EP2826809 - Improved lightning strike protection [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 04.10.2019 Database last updated on 14.05.2024 | |
Former | The patent has been granted Status updated on 26.10.2018 | ||
Former | Grant of patent is intended Status updated on 06.06.2018 | ||
Former | Examination is in progress Status updated on 22.09.2017 | Most recent event Tooltip | 01.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 03.08.2022 [2022/31] | Applicant(s) | For all designated states Goodrich Corporation Four Coliseum Centre 2730 West Tyvola Road Charlotte, NC 28217 / US | For all designated states Rohr, Inc. 850 Lagoon Drive Chula Vista, CA 91910-2098 / US | [2015/04] | Inventor(s) | 01 /
Pujar, Vijay V 15045 Old Oak Drive Strongsville, OH Ohio 44149 / US | 02 /
Kruckenberg, Teresa M 4350 Maple Avenue La Mesa, CA California 91910-2098 / US | [2015/04] | Representative(s) | Dehns St. Bride's House 10 Salisbury Square London EC4Y 8JD / GB | [N/P] |
Former [2018/48] | Dehns St. Brides House 10 Salisbury Square London EC4Y 8JD / GB | ||
Former [2015/04] | Hall, Matthew Benjamin Dehns St. Bride's House 10 Salisbury Square London EC4Y 8JD / GB | Application number, filing date | 14179852.0 | 27.08.2010 | [2015/04] | Priority number, date | US20090549871 | 28.08.2009 Original published format: US 549871 | [2015/04] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP2826809 | Date: | 21.01.2015 | Language: | EN | [2015/04] | Type: | B1 Patent specification | No.: | EP2826809 | Date: | 28.11.2018 | Language: | EN | [2018/48] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 19.12.2014 | Classification | IPC: | C08J5/00, C08J5/04, D06M11/74 | [2015/04] | CPC: |
B64D45/02 (EP,US);
C08J5/005 (EP,US);
C08J5/042 (EP,US);
D06M11/74 (EP,US);
D06M15/55 (EP,US);
D06M2101/40 (EP,US);
Y10T428/24 (EP,US);
Y10T428/25 (EP,US);
Y10T428/26 (EP,US);
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, SE, SI, SK, SM, TR [2015/35] |
Former [2015/04] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, SE, SI, SK, SM, TR | Title | German: | Verbesserter Blitzschlagschutz | [2015/04] | English: | Improved lightning strike protection | [2015/04] | French: | Protection améliorée contre les impacts de foudre | [2015/04] | Examination procedure | 21.07.2015 | Amendment by applicant (claims and/or description) | 21.07.2015 | Examination requested [2015/35] | 20.09.2017 | Despatch of a communication from the examining division (Time limit: M04) | 29.01.2018 | Reply to a communication from the examining division | 07.06.2018 | Communication of intention to grant the patent | 16.10.2018 | Fee for grant paid | 16.10.2018 | Fee for publishing/printing paid | 16.10.2018 | Receipt of the translation of the claim(s) | Parent application(s) Tooltip | EP10251521.0 / EP2289803 | Opposition(s) | 29.08.2019 | No opposition filed within time limit [2019/45] | Fees paid | Renewal fee | 05.08.2014 | Renewal fee patent year 03 | 05.08.2014 | Renewal fee patent year 04 | 05.08.2014 | Renewal fee patent year 05 | 25.08.2015 | Renewal fee patent year 06 | 24.08.2016 | Renewal fee patent year 07 | 23.08.2017 | Renewal fee patent year 08 | 23.08.2018 | Renewal fee patent year 09 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 27.08.2010 | AL | 28.11.2018 | AT | 28.11.2018 | CY | 28.11.2018 | CZ | 28.11.2018 | DK | 28.11.2018 | EE | 28.11.2018 | ES | 28.11.2018 | FI | 28.11.2018 | HR | 28.11.2018 | IT | 28.11.2018 | LT | 28.11.2018 | LV | 28.11.2018 | MC | 28.11.2018 | MK | 28.11.2018 | MT | 28.11.2018 | NL | 28.11.2018 | PL | 28.11.2018 | RO | 28.11.2018 | SE | 28.11.2018 | SI | 28.11.2018 | SK | 28.11.2018 | SM | 28.11.2018 | TR | 28.11.2018 | BG | 28.02.2019 | NO | 28.02.2019 | GR | 01.03.2019 | IS | 28.03.2019 | PT | 28.03.2019 | IE | 27.08.2019 | LU | 27.08.2019 | [2022/31] |
Former [2021/34] | HU | 27.08.2010 | |
AL | 28.11.2018 | ||
AT | 28.11.2018 | ||
CY | 28.11.2018 | ||
CZ | 28.11.2018 | ||
DK | 28.11.2018 | ||
EE | 28.11.2018 | ||
ES | 28.11.2018 | ||
FI | 28.11.2018 | ||
HR | 28.11.2018 | ||
IT | 28.11.2018 | ||
LT | 28.11.2018 | ||
LV | 28.11.2018 | ||
MC | 28.11.2018 | ||
MT | 28.11.2018 | ||
NL | 28.11.2018 | ||
PL | 28.11.2018 | ||
RO | 28.11.2018 | ||
SE | 28.11.2018 | ||
SI | 28.11.2018 | ||
SK | 28.11.2018 | ||
SM | 28.11.2018 | ||
TR | 28.11.2018 | ||
BG | 28.02.2019 | ||
NO | 28.02.2019 | ||
GR | 01.03.2019 | ||
IS | 28.03.2019 | ||
PT | 28.03.2019 | ||
IE | 27.08.2019 | ||
LU | 27.08.2019 | ||
Former [2021/32] | HU | 27.08.2010 | |
AL | 28.11.2018 | ||
AT | 28.11.2018 | ||
CY | 28.11.2018 | ||
CZ | 28.11.2018 | ||
DK | 28.11.2018 | ||
EE | 28.11.2018 | ||
ES | 28.11.2018 | ||
FI | 28.11.2018 | ||
HR | 28.11.2018 | ||
IT | 28.11.2018 | ||
LT | 28.11.2018 | ||
LV | 28.11.2018 | ||
MC | 28.11.2018 | ||
NL | 28.11.2018 | ||
PL | 28.11.2018 | ||
RO | 28.11.2018 | ||
SE | 28.11.2018 | ||
SI | 28.11.2018 | ||
SK | 28.11.2018 | ||
SM | 28.11.2018 | ||
TR | 28.11.2018 | ||
BG | 28.02.2019 | ||
NO | 28.02.2019 | ||
GR | 01.03.2019 | ||
IS | 28.03.2019 | ||
PT | 28.03.2019 | ||
IE | 27.08.2019 | ||
LU | 27.08.2019 | ||
Former [2021/26] | AL | 28.11.2018 | |
AT | 28.11.2018 | ||
CY | 28.11.2018 | ||
CZ | 28.11.2018 | ||
DK | 28.11.2018 | ||
EE | 28.11.2018 | ||
ES | 28.11.2018 | ||
FI | 28.11.2018 | ||
HR | 28.11.2018 | ||
IT | 28.11.2018 | ||
LT | 28.11.2018 | ||
LV | 28.11.2018 | ||
MC | 28.11.2018 | ||
NL | 28.11.2018 | ||
PL | 28.11.2018 | ||
RO | 28.11.2018 | ||
SE | 28.11.2018 | ||
SI | 28.11.2018 | ||
SK | 28.11.2018 | ||
SM | 28.11.2018 | ||
TR | 28.11.2018 | ||
BG | 28.02.2019 | ||
NO | 28.02.2019 | ||
GR | 01.03.2019 | ||
IS | 28.03.2019 | ||
PT | 28.03.2019 | ||
IE | 27.08.2019 | ||
LU | 27.08.2019 | ||
Former [2020/36] | AL | 28.11.2018 | |
AT | 28.11.2018 | ||
CZ | 28.11.2018 | ||
DK | 28.11.2018 | ||
EE | 28.11.2018 | ||
ES | 28.11.2018 | ||
FI | 28.11.2018 | ||
HR | 28.11.2018 | ||
IT | 28.11.2018 | ||
LT | 28.11.2018 | ||
LV | 28.11.2018 | ||
MC | 28.11.2018 | ||
NL | 28.11.2018 | ||
PL | 28.11.2018 | ||
RO | 28.11.2018 | ||
SE | 28.11.2018 | ||
SI | 28.11.2018 | ||
