| EP2952154 - Method for producing dental restorations and dental ceramic production device [Right-click to bookmark this link] | |||
| Former [2015/50] | Method for producing a dental restoration and dental ceramic production device | ||
| [2020/26] | Status | No opposition filed within time limit Status updated on 11.03.2022 Database last updated on 26.03.2026 | |
| Former | The patent has been granted Status updated on 03.04.2021 | ||
| Former | Grant of patent is intended Status updated on 16.09.2020 | ||
| Former | Examination is in progress Status updated on 16.12.2016 | Most recent event Tooltip | 19.12.2025 | Lapse of the patent in a contracting state New state(s): TR | published on 21.01.2026 [2026/04] | Applicant(s) | For all designated states Ivoclar Vivadent AG Bendererstrasse 2 9494 Schaan / LI | [2015/50] | Inventor(s) | 01 /
Ebert, Jörg Heldaustrasse 8 9470 Buchs / CH | 02 /
Gründenfelder, Robert Im Mühleholz 32 9490 Vaduz / LI | 03 /
Specht, Tobias Kreuzstrasse 15 9491 Ruggell / LI | 04 /
Voigt, Oliver Chällenstrasse 11 8852 Altendorf / CH | [2021/18] |
| Former [2015/50] | 01 /
Ebert, Jörg Röllweg 16 9470 Buchs / CH | ||
| 02 /
Gründenfelder, Robert Schwarze Strasse 4 9492 Eschen / LI | |||
| 03 /
Specht, Tobias Langacker 49 9491 Ruggell / LI | |||
| 04 /
Voigt, Oliver Maziferweg 7 9477 Trübbach / CH | Representative(s) | Baronetzky, Klaus Splanemann Patentanwälte Partnerschaft Rumfordstrasse 7 80469 München / DE | [2015/50] | Application number, filing date | 14171268.7 | 05.06.2014 | [2015/50] | Filing language | DE | Procedural language | DE | Publication | Type: | A1 Application with search report | No.: | EP2952154 | Date: | 09.12.2015 | Language: | DE | [2015/50] | Type: | B1 Patent specification | No.: | EP2952154 | Date: | 05.05.2021 | Language: | DE | [2021/18] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 21.11.2014 | Classification | IPC: | A61C13/00, A61C13/083, A61C5/77 | [2020/19] | CPC: |
A61C13/0019 (EP,US);
G05B19/4097 (US);
A61C13/0004 (EP,US);
A61C13/083 (EP,US);
A61C13/0022 (EP,US);
A61C5/77 (EP,US);
|
| Former IPC [2015/50] | A61C13/00, A61C13/083, // A61C5/10 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2016/20] |
| Former [2015/50] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | Verfahren zur Herstellung mehrerer Dentalrestaurationen sowie Dentalkeramik-Erzeugungsvorrichtung | [2020/26] | English: | Method for producing dental restorations and dental ceramic production device | [2020/26] | French: | Procédé de fabrication de restaurations dentaires et dispositif de fabrication de céramiques dentaires | [2020/26] |
| Former [2015/50] | Verfahren zur Herstellung einer Dentalrestauration sowie Dentalkeramik-Erzeugungsvorrichtung | ||
| Former [2015/50] | Method for producing a dental restoration and dental ceramic production device | ||
