EP2845879 - Tube connectors based on a polyamide composition [Right-click to bookmark this link] | Status | Opposition rejected Status updated on 05.08.2022 Database last updated on 13.07.2024 | |
Former | The patent has been granted Status updated on 19.10.2018 | ||
Former | Grant of patent is intended Status updated on 08.07.2018 | ||
Former | Examination is in progress Status updated on 18.11.2016 | Most recent event Tooltip | 05.08.2022 | Opposition rejected | published on 07.09.2022 [2022/36] | Applicant(s) | For all designated states ARKEMA FRANCE 420, rue d'Estienne d'Orves 92700 Colombes / FR | [2015/11] | Inventor(s) | 01 /
Li, Zhenzhong Suzhou Hipro Polymers Co. Ltd. Feixiang Chemical Concentrate Zone, Zhangjiagang 215-613 PR Jiangsu / CN | 02 /
Deyrail, Yves 5 La sente Louvet 27930 Aviron / FR | 03 /
Montanari, Thibaut Résidence Les Hauts de Menneval - Maison 3 Rue du Pré-Hardy MENNEVAL 27300 / FR | 04 /
Benet, Sylvain 9, chemin du bois d'Alençon 27300 BERNAY / FR | [2015/11] | Representative(s) | Arkema Patent Arkema France DRD-DPI 420, rue d'Estienne d'Orves 92705 Colombes Cedex / FR | [N/P] | Application number, filing date | 14180208.2 | 07.08.2014 | [2015/11] | Priority number, date | FR20130058494 | 05.09.2013 Original published format: FR 1358494 | [2015/11] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP2845879 | Date: | 11.03.2015 | Language: | EN | [2015/11] | Type: | B1 Patent specification | No.: | EP2845879 | Date: | 21.11.2018 | Language: | EN | [2018/47] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 06.10.2014 | Classification | IPC: | C08L77/02, C08L77/06, // B29C65/00 | [2015/11] | CPC: |
C08L77/06 (EP,CN,KR,US);
B29C45/0001 (KR,US);
B29D23/003 (KR,US);
C08K7/14 (EP,KR,US);
C08L77/02 (EP,CN,US);
F16L47/02 (EP,KR,US);
B29K2077/00 (EP,US);
B29K2077/10 (KR);
C08L2203/18 (CN,KR);
C08L2205/02 (EP,US);
C08L2205/025 (EP,CN,KR,US);
C08L2205/03 (CN);
| C-Set: |
C08L77/02, C08K7/14, C08L77/06 (EP,US);
C08L77/02, C08L77/06, C08L23/16, C08K7/14 (CN);
C08L77/02, C08L77/06, C08L77/02, C08K7/14 (CN);
C08L77/06, C08K7/14, C08L77/02 (US,EP);
C08L77/06, C08L77/02, C08K7/06 (CN);
C08L77/06, C08L77/02, C08K7/14 (CN); | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2015/19] |
Former [2015/11] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | Schlauchverbinder auf Basis einer Polyamidzusammensetzung | [2015/11] | English: | Tube connectors based on a polyamide composition | [2015/11] | French: | Raccords de tube sur la base d'une composition de polyamide | [2015/11] | Examination procedure | 31.03.2015 | Amendment by applicant (claims and/or description) | 31.03.2015 | Examination requested [2015/19] | 22.11.2016 | Despatch of a communication from the