SK | 28.11.2018 | ||
SM | 28.11.2018 | ||
TR | 28.11.2018 | ||
BG | 28.02.2019 | ||
NO | 28.02.2019 | ||
GR | 01.03.2019 | ||
IS | 28.03.2019 | ||
PT | 28.03.2019 | ||
IE | 27.08.2019 | ||
LU | 27.08.2019 | ||
Former [2020/25] | AL | 28.11.2018 | |
AT | 28.11.2018 | ||
CZ | 28.11.2018 | ||
DK | 28.11.2018 | ||
EE | 28.11.2018 | ||
ES | 28.11.2018 | ||
FI | 28.11.2018 | ||
HR | 28.11.2018 | ||
IT | 28.11.2018 | ||
LT | 28.11.2018 | ||
LV | 28.11.2018 | ||
MC | 28.11.2018 | ||
NL | 28.11.2018 | ||
PL | 28.11.2018 | ||
RO | 28.11.2018 | ||
SE | 28.11.2018 | ||
SI | 28.11.2018 | ||
SK | 28.11.2018 | ||
SM | 28.11.2018 | ||
TR | 28.11.2018 | ||
BG | 28.02.2019 | ||
NO | 28.02.2019 | ||
GR | 01.03.2019 | ||
IS | 28.03.2019 | ||
PT | 28.03.2019 | ||
LU | 27.08.2019 | ||
Former [2020/17] | AL | 28.11.2018 | |
AT | 28.11.2018 | ||
CZ | 28.11.2018 | ||
DK | 28.11.2018 | ||
EE | 28.11.2018 | ||
ES | 28.11.2018 | ||
FI | 28.11.2018 | ||
HR | 28.11.2018 | ||
IT | 28.11.2018 | ||
LT | 28.11.2018 | ||
LV | 28.11.2018 | ||
NL | 28.11.2018 | ||
PL | 28.11.2018 | ||
RO | 28.11.2018 | ||
SE | 28.11.2018 | ||
SI | 28.11.2018 | ||
SK | 28.11.2018 | ||
SM | 28.11.2018 | ||
TR | 28.11.2018 | ||
BG | 28.02.2019 | ||
NO | 28.02.2019 | ||
GR | 01.03.2019 | ||
IS | 28.03.2019 | ||
PT | 28.03.2019 | ||
Former [2019/50] | AL | 28.11.2018 | |
AT | 28.11.2018 | ||
CZ | 28.11.2018 | ||
DK | 28.11.2018 | ||
EE | 28.11.2018 | ||
ES | 28.11.2018 | ||
FI | 28.11.2018 | ||
HR | 28.11.2018 | ||
IT | 28.11.2018 | ||
LT | 28.11.2018 | ||
LV | 28.11.2018 | ||
NL | 28.11.2018 | ||
PL | 28.11.2018 | ||
RO | 28.11.2018 | ||
SE | 28.11.2018 | ||
SI | 28.11.2018 | ||
SK | 28.11.2018 | ||
SM | 28.11.2018 | ||
BG | 28.02.2019 | ||
NO | 28.02.2019 | ||
GR | 01.03.2019 | ||
IS | 28.03.2019 | ||
PT | 28.03.2019 | ||
Former [2019/40] | AL | 28.11.2018 | |
AT | 28.11.2018 | ||
CZ | 28.11.2018 | ||
DK | 28.11.2018 | ||
EE | 28.11.2018 | ||
ES | 28.11.2018 | ||
FI | 28.11.2018 | ||
HR | 28.11.2018 | ||
IT | 28.11.2018 | ||
LT | 28.11.2018 | ||
LV | 28.11.2018 | ||
NL | 28.11.2018 | ||
PL | 28.11.2018 | ||
RO | 28.11.2018 | ||
SE | 28.11.2018 | ||
SK | 28.11.2018 | ||
SM | 28.11.2018 | ||
BG | 28.02.2019 | ||
NO | 28.02.2019 | ||
GR | 01.03.2019 | ||
IS | 28.03.2019 | ||
PT | 28.03.2019 | ||
Former [2019/37] | AL | 28.11.2018 | |
AT | 28.11.2018 | ||
CZ | 28.11.2018 | ||
DK | 28.11.2018 | ||
EE | 28.11.2018 | ||
ES | 28.11.2018 | ||
FI | 28.11.2018 | ||
HR | 28.11.2018 | ||
IT | 28.11.2018 | ||
LT | 28.11.2018 | ||
LV | 28.11.2018 | ||
NL | 28.11.2018 | ||
PL | 28.11.2018 | ||
RO | 28.11.2018 | ||
SE | 28.11.2018 | ||
SM | 28.11.2018 | ||
BG | 28.02.2019 | ||
NO | 28.02.2019 | ||
GR | 01.03.2019 | ||
IS | 28.03.2019 | ||
PT | 28.03.2019 | ||
Former [2019/35] | AL | 28.11.2018 | |
AT | 28.11.2018 | ||
CZ | 28.11.2018 | ||
DK | 28.11.2018 | ||
ES | 28.11.2018 | ||
FI | 28.11.2018 | ||
HR | 28.11.2018 | ||
IT | 28.11.2018 | ||
LT | 28.11.2018 | ||
LV | 28.11.2018 | ||
NL | 28.11.2018 | ||
PL | 28.11.2018 | ||
SE | 28.11.2018 | ||
BG | 28.02.2019 | ||
