EP2860847 - Wound stator with optimised filling of slots and corresponding electric machine [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 14.04.2023 Database last updated on 14.06.2024 | |
Former | The patent has been granted Status updated on 06.05.2022 | ||
Former | Grant of patent is intended Status updated on 23.01.2022 | ||
Former | Examination is in progress Status updated on 18.05.2020 | Most recent event Tooltip | 14.06.2024 | Lapse of the patent in a contracting state New state(s): TR | published on 17.07.2024 [2024/29] | Applicant(s) | For all designated states VALEO EQUIPEMENTS ELECTRIQUES MOTEUR 2, rue André Boulle 94046 Créteil Cedex / FR | [2015/16] | Inventor(s) | 01 /
Leroy, Virginie 5 Rocade de Blancheville 93330 Neuilly sur Marne / FR | 02 /
Bouarroudj, Lilya 8 Place de l'Europe 94220 Charenton le Pont / FR | [2015/16] | Representative(s) | Valeo Powertrain Systems Service Propriété Intellectuelle Immeuble le Delta 14, avenue des Béguines 95892 Cergy Pontoise / FR | [2022/23] |
Former [2015/16] | Ribeil, Alexandre Valeo Equipements Electriques Moteur Propriété Industrielle 2, rue André Boulle 94046 Créteil Cedex / FR | Application number, filing date | 14177886.0 | 21.07.2014 | [2015/16] | Priority number, date | FR20130057216 | 23.07.2013 Original published format: FR 1357216 | [2015/16] | Filing language | FR | Procedural language | FR | Publication | Type: | A1 Application with search report | No.: | EP2860847 | Date: | 15.04.2015 | Language: | FR | [2015/16] | Type: | B1 Patent specification | No.: | EP2860847 | Date: | 08.06.2022 | Language: | FR | [2022/23] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 12.03.2015 | Classification | IPC: | H02K1/14, H02K3/34, H02K1/18 | [2015/16] | CPC: |
H02K1/148 (EP);
H02K3/345 (EP);
H02K1/185 (EP)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2015/16] | Title | German: | Bewickelter Stator mit optimierter Nutenfüllung, und entsprechende elektrische Maschine | [2015/16] | English: | Wound stator with optimised filling of slots and corresponding electric machine | [2015/16] | French: | Stator bobiné à remplissage d'encoches optimisé et machine électrique correspondante | [2015/16] | Examination procedure | 23.07.2014 | Examination requested [2015/16] | 09.10.2015 | Amendment by applicant (claims and/or description) | 25.05.2020 | Despatch of a communication from the examining division (Time limit: M06) | 03.12.2020 | Reply to a communication from the examining division | 04.10.2021 | Despatch of a communication from the examining division (Time limit: M02) | 29.11.2021 | Reply to a communication from the examining division | 24.01.2022 | Communication of intention to grant the patent | 02.05.2022 | Fee for grant paid | 02.05.2022 | Fee for publishing/printing paid | 02.05.2022 | Receipt of the translation of the claim(s) | Opposition(s) | 10.03.2023 | No opposition filed within time limit [2023/20] | Fees paid | Renewal fee | 30.06.2016 | Renewal fee patent year 03 | 29.06.2017 | Renewal fee patent year 04 | 26.06.2018 | Renewal fee patent year 05 | 25.06.2019 | Renewal fee patent year 06 | 25.06.2020 | Renewal fee patent year 07 | 23.06.2021 | Renewal fee patent year 08 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 21.07.2014 | AL | 08.06.2022 | AT | 08.06.2022 | CY | 08.06.2022 | CZ | 08.06.2022 | DK | 08.06.2022 | EE | 08.06.2022 | ES | 08.06.2022 | FI | 08.06.2022 | HR | 08.06.2022 | IT | 08.06.2022 | LT | 08.06.2022 | LV | 08.06.2022 | MC | 08.06.2022 | MK | 08.06.2022 | NL | 08.06.2022 | PL | 08.06.2022 | RO | 08.06.2022 | RS | 08.06.2022 | SE | 08.06.2022 | SI | 08.06.2022 | SK | 08.06.2022 | SM | 08.06.2022 | TR | 08.06.2022 | IE | 21.07.2022 | LU | 21.07.2022 | BE | 31.07.2022 | CH | 31.07.2022 | LI | 31.07.2022 | BG | 08.09.2022 | GB | 08.09.2022 | NO | 08.09.2022 | GR | 09.09.2022 | IS | 08.10.2022 | PT | 10.10.2022 | [2024/29] |
Former [2024/22] | HU | 21.07.2014 | |
AL | 08.06.2022 | ||
AT | 08.06.2022 | ||
CY | 08.06.2022 | ||
CZ | 08.06.2022 | ||
DK | 08.06.2022 | ||
EE | 08.06.2022 | ||
ES | 08.06.2022 | ||
FI | 08.06.2022 | ||
HR | 08.06.2022 | ||
IT | 08.06.2022 | ||
LT | 08.06.2022 | ||
LV | 08.06.2022 | ||
MC | 08.06.2022 | ||
MK | 08.06.2022 | ||
NL | 08.06.2022 | ||
PL | 08.06.2022 | ||
RO | 08.06.2022 | ||
RS | 08.06.2022 | ||
SE | 08.06.2022 | ||
SI | 08.06.2022 | ||
SK | 08.06.2022 | ||
SM | 08.06.2022 | ||
IE | 21.07.2022 | ||
LU | 21.07.2022 | ||
BE | 31.07.2022 | ||
CH | 31.07.2022 | ||
LI | 31.07.2022 | ||
BG | 08.09.2022 | ||
GB | 08.09.2022 | ||
NO | 08.09.2022 | ||
GR | 09.09.2022 | ||
IS | 08.10.2022 | ||
PT | 10.10.2022 | ||
Former [2024/20] | HU | 21.07.2014 | |
AL | 08.06.2022 | ||
AT | 08.06.2022 | ||
CY | 08.06.2022 | ||
CZ | 08.06.2022 | ||
DK | 08.06.2022 | ||
EE | 08.06.2022 | ||
ES | 08.06.2022 | ||
FI | 08.06.2022 | ||
HR | 08.06.2022 | ||
IT | 08.06.2022 | ||
LT | 08.06.2022 | ||
LV | 08.06.2022 | ||
MC | 08.06.2022 | ||
NL | 08.06.2022 | ||
PL | 08.06.2022 | ||
RO | 08.06.2022 | ||
RS | 08.06.2022 | ||
SE | 08.06.2022 | ||
SI | 08.06.2022 | ||
SK | 08.06.2022 | ||
SM | 08.06.2022 | ||
IE | 21.07.2022 | ||
LU | 21.07.2022 | ||
BE | 31.07.2022 | ||
CH | 31.07.2022 | ||
