EP3012282 - Pressboard [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 13.08.2021 Database last updated on 11.05.2024 | |
Former | The patent has been granted Status updated on 04.09.2020 | ||
Former | Grant of patent is intended Status updated on 09.06.2020 | ||
Former | Examination is in progress Status updated on 09.07.2019 | ||
Former | Request for examination was made Status updated on 04.11.2016 | Most recent event Tooltip | 08.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 10.08.2022 [2022/32] | Applicant(s) | For all designated states ABB Power Grids Switzerland AG Bruggerstrasse 72 5400 Baden / CH | [2020/32] |
Former [2017/15] | For all designated states ABB Schweiz AG Brown Boveri Strasse 6 5400 Baden / CH | ||
Former [2016/17] | For all designated states ABB Technology Ltd Affolternstrasse 44 8050 Zürich / CH | Inventor(s) | 01 /
Pitois, Claire Skolagatan 7 SE-172 31 Sundbyberg / SE | 02 /
Montibon, Elson Arkitektvägen 33 SE-572 61 Oskarshamn / SE | 03 /
Sahlen, Fredrik Norsgatan 3 SE-723 49 Västerås / SE | 04 /
Schmidt, Lars Munkgatan 5 SE-572 32 Oskarshamn / SE | 05 /
Girlanda, Orlando Bangatan 7A SE-722 28 Västerås / SE | 06 /
Brattberg, Torbjörn Alholmsvägen 11 SE-572 63 Oskarshamn / SE | 07 /
Wågberg, Lars Jaktgatan 11 SE-115 45 Stockholm / SE | [2016/17] | Representative(s) | Valea AB Box 7086 103 87 Stockholm / SE | [2020/41] |
Former [2016/17] | Savela, Reino Aleksi ABB AB Intellectual Property Ingenjör Bååths Gata 11 721 83 Västerås / SE | Application number, filing date | 14189513.6 | 20.10.2014 | [2016/17] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3012282 | Date: | 27.04.2016 | Language: | EN | [2016/17] | Type: | B1 Patent specification | No.: | EP3012282 | Date: | 07.10.2020 | Language: | EN | [2020/41] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 10.06.2015 | Classification | IPC: | C08J5/04, H01F27/32, D21H17/37, D21J1/20, D21H17/36, H01B17/56 | [2016/17] | CPC: |
D21H17/36 (EP,CN,US);
D21H17/375 (EP,CN,US);
D21H17/56 (EP,CN,US);
D21J1/20 (EP,CN,US);
H01B3/185 (CN,US);
H01B3/447 (EP,CN,US);
H01B3/448 (EP,CN,US);
H01B3/52 (EP,CN,US);
H01F27/32 (EP,US);
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2016/49] |
Former [2016/17] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | Presspan | [2016/17] | English: | Pressboard | [2016/17] | French: | Carton comprimé | [2016/17] | Examination procedure | 20.10.2014 | Date on which the examining division has become responsible | 20.10.2016 | Amendment by applicant (claims and/or description) | 27.10.2016 | Examination requested [2016/49] | 12.07.2019 | Despatch of a communication from the examining division (Time limit: M04) | 27.08.2019 | Reply to a communication from the examining division | 10.06.2020 | Communication of intention to grant the patent | 31.08.2020 | Fee for grant paid | 31.08.2020 | Fee for publishing/printing paid | 31.08.2020 | Receipt of the translation of the claim(s) | Opposition(s) | 08.07.2021 | No opposition