blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP2813803

EP2813803 - Machine vision inspection system and method for performing high-speed focus height measurement operations [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  28.08.2020
Database last updated on 03.10.2024
FormerThe patent has been granted
Status updated on  20.09.2019
FormerGrant of patent is intended
Status updated on  22.05.2019
FormerExamination is in progress
Status updated on  30.11.2018
Most recent event   Tooltip08.07.2022Lapse of the patent in a contracting state
New state(s): MK
published on 10.08.2022  [2022/32]
Applicant(s)For all designated states
Mitutoyo Corporation
20-1, Sakado 1-chome
Takatsu-ku
Kawasaki-shi, Kanagawa 213-0012 / JP
[2014/51]
Inventor(s)01 / Gladnick, Paul Gerard
4337 Palatine Avenue North
Seattle, WA 98103 / US
 [2014/51]
Representative(s)Gill Jennings & Every LLP
The Broadgate Tower
20 Primrose Street
London EC2A 2ES / GB
[2019/43]
Former [2014/51]Skone James, Robert Edmund
Gill Jennings & Every LLP The Broadgate Tower
20 Primrose Street
London EC2A 2ES / GB
Application number, filing date14170484.129.05.2014
[2014/51]
Priority number, dateUS20131391758113.06.2013         Original published format: US201313917581
[2014/51]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP2813803
Date:17.12.2014
Language:EN
[2014/51]
Type: B1 Patent specification 
No.:EP2813803
Date:23.10.2019
Language:EN
[2019/43]
Search report(s)(Supplementary) European search report - dispatched on:EP21.10.2014
ClassificationIPC:G01B11/06, G01B11/24, G06T7/571, G06T7/00
[2019/23]
CPC:
G06T7/0004 (EP,US); G01B11/0608 (EP,US); G01B11/24 (EP,US);
G06T7/571 (EP,US); G06T2207/10016 (EP,US); G06T2207/10152 (EP,US);
G06T2207/30164 (EP,US) (-)
Former IPC [2014/51]G01B11/06
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2015/31]
Former [2014/51]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:Prüfsystem mit maschinellem Sehen und Verfahren zur Durchführung von Höhenmessoperationen mit Hochgeschwindigkeitsfokus[2019/23]
English:Machine vision inspection system and method for performing high-speed focus height measurement operations[2014/51]
French:Système d'inspection par vision industrielle et procédé pour effectuer des opérations de mesure de hauteur par mise au point à grande vitesse[2019/23]
Former [2014/51]Maschinensichtinspektionssystem und Verfahren zur Durchführung von Höhenmessoperationen mit Hochgeschwindigkeitsfokus
Former [2014/51]Système d'inspection de vision artificielle et procédé pour effectuer des opérations de mesure de hauteur de focalisation à grande vitesse
Examination procedure16.06.2015Examination requested  [2015/31]
24.07.2015Despatch of communication that the application is deemed to be withdrawn, reason: reply to the Extended European Search Report/Written Opinion of the International Searching Authority/International Preliminary Examination Report/Supplementary international search report not received in time
11.09.2015Amendment by applicant (claims and/or description)
06.12.2018Despatch of a communication from the examining division (Time limit: M04)
12.04.2019Reply to a communication from the examining division
23.05.2019Communication of intention to grant the patent
13.09.2019Fee for grant paid
13.09.2019Fee for publishing/printing paid
13.09.2019Receipt of the translation of the claim(s)
Opposition(s)24.07.2020No opposition filed within time limit [2020/40]
