blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP2998464

EP2998464 - Fitting for a building door [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  13.09.2019
Database last updated on 19.10.2024
FormerThe patent has been granted
Status updated on  05.10.2018
FormerGrant of patent is intended
Status updated on  14.05.2018
Most recent event   Tooltip01.07.2022Lapse of the patent in a contracting state
New state(s): MK
published on 03.08.2022  [2022/31]
Applicant(s)For all designated states
dormakaba Deutschland GmbH
Dorma Platz 1
58256 Ennepetal / DE
[2017/18]
Former [2016/12]For all designated states
DORMA Deutschland GmbH
DORMA Platz 1
58256 Ennepetal / DE
Inventor(s)01 / SCHWEITZER, Falko
DORMA Deutschland GmbH
Dorma Platz 1
58256 Ennepetal / DE
02 / LORENZ, Leo
DORMA Deutschland GmbH
Dorma Platz 1
58256 Ennepetal / DE
 [2016/12]
Representative(s)Balder IP Law, S.L.
Paseo de la Castellana 93
5ª planta
28046 Madrid / ES
[2018/45]
Former [2016/12]Balder IP Law, S.L.
Paseo de la Castellana 93
5a planta
28046 Madrid / ES
Application number, filing date14185834.022.09.2014
[2016/12]
Filing languageDE
Procedural languageDE
PublicationType: A1 Application with search report 
No.:EP2998464
Date:23.03.2016
Language:DE
[2016/12]
Type: B1 Patent specification 
No.:EP2998464
Date:07.11.2018
Language:DE
[2018/45]
Search report(s)(Supplementary) European search report - dispatched on:EP26.02.2015
ClassificationIPC:E05B3/00, E05B47/06, E05B3/06, // E05B63/04, E05B15/02, E05B47/00, E05B17/10
[2016/12]
CPC:
E05B3/065 (EP); E05B15/02 (EP); E05B17/10 (EP);
E05B2047/0058 (EP); E05B2047/0086 (EP); E05B2047/0094 (EP);
E05B2047/0097 (EP); E05B47/0012 (EP); E05B47/068 (EP);
E05B63/04 (EP) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2016/44]
Former [2016/12]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:Beschlag für eine Gebäudetür[2016/12]
English:Fitting for a building door[2016/12]
French:Armature pour une porte de bâtiment[2016/12]
Examination procedure21.09.2016Amendment by applicant (claims and/or description)
21.09.2016Examination requested  [2016/44]
15.05.2018Communication of intention to grant the patent
20.09.2018Fee for grant paid
20.09.2018Fee for publishing/printing paid
20.09.2018Receipt of the translation of the claim(s)
Opposition(s)08.08.2019No opposition filed within time limit [2019/42]
Fees paidRenewal fee
22.09.2016Renewal fee patent year 03
26.09.2017Renewal fee patent year 04
25.09.2018Renewal fee patent year 05
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU22.09.2014
AL07.11.2018
CY07.11.2018
CZ07.11.2018
DK07.11.2018
EE07.11.2018
ES07.11.2018