filed within time limit [2021/37] | Fees paid | Renewal fee | 31.10.2016 | Renewal fee patent year 03 | 02.11.2017 | Renewal fee patent year 04 | 31.10.2018 | Renewal fee patent year 05 | 25.10.2019 | Renewal fee patent year 06 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 20.10.2014 | AL | 07.10.2020 | AT | 07.10.2020 | CY | 07.10.2020 | CZ | 07.10.2020 | DK | 07.10.2020 | EE | 07.10.2020 | ES | 07.10.2020 | FI | 07.10.2020 | HR | 07.10.2020 | LT | 07.10.2020 | LV | 07.10.2020 | MC | 07.10.2020 | MK | 07.10.2020 | MT | 07.10.2020 | NL | 07.10.2020 | PL | 07.10.2020 | RO | 07.10.2020 | RS | 07.10.2020 | SE | 07.10.2020 | SI | 07.10.2020 | SK | 07.10.2020 | SM | 07.10.2020 | TR | 07.10.2020 | IE | 20.10.2020 | LU | 20.10.2020 | BE | 31.10.2020 | BG | 07.01.2021 | NO | 07.01.2021 | GR | 08.01.2021 | IS | 07.02.2021 | PT | 08.02.2021 | [2022/32] |
Former [2022/27] | HU | 20.10.2014 | |
AL | 07.10.2020 | ||
AT | 07.10.2020 | ||
CY | 07.10.2020 | ||
CZ | 07.10.2020 | ||
DK | 07.10.2020 | ||
EE | 07.10.2020 | ||
ES | 07.10.2020 | ||
FI | 07.10.2020 | ||
HR | 07.10.2020 | ||
LT | 07.10.2020 | ||
LV | 07.10.2020 | ||
MC | 07.10.2020 | ||
MT | 07.10.2020 | ||
NL | 07.10.2020 | ||
PL | 07.10.2020 | ||
RO | 07.10.2020 | ||
RS | 07.10.2020 | ||
SE | 07.10.2020 | ||
SI | 07.10.2020 | ||
SK | 07.10.2020 | ||
SM | 07.10.2020 | ||
TR | 07.10.2020 | ||
IE | 20.10.2020 | ||
LU | 20.10.2020 | ||
BE | 31.10.2020 | ||
BG | 07.01.2021 | ||
NO | 07.01.2021 | ||
GR | 08.01.2021 | ||
IS | 07.02.2021 | ||
PT | 08.02.2021 | ||
Former [2022/23] | AL | 07.10.2020 | |
AT | 07.10.2020 | ||
CZ | 07.10.2020 | ||
DK | 07.10.2020 | ||
EE | 07.10.2020 | ||
ES | 07.10.2020 | ||
FI | 07.10.2020 | ||
HR | 07.10.2020 | ||
LT | 07.10.2020 | ||
LV | 07.10.2020 | ||
MC | 07.10.2020 | ||
NL | 07.10.2020 | ||
PL | 07.10.2020 | ||
RO | 07.10.2020 | ||
RS | 07.10.2020 | ||
SE | 07.10.2020 | ||
SI | 07.10.2020 | ||
SK | 07.10.2020 | ||
SM | 07.10.2020 | ||
IE | 20.10.2020 | ||
LU | 20.10.2020 | ||
BE | 31.10.2020 | ||
BG | 07.01.2021 | ||
NO | 07.01.2021 | ||
GR | 08.01.2021 | ||
IS | 07.02.2021 | ||
PT | 08.02.2021 | ||
Former [2022/10] | AL | 07.10.2020 | |
AT | 07.10.2020 | ||
CZ | 07.10.2020 | ||
DK | 07.10.2020 | ||
EE | 07.10.2020 | ||
ES | 07.10.2020 | ||
FI | 07.10.2020 | ||
HR | 07.10.2020 | ||
LT | 07.10.2020 | ||
LV | 07.10.2020 | ||
MC | 07.10.2020 | ||
NL | 07.10.2020 | ||
PL | 07.10.2020 | ||
RO | 07.10.2020 | ||
RS | 07.10.2020 | ||
SE | 07.10.2020 | ||
SI | 07.10.2020 | ||
SK | 07.10.2020 | ||
SM | 07.10.2020 | ||
IE | 20.10.2020 | ||
LU | 20.10.2020 | ||
BE | 31.10.2020 | ||
BG | 07.01.2021 | ||
NO | 07.01.2021 | ||
GR | 08.01.2021 | ||
PT | 08.02.2021 | ||
Former [2021/50] | AL | 07.10.2020 | |
AT | 07.10.2020 | ||
CZ | 07.10.2020 | ||
DK | 07.10.2020 | ||
EE | 07.10.2020 | ||
ES | 07.10.2020 | ||
FI | 07.10.2020 | ||
HR | 07.10.2020 | ||
LT | 07.10.2020 | ||
LV | 07.10.2020 | ||
MC | 07.10.2020 | ||
NL | 07.10.2020 | ||
PL | 07.10.2020 | ||
RO | 07.10.2020 | ||
