blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP2848375

EP2848375 - METHOD OF MANUFACTURE WITHIN A CONFINED SPACE USING AN INNER END EFFECTOR AND AN OUTER END EFFECTOR [Right-click to bookmark this link]
Former [2015/12]Robot including telescopic assemblies for positioning an end effector
[2022/35]
StatusNo opposition filed within time limit
Status updated on  22.12.2023
Database last updated on 02.09.2024
FormerThe patent has been granted
Status updated on  13.01.2023
FormerGrant of patent is intended
Status updated on  29.08.2022
FormerExamination is in progress
Status updated on  07.07.2020
Most recent event   Tooltip02.08.2024Lapse of the patent in a contracting state
New state(s): BE
published on 04.09.2024 [2024/36]
Applicant(s)For all designated states
The Boeing Company
929 Long Bridge Drive
Arlington, VA 22202 / US
[2023/12]
Former [2023/07]For all designated states
The Boeing Company
100 North Riverside Plaza
Chicago, IL 60606-1596 / US
Former [2015/12]For all designated states
The Boeing Company
100 North Riverside Plaza
Chicago, IL 60606-2016 / US
Inventor(s)01 / Sarh, Branko
19542 Pompano Lane, Unit 7
Huntingon Beach, CA 92648 / US
02 / Davancens, Angelica
18152 Arminta Street
Reseda, CA 91335 / US
 [2015/12]
Representative(s)Boult Wade Tennant LLP
Salisbury Square House
8 Salisbury Square
London EC4Y 8AP / GB
[2023/07]
Former [2015/12]Boult Wade Tennant
Verulam Gardens
70 Gray's Inn Road
London WC1X 8BT / GB
Application number, filing date14184010.801.08.2012
[2015/12]
Priority number, dateUS20111319775703.08.2011         Original published format: US201113197757
[2015/12]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP2848375
Date:18.03.2015
Language:EN
[2015/12]
Type: B1 Patent specification 
No.:EP2848375
Date:15.02.2023
Language:EN
[2023/07]
Search report(s)(Supplementary) European search report - dispatched on:EP17.02.2015
ClassificationIPC:B25J9/10
[2015/12]
CPC:
B25J9/106 (EP,US); Y10T29/49826 (EP,US); Y10T29/5191 (EP,US);
Y10T74/20329 (EP,US)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2015/12]
TitleGerman:FERTIGUNGSVERFAHREN IN EINEM BEENGTEN RAUM MIT EINEM INNEREN ENDEFFEKTOR UND EINEM ÄUSSEREN ENDEFFEKTOR[2022/39]
English:METHOD OF MANUFACTURE WITHIN A CONFINED SPACE USING AN INNER END EFFECTOR AND AN OUTER END EFFECTOR[2022/39]
French:PROCÉDÉ DE CONSTRUCTION DANS UN ESPACE CONFINÉ UTILISANT UN EFFECTEUR INTERNE ET UN EFFECTEUR EXTERNE[2022/39]
Former [2015/12]Roboter mit teleskopischen Baugruppen zur Positionierung eines Endeffektors
Former [2015/12]Robot including telescopic assemblies for positioning an end effector
Former [2015/12]Robot comprenant des ensembles télescopiques permettant de positionner un effecteur d'extrémité
Examination procedure09.09.2014Examination requested  [2015/12]
07.09.2015Amendment by applicant (claims and/or description)
10.07.2020Despatch of a communication from the examining division (Time limit: M04)
