EP2806253 - Measuring arrangement for determining a measured variable [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 06.11.2020 Database last updated on 17.07.2024 | |
Former | The patent has been granted Status updated on 05.12.2019 | ||
Former | Grant of patent is intended Status updated on 31.07.2019 | ||
Former | Request for examination was made Status updated on 06.07.2018 | Most recent event Tooltip | 08.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 10.08.2022 [2022/32] | Applicant(s) | For all designated states Krohne Messtechnik GmbH Ludwig-Krohne-Strasse 5 47058 Duisburg / DE | [2014/48] | Inventor(s) | 01 /
Dymek, Steffen Daniel-Luft-Weg 45 48147 Oberhausen / DE | [2014/48] | Representative(s) | Gesthuysen Patentanwälte Partnerschaftsgesellschaft mbB Huyssenallee 68 45128 Essen / DE | [N/P] |
Former [2014/48] | Gesthuysen Patent- und Rechtsanwälte Patentanwälte Huyssenallee 100 45128 Essen / DE | Application number, filing date | 14168541.2 | 15.05.2014 | [2014/48] | Priority number, date | DE20131008598 | 22.05.2013 Original published format: DE102013008598 | [2014/48] | Filing language | DE | Procedural language | DE | Publication | Type: | A2 Application without search report | No.: | EP2806253 | Date: | 26.11.2014 | Language: | DE | [2014/48] | Type: | A3 Search report | No.: | EP2806253 | Date: | 27.12.2017 | Language: | DE | [2017/52] | Type: | B1 Patent specification | No.: | EP2806253 | Date: | 01.01.2020 | Language: | DE | [2020/01] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 24.11.2017 | Classification | IPC: | G01D21/00, G08C19/02, H04Q9/00, // G01F1/32 | [2019/32] | CPC: |
G01D21/00 (EP,US);
G01R19/0092 (US);
G01L21/00 (US);
G08C19/02 (EP,US);
H04Q9/00 (EP,US)
|
Former IPC [2014/48] | G01D21/00, G08C19/02, // G01F1/32 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2018/32] |
Former [2014/48] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | Messanordnung zur Bestimmung einer Messgröße | [2014/48] | English: | Measuring arrangement for determining a measured variable | [2014/48] | French: | Dispositif de mesure pour déterminer une grandeur de mesure | [2014/48] | Examination procedure | 27.06.2018 | Amendment by applicant (claims and/or description) | 27.06.2018 | Examination requested [2018/32] | 01.08.2019 | Communication of intention to grant the patent | 09.09.2019 | Fee for grant paid | 09.09.2019 | Fee for publishing/printing paid | 26.11.2019 | Receipt of the translation of the claim(s) | Opposition(s) | 02.10.2020 | No opposition filed within time limit [2020/50] | Fees paid | Renewal fee | 25.05.2016 | Renewal fee patent year 03 | 29.05.2017 | Renewal fee patent year 04 | 23.05.2018 | Renewal fee patent year 05 | 28.05.2019 | Renewal fee patent year 06 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 15.05.2014 | AL | 01.01.2020 | CY | 01.01.2020 | CZ | 01.01.2020 | DK | 01.01.2020 | EE | 01.01.2020 | ES | 01.01.2020 | FI | 01.01.2020 | HR | 01.01.2020 | IT | 01.01.2020 | LT | 01.01.2020 | LV | 01.01.2020 | MC | 01.01.2020 | MK | 01.01.2020 | MT | 01.01.2020 | NL | 01.01.2020 | PL | 01.01.2020 | RO | 01.01.2020 | RS | 01.01.2020 | SE | 01.01.2020 | SI | 01.01.2020 | SK | 01.01.2020 | SM | 01.01.2020 | TR | 01.01.2020 | BG | 01.04.2020 | NO | 01.04.2020 | GR | 02.04.2020 | IS | 01.05.2020 | AT | 15.05.2020 | GB | 15.05.2020 | IE | 15.05.2020 | LU | 15.05.2020 | PT | 27.05.2020 | BE | 31.05.2020 | [2022/31] |
Former [2022/30] | HU | 15.05.2014 | |
AL | 01.01.2020 | ||
CY | 01.01.2020 | ||
CZ | 01.01.2020 | ||
DK | 01.01.2020 | ||
EE | 01.01.2020 | ||
ES | 01.01.2020 | ||
FI | 01.01.2020 | ||
HR | 01.01.2020 | ||
IT | 01.01.2020 | ||
LT | 01.01.2020 | ||
LV | 01.01.2020 | ||
MC | 01.01.2020 | ||
MT | 01.01.2020 | ||
NL | 01.01.2020 | ||
PL | 01.01.2020 | ||
RO | 01.01.2020 | ||
RS | 01.01.2020 | ||
SE | 01.01.2020 | ||
SI | 01.01.2020 | ||
SK | 01.01.2020 | ||
SM | 01.01.2020 | ||
TR | 01.01.2020 | ||
BG | 01.04.2020 | ||
NO | 01.04.2020 | ||
GR | 02.04.2020 | ||
IS | 01.05.2020 | ||
AT | 15.05.2020 | ||
GB | 15.05.2020 | ||
IE | 15.05.2020 | ||
LU | 15.05.2020 | ||
PT | 27.05.2020 | ||
BE | 31.05.2020 | ||
Former [2022/27] | HU | 15.05.2014 | |
CY | 01.01.2020 | ||
CZ | 01.01.2020 | ||
DK | 01.01.2020 | ||
EE | 01.01.2020 | ||
ES | 01.01.2020 | ||
FI | 01.01.2020 | ||
HR | 01.01.2020 | ||
IT | 01.01.2020 | ||
LT | 01.01.2020 | ||
LV | 01.01.2020 | ||
MC | 01.01.2020 | ||
MT | 01.01.2020 | ||
NL | 01.01.2020 | ||
PL | 01.01.2020 | ||
RO | 01.01.2020 | ||
RS | 01.01.2020 | ||
SE | 01.01.2020 | ||
SI | 01.01.2020 | ||
SK | 01.01.2020 | ||
SM | 01.01.2020 | ||
TR | 01.01.2020 | ||
BG | 01.04.2020 | ||
NO | 01.04.2020 | ||
GR | 02.04.2020 | ||
IS | 01.05.2020 | ||
AT | 15.05.2020 | ||
GB | 15.05.2020 | ||
IE | 15.05.2020 | ||
LU | 15.05.2020 | ||
PT | 27.05.2020 | ||
BE | 31.05.2020 | ||
Former [2021/37] | CZ | 01.01.2020 | |
DK | 01.01.2020 | ||
EE | 01.01.2020 | ||
ES | 01.01.2020 | ||
FI | 01.01.2020 | ||
HR | 01.01.2020 | ||
IT | 01.01.2020 | ||
LT | 01.01.2020 | ||
LV | 01.01.2020 | ||
MC | 01.01.2020 | ||
NL | 01.01.2020 | ||
PL | 01.01.2020 | ||
RO | 01.01.2020 | ||
RS | 01.01.2020 | ||
SE | 01.01.2020 | ||
SI | 01.01.2020 | ||
SK | 01.01.2020 | ||
SM | 01.01.2020 | ||
BG | 01.04.2020 | ||
NO | 01.04.2020 | ||
GR | 02.04.2020 | ||
IS | 01.05.2020 | ||
AT | 15.05.2020 | ||
GB | 15.05.2020 | ||
IE | 15.05.2020 | ||
LU | 15.05.2020 | ||
PT | 27.05.2020 | ||
BE | 31.05.2020 | ||
Former [2021/24] | CZ | 01.01.2020 | |
DK | 01.01.2020 | ||
EE | 01.01.2020 | ||
ES | 01.01.2020 | ||
FI | 01.01.2020 | ||
HR | 01.01.2020 | ||
IT | 01.01.2020 | ||
LT | 01.01.2020 | ||
LV | 01.01.2020 | ||
MC | 01.01.2020 | ||
NL | 01.01.2020 | ||
PL | 01.01.2020 | ||
RO | 01.01.2020 | ||
RS | 01.01.2020 | ||
SE | 01.01.2020 | ||