RS | 07.10.2020 | ||
SE | 07.10.2020 | ||
SI | 07.10.2020 | ||
SK | 07.10.2020 | ||
SM | 07.10.2020 | ||
IE | 20.10.2020 | ||
LU | 20.10.2020 | ||
BE | 31.10.2020 | ||
BG | 07.01.2021 | ||
NO | 07.01.2021 | ||
GR | 08.01.2021 | ||
IS | 07.02.2021 | ||
PT | 08.02.2021 | ||
Former [2021/46] | AL | 07.10.2020 | |
AT | 07.10.2020 | ||
CZ | 07.10.2020 | ||
DK | 07.10.2020 | ||
EE | 07.10.2020 | ||
ES | 07.10.2020 | ||
FI | 07.10.2020 | ||
HR | 07.10.2020 | ||
LT | 07.10.2020 | ||
LV | 07.10.2020 | ||
MC | 07.10.2020 | ||
NL | 07.10.2020 | ||
PL | 07.10.2020 | ||
RO | 07.10.2020 | ||
RS | 07.10.2020 | ||
SE | 07.10.2020 | ||
SK | 07.10.2020 | ||
SM | 07.10.2020 | ||
IE | 20.10.2020 | ||
LU | 20.10.2020 | ||
BE | 31.10.2020 | ||
BG | 07.01.2021 | ||
NO | 07.01.2021 | ||
GR | 08.01.2021 | ||
IS | 07.02.2021 | ||
PT | 08.02.2021 | ||
Former [2021/45] | AL | 07.10.2020 | |
AT | 07.10.2020 | ||
CZ | 07.10.2020 | ||
DK | 07.10.2020 | ||
EE | 07.10.2020 | ||
ES | 07.10.2020 | ||
FI | 07.10.2020 | ||
HR | 07.10.2020 | ||
LT | 07.10.2020 | ||
LV | 07.10.2020 | ||
MC | 07.10.2020 | ||
NL | 07.10.2020 | ||
PL | 07.10.2020 | ||
RO | 07.10.2020 | ||
RS | 07.10.2020 | ||
SE | 07.10.2020 | ||
SK | 07.10.2020 | ||
SM | 07.10.2020 | ||
LU | 20.10.2020 | ||
BE | 31.10.2020 | ||
BG | 07.01.2021 | ||
NO | 07.01.2021 | ||
GR | 08.01.2021 | ||
IS | 07.02.2021 | ||
PT | 08.02.2021 | ||
Former [2021/37] | AT | 07.10.2020 | |
CZ | 07.10.2020 | ||
DK | 07.10.2020 | ||
EE | 07.10.2020 | ||
ES | 07.10.2020 | ||
FI | 07.10.2020 | ||
HR | 07.10.2020 | ||
LT | 07.10.2020 | ||
LV | 07.10.2020 | ||
MC | 07.10.2020 | ||
NL | 07.10.2020 | ||
PL | 07.10.2020 | ||
RO | 07.10.2020 | ||
RS | 07.10.2020 | ||
SE | 07.10.2020 | ||
SK | 07.10.2020 | ||
SM | 07.10.2020 | ||
LU | 20.10.2020 | ||
BE | 31.10.2020 | ||
BG | 07.01.2021 | ||
NO | 07.01.2021 | ||
GR | 08.01.2021 | ||
IS | 07.02.2021 | ||
PT | 08.02.2021 | ||
Former [2021/36] | AT | 07.10.2020 | |
CZ | 07.10.2020 | ||
EE | 07.10.2020 | ||
ES | 07.10.2020 | ||
FI | 07.10.2020 | ||
HR | 07.10.2020 | ||
LT | 07.10.2020 | ||
LV | 07.10.2020 | ||
MC | 07.10.2020 | ||
NL | 07.10.2020 | ||
PL | 07.10.2020 | ||
RO | 07.10.2020 | ||
RS | 07.10.2020 | ||
SE | 07.10.2020 | ||
SK | 07.10.2020 | ||
SM | 07.10.2020 | ||
LU | 20.10.2020 | ||
BE | 31.10.2020 | ||
BG | 07.01.2021 | ||
NO | 07.01.2021 | ||
GR | 08.01.2021 | ||
IS | 07.02.2021 | ||
PT | 08.02.2021 | ||
Former [2021/35] | AT | 07.10.2020 | |
CZ | 07.10.2020 | ||
ES | 07.10.2020 | ||
FI | 07.10.2020 | ||
HR | 07.10.2020 | ||
LT | 07.10.2020 | ||
LV | 07.10.2020 | ||
MC | 07.10.2020 | ||
NL | 07.10.2020 | ||
PL | 07.10.2020 | ||
RO | 07.10.2020 | ||
RS | 07.10.2020 | ||
SE | 07.10.2020 | ||
SK | 07.10.2020 | ||
SM | 07.10.2020 | ||
LU | 20.10.2020 | ||
BG | 07.01.2021 | ||
NO | 07.01.2021 | ||
GR | 08.01.2021 | ||
IS | 07.02.2021 | ||
PT | 08.02.2021 | ||
Former [2021/34] | AT | 07.10.2020 | |
CZ | 07.10.2020 | ||
ES | 07.10.2020 | ||
FI | 07.10.2020 | ||
HR | 07.10.2020 | ||
LT | 07.10.2020 | ||