Request for further processing for:The application is deemed to be withdrawn due to failure to reply to the Extended European Search Report/Written Opinion of the International Searching Authority/International Preliminary Examination Report/Supplementary international search report/Supplementary European search report
11.09.2015Request for further processing filed
11.09.2015Full payment received (date of receipt of payment)
Request granted
21.09.2015Decision despatched
Fees paidRenewal fee
30.03.2016Renewal fee patent year 03
23.05.2017Renewal fee patent year 04
25.05.2018Renewal fee patent year 05
23.05.2019Renewal fee patent year 06
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU29.05.2014
AL23.10.2019
AT23.10.2019
CY23.10.2019
CZ23.10.2019
DK23.10.2019
EE23.10.2019
ES23.10.2019
FI23.10.2019
HR23.10.2019
IT23.10.2019
LT23.10.2019
LV23.10.2019
MC23.10.2019
MK23.10.2019
MT23.10.2019
NL23.10.2019
PL23.10.2019
RO23.10.2019
RS23.10.2019
SE23.10.2019
SI23.10.2019
SK23.10.2019
SM23.10.2019
TR23.10.2019
BG23.01.2020
NO23.01.2020
GR24.01.2020
IS23.02.2020
PT24.02.2020
IE29.05.2020
LU29.05.2020
BE31.05.2020
CH31.05.2020
FR31.05.2020
LI31.05.2020
[2022/32]
Former [2022/27]HU29.05.2014
AL23.10.2019
AT23.10.2019
CY23.10.2019
CZ23.10.2019
DK23.10.2019
EE23.10.2019
ES23.10.2019
FI23.10.2019
HR23.10.2019
IT23.10.2019
LT23.10.2019
LV23.10.2019
MC23.10.2019
MT23.10.2019
NL23.10.2019
PL23.10.2019
RO23.10.2019
RS23.10.2019
SE23.10.2019
SI23.10.2019
SK23.10.2019
SM23.10.2019
TR23.10.2019
BG23.01.2020
NO23.01.2020
GR24.01.2020
IS23.02.2020
PT24.02.2020
IE29.05.2020
LU29.05.2020
BE31.05.2020
CH31.05.2020
FR31.05.2020
LI31.05.2020
Former [2021/23]AL23.10.2019
AT23.10.2019
CZ23.10.2019
DK23.10.2019
EE23.10.2019
ES23.10.2019
FI23.10.2019
HR23.10.2019
IT23.10.2019
LT23.10.2019
LV23.10.2019
MC23.10.2019
NL23.10.2019
PL23.10.2019
RO23.10.2019
RS23.10.2019
SE23.10.2019
SI23.10.2019
SK23.10.2019
SM23.10.2019
BG23.01.2020
NO23.01.2020
GR24.01.2020
IS23.02.2020
PT24.02.2020
IE29.05.2020
LU29.05.2020
BE31.05.2020
CH31.05.2020
FR31.05.2020
LI31.05.2020
Former [2021/20]AL23.10.2019
AT23.10.2019
CZ23.10.2019
DK23.10.2019
EE23.10.2019
ES23.10.2019
FI23.10.2019
HR23.10.2019
IT23.10.2019
LT23.10.2019
LV23.10.2019
MC23.10.2019
NL23.10.2019
PL23.10.2019
RO23.10.2019
RS23.10.2019
SE23.10.2019
SI23.10.2019
SK23.10.2019
SM23.10.2019
BG23.01.2020
NO23.01.2020
GR24.01.2020
IS23.02.2020
PT24.02.2020
IE29.05.2020
LU29.05.2020
CH31.05.2020
LI31.05.2020
Former [2021/15]AL23.10.2019
AT23.10.2019
CZ23.10.2019
DK23.10.2019
EE23.10.2019
ES23.10.2019
FI23.10.2019
HR23.10.2019
IT23.10.2019
LT23.10.2019
LV23.10.2019
MC23.10.2019
NL23.10.2019
PL23.10.2019
RO23.10.2019
RS23.10.2019
SE23.10.2019
SI23.10.2019
SK23.10.2019
SM23.10.2019
BG23.01.2020
NO23.01.2020
GR24.01.2020
IS23.02.2020
PT24.02.2020
LU29.05.2020
CH31.05.2020
LI31.05.2020
Former [2021/12]AL23.10.2019
AT23.10.2019
CZ23.10.2019
DK23.10.2019
EE23.10.2019
ES23.10.2019
FI23.10.2019
HR23.10.2019
IT23.10.2019
LT23.10.2019
LV23.10.2019
MC23.10.2019
NL23.10.2019
PL23.10.2019
RO23.10.2019
RS23.10.2019
SE23.10.2019
SI23.10.2019
SK23.10.2019
SM23.10.2019
BG23.01.2020
NO23.01.2020
GR24.01.2020
IS23.02.2020
PT24.02.2020
CH31.05.2020
LI31.05.2020
Former [2021/07]AL23.10.2019
AT23.10.2019
CZ23.10.2019
DK23.10.2019
EE23.10.2019
ES23.10.2019
FI23.10.2019
HR23.10.2019
IT23.10.2019
LT23.10.2019
LV23.10.2019
NL23.10.2019
PL23.10.2019
RO23.10.2019
RS23.10.2019
SE23.10.2019
SI23.10.2019
SK23.10.2019
SM23.10.2019
BG23.01.2020
NO23.01.2020
GR24.01.2020
IS23.02.2020
PT24.02.2020
CH31.05.2020
LI31.05.2020
Former [2020/51]AL23.10.2019