| Former [2015/50] | Procédé de fabrication d'une restauration dentaire et dispositif de fabrication de céramique dentaire | Examination procedure | 04.04.2016 | Amendment by applicant (claims and/or description) | 04.04.2016 | Examination requested [2016/20] | 15.12.2016 | Despatch of a communication from the examining division (Time limit: M06) | 02.06.2017 | Reply to a communication from the examining division | 17.09.2020 | Communication of intention to grant the patent | 15.01.2021 | Fee for grant paid | 15.01.2021 | Fee for publishing/printing paid | 15.01.2021 | Receipt of the translation of the claim(s) | Opposition(s) | 08.02.2022 | No opposition filed within time limit [2022/15] | Fees paid | Renewal fee | 23.05.2016 | Renewal fee patent year 03 | 07.06.2017 | Renewal fee patent year 04 | 18.06.2018 | Renewal fee patent year 05 | 17.06.2019 | Renewal fee patent year 06 | 17.06.2020 | Renewal fee patent year 07 |
| Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
| Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 05.06.2014 | AL | 05.05.2021 | CY | 05.05.2021 | CZ | 05.05.2021 | DK | 05.05.2021 | EE | 05.05.2021 | FI | 05.05.2021 | HR | 05.05.2021 | LT | 05.05.2021 | LV | 05.05.2021 | MC | 05.05.2021 | MK | 05.05.2021 | MT | 05.05.2021 | PL | 05.05.2021 | RO | 05.05.2021 | RS | 05.05.2021 | SE | 05.05.2021 | SI | 05.05.2021 | SK | 05.05.2021 | SM | 05.05.2021 | TR | 05.05.2021 | IE | 05.06.2021 | LU | 05.06.2021 | BG | 05.08.2021 | NO | 05.08.2021 | GR | 06.08.2021 | IS | 05.09.2021 | PT | 06.09.2021 | [2026/04] |
| Former [2024/41] | HU | 05.06.2014 | |
| AL | 05.05.2021 | ||
| CY | 05.05.2021 | ||
| CZ | 05.05.2021 | ||
| DK | 05.05.2021 | ||
| EE | 05.05.2021 | ||
| FI | 05.05.2021 | ||
| HR | 05.05.2021 | ||
| LT | 05.05.2021 | ||
| LV | 05.05.2021 | ||
| MC | 05.05.2021 | ||
| MK | 05.05.2021 | ||
| MT | 05.05.2021 | ||
| PL | 05.05.2021 | ||
| RO | 05.05.2021 | ||
| RS | 05.05.2021 | ||
| SE | 05.05.2021 | ||
| SI | 05.05.2021 | ||
| SK | 05.05.2021 | ||
| SM | 05.05.2021 | ||
| IE | 05.06.2021 | ||
| LU | 05.06.2021 | ||
| BG | 05.08.2021 | ||
| NO | 05.08.2021 | ||
| GR | 06.08.2021 | ||
| IS | 05.09.2021 | ||
| PT | 06.09.2021 | ||
| Former [2024/22] | HU | 05.06.2014 | |
| AL | 05.05.2021 | ||
| CY | 05.05.2021 | ||
| CZ | 05.05.2021 | ||
| DK | 05.05.2021 | ||
| EE | 05.05.2021 | ||
| FI | 05.05.2021 | ||
| HR | 05.05.2021 | ||
| LT | 05.05.2021 | ||
| LV | 05.05.2021 | ||
| MC | 05.05.2021 | ||
| MK | 05.05.2021 | ||
| PL | 05.05.2021 | ||
| RO | 05.05.2021 | ||
| RS | 05.05.2021 | ||
| SE | 05.05.2021 | ||
| SI | 05.05.2021 | ||
| SK | 05.05.2021 | ||
| SM | 05.05.2021 | ||
| IE | 05.06.2021 | ||
| LU | 05.06.2021 | ||
| BG | 05.08.2021 | ||
| NO | 05.08.2021 | ||
| GR | 06.08.2021 | ||
| IS | 05.09.2021 | ||
| PT | 06.09.2021 | ||
| Former [2023/30] | HU | 05.06.2014 | |
| AL | 05.05.2021 | ||
| CY | 05.05.2021 | ||
| CZ | 05.05.2021 | ||
| DK | 05.05.2021 | ||
| EE | 05.05.2021 | ||
| FI | 05.05.2021 | ||
| HR | 05.05.2021 | ||
| LT | 05.05.2021 | ||
| LV | 05.05.2021 | ||
| MC | 05.05.2021 | ||
| PL | 05.05.2021 | ||
| RO | 05.05.2021 | ||
| RS | 05.05.2021 | ||
| SE | 05.05.2021 | ||
| SI | 05.05.2021 | ||
| SK | 05.05.2021 | ||
| SM | 05.05.2021 | ||
| IE | 05.06.2021 | ||
| LU | 05.06.2021 | ||
| BG | 05.08.2021 | ||
| NO | 05.08.2021 | ||