SI | 01.01.2020 | ||
SK | 01.01.2020 | ||
SM | 01.01.2020 | ||
BG | 01.04.2020 | ||
NO | 01.04.2020 | ||
GR | 02.04.2020 | ||
IS | 01.05.2020 | ||
GB | 15.05.2020 | ||
IE | 15.05.2020 | ||
LU | 15.05.2020 | ||
PT | 27.05.2020 | ||
BE | 31.05.2020 | ||
Former [2021/22] | CZ | 01.01.2020 | |
DK | 01.01.2020 | ||
EE | 01.01.2020 | ||
ES | 01.01.2020 | ||
FI | 01.01.2020 | ||
HR | 01.01.2020 | ||
IT | 01.01.2020 | ||
LT | 01.01.2020 | ||
LV | 01.01.2020 | ||
MC | 01.01.2020 | ||
NL | 01.01.2020 | ||
PL | 01.01.2020 | ||
RO | 01.01.2020 | ||
RS | 01.01.2020 | ||
SE | 01.01.2020 | ||
SI | 01.01.2020 | ||
SK | 01.01.2020 | ||
SM | 01.01.2020 | ||
BG | 01.04.2020 | ||
NO | 01.04.2020 | ||
GR | 02.04.2020 | ||
IS | 01.05.2020 | ||
GB | 15.05.2020 | ||
IE | 15.05.2020 | ||
LU | 15.05.2020 | ||
PT | 27.05.2020 | ||
Former [2021/20] | CZ | 01.01.2020 | |
DK | 01.01.2020 | ||
EE | 01.01.2020 | ||
ES | 01.01.2020 | ||
FI | 01.01.2020 | ||
HR | 01.01.2020 | ||
IT | 01.01.2020 | ||
LT | 01.01.2020 | ||
LV | 01.01.2020 | ||
MC | 01.01.2020 | ||
NL | 01.01.2020 | ||
PL | 01.01.2020 | ||
RO | 01.01.2020 | ||
RS | 01.01.2020 | ||
SE | 01.01.2020 | ||
SI | 01.01.2020 | ||
SK | 01.01.2020 | ||
SM | 01.01.2020 | ||
BG | 01.04.2020 | ||
NO | 01.04.2020 | ||
GR | 02.04.2020 | ||
IS | 01.05.2020 | ||
IE | 15.05.2020 | ||
LU | 15.05.2020 | ||
PT | 27.05.2020 | ||
Former [2021/15] | CZ | 01.01.2020 | |
DK | 01.01.2020 | ||
EE | 01.01.2020 | ||
ES | 01.01.2020 | ||
FI | 01.01.2020 | ||
HR | 01.01.2020 | ||
IT | 01.01.2020 | ||
LT | 01.01.2020 | ||
LV | 01.01.2020 | ||
MC | 01.01.2020 | ||
NL | 01.01.2020 | ||
PL | 01.01.2020 | ||
RO | 01.01.2020 | ||
RS | 01.01.2020 | ||
SE | 01.01.2020 | ||
SI | 01.01.2020 | ||
SK | 01.01.2020 | ||
SM | 01.01.2020 | ||
BG | 01.04.2020 | ||
NO | 01.04.2020 | ||
GR | 02.04.2020 | ||
IS | 01.05.2020 | ||
LU | 15.05.2020 | ||
PT | 27.05.2020 | ||
Former [2021/10] | CZ | 01.01.2020 | |
DK | 01.01.2020 | ||
EE | 01.01.2020 | ||
ES | 01.01.2020 | ||
FI | 01.01.2020 | ||
HR | 01.01.2020 | ||
IT | 01.01.2020 | ||
LT | 01.01.2020 | ||
LV | 01.01.2020 | ||
MC | 01.01.2020 | ||
NL | 01.01.2020 | ||
PL | 01.01.2020 | ||
RO | 01.01.2020 | ||
RS | 01.01.2020 | ||
SE | 01.01.2020 | ||
SI | 01.01.2020 | ||
SK | 01.01.2020 | ||
SM | 01.01.2020 | ||
BG | 01.04.2020 | ||
NO | 01.04.2020 | ||
GR | 02.04.2020 | ||
IS | 01.05.2020 | ||
PT | 27.05.2020 | ||
Former [2020/50] | CZ | 01.01.2020 | |
DK | 01.01.2020 | ||
EE | 01.01.2020 | ||
ES | 01.01.2020 | ||
FI | 01.01.2020 | ||
HR | 01.01.2020 | ||
LT | 01.01.2020 | ||
LV | 01.01.2020 | ||
NL | 01.01.2020 | ||
RO | 01.01.2020 | ||
RS | 01.01.2020 | ||
SE | 01.01.2020 | ||
SK | 01.01.2020 | ||
SM | 01.01.2020 | ||
BG | 01.04.2020 | ||
NO | 01.04.2020 | ||
GR | 02.04.2020 | ||
IS | 01.05.2020 | ||
PT | 27.05.2020 | ||
Former [2020/49] | CZ | 01.01.2020 | |
DK | 01.01.2020 | ||
ES | 01.01.2020 | ||