examining division (Time limit: M06) | 11.07.2017 | Reply to a communication from the examining division | 26.07.2017 | Despatch of a communication from the examining division (Time limit: M06) | 06.03.2018 | Despatch of communication that the application is deemed to be withdrawn, reason: reply to the communication from the examining division not received in time | 15.05.2018 | Reply to a communication from the examining division | 09.07.2018 | Communication of intention to grant the patent | 10.10.2018 | Fee for grant paid | 10.10.2018 | Fee for publishing/printing paid | 10.10.2018 | Receipt of the translation of the claim(s) | Opposition(s) | Opponent(s) | 01
21.08.2019
27.08.2019
ADMISSIBLE EMS-CHEMIE AG Via Innovativa 1 7013 Domat/Ems / CH | [2021/03] |
Former [2019/40] | |||
Opponent(s) | 01
21.08.2019
27.08.2019
ADMISSIBLE EMS-PATENT AG Via Innovativa 1 7013 Domats/Ems / CH | 05.09.2019 | Invitation to proprietor to file observations on the notice of opposition | 15.01.2020 | Reply of patent proprietor to notice(s) of opposition | 03.07.2020 | Despatch of a communication from the opposition division (Time limit: M04) | 13.11.2020 | Reply to a communication from the opposition division | 17.01.2022 | Cancellation of oral proceeding that was planned for 04.05.2022 | 20.04.2022 | Date of despatch of rejection of opposition | 30.04.2022 | Legal effect of rejection of opposition [2022/36] | 04.05.2022 | Date of oral proceedings | Request for further processing for: | The application is deemed to be withdrawn due to failure to reply to the examination report | 15.05.2018 | Request for further processing filed | 15.05.2018 | Full payment received (date of receipt of payment) Request granted | 24.05.2018 | Decision despatched | The application is deemed to be withdrawn due to failure to reply to the examination report | 11.07.2017 | Request for further processing filed | 11.07.2017 | Full payment received (date of receipt of payment) Request granted | 21.07.2017 | Decision despatched | Fees paid | Renewal fee | 11.08.2016 | Renewal fee patent year 03 | 14.08.2017 | Renewal fee patent year 04 | 10.08.2018 | Renewal fee patent year 05 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 07.08.2014 | AL | 21.11.2018 | AT | 21.11.2018 | CY | 21.11.2018 | CZ | 21.11.2018 | DK | 21.11.2018 | EE | 21.11.2018 | ES | 21.11.2018 | FI | 21.11.2018 | HR | 21.11.2018 | IT | 21.11.2018 | LT | 21.11.2018 | LV | 21.11.2018 | MC | 21.11.2018 | MK | 21.11.2018 | MT | 21.11.2018 | NL | 21.11.2018 | PL | 21.11.2018 | RO | 21.11.2018 | RS | 21.11.2018 | SI | 21.11.2018 | SK | 21.11.2018 | SM | 21.11.2018 | TR | 21.11.2018 | BG | 21.02.2019 | NO | 21.02.2019 | GR | 22.02.2019 | IS | 21.03.2019 | PT | 21.03.2019 | IE | 07.08.2019 | LU | 07.08.2019 | BE | 31.08.2019 | CH | 31.08.2019 | LI | 31.08.2019 | SE | 08.08.2021 | [2022/31] |
