blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP2816624

EP2816624 - Method for producing a through substrate via and a through substrate capacitor in a substrate [Right-click to bookmark this link]
Former [2014/52]Method for producing a through electrical connection and a through capacitor in a substrate, and corresponding device
[2021/29]
StatusNo opposition filed within time limit
Status updated on  21.10.2022
Database last updated on 19.10.2024
FormerThe patent has been granted
Status updated on  12.11.2021
FormerGrant of patent is intended
Status updated on  27.07.2021
FormerExamination is in progress
Status updated on  01.05.2019
Most recent event   Tooltip06.09.2024Lapse of the patent in a contracting state
New state(s): MT
published on 09.10.2024  [2024/41]
Applicant(s)For all designated states
STMicroelectronics (Crolles 2) SAS
850, rue Jean Monnet
38920 Crolles / FR
For all designated states
COMMISSARIAT À L'ÉNERGIE ATOMIQUE ET AUX ÉNERGIES ALTERNATIVES
Bâtiment "Le Ponant D"
25, Rue Leblanc
75015 Paris / FR
[N/P]
Former [2021/50]For all designated states
STMicroelectronics (Crolles 2) SAS
850, rue Jean Monnet
38920 Crolles / FR
For all designated states
COMMISSARIAT À L'ÉNERGIE ATOMIQUE ET AUX ÉNERGIES ALTERNATIVES
Bâtiment "Le Ponant D"
25, rue Leblanc
75015 Paris / FR
Former [2014/52]For all designated states
STMicroelectronics (Crolles 2) SAS
850, rue Jean Monnet
38920 Crolles / FR
For all designated states
COMMISSARIAT A L'ENERGIE ATOMIQUE ET AUX ENERGIES ALTERNATIVES
Bâtiment "Le Ponant D" 25, rue Leblanc
75015 Paris / FR
Inventor(s)01 / Joblot, Sylvain
34 Chemin de Longechenal
38690 Bizonnes / FR
02 / Colonna, Jean-Philippe
142 route de Chartreuse
38700 CORENC / FR
03 / Guiller, Olivier
La croix du rocher
38700 LE SAPPEY EN CHARTREUSE / FR
04 / Mourier, Thierry
51 D R des ayguinards
38240 MEYLAN / FR
 [2021/50]
Former [2015/12]01 / Joblot, Sylvain
34 Chemin de Longechenal
38690 Bizonnes / FR
02 / Colonna, Jean-Philippe
142 route de Chartreuse
38700 CORENC / FR
03 / Guiller, Olivier
24 rue Jean Bocq
38600 FONTAINE / FR
04 / Mourier, Thierry
51 D R des ayguinards
38240 MEYLAN / FR
Former [2014/52]01 / Joblot, Sylvain
34 Chemin de Longechenal
38690 Bizonnes / FR
02 / Colonna, Jean-Philippe
142 route de Chartreuse
38700 CORENC / FR
03 / Guiller, Olivier
1 rue Edgar Quinet
38000 GRENOBLE / FR
04 / Mourier, Thierry
51 D R des ayguinards
38240 MEYLAN / FR
Representative(s)Casalonga
Casalonga & Partners
Bayerstraße 71/73
80335 München / DE
[2014/52]
Application number, filing date14172883.218.06.2014
[2014/52]
Priority number, dateFR2013005571018.06.2013         Original published format: FR 1355710
[2014/52]
Filing languageFR
Procedural languageFR
PublicationType: A1 Application with search report 
No.:EP2816624
Date:24.12.2014
Language:FR
[2014/52]