NO | 28.02.2019 | ||
GR | 01.03.2019 | ||
IS | 28.03.2019 | ||
PT | 28.03.2019 | ||
Former [2019/34] | AL | 28.11.2018 | |
AT | 28.11.2018 | ||
DK | 28.11.2018 | ||
ES | 28.11.2018 | ||
FI | 28.11.2018 | ||
HR | 28.11.2018 | ||
IT | 28.11.2018 | ||
LT | 28.11.2018 | ||
LV | 28.11.2018 | ||
NL | 28.11.2018 | ||
SE | 28.11.2018 | ||
BG | 28.02.2019 | ||
NO | 28.02.2019 | ||
GR | 01.03.2019 | ||
IS | 28.03.2019 | ||
PT | 28.03.2019 | ||
Former [2019/30] | AL | 28.11.2018 | |
AT | 28.11.2018 | ||
ES | 28.11.2018 | ||
FI | 28.11.2018 | ||
HR | 28.11.2018 | ||
LT | 28.11.2018 | ||
LV | 28.11.2018 | ||
NL | 28.11.2018 | ||
SE | 28.11.2018 | ||
BG | 28.02.2019 | ||
NO | 28.02.2019 | ||
GR | 01.03.2019 | ||
IS | 28.03.2019 | ||
PT | 28.03.2019 | ||
Former [2019/26] | AL | 28.11.2018 | |
AT | 28.11.2018 | ||
ES | 28.11.2018 | ||
FI | 28.11.2018 | ||
HR | 28.11.2018 | ||
LT | 28.11.2018 | ||
LV | 28.11.2018 | ||
SE | 28.11.2018 | ||
BG | 28.02.2019 | ||
NO | 28.02.2019 | ||
GR | 01.03.2019 | ||
IS | 28.03.2019 | ||
PT | 28.03.2019 | ||
Former [2019/24] | AT | 28.11.2018 | |
ES | 28.11.2018 | ||
FI | 28.11.2018 | ||
HR | 28.11.2018 | ||
LT | 28.11.2018 | ||
LV | 28.11.2018 | ||
SE | 28.11.2018 | ||
BG | 28.02.2019 | ||
NO | 28.02.2019 | ||
GR | 01.03.2019 | ||
IS | 28.03.2019 | ||
Former [2019/23] | AT | 28.11.2018 | |
ES | 28.11.2018 | ||
FI | 28.11.2018 | ||
HR | 28.11.2018 | ||
LT | 28.11.2018 | ||
LV | 28.11.2018 | ||
BG | 28.02.2019 | ||
NO | 28.02.2019 | ||
IS | 28.03.2019 | ||
Former [2019/22] | FI | 28.11.2018 | |
LT | 28.11.2018 | ||
BG | 28.02.2019 | ||
NO | 28.02.2019 | ||
IS | 28.03.2019 | ||
Former [2019/21] | FI | 28.11.2018 | |
LT | 28.11.2018 | ||
NO | 28.02.2019 | ||
IS | 28.03.2019 | ||
Former [2019/20] | LT | 28.11.2018 | |
NO | 28.02.2019 | Documents cited: | Search | [XI]JP2003239171 (TORAY INDUSTRIES) [X] 11,13 * the whole document * [I] 12; | [Y]US2004067364 (ISHIKAWA TAKASHI [JP], et al) [Y] 11-13 * paragraphs [0001] - [0029]; figures 1-3; claims 1-4 *; | [X]WO2005028174 (UNIV RICE WILLIAM M [US], et al) [X] 11-13 * paragraphs [0001] - [0106]; figures 1-18; claims 1-90 *; | [X]US2007128960 (GHASEMI NEJHAD MOHAMMAD N [US], et al) [X] 11-13 * paragraphs [0001] - [0091]; claims 1-24 *; | [X]WO2007130979 (ROHR INC [US], et al) [X] 11-13 * paragraphs [0001] - [0097]; figures 1-4; claims 1-67 *; | [Y]WO2007136613 (UNIV DAYTON [US], et al) [Y] 11-13 * page 1, line 1 - page 8, line l; claims 1-18 *; | [X]WO2008054409 (UNIV HAWAII [US], et al) [X] 11-13 * paragraphs [0001] - [0086]; claims 1-24 *; | [Y]US2009140098 (LENGSFELD HAUKE [DE], et al) [Y] 11-13 * paragraphs [0001] - [0055]; figures 1-4; claims 1-7 *; | [E]WO2010144161 (LOCKHEED CORP [US], et al) [E] 11-13* paragraphs [0001] - [0229]; claims 1-33 *; | [XI] - HONMA M ET AL, "Carbon fiber for electroconductive molded product, contains preset amount of vapor phase epitaxial carbon fiber and/or carbon nanotube", WPI / THOMSON, (20071025), XP002455574 [X] 11,13 * abstract * [I] 12 | by applicant | US5417385 | US5470413 | WO2007US11577 |