11.11.2020Reply to a communication from the examining division
30.08.2022Communication of intention to grant the patent
05.01.2023Fee for grant paid
05.01.2023Fee for publishing/printing paid
05.01.2023Receipt of the translation of the claim(s)
Parent application(s)   TooltipEP12178833.5  / EP2554337
Opposition(s)16.11.2023No opposition filed within time limit [2024/04]
Fees paidRenewal fee
09.09.2014Renewal fee patent year 03
27.08.2015Renewal fee patent year 04
29.08.2016Renewal fee patent year 05
28.08.2017Renewal fee patent year 06
27.08.2018Renewal fee patent year 07
27.08.2019Renewal fee patent year 08
27.08.2020Renewal fee patent year 09
27.08.2021Renewal fee patent year 10
29.08.2022Renewal fee patent year 11
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipAT15.02.2023
CZ15.02.2023
DK15.02.2023
EE15.02.2023
ES15.02.2023
FI15.02.2023
HR15.02.2023
IT15.02.2023
LT15.02.2023
LV15.02.2023
MC15.02.2023
NL15.02.2023
PL15.02.2023
RO15.02.2023
RS15.02.2023
SE15.02.2023
SI15.02.2023
SK15.02.2023
SM15.02.2023
NO15.05.2023
GR16.05.2023
IS15.06.2023
PT15.06.2023
IE01.08.2023
LU01.08.2023
BE31.08.2023
CH31.08.2023
[2024/36]
Former [2024/33]AT15.02.2023
CZ15.02.2023
DK15.02.2023
EE15.02.2023
ES15.02.2023
FI15.02.2023
HR15.02.2023
IT15.02.2023
LT15.02.2023
LV15.02.2023
MC15.02.2023
NL15.02.2023
PL15.02.2023
RO15.02.2023
RS15.02.2023
SE15.02.2023
SI15.02.2023
SK15.02.2023
SM15.02.2023
NO15.05.2023
GR16.05.2023
IS15.06.2023
PT15.06.2023
IE01.08.2023
LU01.08.2023
CH31.08.2023
Former [2024/26]AT15.02.2023
CZ15.02.2023
DK15.02.2023
EE15.02.2023
ES15.02.2023
FI15.02.2023
HR15.02.2023
IT15.02.2023
LT15.02.2023
LV15.02.2023
MC15.02.2023
NL15.02.2023
PL15.02.2023
RO15.02.2023
RS15.02.2023
SE15.02.2023
SI15.02.2023
SK15.02.2023
SM15.02.2023
NO15.05.2023
GR16.05.2023
IS15.06.2023
PT15.06.2023
LU01.08.2023
CH31.08.2023
Former [2024/24]AT15.02.2023
CZ15.02.2023
DK15.02.2023
EE15.02.2023
ES15.02.2023
FI15.02.2023
HR15.02.2023
LT15.02.2023
LV15.02.2023
MC15.02.2023
NL15.02.2023
PL15.02.2023
RO15.02.2023
RS15.02.2023
SE15.02.2023
SI15.02.2023
SK15.02.2023
SM15.02.2023
NO15.05.2023
GR16.05.2023
IS15.06.2023
PT15.06.2023
LU01.08.2023
CH31.08.2023
Former [2024/21]AT15.02.2023
CZ15.02.2023
DK15.02.2023
EE15.02.2023
ES15.02.2023
FI15.02.2023
HR15.02.2023
LT15.02.2023
LV15.02.2023
MC15.02.2023
NL15.02.2023
PL15.02.2023
RO15.02.2023
RS15.02.2023
SE15.02.2023
SI15.02.2023
SK15.02.2023
SM15.02.2023
NO15.05.2023
GR16.05.2023
IS15.06.2023
PT15.06.2023
LU01.08.2023
Former [2024/16]AT15.02.2023
CZ15.02.2023
DK15.02.2023
EE15.02.2023
ES15.02.2023
FI15.02.2023
HR15.02.2023
LT15.02.2023
LV15.02.2023
MC15.02.2023
NL15.02.2023
PL15.02.2023
RO15.02.2023
RS15.02.2023
SE15.02.2023
SI15.02.2023
SK15.02.2023
SM15.02.2023
NO15.05.2023
GR16.05.2023
IS15.06.2023
PT15.06.2023
Former [2024/11]AT15.02.2023
CZ15.02.2023
DK15.02.2023
EE15.02.2023
ES15.02.2023
FI15.02.2023
