023 | |
FI | 01.03.2023 | ||
HR | 01.03.2023 | ||
LT | 01.03.2023 | ||
LV | 01.03.2023 | ||
NL | 01.03.2023 | ||
PL | 01.03.2023 | ||
RS | 01.03.2023 | ||
SE | 01.03.2023 | ||
NO | 01.06.2023 | ||
GR | 02.06.2023 | ||
Former [2023/37] | ES | 01.03.2023 | |
FI | 01.03.2023 | ||
HR | 01.03.2023 | ||
LT | 01.03.2023 | ||
LV | 01.03.2023 | ||
RS | 01.03.2023 | ||
SE | 01.03.2023 | ||
NO | 01.06.2023 | ||
GR | 02.06.2023 | ||
Former [2023/36] | ES | 01.03.2023 | |
FI | 01.03.2023 | ||
HR | 01.03.2023 | ||
LT | 01.03.2023 | ||
LV | 01.03.2023 | ||
RS | 01.03.2023 | ||
SE | 01.03.2023 | ||
NO | 01.06.2023 | ||
Former [2023/35] | ES | 01.03.2023 | |
HR | 01.03.2023 | ||
LT | 01.03.2023 | ||
RS | 01.03.2023 | ||
NO | 01.06.2023 | ||
Former [2023/34] | ES | 01.03.2023 | |
LT | 01.03.2023 | ||
RS | 01.03.2023 | ||
Former [2023/33] | ES | 01.03.2023 | |
LT | 01.03.2023 | Documents cited: | Search | [A]US2013055210 (MURTHY PRAVEEN K [US], et al) [A] 1-15* abstract *; | [I] - MANFRED BROY ET AL, "Cross-layer analysis, testing and verification of automotive control software", EMBEDDED SOFTWARE (EMSOFT), 2011 PROCEEDINGS OF THE INTERNATIONAL CONFERENCE ON, IEEE, 2 PENN PLAZA, SUITE 701 NEW YORK NY 10121-0701 USA, (20111009), doi:10.1145/2038642.2038683, ISBN 978-1-4503-0714-7, pages 263 - 272, XP058004997 [I] 1-15 * the whole document * DOI: http://dx.doi.org/10.1145/2038642.2038683 | [I] - RUPAK MAJUMDAR ET AL, CLSE: Closed-Loop Symbolic Execution, NASA FORMAL METHODS, SPRINGER BERLIN HEIDELBERG, BERLIN, HEIDELBERG, PAGE(S) 356 - 370, (20120403), ISBN 978-3-642-28890-6, XP019175184 [I] 1-15 * the whole document * | [A] - CRISTIAN CADAR ET AL, "Symbolic execution for software testing", COMMUNICATIONS OF THE ACM, ASSOCIATION FOR COMPUTING MACHINERY, INC, UNITED STATES, (20130201), vol. 56, no. 2, doi:10.1145/2408776.2408795, ISSN 0001-0782, pages 82 - 90, XP058030308 [A] 1-15 * the whole document * DOI: http://dx.doi.org/10.1145/2408776.2408795 | by applicant | JP2009014406 | - C. CADAR; K. SEN, SYMBOLIC EXECUTION FOR SOFTWARE TESTING: THREE DECADES LATER |