| GR | 06.08.2021 | ||
| IS | 05.09.2021 | ||
| PT | 06.09.2021 | ||
| Former [2023/29] | HU | 05.06.2014 | |
| AL | 05.05.2021 | ||
| CZ | 05.05.2021 | ||
| DK | 05.05.2021 | ||
| EE | 05.05.2021 | ||
| FI | 05.05.2021 | ||
| HR | 05.05.2021 | ||
| LT | 05.05.2021 | ||
| LV | 05.05.2021 | ||
| MC | 05.05.2021 | ||
| PL | 05.05.2021 | ||
| RO | 05.05.2021 | ||
| RS | 05.05.2021 | ||
| SE | 05.05.2021 | ||
| SI | 05.05.2021 | ||
| SK | 05.05.2021 | ||
| SM | 05.05.2021 | ||
| IE | 05.06.2021 | ||
| LU | 05.06.2021 | ||
| BG | 05.08.2021 | ||
| NO | 05.08.2021 | ||
| GR | 06.08.2021 | ||
| IS | 05.09.2021 | ||
| PT | 06.09.2021 | ||
| Former [2022/29] | AL | 05.05.2021 | |
| CZ | 05.05.2021 | ||
| DK | 05.05.2021 | ||
| EE | 05.05.2021 | ||
| FI | 05.05.2021 | ||
| HR | 05.05.2021 | ||
| LT | 05.05.2021 | ||
| LV | 05.05.2021 | ||
| MC | 05.05.2021 | ||
| PL | 05.05.2021 | ||
| RO | 05.05.2021 | ||
| RS | 05.05.2021 | ||
| SE | 05.05.2021 | ||
| SI | 05.05.2021 | ||
| SK | 05.05.2021 | ||
| SM | 05.05.2021 | ||
| IE | 05.06.2021 | ||
| LU | 05.06.2021 | ||
| BG | 05.08.2021 | ||
| NO | 05.08.2021 | ||
| GR | 06.08.2021 | ||
| IS | 05.09.2021 | ||
| PT | 06.09.2021 | ||
| Former [2022/26] | AL | 05.05.2021 | |
| CZ | 05.05.2021 | ||
| DK | 05.05.2021 | ||
| EE | 05.05.2021 | ||
| FI | 05.05.2021 | ||
| HR | 05.05.2021 | ||
| LT | 05.05.2021 | ||
| LV | 05.05.2021 | ||
| MC | 05.05.2021 | ||
| PL | 05.05.2021 | ||
| RO | 05.05.2021 | ||
| RS | 05.05.2021 | ||
| SE | 05.05.2021 | ||
| SK | 05.05.2021 | ||
| SM | 05.05.2021 | ||
| IE | 05.06.2021 | ||
| LU | 05.06.2021 | ||
| BG | 05.08.2021 | ||
| NO | 05.08.2021 | ||
| GR | 06.08.2021 | ||
| IS | 05.09.2021 | ||
| PT | 06.09.2021 | ||
| Former [2022/23] | CZ | 05.05.2021 | |
| DK | 05.05.2021 | ||
| EE | 05.05.2021 | ||
| FI | 05.05.2021 | ||
| HR | 05.05.2021 | ||
| LT | 05.05.2021 | ||
| LV | 05.05.2021 | ||
| MC | 05.05.2021 | ||
| PL | 05.05.2021 | ||
| RO | 05.05.2021 | ||
| RS | 05.05.2021 | ||
| SE | 05.05.2021 | ||
| SK | 05.05.2021 | ||
| SM | 05.05.2021 | ||
| IE | 05.06.2021 | ||
| LU | 05.06.2021 | ||
| BG | 05.08.2021 | ||
| NO | 05.08.2021 | ||
| GR | 06.08.2021 | ||
| IS | 05.09.2021 | ||
| PT | 06.09.2021 | ||
| Former [2022/21] | CZ | 05.05.2021 | |
| DK | 05.05.2021 | ||
| EE | 05.05.2021 | ||
| FI | 05.05.2021 | ||
| HR | 05.05.2021 | ||
| LT | 05.05.2021 | ||
| LV | 05.05.2021 | ||
| MC | 05.05.2021 | ||
| PL | 05.05.2021 | ||
| RO | 05.05.2021 | ||
| RS | 05.05.2021 | ||
| SE | 05.05.2021 | ||
| SK | 05.05.2021 | ||
| SM | 05.05.2021 | ||
| IE | 05.06.2021 | ||
| LU | 05.06.2021 | ||
| BG | 05.08.2021 | ||
| NO | 05.08.2021 | ||
| GR | 06.08.2021 | ||
| PT | 06.09.2021 | ||
| IS | 22.12.2021 | ||
| Former [2022/18] | CZ | 05.05.2021 | |
| DK | 05.05.2021 | ||
| EE | 05.05.2021 | ||
| FI | 05.05.2021 | ||
| HR | 05.05.2021 | ||
| LT | 05.05.2021 | ||
| LV | 05.05.2021 | ||
| MC | 05.05.2021 | ||
| PL | 05.05.2021 | ||
| RO | 05.05.2021 | ||
| RS | 05.05.2021 | ||
| SE | 05.05.2021 | ||
| SK | 05.05.2021 | ||
| SM | 05.05.2021 | ||
| LU | 05.06.2021 | ||
| BG | 05.08.2021 | ||