Type: B1 Patent specification 
No.:EP2816624
Date:15.12.2021
Language:FR
[2021/50]
Search report(s)(Supplementary) European search report - dispatched on:EP13.11.2014
ClassificationIPC:H01L49/02, H01L21/768, H01L23/48, H01L23/64, H01G2/10, H01G4/236, H01G4/35
[2021/29]
CPC:
H01L28/40 (EP,US); H01G2/103 (EP,US); H01G4/236 (EP,US);
H01G4/35 (EP,US); H01L21/76898 (EP,US); H01L23/481 (EP,US);
H01L23/642 (US); H01L28/90 (EP,US); H01L2924/0002 (EP,US) (-)
C-Set:
H01L2924/0002, H01L2924/00 (EP,US)
Former IPC [2014/52]H01L49/02, H01L21/768, H01L23/48, H01L23/64
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2014/52]
TitleGerman:Verfahren zur Herstellung einer Substratdurchkontaktierung und eines durchgehenden Kondensators in einem Substrat[2021/31]
English:Method for producing a through substrate via and a through substrate capacitor in a substrate[2021/31]
French:Procédé de réalisation d'une liaison électrique traversante et d'un condensateur traversant dans un substrat[2021/29]
Former [2014/52]Verfahren zur Herstellung einer durchgehenden elektrischen Verbindung und eines durchgehenden Kondensators in einem Substrat, und entsprechende Vorrichtung
Former [2014/52]Method for producing a through electrical connection and a through capacitor in a substrate, and corresponding device
Former [2014/52]Procédé de réalisation d'une liaison électrique traversante et d'un condensateur traversant dans un substrat, et dispositif correspondant
Examination procedure26.05.2015Amendment by applicant (claims and/or description)
10.06.2015Examination requested  [2015/30]
06.05.2019Despatch of a communication from the examining division (Time limit: M04)
28.08.2019Reply to a communication from the examining division
28.07.2021Communication of intention to grant the patent
08.11.2021Fee for grant paid
08.11.2021Fee for publishing/printing paid
08.11.2021Receipt of the translation of the claim(s)
Opposition(s)16.09.2022No opposition filed within time limit [2022/47]
Fees paidRenewal fee
19.05.2016Renewal fee patent year 03
17.05.2017Renewal fee patent year 04
16.05.2018Renewal fee patent year 05
15.05.2019Renewal fee patent year 06
11.05.2020Renewal fee patent year 07
12.05.2021Renewal fee patent year 08
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU18.06.2014
AL15.12.2021
AT15.12.2021
CY15.12.2021
CZ15.12.2021
DK15.12.2021
EE15.12.2021
ES15.12.2021
FI15.12.2021
HR15.12.2021
IT15.12.2021
LT15.12.2021
LV15.12.2021
MC15.12.2021
MK15.12.2021
MT15.12.2021
NL15.12.2021
PL15.12.2021
RO15.12.2021
RS15.12.2021
SE15.12.2021
SI15.12.2021
SK15.12.2021
SM15.12.2021
BG15.03.2022
NO15.03.2022
GR16.03.2022
IS15.04.2022
PT18.04.2022
IE18.06.2022
LU18.06.2022
BE30.06.2022
CH30.06.2022
LI30.06.2022
[2024/41]
Former [2024/22]HU18.06.2014
AL15.12.2021
AT15.12.2021
CY15.12.2021
CZ15.12.2021
DK15.12.2021