LI | 31.07.2022 | ||
BG | 08.09.2022 | ||
GB | 08.09.2022 | ||
NO | 08.09.2022 | ||
GR | 09.09.2022 | ||
IS | 08.10.2022 | ||
PT | 10.10.2022 | ||
Former [2024/18] | HU | 21.07.2014 | |
AL | 08.06.2022 | ||
AT | 08.06.2022 | ||
CZ | 08.06.2022 | ||
DK | 08.06.2022 | ||
EE | 08.06.2022 | ||
ES | 08.06.2022 | ||
FI | 08.06.2022 | ||
HR | 08.06.2022 | ||
IT | 08.06.2022 | ||
LT | 08.06.2022 | ||
LV | 08.06.2022 | ||
MC | 08.06.2022 | ||
NL | 08.06.2022 | ||
PL | 08.06.2022 | ||
RO | 08.06.2022 | ||
RS | 08.06.2022 | ||
SE | 08.06.2022 | ||
SI | 08.06.2022 | ||
SK | 08.06.2022 | ||
SM | 08.06.2022 | ||
IE | 21.07.2022 | ||
LU | 21.07.2022 | ||
BE | 31.07.2022 | ||
CH | 31.07.2022 | ||
LI | 31.07.2022 | ||
BG | 08.09.2022 | ||
GB | 08.09.2022 | ||
NO | 08.09.2022 | ||
GR | 09.09.2022 | ||
IS | 08.10.2022 | ||
PT | 10.10.2022 | ||
Former [2024/11] | AL | 08.06.2022 | |
AT | 08.06.2022 | ||
CZ | 08.06.2022 | ||
DK | 08.06.2022 | ||
EE | 08.06.2022 | ||
ES | 08.06.2022 | ||
FI | 08.06.2022 | ||
HR | 08.06.2022 | ||
IT | 08.06.2022 | ||
LT | 08.06.2022 | ||
LV | 08.06.2022 | ||
MC | 08.06.2022 | ||
NL | 08.06.2022 | ||
PL | 08.06.2022 | ||
RO | 08.06.2022 | ||
RS | 08.06.2022 | ||
SE | 08.06.2022 | ||
SI | 08.06.2022 | ||
SK | 08.06.2022 | ||
SM | 08.06.2022 | ||
IE | 21.07.2022 | ||
LU | 21.07.2022 | ||
BE | 31.07.2022 | ||
CH | 31.07.2022 | ||
LI | 31.07.2022 | ||
BG | 08.09.2022 | ||
GB | 08.09.2022 | ||
NO | 08.09.2022 | ||
GR | 09.09.2022 | ||
IS | 08.10.2022 | ||
PT | 10.10.2022 | ||
Former [2023/47] | AL | 08.06.2022 | |
AT | 08.06.2022 | ||
CZ | 08.06.2022 | ||
DK | 08.06.2022 | ||
EE | 08.06.2022 | ||
ES | 08.06.2022 | ||
FI | 08.06.2022 | ||
HR | 08.06.2022 | ||
LT | 08.06.2022 | ||
LV | 08.06.2022 | ||
MC | 08.06.2022 | ||
NL | 08.06.2022 | ||
PL | 08.06.2022 | ||
RO | 08.06.2022 | ||
RS | 08.06.2022 | ||
SE | 08.06.2022 | ||
SI | 08.06.2022 | ||
SK | 08.06.2022 | ||
SM | 08.06.2022 | ||
IE | 21.07.2022 | ||
LU | 21.07.2022 | ||
BE | 31.07.2022 | ||
CH | 31.07.2022 | ||
LI | 31.07.2022 | ||
BG | 08.09.2022 | ||
GB | 08.09.2022 | ||
NO | 08.09.2022 | ||
GR | 09.09.2022 | ||
IS | 08.10.2022 | ||
PT | 10.10.2022 | ||
Former [2023/33] | AL | 08.06.2022 | |
AT | 08.06.2022 | ||
CZ | 08.06.2022 | ||
DK | 08.06.2022 | ||
EE | 08.06.2022 | ||
ES | 08.06.2022 | ||
FI | 08.06.2022 | ||
HR | 08.06.2022 | ||
LT | 08.06.2022 | ||
LV | 08.06.2022 | ||
MC | 08.06.2022 | ||
NL | 08.06.2022 | ||
PL | 08.06.2022 | ||
RO | 08.06.2022 | ||
RS | 08.06.2022 | ||
SE | 08.06.2022 | ||
SI | 08.06.2022 | ||
SK | 08.06.2022 | ||
SM | 08.06.2022 | ||
IE | 21.07.2022 | ||
