blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP2982780

EP2982780 - METHOD FOR PREPARING A SILICON BLOCK, MOULD MADE OF QUARTZ GLASS OR QUARTZ SUITABLE FOR THAT METHOD, AND METHOD FOR THE PREPARATION OF SAME [Right-click to bookmark this link]
Former [2016/06]Mould made of quartz glass or quartz and method for the preparation of same
[2019/31]
StatusNo opposition filed within time limit
Status updated on  16.10.2020
Database last updated on 19.07.2024
FormerThe patent has been granted
Status updated on  08.11.2019
FormerGrant of patent is intended
Status updated on  04.07.2019
FormerExamination is in progress
Status updated on  23.11.2018
Most recent event   Tooltip08.07.2022Lapse of the patent in a contracting state
New state(s): MK
published on 10.08.2022  [2022/32]
Applicant(s)For all designated states
Heraeus Quarzglas GmbH & Co. KG
Quarzstrasse 8
63450 Hanau / DE
For all designated states
SolarWorld Innovations GmbH
Berthelsdorfer Straße 111A
09599 Freiberg / DE
[2016/06]
Inventor(s)01 / Schenk, Christian
Wackernheimer Strasse 24
55218 Ingelheim / DE
02 / Scheich, Gerrit
Schäferstraße 10
63500 Seligenstadt / DE
03 / Nielsen, Nils-Christian
Mainstrasse 19
65388 Schlangenbad / DE
04 / Lehmann, Walter
Magdeburger Strasse 25
04155 Leipzig / DE
05 / Freudenberg, Bernhard
Birkenweg 30
96450 Coburg / DE
06 / Dadzis, Kaspars
Maxim-Gorki-Strasse
09599 Freiberg / DE
07 / Nadolny, Sandra
Wasserturmstrasse 13
09599 Freiberg / DE
08 / Wolny, Franziska
Rudolf-Leonhard-Strasse 2
01097 Dresden / DE
09 / Fischer, Gerd
Lockwitzer Strasse 1a
01809 Dohna / DE
 [2016/06]
Representative(s)Staudt, Armin Walter
Sandeldamm 24a
63450 Hanau / DE
[2016/06]
Application number, filing date14182961.429.08.2014
[2016/06]
Priority number, dateEP2014017976004.08.2014         Original published format: EP 14179760
[2016/06]
Filing languageDE
Procedural languageDE
PublicationType: A1 Application with search report 
No.:EP2982780
Date:10.02.2016
Language:DE
[2016/06]
Type: B1 Patent specification 
No.:EP2982780
Date:11.12.2019
Language:DE
[2019/50]
Search report(s)(Supplementary) European search report - dispatched on:EP26.03.2015
ClassificationIPC:C30B11/00, C30B29/06, C30B35/00, C03B19/09
[2019/31]
CPC:
C30B11/002 (EP,US); C03B19/09 (US); C30B29/06 (EP,US);
C30B35/002 (EP,US); C03B2201/03 (US)
Former IPC [2016/06]C30B11/00, C30B29/06, C30B35/00
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2016/38]
Former [2016/06]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:VERFAHREN ZUR HERSTELLUNG EINES SILIZIUMBLOCKS, ZUR VERFAHRENSDURCHFÜHRUNG GEEIGNETE KOKILLE AUS QUARZGLAS ODER QUARZGUT SOWIE VERFAHREN FÜR DEREN HERSTELLUNG[2019/31]