EE15.12.2021
ES15.12.2021
FI15.12.2021
HR15.12.2021
IT15.12.2021
LT15.12.2021
LV15.12.2021
MC15.12.2021
MK15.12.2021
NL15.12.2021
PL15.12.2021
RO15.12.2021
RS15.12.2021
SE15.12.2021
SI15.12.2021
SK15.12.2021
SM15.12.2021
BG15.03.2022
NO15.03.2022
GR16.03.2022
IS15.04.2022
PT18.04.2022
IE18.06.2022
LU18.06.2022
BE30.06.2022
CH30.06.2022
LI30.06.2022
Former [2024/20]HU18.06.2014
AL15.12.2021
AT15.12.2021
CY15.12.2021
CZ15.12.2021
DK15.12.2021
EE15.12.2021
ES15.12.2021
FI15.12.2021
HR15.12.2021
IT15.12.2021
LT15.12.2021
LV15.12.2021
MC15.12.2021
NL15.12.2021
PL15.12.2021
RO15.12.2021
RS15.12.2021
SE15.12.2021
SI15.12.2021
SK15.12.2021
SM15.12.2021
BG15.03.2022
NO15.03.2022
GR16.03.2022
IS15.04.2022
PT18.04.2022
IE18.06.2022
LU18.06.2022
BE30.06.2022
CH30.06.2022
LI30.06.2022
Former [2024/18]HU18.06.2014
AL15.12.2021
AT15.12.2021
CZ15.12.2021
DK15.12.2021
EE15.12.2021
ES15.12.2021
FI15.12.2021
HR15.12.2021
IT15.12.2021
LT15.12.2021
LV15.12.2021
MC15.12.2021
NL15.12.2021
PL15.12.2021
RO15.12.2021
RS15.12.2021
SE15.12.2021
SI15.12.2021
SK15.12.2021
SM15.12.2021
BG15.03.2022
NO15.03.2022
GR16.03.2022
IS15.04.2022
PT18.04.2022
IE18.06.2022
LU18.06.2022
BE30.06.2022
CH30.06.2022
LI30.06.2022
Former [2023/25]AL15.12.2021
AT15.12.2021
CZ15.12.2021
DK15.12.2021
EE15.12.2021
ES15.12.2021
FI15.12.2021
HR15.12.2021
IT15.12.2021
LT15.12.2021
LV15.12.2021
MC15.12.2021
NL15.12.2021
PL15.12.2021
RO15.12.2021
RS15.12.2021
SE15.12.2021
SI15.12.2021
SK15.12.2021
SM15.12.2021
BG15.03.2022
NO15.03.2022
GR16.03.2022
IS15.04.2022
PT18.04.2022
IE18.06.2022
LU18.06.2022
BE30.06.2022
CH30.06.2022
LI30.06.2022
Former [2023/21]AL15.12.2021
AT15.12.2021
CZ15.12.2021
DK15.12.2021
EE15.12.2021
ES15.12.2021
FI15.12.2021
HR15.12.2021
LT15.12.2021
LV15.12.2021
MC15.12.2021
NL15.12.2021
PL15.12.2021
RO15.12.2021
RS15.12.2021
SE15.12.2021
SI15.12.2021
SK15.12.2021
SM15.12.2021
BG15.03.2022
NO15.03.2022
GR16.03.2022
IS15.04.2022
PT18.04.2022
IE18.06.2022
LU18.06.2022
CH30.06.2022
LI30.06.2022
Former [2023/20]AL15.12.2021
AT15.12.2021
CZ15.12.2021
DK15.12.2021
EE15.12.2021
ES15.12.2021
FI15.12.2021
HR15.12.2021
LT15.12.2021
LV15.12.2021
MC15.12.2021
NL15.12.2021
PL15.12.2021
RO15.12.2021
RS15.12.2021
SE15.12.2021
SI15.12.2021
SK15.12.2021
SM15.12.2021
BG15.03.2022
NO15.03.2022
GR16.03.2022
IS15.04.2022
PT18.04.2022
IE18.06.2022
Former [2023/08]AL15.12.2021
AT15.12.2021
CZ15.12.2021
DK15.12.2021
EE15.12.2021
ES15.12.2021
FI15.12.2021
HR15.12.2021
LT15.12.2021
LV15.12.2021
MC15.12.2021
NL15.12.2021
PL15.12.2021
RO15.12.2021
RS15.12.2021
SE15.12.2021
SI15.12.2021
SK15.12.2021
SM15.12.2021
BG15.03.2022
NO15.03.2022
GR16.03.2022
IS15.04.2022
PT18.04.2022
Former [2023/01]AL15.12.2021
AT15.12.2021
CZ15.12.2021
DK15.12.2021
EE15.12.2021
ES15.12.2021
FI15.12.2021
HR15.12.2021
LT15.12.2021
LV15.12.2021
NL15.12.2021
