blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP2808145

EP2808145 - Device and method for mixing at least two thermoplastic materials [Right-click to bookmark this link]
Former [2014/49]Device and method for mixing at least two thermoplastic materials having controlled viscosity
[2017/10]
StatusNo opposition filed within time limit
Status updated on  25.05.2018
Database last updated on 20.07.2024
FormerThe patent has been granted
Status updated on  16.06.2017
FormerGrant of patent is intended
Status updated on  13.02.2017
FormerExamination is in progress
Status updated on  21.12.2016
Most recent event   Tooltip17.07.2020Lapse of the patent in a contracting state
New state(s): AL
published on 19.08.2020  [2020/34]
Applicant(s)For all designated states
Faurecia Automotive Composites
2 rue Hennape
92000 Nanterre / FR
[2014/49]
Inventor(s)01 / Amosse, Yannick Eugène Jean Marie
13, chemin des Monneries
Les Monceaux
44470 Carquefou / FR
02 / Nedelec, Gilles Alain Guillaume
26 allée Gabriel Andouard
53000 Laval / FR
03 / Ledoux, Christophe Philippe René
13 rue de la Buzardière
35400 Saint Malo / FR
 [2014/49]
Representative(s)Lavoix
2, place d'Estienne d'Orves
75441 Paris Cedex 09 / FR
[2017/29]
Former [2014/49]Blot, Philippe Robert Emile
Cabinet Lavoix
2, place d'Estienne d'Orves
75441 Paris Cedex 09 / FR
Application number, filing date14170438.728.05.2014
[2014/49]
Priority number, dateFR2013005501431.05.2013         Original published format: FR 1355014
[2014/49]
Filing languageFR
Procedural languageFR
PublicationType: A1 Application with search report 
No.:EP2808145
Date:03.12.2014
Language:FR
[2014/49]
Type: B1 Patent specification 
No.:EP2808145
Date:19.07.2017
Language:FR
[2017/29]
Search report(s)(Supplementary) European search report - dispatched on:EP21.08.2014
ClassificationIPC:B29B7/72, B29B7/74, B29B7/76, B29C67/24, // B29C70/48, B29C70/52, B29K105/00, B29K77/00
[2017/10]
CPC:
B29B7/7615 (EP); B29B7/603 (EP); B29B7/726 (EP);
B29B7/728 (EP); B29B7/7471 (EP); B29B7/748 (EP);
B29C67/246 (EP); B29B7/7605 (EP); B29C70/48 (EP);
B29C70/523 (EP); B29K2077/00 (EP); B29K2105/0002 (EP) (-)
Former IPC [2014/49]B29B7/76, B29B7/74, B29B7/72, B29C67/24, // B29K77/00
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2015/29]
Former [2014/49]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:Vorrichtung und Verfahren zum Mischen von mindestens zwei thermoplastischen Werkstoffen[2017/10]
English:Device and method for mixing at least two thermoplastic materials[2017/10]
French:Dispositif et procédé de mélange d'au moins deux matériaux thermoplastiques[2017/10]
Former [2014/49]Vorrichtung und Verfahren zum Mischen von mindestens zwei thermoplastischen Materialien, die eine kontrollierte Viskosität aufweisen
Former [2014/49]Device and method for mixing at least two thermoplastic materials having controlled viscosity