English:METHOD FOR PREPARING A SILICON BLOCK, MOULD MADE OF QUARTZ GLASS OR QUARTZ SUITABLE FOR THAT METHOD, AND METHOD FOR THE PREPARATION OF SAME[2019/31]
French:PROCÉDÉ POUR LA FABRICATION D'UN BLOC DE SILICIUM, LINGOTIÈRE EN VERRE DE QUARTZ OU EN QUARTZ APPROPRIÉE POUR CE PROCÉDÉ, ET SON PROCÉDÉ DE FABRICATION[2019/31]
Former [2016/06]Kokille aus Quarzglas oder Quarzgut sowie Verfahren für deren Herstellung
Former [2016/06]Mould made of quartz glass or quartz and method for the preparation of same
Former [2016/06]Lingotière en verre de quartz ou en quartz et son procédé de fabrication
Examination procedure10.08.2016Amendment by applicant (claims and/or description)
10.08.2016Examination requested  [2016/38]
21.11.2018Despatch of a communication from the examining division (Time limit: M06)
03.06.2019Reply to a communication from the examining division
05.07.2019Communication of intention to grant the patent
24.10.2019Fee for grant paid
24.10.2019Fee for publishing/printing paid
24.10.2019Receipt of the translation of the claim(s)
Opposition(s)14.09.2020No opposition filed within time limit [2020/47]
Fees paidRenewal fee
22.08.2016Renewal fee patent year 03
22.08.2017Renewal fee patent year 04
28.08.2018Renewal fee patent year 05
26.08.2019Renewal fee patent year 06
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Stay/Interruption01.08.2017Interruption of proceedings. Reason: legal prevention of applicant[2018/04]
01.08.2018Resumption of proceedings[2018/04]
Lapses during opposition  TooltipHU29.08.2014
AL11.12.2019
CY11.12.2019
CZ11.12.2019
DK11.12.2019
EE11.12.2019
ES11.12.2019
FI11.12.2019
HR11.12.2019
IT11.12.2019
LT11.12.2019
LV11.12.2019
MC11.12.2019
MK11.12.2019
MT11.12.2019
NL11.12.2019
PL11.12.2019
RO11.12.2019
RS11.12.2019
SE11.12.2019
SI11.12.2019
SK11.12.2019
SM11.12.2019
TR11.12.2019
BG11.03.2020
NO11.03.2020
GR12.03.2020
IS11.04.2020
PT06.05.2020
AT29.08.2020
GB29.08.2020
IE29.08.2020
LU29.08.2020
BE31.08.2020
CH31.08.2020
LI31.08.2020
[2022/32]
Former [2022/27]HU29.08.2014
AL11.12.2019
CY11.12.2019
CZ11.12.2019
DK11.12.2019
EE11.12.2019
ES11.12.2019
FI11.12.2019
HR11.12.2019
IT11.12.2019
LT11.12.2019
LV11.12.2019
MC11.12.2019
MT11.12.2019
NL11.12.2019
PL11.12.2019
RO11.12.2019
RS11.12.2019
SE11.12.2019
SI11.12.2019
SK11.12.2019
SM11.12.2019
TR11.12.2019
BG11.03.2020
NO11.03.2020
GR12.03.2020
IS11.04.2020
PT06.05.2020
AT29.08.2020
GB29.08.2020
IE29.08.2020
LU29.08.2020
BE31.08.2020
CH31.08.2020
LI31.08.2020
Former [2021/47]AL11.12.2019
CZ11.12.2019
DK11.12.2019
EE11.12.2019
ES11.12.2019
FI11.12.2019
HR11.12.2019
IT11.12.2019
LT11.12.2019
LV11.12.2019
MC11.12.2019
NL11.12.2019
PL11.12.2019