HR15.02.2023
LT15.02.2023
LV15.02.2023
NL15.02.2023
PL15.02.2023
RO15.02.2023
RS15.02.2023
SE15.02.2023
SI15.02.2023
SK15.02.2023
SM15.02.2023
NO15.05.2023
GR16.05.2023
IS15.06.2023
PT15.06.2023
Former [2023/50]AT15.02.2023
CZ15.02.2023
DK15.02.2023
EE15.02.2023
ES15.02.2023
FI15.02.2023
HR15.02.2023
LT15.02.2023
LV15.02.2023
NL15.02.2023
PL15.02.2023
RO15.02.2023
RS15.02.2023
SE15.02.2023
SK15.02.2023
SM15.02.2023
NO15.05.2023
GR16.05.2023
IS15.06.2023
PT15.06.2023
Former [2023/49]AT15.02.2023
CZ15.02.2023
DK15.02.2023
EE15.02.2023
ES15.02.2023
FI15.02.2023
HR15.02.2023
LT15.02.2023
LV15.02.2023
NL15.02.2023
PL15.02.2023
RO15.02.2023
RS15.02.2023
SE15.02.2023
SM15.02.2023
NO15.05.2023
GR16.05.2023
IS15.06.2023
PT15.06.2023
Former [2023/48]AT15.02.2023
DK15.02.2023
EE15.02.2023
ES15.02.2023
FI15.02.2023
HR15.02.2023
LT15.02.2023
LV15.02.2023
NL15.02.2023
PL15.02.2023
RS15.02.2023
SE15.02.2023
SM15.02.2023
NO15.05.2023
GR16.05.2023
IS15.06.2023
PT15.06.2023
Former [2023/46]AT15.02.2023
DK15.02.2023
ES15.02.2023
FI15.02.2023
HR15.02.2023
LT15.02.2023
LV15.02.2023
NL15.02.2023
PL15.02.2023
RS15.02.2023
SE15.02.2023
SM15.02.2023
NO15.05.2023
GR16.05.2023
IS15.06.2023
PT15.06.2023
Former [2023/39]AT15.02.2023
ES15.02.2023
FI15.02.2023
HR15.02.2023
LT15.02.2023
LV15.02.2023
NL15.02.2023
PL15.02.2023
RS15.02.2023
SE15.02.2023
NO15.05.2023
GR16.05.2023
IS15.06.2023
PT15.06.2023
Former [2023/38]AT15.02.2023
ES15.02.2023
FI15.02.2023
HR15.02.2023
LT15.02.2023
LV15.02.2023
NL15.02.2023
PL15.02.2023
RS15.02.2023
SE15.02.2023
NO15.05.2023
GR16.05.2023
PT15.06.2023
Former [2023/37]AT15.02.2023
ES15.02.2023
FI15.02.2023
HR15.02.2023
LT15.02.2023
LV15.02.2023
NL15.02.2023
RS15.02.2023
SE15.02.2023
NO15.05.2023
GR16.05.2023
PT15.06.2023
Former [2023/36]AT15.02.2023
ES15.02.2023
FI15.02.2023
HR15.02.2023
LT15.02.2023
LV15.02.2023
NL15.02.2023
RS15.02.2023
SE15.02.2023
NO15.05.2023
PT15.06.2023
Former [2023/35]AT15.02.2023
ES15.02.2023
HR15.02.2023
LT15.02.2023
NL15.02.2023
RS15.02.2023
NO15.05.2023
PT15.06.2023
Former [2023/34]ES15.02.2023
LT15.02.2023
RS15.02.2023
PT15.06.2023
Former [2023/33]ES15.02.2023
LT15.02.2023
Documents cited:Search[A]JPS61236493  (MITSUBISHI HEAVY IND LTD) [A] 1 * figures 1-7 *;
 [Y]JPS62137327  (SUMITOMO HEAVY INDUSTRIES) [Y] 1-4 * abstract *;
 [A]US4967947  (SARH BRANKO [US]) [A] 1-4 * abstract * * column 3, line 46 - line 65. *;
 [A]FR2722437  (DARSOUZE PATRICK [FR]) [A] 1-4 * abstract * * page 7, line 5 - line 26 * * page 8, line 11 - line 14 * * page 8, line 23 - line 34 *;
 [A]JP2007290068  (TAKANISHI ATSUO, et al) [A] 1* abstract *;
 [Y]EP2116340  (BOEING CO [US]) [Y] 1-4 * abstract * * paragraph [0054] - paragraph [0058] * * paragraph [0033] * * paragraphs [0038] , [0039] *;
 [A]JP2010023201  (SHINMAYWA IND LTD) [A] 1 * figures 4-8 *
ExaminationUS4818175
by applicantUS7937817
 US20080117153
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.