FI07.11.2018
HR07.11.2018
IT07.11.2018
LT07.11.2018
LV07.11.2018
MC07.11.2018
MK07.11.2018
MT07.11.2018
NL07.11.2018
PL07.11.2018
RO07.11.2018
RS07.11.2018
SE07.11.2018
SI07.11.2018
SK07.11.2018
SM07.11.2018
TR07.11.2018
BG07.02.2019
NO07.02.2019
GR08.02.2019
IS07.03.2019
PT07.03.2019
[2022/31]
Former [2021/34]HU22.09.2014
AL07.11.2018
CY07.11.2018
CZ07.11.2018
DK07.11.2018
EE07.11.2018
ES07.11.2018
FI07.11.2018
HR07.11.2018
IT07.11.2018
LT07.11.2018
LV07.11.2018
MC07.11.2018
MT07.11.2018
NL07.11.2018
PL07.11.2018
RO07.11.2018
RS07.11.2018
SE07.11.2018
SI07.11.2018
SK07.11.2018
SM07.11.2018
TR07.11.2018
BG07.02.2019
NO07.02.2019
GR08.02.2019
IS07.03.2019
PT07.03.2019
Former [2021/32]HU22.09.2014
AL07.11.2018
CY07.11.2018
CZ07.11.2018
DK07.11.2018
EE07.11.2018
ES07.11.2018
FI07.11.2018
HR07.11.2018
IT07.11.2018
LT07.11.2018
LV07.11.2018
MC07.11.2018
NL07.11.2018
PL07.11.2018
RO07.11.2018
RS07.11.2018
SE07.11.2018
SI07.11.2018
SK07.11.2018
SM07.11.2018
TR07.11.2018
BG07.02.2019
NO07.02.2019
GR08.02.2019
IS07.03.2019
PT07.03.2019
Former [2021/26]AL07.11.2018
CY07.11.2018
CZ07.11.2018
DK07.11.2018
EE07.11.2018
ES07.11.2018
FI07.11.2018
HR07.11.2018
IT07.11.2018
LT07.11.2018
LV07.11.2018
MC07.11.2018
NL07.11.2018
PL07.11.2018
RO07.11.2018
RS07.11.2018
SE07.11.2018
SI07.11.2018
SK07.11.2018
SM07.11.2018
TR07.11.2018
BG07.02.2019
NO07.02.2019
GR08.02.2019
IS07.03.2019
PT07.03.2019
Former [2020/25]AL07.11.2018
CZ07.11.2018
DK07.11.2018
EE07.11.2018
ES07.11.2018
FI07.11.2018
HR07.11.2018
IT07.11.2018
LT07.11.2018
LV07.11.2018
MC07.11.2018
NL07.11.2018
PL07.11.2018
RO07.11.2018
RS07.11.2018
SE07.11.2018
SI07.11.2018
SK07.11.2018
SM07.11.2018
TR07.11.2018
BG07.02.2019
NO07.02.2019
GR08.02.2019
IS07.03.2019
PT07.03.2019
Former [2020/17]AL07.11.2018
CZ07.11.2018
DK07.11.2018
EE07.11.2018
ES07.11.2018
FI07.11.2018
HR07.11.2018
IT07.11.2018
LT07.11.2018
LV07.11.2018
NL07.11.2018
PL07.11.2018
RO07.11.2018
RS07.11.2018
SE07.11.2018
SI07.11.2018
SK07.11.2018
SM07.11.2018
TR07.11.2018
BG07.02.2019
NO07.02.2019
GR08.02.2019
IS07.03.2019
PT07.03.2019
Former [2019/50]AL07.11.2018
CZ07.11.2018
DK07.11.2018
EE07.11.2018
ES07.11.2018
FI07.11.2018
HR07.11.2018
IT07.11.2018
LT07.11.2018
LV07.11.2018
NL07.11.2018
PL07.11.2018
RO07.11.2018
RS07.11.2018
SE07.11.2018
SI07.11.2018
SK07.11.2018
SM07.11.2018
BG07.02.2019
NO07.02.2019
GR08.02.2019
IS07.03.2019
PT07.03.2019
Former [2019/40]AL07.11.2018
CZ07.11.2018
DK07.11.2018
EE07.11.2018
ES07.11.2018
FI07.11.2018
HR07.11.2018
IT07.11.2018
LT07.11.2018
LV07.11.2018
NL07.11.2018
PL07.11.2018
RO07.11.2018
RS07.11.2018
SE07.11.2018
SK07.11.2018
SM07.11.2018
BG07.02.2019