Former [2022/25] | HU | 07.08.2014 | |
AL | 21.11.2018 | ||
AT | 21.11.2018 | ||
CY | 21.11.2018 | ||
CZ | 21.11.2018 | ||
DK | 21.11.2018 | ||
EE | 21.11.2018 | ||
ES | 21.11.2018 | ||
FI | 21.11.2018 | ||
HR | 21.11.2018 | ||
IT | 21.11.2018 | ||
LT | 21.11.2018 | ||
LV | 21.11.2018 | ||
MC | 21.11.2018 | ||
MT | 21.11.2018 | ||
NL | 21.11.2018 | ||
PL | 21.11.2018 | ||
RO | 21.11.2018 | ||
RS | 21.11.2018 | ||
SI | 21.11.2018 | ||
SK | 21.11.2018 | ||
SM | 21.11.2018 | ||
TR | 21.11.2018 | ||
BG | 21.02.2019 | ||
NO | 21.02.2019 | ||
GR | 22.02.2019 | ||
IS | 21.03.2019 | ||
PT | 21.03.2019 | ||
IE | 07.08.2019 | ||
LU | 07.08.2019 | ||
BE | 31.08.2019 | ||
CH | 31.08.2019 | ||
LI | 31.08.2019 | ||
SE | 08.08.2021 | ||
Former [2021/34] | HU | 07.08.2014 | |
AL | 21.11.2018 | ||
AT | 21.11.2018 | ||
CY | 21.11.2018 | ||
CZ | 21.11.2018 | ||
DK | 21.11.2018 | ||
EE | 21.11.2018 | ||
ES | 21.11.2018 | ||
FI | 21.11.2018 | ||
HR | 21.11.2018 | ||
IT | 21.11.2018 | ||
LT | 21.11.2018 | ||
LV | 21.11.2018 | ||
MC | 21.11.2018 | ||
MT | 21.11.2018 | ||
NL | 21.11.2018 | ||
PL | 21.11.2018 | ||
RO | 21.11.2018 | ||
RS | 21.11.2018 | ||
SI | 21.11.2018 | ||
SK | 21.11.2018 | ||
SM | 21.11.2018 | ||
TR | 21.11.2018 | ||
BG | 21.02.2019 | ||
NO | 21.02.2019 | ||
GR | 22.02.2019 | ||
IS | 21.03.2019 | ||
PT | 21.03.2019 | ||
IE | 07.08.2019 | ||
LU | 07.08.2019 | ||
BE | 31.08.2019 | ||
CH | 31.08.2019 | ||
LI | 31.08.2019 | ||
Former [2021/32] | HU | 07.08.2014 | |
AL | 21.11.2018 | ||
AT | 21.11.2018 | ||
CY | 21.11.2018 | ||
CZ | 21.11.2018 | ||
DK | 21.11.2018 | ||
EE | 21.11.2018 | ||
ES | 21.11.2018 | ||
FI | 21.11.2018 | ||
HR | 21.11.2018 | ||
IT | 21.11.2018 | ||
LT | 21.11.2018 | ||
LV | 21.11.2018 | ||
MC | 21.11.2018 | ||
NL | 21.11.2018 | ||
PL | 21.11.2018 | ||
RO | 21.11.2018 | ||
RS | 21.11.2018 | ||
SI | 21.11.2018 | ||
SK | 21.11.2018 | ||
SM | 21.11.2018 | ||
TR | 21.11.2018 | ||
BG | 21.02.2019 | ||
NO | 21.02.2019 | ||
GR | 22.02.2019 | ||
IS | 21.03.2019 | ||
PT | 21.03.2019 | ||
IE | 07.08.2019 | ||
LU | 07.08.2019 | ||
BE | 31.08.2019 | ||
CH | 31.08.2019 | ||
LI | 31.08.2019 | ||
Former [2021/26] | AL | 21.11.2018 | |
AT | 21.11.2018 | ||
CY | 21.11.2018 | ||
CZ | 21.11.2018 | ||
DK | 21.11.2018 | ||
EE | 21.11.2018 | ||
ES | 21.11.2018 | ||
FI | 21.11.2018 | ||
HR | 21.11.2018 | ||
IT | 21.11.2018 | ||
LT | 21.11.2018 | ||
LV | 21.11.2018 | ||
MC | 21.11.2018 | ||
NL | 21.11.2018 | ||
PL | 21.11.2018 | ||
RO | 21.11.2018 | ||
RS | 21.11.2018 | ||
SI | 21.11.2018 | ||
SK | 21.11.2018 | ||
SM | 21.11.2018 | ||
TR | 21.11.2018 | ||