LU | 21.07.2022 | ||
BE | 31.07.2022 | ||
CH | 31.07.2022 | ||
LI | 31.07.2022 | ||
BG | 08.09.2022 | ||
NO | 08.09.2022 | ||
GR | 09.09.2022 | ||
IS | 08.10.2022 | ||
PT | 10.10.2022 | ||
Former [2023/25] | AL | 08.06.2022 | |
AT | 08.06.2022 | ||
CZ | 08.06.2022 | ||
DK | 08.06.2022 | ||
EE | 08.06.2022 | ||
ES | 08.06.2022 | ||
FI | 08.06.2022 | ||
HR | 08.06.2022 | ||
LT | 08.06.2022 | ||
LV | 08.06.2022 | ||
MC | 08.06.2022 | ||
NL | 08.06.2022 | ||
PL | 08.06.2022 | ||
RO | 08.06.2022 | ||
RS | 08.06.2022 | ||
SE | 08.06.2022 | ||
SI | 08.06.2022 | ||
SK | 08.06.2022 | ||
SM | 08.06.2022 | ||
LU | 21.07.2022 | ||
BE | 31.07.2022 | ||
CH | 31.07.2022 | ||
LI | 31.07.2022 | ||
BG | 08.09.2022 | ||
NO | 08.09.2022 | ||
GR | 09.09.2022 | ||
IS | 08.10.2022 | ||
PT | 10.10.2022 | ||
Former [2023/21] | AL | 08.06.2022 | |
AT | 08.06.2022 | ||
CZ | 08.06.2022 | ||
DK | 08.06.2022 | ||
EE | 08.06.2022 | ||
ES | 08.06.2022 | ||
FI | 08.06.2022 | ||
HR | 08.06.2022 | ||
LT | 08.06.2022 | ||
LV | 08.06.2022 | ||
MC | 08.06.2022 | ||
NL | 08.06.2022 | ||
PL | 08.06.2022 | ||
RO | 08.06.2022 | ||
RS | 08.06.2022 | ||
SE | 08.06.2022 | ||
SK | 08.06.2022 | ||
SM | 08.06.2022 | ||
LU | 21.07.2022 | ||
CH | 31.07.2022 | ||
LI | 31.07.2022 | ||
BG | 08.09.2022 | ||
NO | 08.09.2022 | ||
GR | 09.09.2022 | ||
IS | 08.10.2022 | ||
PT | 10.10.2022 | ||
Former [2023/17] | AL | 08.06.2022 | |
AT | 08.06.2022 | ||
CZ | 08.06.2022 | ||
EE | 08.06.2022 | ||
ES | 08.06.2022 | ||
FI | 08.06.2022 | ||
HR | 08.06.2022 | ||
LT | 08.06.2022 | ||
LV | 08.06.2022 | ||
MC | 08.06.2022 | ||
NL | 08.06.2022 | ||
PL | 08.06.2022 | ||
RO | 08.06.2022 | ||
RS | 08.06.2022 | ||
SE | 08.06.2022 | ||
SK | 08.06.2022 | ||
SM | 08.06.2022 | ||
BG | 08.09.2022 | ||
NO | 08.09.2022 | ||
GR | 09.09.2022 | ||
IS | 08.10.2022 | ||
PT | 10.10.2022 | ||
Former [2023/16] | AT | 08.06.2022 | |
CZ | 08.06.2022 | ||
EE | 08.06.2022 | ||
ES | 08.06.2022 | ||
FI | 08.06.2022 | ||
HR | 08.06.2022 | ||
LT | 08.06.2022 | ||
LV | 08.06.2022 | ||
MC | 08.06.2022 | ||
NL | 08.06.2022 | ||
PL | 08.06.2022 | ||
RO | 08.06.2022 | ||
RS | 08.06.2022 | ||
SE | 08.06.2022 | ||
SK | 08.06.2022 | ||
SM | 08.06.2022 | ||
BG | 08.09.2022 | ||
NO | 08.09.2022 | ||
GR | 09.09.2022 | ||
IS | 08.10.2022 | ||
PT | 10.10.2022 | ||
Former [2023/12] | AT | 08.06.2022 | |
CZ | 08.06.2022 | ||
EE | 08.06.2022 | ||
ES | 08.06.2022 | ||
FI | 08.06.2022 | ||
HR | 08.06.2022 | ||
LT | 08.06.2022 | ||
LV | 08.06.2022 | ||
NL | 08.06.2022 | ||
PL | 08.06.2022 | ||
RO | 08.06.2022 | ||
RS | 08.06.2022 | ||
SE | 08.06.2022 | ||
SK | 08.06.2022 | ||