Former [2014/49]Dispositif et procédé de mélange d'au moins deux matériaux thermoplastiques présentant une viscositée régulée
Examination procedure18.02.2015Amendment by applicant (claims and/or description)
02.06.2015Examination requested  [2015/29]
22.10.2015Despatch of a communication from the examining division (Time limit: M04)
08.02.2016Reply to a communication from the examining division
21.06.2016Despatch of a communication from the examining division (Time limit: M06)
19.12.2016Reply to a communication from the examining division
14.02.2017Communication of intention to grant the patent
06.06.2017Fee for grant paid
06.06.2017Fee for publishing/printing paid
06.06.2017Receipt of the translation of the claim(s)
Opposition(s)20.04.2018No opposition filed within time limit [2018/26]
Fees paidRenewal fee
26.05.2016Renewal fee patent year 03
24.05.2017Renewal fee patent year 04
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU28.05.2014
AL19.07.2017
AT19.07.2017
CY19.07.2017
CZ19.07.2017
DK19.07.2017
EE19.07.2017
ES19.07.2017
FI19.07.2017
HR19.07.2017
LT19.07.2017
LV19.07.2017
MC19.07.2017
MK19.07.2017
MT19.07.2017
NL19.07.2017
PL19.07.2017
PT19.07.2017
RO19.07.2017
RS19.07.2017
SE19.07.2017
SI19.07.2017
SK19.07.2017
SM19.07.2017
TR19.07.2017
BG19.10.2017
NO19.10.2017
GR20.10.2017
IS19.11.2017
[2020/34]
Former [2020/31]HU28.05.2014
AT19.07.2017
CY19.07.2017
CZ19.07.2017
DK19.07.2017
EE19.07.2017
ES19.07.2017
FI19.07.2017
HR19.07.2017
LT19.07.2017
LV19.07.2017
MC19.07.2017
MK19.07.2017
MT19.07.2017
NL19.07.2017
PL19.07.2017
PT19.07.2017
RO19.07.2017
RS19.07.2017
SE19.07.2017
SI19.07.2017
SK19.07.2017
SM19.07.2017
TR19.07.2017
BG19.10.2017
NO19.10.2017
GR20.10.2017
IS19.11.2017
Former [2020/28]HU28.05.2014
AT19.07.2017
CZ19.07.2017
DK19.07.2017
EE19.07.2017
ES19.07.2017
FI19.07.2017
HR19.07.2017
LT19.07.2017
LV19.07.2017
MC19.07.2017
MT19.07.2017
NL19.07.2017
PL19.07.2017
PT19.07.2017
RO19.07.2017
RS19.07.2017
SE19.07.2017
SI19.07.2017
SK19.07.2017
SM19.07.2017
TR19.07.2017
BG19.10.2017
NO19.10.2017
GR20.10.2017
IS19.11.2017
Former [2020/15]AT19.07.2017
CZ19.07.2017
DK19.07.2017
EE19.07.2017
ES19.07.2017
FI19.07.2017
HR19.07.2017
LT19.07.2017
LV19.07.2017
MC19.07.2017
MT19.07.2017
NL19.07.2017
PL19.07.2017
RO19.07.2017
RS19.07.2017
SE19.07.2017
SI19.07.2017
SK19.07.2017
SM19.07.2017
TR19.07.2017
BG19.10.2017
NO19.10.2017
GR20.10.2017
IS19.11.2017
Former [2019/06]AT19.07.2017
CZ19.07.2017
DK19.07.2017
EE19.07.2017
ES19.07.2017
FI19.07.2017
HR19.07.2017
LT19.07.2017
LV19.07.2017
MC19.07.2017
MT19.07.2017
NL19.07.2017
PL19.07.2017
RO19.07.2017
RS19.07.2017
SE19.07.2017
SI19.07.2017
SK19.07.2017
SM19.07.2017
BG19.10.2017
NO19.10.2017
GR20.10.2017
IS19.11.2017
Former [2018/43]AT19.07.2017
CZ19.07.2017
DK19.07.2017
EE19.07.2017
ES19.07.2017
FI19.07.2017
HR19.07.2017
LT19.07.2017
LV19.07.2017
MT19.07.2017
NL19.07.2017
PL19.07.2017