BG | 21.02.2019 | ||
NO | 21.02.2019 | ||
GR | 22.02.2019 | ||
IS | 21.03.2019 | ||
PT | 21.03.2019 | ||
IE | 07.08.2019 | ||
LU | 07.08.2019 | ||
BE | 31.08.2019 | ||
CH | 31.08.2019 | ||
LI | 31.08.2019 | ||
Former [2020/38] | AL | 21.11.2018 | |
AT | 21.11.2018 | ||
CZ | 21.11.2018 | ||
DK | 21.11.2018 | ||
EE | 21.11.2018 | ||
ES | 21.11.2018 | ||
FI | 21.11.2018 | ||
HR | 21.11.2018 | ||
IT | 21.11.2018 | ||
LT | 21.11.2018 | ||
LV | 21.11.2018 | ||
MC | 21.11.2018 | ||
NL | 21.11.2018 | ||
PL | 21.11.2018 | ||
RO | 21.11.2018 | ||
RS | 21.11.2018 | ||
SI | 21.11.2018 | ||
SK | 21.11.2018 | ||
SM | 21.11.2018 | ||
TR | 21.11.2018 | ||
BG | 21.02.2019 | ||
NO | 21.02.2019 | ||
GR | 22.02.2019 | ||
IS | 21.03.2019 | ||
PT | 21.03.2019 | ||
IE | 07.08.2019 | ||
LU | 07.08.2019 | ||
BE | 31.08.2019 | ||
CH | 31.08.2019 | ||
LI | 31.08.2019 | ||
Former [2020/36] | AL | 21.11.2018 | |
AT | 21.11.2018 | ||
CZ | 21.11.2018 | ||
DK | 21.11.2018 | ||
EE | 21.11.2018 | ||
ES | 21.11.2018 | ||
FI | 21.11.2018 | ||
HR | 21.11.2018 | ||
IT | 21.11.2018 | ||
LT | 21.11.2018 | ||
LV | 21.11.2018 | ||
MC | 21.11.2018 | ||
NL | 21.11.2018 | ||
PL | 21.11.2018 | ||
RO | 21.11.2018 | ||
RS | 21.11.2018 | ||
SI | 21.11.2018 | ||
SK | 21.11.2018 | ||
SM | 21.11.2018 | ||
TR | 21.11.2018 | ||
BG | 21.02.2019 | ||
NO | 21.02.2019 | ||
GR | 22.02.2019 | ||
IS | 21.03.2019 | ||
PT | 21.03.2019 | ||
IE | 07.08.2019 | ||
LU | 07.08.2019 | ||
CH | 31.08.2019 | ||
LI | 31.08.2019 | ||
Former [2020/25] | AL | 21.11.2018 | |
AT | 21.11.2018 | ||
CZ | 21.11.2018 | ||
DK | 21.11.2018 | ||
EE | 21.11.2018 | ||
ES | 21.11.2018 | ||
FI | 21.11.2018 | ||
HR | 21.11.2018 | ||
IT | 21.11.2018 | ||
LT | 21.11.2018 | ||
LV | 21.11.2018 | ||
MC | 21.11.2018 | ||
NL | 21.11.2018 | ||
PL | 21.11.2018 | ||
RO | 21.11.2018 | ||
RS | 21.11.2018 | ||
SI | 21.11.2018 | ||
SK | 21.11.2018 | ||
SM | 21.11.2018 | ||
TR | 21.11.2018 | ||
BG | 21.02.2019 | ||
NO | 21.02.2019 | ||
GR | 22.02.2019 | ||
IS | 21.03.2019 | ||
PT | 21.03.2019 | ||
LU | 07.08.2019 | ||
CH | 31.08.2019 | ||
LI | 31.08.2019 | ||
Former [2020/17] | AL | 21.11.2018 | |
AT | 21.11.2018 | ||
CZ | 21.11.2018 | ||
DK | 21.11.2018 | ||
EE | 21.11.2018 | ||
ES | 21.11.2018 | ||
FI | 21.11.2018 | ||
HR | 21.11.2018 | ||
IT | 21.11.2018 | ||
LT | 21.11.2018 | ||
LV | 21.11.2018 | ||
NL | 21.11.2018 | ||
PL | 21.11.2018 | ||
RO | 21.11.2018 | ||
RS | 21.11.2018 | ||
SI | 21.11.2018 | ||
SK | 21.11.2018 | ||
SM | 21.11.2018 | ||
TR | 21.11.2018 | ||
BG | 21.02.2019 | ||
NO | 21.02.2019 | ||
GR | 22.02.2019 | ||
IS | 21.03.2019 | ||
PT | 21.03.2019 | ||
Former [2019/50] | AL | 21.11.2018 | |
AT | 21.11.2018 | ||
CZ | 21.11.2018 | ||
DK | 21.11.2018 | ||
EE | 21.11.2018 | ||