RO11.12.2019
RS11.12.2019
SE11.12.2019
SI11.12.2019
SK11.12.2019
SM11.12.2019
BG11.03.2020
NO11.03.2020
GR12.03.2020
IS11.04.2020
PT06.05.2020
AT29.08.2020
GB29.08.2020
IE29.08.2020
LU29.08.2020
BE31.08.2020
CH31.08.2020
LI31.08.2020
Former [2021/38]AL11.12.2019
CZ11.12.2019
DK11.12.2019
EE11.12.2019
ES11.12.2019
FI11.12.2019
HR11.12.2019
IT11.12.2019
LT11.12.2019
LV11.12.2019
MC11.12.2019
NL11.12.2019
PL11.12.2019
RO11.12.2019
RS11.12.2019
SE11.12.2019
SI11.12.2019
SK11.12.2019
SM11.12.2019
BG11.03.2020
NO11.03.2020
GR12.03.2020
IS11.04.2020
PT06.05.2020
GB29.08.2020
IE29.08.2020
LU29.08.2020
BE31.08.2020
CH31.08.2020
LI31.08.2020
Former [2021/37]AL11.12.2019
CZ11.12.2019
DK11.12.2019
EE11.12.2019
ES11.12.2019
FI11.12.2019
HR11.12.2019
IT11.12.2019
LT11.12.2019
LV11.12.2019
MC11.12.2019
NL11.12.2019
PL11.12.2019
RO11.12.2019
RS11.12.2019
SE11.12.2019
SI11.12.2019
SK11.12.2019
SM11.12.2019
BG11.03.2020
NO11.03.2020
GR12.03.2020
IS11.04.2020
PT06.05.2020
IE29.08.2020
LU29.08.2020
BE31.08.2020
CH31.08.2020
LI31.08.2020
Former [2021/36]AL11.12.2019
CZ11.12.2019
DK11.12.2019
EE11.12.2019
ES11.12.2019
FI11.12.2019
HR11.12.2019
IT11.12.2019
LT11.12.2019
LV11.12.2019
MC11.12.2019
NL11.12.2019
PL11.12.2019
RO11.12.2019
RS11.12.2019
SE11.12.2019
SI11.12.2019
SK11.12.2019
SM11.12.2019
BG11.03.2020
NO11.03.2020
GR12.03.2020
IS11.04.2020
PT06.05.2020
LU29.08.2020
BE31.08.2020
CH31.08.2020
LI31.08.2020
Former [2021/20]AL11.12.2019
CZ11.12.2019
DK11.12.2019
EE11.12.2019
ES11.12.2019
FI11.12.2019
HR11.12.2019
IT11.12.2019
LT11.12.2019
LV11.12.2019
MC11.12.2019
NL11.12.2019
PL11.12.2019
RO11.12.2019
RS11.12.2019
SE11.12.2019
SI11.12.2019
SK11.12.2019
SM11.12.2019
BG11.03.2020
NO11.03.2020
GR12.03.2020
IS11.04.2020
PT06.05.2020
LU29.08.2020
CH31.08.2020
LI31.08.2020
Former [2021/18]AL11.12.2019
CZ11.12.2019
DK11.12.2019
EE11.12.2019
ES11.12.2019
FI11.12.2019
HR11.12.2019
IT11.12.2019
LT11.12.2019
LV11.12.2019
MC11.12.2019
NL11.12.2019
PL11.12.2019
RO11.12.2019
RS11.12.2019
SE11.12.2019
SI11.12.2019
SK11.12.2019
SM11.12.2019
BG11.03.2020
NO11.03.2020
GR12.03.2020
IS11.04.2020
PT06.05.2020
Former [2021/10]AL11.12.2019
CZ11.12.2019
DK11.12.2019
EE11.12.2019
ES11.12.2019
FI11.12.2019
HR11.12.2019
IT11.12.2019
LT11.12.2019
LV11.12.2019
NL11.12.2019
PL11.12.2019
RO11.12.2019
RS11.12.2019
SE11.12.2019
SI11.12.2019
SK11.12.2019
SM11.12.2019
BG11.03.2020
NO11.03.2020
GR12.03.2020
IS11.04.2020
PT06.05.2020
Former [2020/51]AL11.12.2019
CZ11.12.2019
DK11.12.2019
EE11.12.2019
ES11.12.2019
FI11.12.2019
HR11.12.2019
LT11.12.2019
LV11.12.2019
NL11.12.2019
PL11.12.2019
RO11.12.2019
RS11.12.2019
SE11.12.2019
SI11.12.2019
SK11.12.2019
SM11.12.2019
BG11.03.2020