AT23.10.2019
CZ23.10.2019
DK23.10.2019
EE23.10.2019
ES23.10.2019
FI23.10.2019
HR23.10.2019
IT23.10.2019
LT23.10.2019
LV23.10.2019
NL23.10.2019
PL23.10.2019
RO23.10.2019
RS23.10.2019
SE23.10.2019
SI23.10.2019
SK23.10.2019
SM23.10.2019
BG23.01.2020
NO23.01.2020
GR24.01.2020
IS23.02.2020
PT24.02.2020
Former [2020/38]AL23.10.2019
CZ23.10.2019
DK23.10.2019
EE23.10.2019
ES23.10.2019
FI23.10.2019
HR23.10.2019
IT23.10.2019
LT23.10.2019
LV23.10.2019
NL23.10.2019
PL23.10.2019
RO23.10.2019
RS23.10.2019
SE23.10.2019
SK23.10.2019
SM23.10.2019
BG23.01.2020
NO23.01.2020
GR24.01.2020
IS23.02.2020
PT24.02.2020
Former [2020/37]AL23.10.2019
CZ23.10.2019
DK23.10.2019
EE23.10.2019
ES23.10.2019
FI23.10.2019
HR23.10.2019
LT23.10.2019
LV23.10.2019
NL23.10.2019
PL23.10.2019
RO23.10.2019
RS23.10.2019
SE23.10.2019
SK23.10.2019
SM23.10.2019
BG23.01.2020
NO23.01.2020
GR24.01.2020
IS23.02.2020
PT24.02.2020
Former [2020/36]AL23.10.2019
CZ23.10.2019
DK23.10.2019
EE23.10.2019
ES23.10.2019
FI23.10.2019
HR23.10.2019
LT23.10.2019
LV23.10.2019
NL23.10.2019
PL23.10.2019
RO23.10.2019
RS23.10.2019
SE23.10.2019
BG23.01.2020
NO23.01.2020
GR24.01.2020
IS23.02.2020
PT24.02.2020
Former [2020/35]AL23.10.2019
CZ23.10.2019
ES23.10.2019
FI23.10.2019
HR23.10.2019
LT23.10.2019
LV23.10.2019
NL23.10.2019
PL23.10.2019
RO23.10.2019
RS23.10.2019
SE23.10.2019
BG23.01.2020
NO23.01.2020
GR24.01.2020
IS24.02.2020
PT24.02.2020
Former [2020/32]AL23.10.2019
ES23.10.2019
FI23.10.2019
HR23.10.2019
LT23.10.2019
LV23.10.2019
NL23.10.2019
PL23.10.2019
RS23.10.2019
SE23.10.2019
BG23.01.2020
NO23.01.2020
GR24.01.2020
IS24.02.2020
PT24.02.2020
Former [2020/25]ES23.10.2019
FI23.10.2019
HR23.10.2019
LT23.10.2019
LV23.10.2019
NL23.10.2019
PL23.10.2019
RS23.10.2019
SE23.10.2019
BG23.01.2020
NO23.01.2020
GR24.01.2020
IS24.02.2020
PT24.02.2020
Former [2020/24]ES23.10.2019
FI23.10.2019
LT23.10.2019
LV23.10.2019
NL23.10.2019
PL23.10.2019
SE23.10.2019
BG23.01.2020
NO23.01.2020
GR24.01.2020
IS24.02.2020
PT24.02.2020
Former [2020/23]ES23.10.2019
FI23.10.2019
LT23.10.2019
LV23.10.2019
NL23.10.2019
PL23.10.2019
SE23.10.2019
BG23.01.2020
NO23.01.2020
GR24.01.2020
PT24.02.2020
Former [2020/22]FI23.10.2019
LT23.10.2019
NL23.10.2019
SE23.10.2019
BG23.01.2020
NO23.01.2020
PT24.02.2020
Former [2020/21]NL23.10.2019
NO23.01.2020
Former [2020/20]NL23.10.2019
Documents cited:Search[Y]US2008100829  (WATSON MATHEW DAVID [US]) [Y] 1-15 * paragraphs [0024] - [0028] - [0 47]; figure 1 *;
 [Y]DE102006004060  (BASLER AG [DE]) [Y] 6-9,12,14,15 * paragraphs [0001] , [0024]; figure 1 *;
 [A]US2010177951  (VODANOVIC BOJKO [CA]) [A] 6,8,9,12,15 * paragraph [0024]; figure 1 *;
 [AD]US8111905  (CAMPBELL SHANNON R [US]) [AD] 1,10 * the whole document *;
 [AD]US8111938  (BRYLL ROBERT K [US], et al) [AD] 1,10 * the whole document *;
 [A]US2011133054  (CAMPBELL SHANNON R [US]) [A] 1,10 * the whole document *
 [YD]  - MERMILLOD-BLONDIN A ET AL, "High-speed varifocal imaging with a tunable acoustic gradient index of refraction lens", OPTICS LETTERS, OPTICAL SOCIETY OF AMERICA, US, (20080915), vol. 33, no. 18, doi:10.1364/OL.33.002146, ISSN 0146-9592, pages 2146 - 2148, XP001516916 [YD] 1-15 * the whole document *

DOI:   http://dx.doi.org/10.1364/OL.33.002146
ExaminationJP2011191086
 JP2011047883
by applicantUS6542180
 US5790710
 US7454053
 US7324682
 US8111905
 US8111938
    - "High-speed varifocal imaging with a tunable acoustic gradient index of refraction lens", OPTICS LETTERS, (20080915), vol. 33, no. 18
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.