ES | 21.11.2018 | ||
FI | 21.11.2018 | ||
HR | 21.11.2018 | ||
IT | 21.11.2018 | ||
LT | 21.11.2018 | ||
LV | 21.11.2018 | ||
NL | 21.11.2018 | ||
PL | 21.11.2018 | ||
RO | 21.11.2018 | ||
RS | 21.11.2018 | ||
SI | 21.11.2018 | ||
SK | 21.11.2018 | ||
SM | 21.11.2018 | ||
BG | 21.02.2019 | ||
NO | 21.02.2019 | ||
GR | 22.02.2019 | ||
IS | 21.03.2019 | ||
PT | 21.03.2019 | ||
Former [2019/40] | AL | 21.11.2018 | |
AT | 21.11.2018 | ||
CZ | 21.11.2018 | ||
DK | 21.11.2018 | ||
EE | 21.11.2018 | ||
ES | 21.11.2018 | ||
FI | 21.11.2018 | ||
HR | 21.11.2018 | ||
IT | 21.11.2018 | ||
LT | 21.11.2018 | ||
LV | 21.11.2018 | ||
NL | 21.11.2018 | ||
PL | 21.11.2018 | ||
RO | 21.11.2018 | ||
RS | 21.11.2018 | ||
SK | 21.11.2018 | ||
SM | 21.11.2018 | ||
BG | 21.02.2019 | ||
NO | 21.02.2019 | ||
GR | 22.02.2019 | ||
IS | 21.03.2019 | ||
PT | 21.03.2019 | ||
Former [2019/37] | AL | 21.11.2018 | |
AT | 21.11.2018 | ||
CZ | 21.11.2018 | ||
DK | 21.11.2018 | ||
EE | 21.11.2018 | ||
ES | 21.11.2018 | ||
FI | 21.11.2018 | ||
HR | 21.11.2018 | ||
IT | 21.11.2018 | ||
LT | 21.11.2018 | ||
LV | 21.11.2018 | ||
NL | 21.11.2018 | ||
PL | 21.11.2018 | ||
RO | 21.11.2018 | ||
RS | 21.11.2018 | ||
SM | 21.11.2018 | ||
BG | 21.02.2019 | ||
NO | 21.02.2019 | ||
GR | 22.02.2019 | ||
IS | 21.03.2019 | ||
PT | 21.03.2019 | ||
Former [2019/35] | AL | 21.11.2018 | |
AT | 21.11.2018 | ||
CZ | 21.11.2018 | ||
DK | 21.11.2018 | ||
ES | 21.11.2018 | ||
FI | 21.11.2018 | ||
HR | 21.11.2018 | ||
IT | 21.11.2018 | ||
LT | 21.11.2018 | ||
LV | 21.11.2018 | ||
NL | 21.11.2018 | ||
PL | 21.11.2018 | ||
RS | 21.11.2018 | ||
BG | 21.02.2019 | ||
NO | 21.02.2019 | ||
GR | 22.02.2019 | ||
IS | 21.03.2019 | ||
PT | 21.03.2019 | ||
Former [2019/34] | AL | 21.11.2018 | |
AT | 21.11.2018 | ||
DK | 21.11.2018 | ||
ES | 21.11.2018 | ||
FI | 21.11.2018 | ||
HR | 21.11.2018 | ||
IT | 21.11.2018 | ||
LT | 21.11.2018 | ||
LV | 21.11.2018 | ||
NL | 21.11.2018 | ||
RS | 21.11.2018 | ||
BG | 21.02.2019 | ||
NO | 21.02.2019 | ||
GR | 22.02.2019 | ||
IS | 21.03.2019 | ||
PT | 21.03.2019 | ||
Former [2019/26] | AL | 21.11.2018 | |
AT | 21.11.2018 | ||
ES | 21.11.2018 | ||
FI | 21.11.2018 | ||
HR | 21.11.2018 | ||
LT | 21.11.2018 | ||
LV | 21.11.2018 | ||
NL | 21.11.2018 | ||
RS | 21.11.2018 | ||
BG | 21.02.2019 | ||
NO | 21.02.2019 | ||
GR | 22.02.2019 | ||
IS | 21.03.2019 | ||
PT | 21.03.2019 | ||
Former [2019/25] | AT | 21.11.2018 | |
ES | 21.11.2018 | ||
FI | 21.11.2018 | ||
HR | 21.11.2018 | ||
LT | 21.11.2018 | ||
LV | 21.11.2018 | ||
NL | 21.11.2018 | ||
RS | 21.11.2018 | ||
BG | 21.02.2019 | ||
NO | 21.02.2019 | ||
GR | 22.02.2019 | ||
IS | 21.03.2019 | ||
Former [2019/24] | AT | 21.11.2018 | |
ES | 21.11.2018 | ||
FI | 21.11.2018 | ||