FI | 01.01.2020 | ||
HR | 01.01.2020 | ||
LT | 01.01.2020 | ||
LV | 01.01.2020 | ||
NL | 01.01.2020 | ||
RO | 01.01.2020 | ||
RS | 01.01.2020 | ||
SE | 01.01.2020 | ||
SK | 01.01.2020 | ||
SM | 01.01.2020 | ||
BG | 01.04.2020 | ||
NO | 01.04.2020 | ||
GR | 02.04.2020 | ||
IS | 01.05.2020 | ||
PT | 27.05.2020 | ||
Former [2020/48] | CZ | 01.01.2020 | |
DK | 01.01.2020 | ||
ES | 01.01.2020 | ||
FI | 01.01.2020 | ||
HR | 01.01.2020 | ||
LT | 01.01.2020 | ||
LV | 01.01.2020 | ||
NL | 01.01.2020 | ||
RO | 01.01.2020 | ||
RS | 01.01.2020 | ||
SE | 01.01.2020 | ||
SM | 01.01.2020 | ||
BG | 01.04.2020 | ||
NO | 01.04.2020 | ||
GR | 02.04.2020 | ||
IS | 01.05.2020 | ||
PT | 27.05.2020 | ||
Former [2020/47] | CZ | 01.01.2020 | |
DK | 01.01.2020 | ||
ES | 01.01.2020 | ||
FI | 01.01.2020 | ||
HR | 01.01.2020 | ||
LT | 01.01.2020 | ||
LV | 01.01.2020 | ||
NL | 01.01.2020 | ||
RS | 01.01.2020 | ||
SE | 01.01.2020 | ||
BG | 01.04.2020 | ||
NO | 01.04.2020 | ||
GR | 02.04.2020 | ||
IS | 01.05.2020 | ||
PT | 27.05.2020 | ||
Former [2020/40] | CZ | 01.01.2020 | |
FI | 01.01.2020 | ||
HR | 01.01.2020 | ||
LT | 01.01.2020 | ||
LV | 01.01.2020 | ||
NL | 01.01.2020 | ||
RS | 01.01.2020 | ||
SE | 01.01.2020 | ||
BG | 01.04.2020 | ||
NO | 01.04.2020 | ||
GR | 02.04.2020 | ||
IS | 01.05.2020 | ||
PT | 27.05.2020 | ||
Former [2020/39] | CZ | 01.01.2020 | |
FI | 01.01.2020 | ||
HR | 01.01.2020 | ||
LT | 01.01.2020 | ||
LV | 01.01.2020 | ||
NL | 01.01.2020 | ||
RS | 01.01.2020 | ||
SE | 01.01.2020 | ||
BG | 01.04.2020 | ||
NO | 01.04.2020 | ||
GR | 02.04.2020 | ||
PT | 27.05.2020 | ||
Former [2020/38] | CZ | 01.01.2020 | |
FI | 01.01.2020 | ||
HR | 01.01.2020 | ||
LT | 01.01.2020 | ||
LV | 01.01.2020 | ||
NL | 01.01.2020 | ||
RS | 01.01.2020 | ||
SE | 01.01.2020 | ||
NO | 01.04.2020 | ||
GR | 02.04.2020 | ||
PT | 27.05.2020 | ||
Former [2020/37] | CZ | 01.01.2020 | |
FI | 01.01.2020 | ||
HR | 01.01.2020 | ||
LT | 01.01.2020 | ||
LV | 01.01.2020 | ||
NL | 01.01.2020 | ||
RS | 01.01.2020 | ||
SE | 01.01.2020 | ||
NO | 01.04.2020 | ||
PT | 27.05.2020 | ||
Former [2020/36] | CZ | 01.01.2020 | |
FI | 01.01.2020 | ||
LT | 01.01.2020 | ||
NL | 01.01.2020 | ||
RS | 01.01.2020 | ||
NO | 01.04.2020 | ||
PT | 27.05.2020 | ||
Former [2020/35] | CZ | 01.01.2020 | |
FI | 01.01.2020 | ||
LT | 01.01.2020 | ||
NL | 01.01.2020 | ||
NO | 01.04.2020 | ||
Former [2020/33] | NL | 01.01.2020 | Documents cited: | Search | [A]DE102006030962 (FLOWTEC AG [CH]) [A] 1 * abstract * * paragraphs [0080] , [ 103] - [0108]; figure 5 * * paragraph [0112] *; | [A]US2008310195 (SEBERGER STEPHEN G [US], et al) [A] 1* paragraphs [0047] , [0 51]; figure 6 *; | [XAI]DE102010063949 (ENDRESS & HAUSER GMBH & CO KG [DE]) [X] 1-6 * abstract * * paragraph [0044] - paragraph [0048] * * paragraph [0050] - paragraph [0053] * * paragraph [0056] * [A] 7 [I] 8-10 | by applicant | DE19925943 | DE102006030962 | DE102008062815 |