PL15.12.2021
RO15.12.2021
RS15.12.2021
SE15.12.2021
SI15.12.2021
SK15.12.2021
SM15.12.2021
BG15.03.2022
NO15.03.2022
GR16.03.2022
IS15.04.2022
PT18.04.2022
Former [2022/49]AL15.12.2021
AT15.12.2021
CZ15.12.2021
DK15.12.2021
EE15.12.2021
ES15.12.2021
FI15.12.2021
HR15.12.2021
LT15.12.2021
LV15.12.2021
NL15.12.2021
PL15.12.2021
RO15.12.2021
RS15.12.2021
SE15.12.2021
SK15.12.2021
SM15.12.2021
BG15.03.2022
NO15.03.2022
GR16.03.2022
IS15.04.2022
PT18.04.2022
Former [2022/46]AT15.12.2021
CZ15.12.2021
DK15.12.2021
EE15.12.2021
ES15.12.2021
FI15.12.2021
HR15.12.2021
LT15.12.2021
LV15.12.2021
NL15.12.2021
PL15.12.2021
RO15.12.2021
RS15.12.2021
SE15.12.2021
SK15.12.2021
SM15.12.2021
BG15.03.2022
NO15.03.2022
GR16.03.2022
IS15.04.2022
PT18.04.2022
Former [2022/42]AT15.12.2021
CZ15.12.2021
EE15.12.2021
ES15.12.2021
FI15.12.2021
HR15.12.2021
LT15.12.2021
LV15.12.2021
NL15.12.2021
PL15.12.2021
RO15.12.2021
RS15.12.2021
SE15.12.2021
SK15.12.2021
SM15.12.2021
BG15.03.2022
NO15.03.2022
GR16.03.2022
IS15.04.2022
PT18.04.2022
Former [2022/36]AT15.12.2021
CZ15.12.2021
EE15.12.2021
ES15.12.2021
FI15.12.2021
HR15.12.2021
LT15.12.2021
LV15.12.2021
NL15.12.2021
PL15.12.2021
RO15.12.2021
RS15.12.2021
SE15.12.2021
SK15.12.2021
SM15.12.2021
BG15.03.2022
NO15.03.2022
GR16.03.2022
PT18.04.2022
Former [2022/35]CZ15.12.2021
EE15.12.2021
ES15.12.2021
FI15.12.2021
HR15.12.2021
LT15.12.2021
LV15.12.2021
NL15.12.2021
RO15.12.2021
RS15.12.2021
SE15.12.2021
SK15.12.2021
SM15.12.2021
BG15.03.2022
NO15.03.2022
GR16.03.2022
PT18.04.2022
Former [2022/34]EE15.12.2021
ES15.12.2021
FI15.12.2021
HR15.12.2021
LT15.12.2021
LV15.12.2021
NL15.12.2021
RO15.12.2021
RS15.12.2021
SE15.12.2021
SM15.12.2021
BG15.03.2022
NO15.03.2022
GR16.03.2022
PT18.04.2022
Former [2022/33]FI15.12.2021
HR15.12.2021
LT15.12.2021
LV15.12.2021
NL15.12.2021
RS15.12.2021
SE15.12.2021
SM15.12.2021
BG15.03.2022
NO15.03.2022
GR16.03.2022
Former [2022/30]FI15.12.2021
HR15.12.2021
LT15.12.2021
LV15.12.2021
NL15.12.2021
RS15.12.2021
SE15.12.2021
BG15.03.2022
NO15.03.2022
GR16.03.2022
Former [2022/25]FI15.12.2021
HR15.12.2021
LT15.12.2021
LV15.12.2021
RS15.12.2021
SE15.12.2021
BG15.03.2022
NO15.03.2022
GR16.03.2022
Former [2022/24]FI15.12.2021
HR15.12.2021
LT15.12.2021
LV15.12.2021
RS15.12.2021
SE15.12.2021
BG15.03.2022
GR16.03.2022
Former [2022/22]FI15.12.2021
LT15.12.2021
RS15.12.2021
BG15.03.2022
Former [2022/21]RS15.12.2021
BG15.03.2022
Former [2022/19]BG15.03.2022
Documents cited:Search[A]US2006001174  (MATSUI SATOSHI [JP]);
 [YA]US2008173993  (ANDRY PAUL S [US], et al);
 [A]US2010308435  (NOWAK MATTHEW MICHAEL [US], et al);
 [YA]US2011027962  (BERNSTEIN KERRY [US], et al);
 [XDY]FR2968130  (ST MICROELECTRONICS SA [FR], et al);
 [A]US2012258589  (VOLANT RICHARD P [US], et al);
by applicantFR1059919
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.