| NO | 05.08.2021 | ||
| GR | 06.08.2021 | ||
| PT | 06.09.2021 | ||
| IS | 22.12.2021 | ||
| Former [2022/10] | CZ | 05.05.2021 | |
| DK | 05.05.2021 | ||
| EE | 05.05.2021 | ||
| FI | 05.05.2021 | ||
| HR | 05.05.2021 | ||
| LT | 05.05.2021 | ||
| LV | 05.05.2021 | ||
| PL | 05.05.2021 | ||
| RO | 05.05.2021 | ||
| RS | 05.05.2021 | ||
| SE | 05.05.2021 | ||
| SK | 05.05.2021 | ||
| SM | 05.05.2021 | ||
| BG | 05.08.2021 | ||
| NO | 05.08.2021 | ||
| GR | 06.08.2021 | ||
| PT | 06.09.2021 | ||
| IS | 22.12.2021 | ||
| Former [2022/09] | CZ | 05.05.2021 | |
| DK | 05.05.2021 | ||
| FI | 05.05.2021 | ||
| HR | 05.05.2021 | ||
| LT | 05.05.2021 | ||
| LV | 05.05.2021 | ||
| PL | 05.05.2021 | ||
| RO | 05.05.2021 | ||
| RS | 05.05.2021 | ||
| SE | 05.05.2021 | ||
| SK | 05.05.2021 | ||
| SM | 05.05.2021 | ||
| BG | 05.08.2021 | ||
| NO | 05.08.2021 | ||
| GR | 06.08.2021 | ||
| IS | 05.09.2021 | ||
| PT | 06.09.2021 | ||
| Former [2022/08] | CZ | 05.05.2021 | |
| DK | 05.05.2021 | ||
| FI | 05.05.2021 | ||
| HR | 05.05.2021 | ||
| LT | 05.05.2021 | ||
| LV | 05.05.2021 | ||
| PL | 05.05.2021 | ||
| RS | 05.05.2021 | ||
| SE | 05.05.2021 | ||
| SM | 05.05.2021 | ||
| BG | 05.08.2021 | ||
| NO | 05.08.2021 | ||
| GR | 06.08.2021 | ||
| IS | 05.09.2021 | ||
| PT | 06.09.2021 | ||
| Former [2022/07] | FI | 05.05.2021 | |
| HR | 05.05.2021 | ||
| LT | 05.05.2021 | ||
| LV | 05.05.2021 | ||
| PL | 05.05.2021 | ||
| RS | 05.05.2021 | ||
| SE | 05.05.2021 | ||
| SM | 05.05.2021 | ||
| BG | 05.08.2021 | ||
| NO | 05.08.2021 | ||
| GR | 06.08.2021 | ||
| IS | 05.09.2021 | ||
| PT | 06.09.2021 | ||
| Former [2021/52] | FI | 05.05.2021 | |
| HR | 05.05.2021 | ||
| LT | 05.05.2021 | ||
| LV | 05.05.2021 | ||
| PL | 05.05.2021 | ||
| RS | 05.05.2021 | ||
| SE | 05.05.2021 | ||
| BG | 05.08.2021 | ||
| NO | 05.08.2021 | ||
| GR | 06.08.2021 | ||
| IS | 05.09.2021 | ||
| PT | 06.09.2021 | ||
| Former [2021/51] | FI | 05.05.2021 | |
| HR | 05.05.2021 | ||
| LT | 05.05.2021 | ||
| LV | 05.05.2021 | ||
| RS | 05.05.2021 | ||
| SE | 05.05.2021 | ||
| BG | 05.08.2021 | ||
| NO | 05.08.2021 | ||
| GR | 06.08.2021 | ||
| IS | 05.09.2021 | ||
| PT | 06.09.2021 | ||
| Former [2021/50] | FI | 05.05.2021 | |
| HR | 05.05.2021 | ||
| LT | 05.05.2021 | ||
| LV | 05.05.2021 | ||
| SE | 05.05.2021 | ||
| BG | 05.08.2021 | ||
| NO | 05.08.2021 | ||
| GR | 06.08.2021 | ||
| PT | 06.09.2021 | ||
| Former [2021/49] | FI | 05.05.2021 | |
| HR | 05.05.2021 | ||
| LT | 05.05.2021 | ||
| LV | 05.05.2021 | ||
| SE | 05.05.2021 | ||
| BG | 05.08.2021 | ||
| NO | 05.08.2021 | ||
| GR | 06.08.2021 | ||
| Former [2021/47] | FI | 05.05.2021 | |
| LT | 05.05.2021 | ||
| BG | 05.08.2021 | ||
| Former [2021/46] | FI | 05.05.2021 | |
| LT | 05.05.2021 | Documents cited: | Search | [XI] WO03017864 (CYNOVAD INC et al.) | [XI] US2008142183 (MARSHALL MICHAEL CRAIG et al.) | [XI] US2008220395 (MARSHALL MICHAEL C et al.) [X] 1-7,9,10,13,18-21 * page 6, line 18 - page 7, line 25 * * claims 1-13 * * figures 1,2,4 *[I] 8,11,12,14-17,22-24 | Examination | US2008153069 | by applicant | DE10332802 | WO9528688 |