NO11.03.2020
GR12.03.2020
IS11.04.2020
PT06.05.2020
Former [2020/47]AL11.12.2019
CZ11.12.2019
DK11.12.2019
EE11.12.2019
ES11.12.2019
FI11.12.2019
HR11.12.2019
LT11.12.2019
LV11.12.2019
NL11.12.2019
RO11.12.2019
RS11.12.2019
SE11.12.2019
SK11.12.2019
SM11.12.2019
BG11.03.2020
NO11.03.2020
GR12.03.2020
IS11.04.2020
PT06.05.2020
Former [2020/40]AL11.12.2019
CZ11.12.2019
EE11.12.2019
ES11.12.2019
FI11.12.2019
HR11.12.2019
LT11.12.2019
LV11.12.2019
NL11.12.2019
RO11.12.2019
RS11.12.2019
SE11.12.2019
SK11.12.2019
SM11.12.2019
BG11.03.2020
NO11.03.2020
GR12.03.2020
IS11.04.2020
PT06.05.2020
Former [2020/37]AL11.12.2019
CZ11.12.2019
EE11.12.2019
ES11.12.2019
FI11.12.2019
HR11.12.2019
LT11.12.2019
LV11.12.2019
NL11.12.2019
RO11.12.2019
RS11.12.2019
SE11.12.2019
SK11.12.2019
SM11.12.2019
BG11.03.2020
NO11.03.2020
GR12.03.2020
PT06.05.2020
Former [2020/36]AL11.12.2019
CZ11.12.2019
EE11.12.2019
ES11.12.2019
FI11.12.2019
HR11.12.2019
LT11.12.2019
LV11.12.2019
NL11.12.2019
RO11.12.2019
RS11.12.2019
SE11.12.2019
BG11.03.2020
NO11.03.2020
GR12.03.2020
PT06.05.2020
Former [2020/35]AL11.12.2019
CZ11.12.2019
ES11.12.2019
FI11.12.2019
HR11.12.2019
LT11.12.2019
LV11.12.2019
NL11.12.2019
RO11.12.2019
RS11.12.2019
SE11.12.2019
BG11.03.2020
NO11.03.2020
GR12.03.2020
Former [2020/34]AL11.12.2019
ES11.12.2019
FI11.12.2019
HR11.12.2019
LT11.12.2019
LV11.12.2019
NL11.12.2019
RS11.12.2019
SE11.12.2019
BG11.03.2020
NO11.03.2020
GR12.03.2020
Former [2020/32]AL11.12.2019
FI11.12.2019
HR11.12.2019
LT11.12.2019
LV11.12.2019
NL11.12.2019
RS11.12.2019
SE11.12.2019
BG11.03.2020
NO11.03.2020
GR12.03.2020
Former [2020/25]FI11.12.2019
HR11.12.2019
LT11.12.2019
LV11.12.2019
RS11.12.2019
SE11.12.2019
BG11.03.2020
NO11.03.2020
GR12.03.2020
Former [2020/23]FI11.12.2019
LT11.12.2019
LV11.12.2019
SE11.12.2019
BG11.03.2020
NO11.03.2020
GR12.03.2020
Former [2020/22]FI11.12.2019
LT11.12.2019
SE11.12.2019
BG11.03.2020
NO11.03.2020
Former [2020/21]NO11.03.2020
Documents cited:Search[XDY]EP0949358  (MITSUBISHI MATERIALS CORP [JP]) [XD] 8-10 * figures 1, 4 * * claims 10-13, 17-21 * * examples 1, 4 * [Y] 1-7;
 [A]DE19943103  (WACKER CHEMIE GMBH [DE]) [A] 1-10 * the whole document *;
 [A]FR2854398  (WACKER CHEMIE GMBH SOC [DE]) [A] 1-10 * the whole document *;
 [A]DE10344189  (HERAEUS QUARZGLAS [DE]) [A] 1-10* the whole document *;
 [Y]DE102009049032  (HERAEUS QUARZGLAS [DE]) [Y] 1-7 * paragraphs [0002] , [0 29] , [0 47] * * claims 1, 6, 9, 12 *;
 [A]US2013015318  (WAKITA SABURO [JP], et al) [A] 1-10 * the whole document *
by applicantUS5053359
 EP0949358
 WO2005106084
 WO2007063996
 DE102005013410
 DE102011082628
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.