HR | 21.11.2018 | ||
LT | 21.11.2018 | ||
LV | 21.11.2018 | ||
NL | 21.11.2018 | ||
BG | 21.02.2019 | ||
NO | 21.02.2019 | ||
GR | 22.02.2019 | ||
IS | 21.03.2019 | ||
Former [2019/23] | AT | 21.11.2018 | |
ES | 21.11.2018 | ||
FI | 21.11.2018 | ||
HR | 21.11.2018 | ||
LT | 21.11.2018 | ||
LV | 21.11.2018 | ||
NL | 21.11.2018 | ||
BG | 21.02.2019 | ||
NO | 21.02.2019 | ||
IS | 21.03.2019 | ||
Former [2019/22] | FI | 21.11.2018 | |
LT | 21.11.2018 | ||
BG | 21.02.2019 | ||
NO | 21.02.2019 | ||
IS | 21.03.2019 | ||
Former [2019/21] | FI | 21.11.2018 | |
LT | 21.11.2018 | ||
NO | 21.02.2019 | ||
IS | 21.03.2019 | ||
Former [2019/20] | LT | 21.11.2018 | |
NO | 21.02.2019 | Documents cited: | Search | [XI]EP1195419 (UBE INDUSTRIES [JP]) [X] 1-8,15,17,19 * paragraph [0001] * * paragraph [0005] - paragraph [0015] * * paragraph [0023] - paragraph [0025] * * paragraph [0032] * * paragraph [0035] - paragraph [0036] * * paragraph [0045] - paragraph [0047] * * examples 6-18 * * claims 1-3,5,8,9,11,14,15,18-20 * * figures 1,2 * [I] 16,20; | [A]WO2009027231 (EVONIK DEGUSSA GMBH [DE], et al) [A] 1-20 * page 1, line 3 - line 5 * * page 2, line 9 - line 24 * * page 5, line 10 - line 12 * * page 6, line 15 - line 23 ** claims 1-6 *; | [I]EP2290004 (EMS PATENT AG [CH]) [I] 1-20 * paragraph [0001] * * paragraph [0018] - paragraph [0020] * * paragraph [0030] - paragraph [0032] * * paragraph [0045] - paragraph [0053] * * paragraph [0066] - paragraph [0069] * * example - * * claims 1,2,7-12,17,19,22 *; | [I]WO2011120949 (BASF SE [DE], et al) [I] 1-8,17-20 * page 1, line 5 - line 21 * * page 2, line 27 - page 3, line 9 * * page 13, line 34 - page 14, line 19 * * example - * * claims 1,8,9 * | by applicant | US2705227 | US2012279605 | Opposition | EP0635670 | EP0735098 | EP0997496 | US2005121105 | EP1552916 | EP1860134 | US2009252979 | EP2703435 | - "Polyphthalamides", M. I. KOHAN, Nylon Plastics Handbook, Hanser, (19950000), pages 592 - 593, XP055637945 | - "Ultrasonic Welding", M. I. KOHAN, Nylon Plastics Handbook, Hanser, (19950000), pages 464 - 470, XP055637946 | - "Welding", J.W. GOOCH, Encyclopedic Dictionary of Polymers, Springer, (20070000), page 1064, XP055637949 DOI: http://dx.doi.org/10.1007/978-0-387-30160-0_12532 | - "Schweißen", Becker / Braun, Polyamide. Kunststoff Handbuch 3 / 4, Hanser, (19980000), pages 440 - 441, XP055637951 | - ISO, "Plastics—Injection moulding of test specimens of thermoplastic materials— Part 4: Determination of moulding shrinkage", ISO 294-4, (20011215), XP009510450 | - Thomas S. Ellis, "Mixing relationships in aliphatic polyamide blends", Polymer, (19920100), vol. 33, no. 7, pages 1469 - 1476, XP023898577 DOI: http://dx.doi.org/10.1016/0032-3861(92)90124-F |