RO19.07.2017
RS19.07.2017
SE19.07.2017
SI19.07.2017
SK19.07.2017
SM19.07.2017
BG19.10.2017
NO19.10.2017
GR20.10.2017
IS19.11.2017
Former [2018/39]AT19.07.2017
CZ19.07.2017
DK19.07.2017
EE19.07.2017
ES19.07.2017
FI19.07.2017
HR19.07.2017
LT19.07.2017
LV19.07.2017
NL19.07.2017
PL19.07.2017
RO19.07.2017
RS19.07.2017
SE19.07.2017
SI19.07.2017
SK19.07.2017
SM19.07.2017
BG19.10.2017
NO19.10.2017
GR20.10.2017
IS19.11.2017
Former [2018/25]AT19.07.2017
CZ19.07.2017
DK19.07.2017
EE19.07.2017
ES19.07.2017
FI19.07.2017
HR19.07.2017
LT19.07.2017
LV19.07.2017
NL19.07.2017
PL19.07.2017
RO19.07.2017
RS19.07.2017
SE19.07.2017
SK19.07.2017
SM19.07.2017
BG19.10.2017
NO19.10.2017
GR20.10.2017
IS19.11.2017
Former [2018/23]AT19.07.2017
CZ19.07.2017
DK19.07.2017
EE19.07.2017
ES19.07.2017
FI19.07.2017
HR19.07.2017
LT19.07.2017
LV19.07.2017
NL19.07.2017
PL19.07.2017
RO19.07.2017
RS19.07.2017
SE19.07.2017
SK19.07.2017
BG19.10.2017
NO19.10.2017
GR20.10.2017
IS19.11.2017
Former [2018/21]AT19.07.2017
CZ19.07.2017
DK19.07.2017
ES19.07.2017
FI19.07.2017
HR19.07.2017
LT19.07.2017
LV19.07.2017
NL19.07.2017
PL19.07.2017
RS19.07.2017
SE19.07.2017
BG19.10.2017
NO19.10.2017
GR20.10.2017
IS19.11.2017
Former [2018/12]AT19.07.2017
ES19.07.2017
FI19.07.2017
HR19.07.2017
LT19.07.2017
LV19.07.2017
NL19.07.2017
PL19.07.2017
RS19.07.2017
SE19.07.2017
BG19.10.2017
NO19.10.2017
GR20.10.2017
IS19.11.2017
Former [2018/11]AT19.07.2017
ES19.07.2017
FI19.07.2017
HR19.07.2017
LT19.07.2017
NL19.07.2017
PL19.07.2017
RS19.07.2017
SE19.07.2017
BG19.10.2017
NO19.10.2017
GR20.10.2017
IS19.11.2017
Former [2018/10]AT19.07.2017
FI19.07.2017
HR19.07.2017
LT19.07.2017
NL19.07.2017
RS19.07.2017
SE19.07.2017
NO19.10.2017
Former [2018/09]FI19.07.2017
LT19.07.2017
NL19.07.2017
SE19.07.2017
NO19.10.2017
Former [2018/08]FI19.07.2017
LT19.07.2017
NL19.07.2017
NO19.10.2017
Former [2018/07]LT19.07.2017
NO19.10.2017
Documents cited:Search[X]US6102304  (GONITZKE JOHN [US], et al) [X] 1-11 * column 1, lines 9-12 * * column 2, line 60 - column 3, line 9 * * column 3, lines 34-43 * * column 4, line 30 - column 8, line 25 * * abstract *;
 [X]WO2011066095  (DOW GLOBAL TECHNOLOGIES INC [US], et al) [X] 1-11 * page 1, lines 5-14 * * page 2, line 21 - page 4, line 14 * * page 5, line 32 - page 7, line 22 * * page 9, line 1 - page 11, line 20 * * page 12, lines 1-19 * * abstract *;
 [X]US3172925  (PREOTLE J J [US]) [X] 1-11 * column 2, line 1 - column 3, line 13 * * figure 1 *;
 [A]US4069948  (SAATY SAMIR N, et al) [A] 1-11 * column 4, lines 21-24 * * abstract *;
 [A]US6280692  (BARTLETT JR HENRY WALKER [US]) [A] 1-11 * column 6, line 57 - column 8, line 64 * * abstract *;
 [A]US2003195651  (CHERFANE RAYMOND [US], et al) [A] 1-11 * abstract *;
 [A]US5271521  (NOSS JEFFREY S [US], et al) [A] 1-11 * abstract *
ExaminationEP2808144
by applicantDE2637355
 DE4411161
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.