LV | 07.10.2020 | ||
MC | 07.10.2020 | ||
NL | 07.10.2020 | ||
PL | 07.10.2020 | ||
RS | 07.10.2020 | ||
SE | 07.10.2020 | ||
SM | 07.10.2020 | ||
LU | 20.10.2020 | ||
BG | 07.01.2021 | ||
NO | 07.01.2021 | ||
GR | 08.01.2021 | ||
IS | 07.02.2021 | ||
PT | 08.02.2021 | ||
Former [2021/33] | AT | 07.10.2020 | |
ES | 07.10.2020 | ||
FI | 07.10.2020 | ||
HR | 07.10.2020 | ||
LT | 07.10.2020 | ||
LV | 07.10.2020 | ||
NL | 07.10.2020 | ||
PL | 07.10.2020 | ||
RS | 07.10.2020 | ||
SE | 07.10.2020 | ||
SM | 07.10.2020 | ||
LU | 20.10.2020 | ||
BG | 07.01.2021 | ||
NO | 07.01.2021 | ||
GR | 08.01.2021 | ||
IS | 07.02.2021 | ||
PT | 08.02.2021 | ||
Former [2021/32] | AT | 07.10.2020 | |
ES | 07.10.2020 | ||
FI | 07.10.2020 | ||
HR | 07.10.2020 | ||
LV | 07.10.2020 | ||
NL | 07.10.2020 | ||
PL | 07.10.2020 | ||
RS | 07.10.2020 | ||
SE | 07.10.2020 | ||
SM | 07.10.2020 | ||
LU | 20.10.2020 | ||
BG | 07.01.2021 | ||
NO | 07.01.2021 | ||
GR | 08.01.2021 | ||
IS | 07.02.2021 | ||
PT | 08.02.2021 | ||
Former [2021/31] | AT | 07.10.2020 | |
ES | 07.10.2020 | ||
FI | 07.10.2020 | ||
HR | 07.10.2020 | ||
LV | 07.10.2020 | ||
NL | 07.10.2020 | ||
PL | 07.10.2020 | ||
RS | 07.10.2020 | ||
SE | 07.10.2020 | ||
LU | 20.10.2020 | ||
BG | 07.01.2021 | ||
NO | 07.01.2021 | ||
GR | 08.01.2021 | ||
IS | 07.02.2021 | ||
PT | 08.02.2021 | ||
Former [2021/28] | AT | 07.10.2020 | |
ES | 07.10.2020 | ||
FI | 07.10.2020 | ||
HR | 07.10.2020 | ||
LV | 07.10.2020 | ||
NL | 07.10.2020 | ||
PL | 07.10.2020 | ||
RS | 07.10.2020 | ||
SE | 07.10.2020 | ||
BG | 07.01.2021 | ||
NO | 07.01.2021 | ||
GR | 08.01.2021 | ||
IS | 07.02.2021 | ||
PT | 08.02.2021 | ||
Former [2021/25] | AT | 07.10.2020 | |
ES | 07.10.2020 | ||
FI | 07.10.2020 | ||
LV | 07.10.2020 | ||
NL | 07.10.2020 | ||
PL | 07.10.2020 | ||
RS | 07.10.2020 | ||
SE | 07.10.2020 | ||
BG | 07.01.2021 | ||
NO | 07.01.2021 | ||
GR | 08.01.2021 | ||
IS | 07.02.2021 | ||
PT | 08.02.2021 | ||
Former [2021/24] | AT | 07.10.2020 | |
FI | 07.10.2020 | ||
LV | 07.10.2020 | ||
NL | 07.10.2020 | ||
RS | 07.10.2020 | ||
SE | 07.10.2020 | ||
BG | 07.01.2021 | ||
NO | 07.01.2021 | ||
GR | 08.01.2021 | ||
PT | 08.02.2021 | ||
Former [2021/23] | FI | 07.10.2020 | |
LV | 07.10.2020 | ||
NL | 07.10.2020 | ||
RS | 07.10.2020 | ||
SE | 07.10.2020 | ||
NO | 07.01.2021 | ||
GR | 08.01.2021 | ||
PT | 08.02.2021 | ||
Former [2021/22] | FI | 07.10.2020 | |
NL | 07.10.2020 | ||
RS | 07.10.2020 | ||
NO | 07.01.2021 | ||
PT | 08.02.2021 | ||
Former [2021/21] | FI | 07.10.2020 | |
NL | 07.10.2020 | ||
PT | 08.02.2021 | ||
Former [2021/20] | FI | 07.10.2020 | Documents cited: | Search | [A]US6132558 (DYLLICK-BRENZINGER RAINER [DE], et al) [A] 1-15 * claim 1 *; | [A]EP1579071 (KIMBERLY CLARK CO [US]) [A] 1-15 * claims 5,12 *; | [A]EP1938967 (DAIKIN IND LTD [JP]) [A] 1-15 * paragraph [0031] *; | [XA]WO2011090672 (HERCULES INC [US]) [X] 1-7 * paragraphs [0010] , [0044]; claims 1-4 * [A] 8-15; | [A]EP2617896 (ABB TECHNOLOGY LTD [CH]) [A] 1-15* claim 1 * |