SM | 08.06.2022 | ||
BG | 08.09.2022 | ||
NO | 08.09.2022 | ||
GR | 09.09.2022 | ||
IS | 08.10.2022 | ||
PT | 10.10.2022 | ||
Former [2023/11] | AT | 08.06.2022 | |
CZ | 08.06.2022 | ||
EE | 08.06.2022 | ||
ES | 08.06.2022 | ||
FI | 08.06.2022 | ||
HR | 08.06.2022 | ||
LT | 08.06.2022 | ||
LV | 08.06.2022 | ||
NL | 08.06.2022 | ||
PL | 08.06.2022 | ||
RO | 08.06.2022 | ||
RS | 08.06.2022 | ||
SE | 08.06.2022 | ||
SK | 08.06.2022 | ||
SM | 08.06.2022 | ||
BG | 08.09.2022 | ||
NO | 08.09.2022 | ||
GR | 09.09.2022 | ||
PT | 10.10.2022 | ||
Former [2023/09] | AT | 08.06.2022 | |
CZ | 08.06.2022 | ||
EE | 08.06.2022 | ||
ES | 08.06.2022 | ||
FI | 08.06.2022 | ||
HR | 08.06.2022 | ||
LT | 08.06.2022 | ||
LV | 08.06.2022 | ||
NL | 08.06.2022 | ||
RO | 08.06.2022 | ||
RS | 08.06.2022 | ||
SE | 08.06.2022 | ||
SK | 08.06.2022 | ||
SM | 08.06.2022 | ||
BG | 08.09.2022 | ||
NO | 08.09.2022 | ||
GR | 09.09.2022 | ||
PT | 10.10.2022 | ||
Former [2023/07] | AT | 08.06.2022 | |
ES | 08.06.2022 | ||
FI | 08.06.2022 | ||
HR | 08.06.2022 | ||
LT | 08.06.2022 | ||
LV | 08.06.2022 | ||
NL | 08.06.2022 | ||
RS | 08.06.2022 | ||
SE | 08.06.2022 | ||
BG | 08.09.2022 | ||
NO | 08.09.2022 | ||
GR | 09.09.2022 | ||
Former [2023/02] | ES | 08.06.2022 | |
FI | 08.06.2022 | ||
HR | 08.06.2022 | ||
LT | 08.06.2022 | ||
LV | 08.06.2022 | ||
NL | 08.06.2022 | ||
RS | 08.06.2022 | ||
SE | 08.06.2022 | ||
BG | 08.09.2022 | ||
NO | 08.09.2022 | ||
GR | 09.09.2022 | ||
Former [2022/50] | ES | 08.06.2022 | |
FI | 08.06.2022 | ||
HR | 08.06.2022 | ||
LT | 08.06.2022 | ||
LV | 08.06.2022 | ||
RS | 08.06.2022 | ||
SE | 08.06.2022 | ||
BG | 08.09.2022 | ||
NO | 08.09.2022 | ||
GR | 09.09.2022 | ||
Former [2022/49] | ES | 08.06.2022 | |
FI | 08.06.2022 | ||
HR | 08.06.2022 | ||
LT | 08.06.2022 | ||
LV | 08.06.2022 | ||
SE | 08.06.2022 | ||
BG | 08.09.2022 | ||
NO | 08.09.2022 | ||
GR | 09.09.2022 | ||
Former [2022/47] | ES | 08.06.2022 | |
FI | 08.06.2022 | ||
LT | 08.06.2022 | ||
SE | 08.06.2022 | ||
NO | 08.09.2022 | Documents cited: | Search | [Y]US2004124733 (YAMAMOTO NORIAKI [JP], et al) [Y] 13* paragraphs [0057] , [0058]; figures 5,6 *; | [Y]EP1602554 (HITACHI LTD [JP]) [Y] 8,14 * paragraph [0043]; figures 2B, 7 *; | [Y]EP1806822 (TOYOTA MOTOR CO LTD [JP]) [Y] 1-15 * paragraphs [0004] - [0014]; figure 14 *; | [Y]JP2007221913 (SAWAFUJI ELECTRIC CO LTD) [Y] 1-3,5-7,9-12,15 * abstract *; | [Y]US2009085422 (KUSAWAKE KAZUSHI [JP], et al) [Y] 4 * paragraph [0087]; figures 1-7B * | Examination | EP2378629 | by applicant | EP0803962 | EP0831580 | JP2004350450 | FR2890798 | FR20120054733 |