NO07.02.2019
GR08.02.2019
IS07.03.2019
PT07.03.2019
Former [2019/37]AL07.11.2018
CZ07.11.2018
DK07.11.2018
EE07.11.2018
ES07.11.2018
FI07.11.2018
HR07.11.2018
IT07.11.2018
LT07.11.2018
LV07.11.2018
NL07.11.2018
PL07.11.2018
RO07.11.2018
RS07.11.2018
SE07.11.2018
SM07.11.2018
BG07.02.2019
NO07.02.2019
GR08.02.2019
IS07.03.2019
PT07.03.2019
Former [2019/35]AL07.11.2018
CZ07.11.2018
DK07.11.2018
ES07.11.2018
FI07.11.2018
HR07.11.2018
IT07.11.2018
LT07.11.2018
LV07.11.2018
NL07.11.2018
PL07.11.2018
RS07.11.2018
SE07.11.2018
BG07.02.2019
NO07.02.2019
GR08.02.2019
IS07.03.2019
PT07.03.2019
Former [2019/34]AL07.11.2018
DK07.11.2018
ES07.11.2018
FI07.11.2018
HR07.11.2018
IT07.11.2018
LT07.11.2018
LV07.11.2018
NL07.11.2018
RS07.11.2018
SE07.11.2018
BG07.02.2019
NO07.02.2019
GR08.02.2019
IS07.03.2019
PT07.03.2019
Former [2019/26]AL07.11.2018
ES07.11.2018
FI07.11.2018
HR07.11.2018
LT07.11.2018
LV07.11.2018
NL07.11.2018
RS07.11.2018
SE07.11.2018
BG07.02.2019
NO07.02.2019
GR08.02.2019
IS07.03.2019
PT07.03.2019
Former [2019/25]ES07.11.2018
FI07.11.2018
HR07.11.2018
LT07.11.2018
LV07.11.2018
NL07.11.2018
RS07.11.2018
SE07.11.2018
BG07.02.2019
NO07.02.2019
GR08.02.2019
IS07.03.2019
Former [2019/24]ES07.11.2018
FI07.11.2018
HR07.11.2018
LT07.11.2018
LV07.11.2018
NL07.11.2018
SE07.11.2018
BG07.02.2019
NO07.02.2019
GR08.02.2019
IS07.03.2019
Former [2019/23]ES07.11.2018
FI07.11.2018
HR07.11.2018
LT07.11.2018
LV07.11.2018
NL07.11.2018
BG07.02.2019
NO07.02.2019
IS07.03.2019
Former [2019/22]FI07.11.2018
LT07.11.2018
BG07.02.2019
NO07.02.2019
IS07.03.2019
Former [2019/21]FI07.11.2018
LT07.11.2018
NO07.02.2019
IS07.03.2019
Former [2019/20]LT07.11.2018
NO07.02.2019
Documents cited:Search[XAYI]GB840813  (T J COOKE & SON LTD) [X] 1-6,8-10 * page 2, line 3 - line 101; figures 1-4 * [A] 7 [Y] 13 [I] 14,15;
 [XI]US4982986  (GRESSETT JR CHARLES A [US], et al) [X] 1,2,5 * column 4, line 19 - line 47; figures 1-19 * [I] 14;
 [YA]WO9641486  (MASTER LOCK CO [US]) [Y] 13 * page 43, line 29 - page 44, line 23; figures 14-16 * [A] 1,12;
 [XAI]GB2304789  (BASTA IRELAND LTD [IE], et al) [X] 1-5,9,10,15 * page 14, line 8 - page 15, line 7; figures 1-13 * [A] 7 [I] 14;
 [A]EP0796968  (WINKHAUS FA AUGUST [DE]) [A] 1,3,5,8,11 * column 5, line 56 - column 6, line 51; figures 2,8 ** column 9, line 50 - column 10, line 10 *;
 [X]FR2801069  (BEZAULT SA [FR]) [X] 1,7 * page 4, line 4 - page 5, line 12; figures 1-5 *;
 [XA]WO2014019375  (MIN YU [CN]) [X] 1,5,6 * abstract * [A] 7,9;
 [XA]EP2754794  (FUHR CARL GMBH & CO KG [DE]) [X] 1-3,5,6,12 * paragraph [0046]; figures 1-5E * [A] 7
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.