blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP2884006

EP2884006 - Driven pile and method for introducing a driven pile into a seabed [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  17.11.2017
Database last updated on 14.09.2024
FormerThe patent has been granted
Status updated on  09.12.2016
Most recent event   Tooltip17.07.2020Lapse of the patent in a contracting state
New state(s): AL
published on 19.08.2020  [2020/34]
Applicant(s)For all designated states
innogy SE
Opernplatz 1
45128 Essen / DE
[2017/10]
Former [2015/25]For all designated states
RWE Innogy GmbH
Gildehof 1
45127 Essen / DE
Inventor(s)01 / Bartminn, Daniel
Moltkestraße 11 b
25335 Elmshorn / DE
02 / Matlock, Benjamin
Eppendorfer Weg 125
20259 Hamburg / DE
 [2015/25]
Representative(s)Richly & Ritschel Patentanwälte PartG mbB
Postfach 100411
51404 Bergisch Gladbach / DE
[N/P]
Former [2017/02]Kierdorf Ritschel Richly
Patentanwälte PartG mbB
Sattlerweg 14
51429 Bergisch Gladbach / DE
Former [2015/25]Kierdorf Ritschel
Sattlerweg 14
51429 Bergisch Gladbach / DE
Application number, filing date14191626.204.11.2014
[2015/25]
Priority number, dateDE2013101928819.11.2013         Original published format: DE102013019288
[2015/25]
Filing languageDE
Procedural languageDE
PublicationType: A2 Application without search report 
No.:EP2884006
Date:17.06.2015
Language:DE
[2015/25]
Type: A3 Search report 
No.:EP2884006
Date:05.08.2015
Language:DE
[2015/32]
Type: B1 Patent specification 
No.:EP2884006
Date:11.01.2017
Language:DE
[2017/02]
Search report(s)(Supplementary) European search report - dispatched on:EP07.07.2015
ClassificationIPC:E02D5/28, E02D13/00
[2015/32]
CPC:
E02D5/28 (EP); E02D13/005 (EP)
Former IPC [2015/25]E02D5/28, E02D7/06, E02D13/00
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2016/11]
Former [2015/25]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:Rammpfahl sowie Verfahren zur Einbringung eines Rammpfahls in den Meeresgrund[2015/25]
English:Driven pile and method for introducing a driven pile into a seabed[2015/25]
French:Pieux et procédé de pose d'un pieu battu au fond de la mer[2015/25]
Examination procedure05.02.2016Amendment by applicant (claims and/or description)
05.02.2016Examination requested  [2016/11]
25.05.2016Communication of intention to grant the patent
29.09.2016Fee for grant paid
29.09.2016Fee for publishing/printing paid
29.09.2016Receipt of the translation of the claim(s)
Opposition(s)12.10.2017No opposition filed within time limit [2017/51]
Fees paidRenewal fee
29.11.2016Renewal fee patent year 03
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU04.11.2014
AL11.01.2017
CY11.01.2017
CZ11.01.2017
EE11.01.2017
ES11.01.2017
FI11.01.2017
HR11.01.2017
IT11.01.2017
MC11.01.2017
MK11.01.2017
MT11.01.2017
RO11.01.2017
RS11.01.2017
SE11.01.2017
SI11.01.2017
SK11.01.2017
SM11.01.2017
TR11.01.2017
BG11.04.2017
NO11.04.2017
GR12.04.2017
IS11.05.2017
PT11.05.2017
[2020/34]
Former [2020/15]HU04.11.2014
CY11.01.2017
CZ11.01.2017
EE11.01.2017
ES11.01.2017
FI11.01.2017
HR11.01.2017
IT11.01.2017
MC11.01.2017
MK11.01.2017
MT11.01.2017
RO11.01.2017
RS11.01.2017
SE11.01.2017
SI11.01.2017
SK11.01.2017
SM11.01.2017
TR11.01.2017
BG11.04.2017
NO11.04.2017
GR12.04.2017
IS11.05.2017
PT11.05.2017
Former [2019/52]HU04.11.2014
CY11.01.2017
CZ11.01.2017
EE11.01.2017
ES11.01.2017
FI11.01.2017
HR11.01.2017
IT11.01.2017
MC11.01.2017
MK11.01.2017
MT11.01.2017
RO11.01.2017
RS11.01.2017
SE11.01.2017
SI11.01.2017
SK11.01.2017
SM11.01.2017
BG11.04.2017
NO11.04.2017
GR12.04.2017
IS11.05.2017
PT11.05.2017
Former [2019/47]HU04.11.2014
CY11.01.2017
CZ11.01.2017
EE11.01.2017
ES11.01.2017
FI11.01.2017
HR11.01.2017
IT11.01.2017
MC11.01.2017
MT11.01.2017
RO11.01.2017
RS11.01.2017
SE11.01.2017
SI11.01.2017
SK11.01.2017
SM11.01.2017
BG11.04.2017
NO11.04.2017
GR12.04.2017
IS11.05.2017
PT11.05.2017
Former [2019/31]HU04.11.2014
CZ11.01.2017
EE11.01.2017
ES11.01.2017
FI11.01.2017
HR11.01.2017
IT11.01.2017
MC11.01.2017
MT11.01.2017
RO11.01.2017
RS11.01.2017
SE11.01.2017
SI11.01.2017
SK11.01.2017
SM11.01.2017
BG11.04.2017
NO11.04.2017
GR12.04.2017
IS11.05.2017
PT11.05.2017
Former [2018/43]CZ11.01.2017
EE11.01.2017
ES11.01.2017
FI11.01.2017
HR11.01.2017
IT11.01.2017
MC11.01.2017
MT11.01.2017
RO11.01.2017
RS11.01.2017
SE11.01.2017
SI11.01.2017
SK11.01.2017
SM11.01.2017
BG11.04.2017
NO11.04.2017
GR12.04.2017
IS11.05.2017
PT11.05.2017
Former [2018/33]CZ11.01.2017
EE11.01.2017
ES11.01.2017
FI11.01.2017
HR11.01.2017
IT11.01.2017
MC11.01.2017
RO11.01.2017
RS11.01.2017
SE11.01.2017
SI11.01.2017
SK11.01.2017
SM11.01.2017
BG11.04.2017
NO11.04.2017
GR12.04.2017
IS11.05.2017
PT11.05.2017
Former [2018/14]CZ11.01.2017
EE11.01.2017
ES11.01.2017
FI11.01.2017
HR11.01.2017
IT11.01.2017
RO11.01.2017
RS11.01.2017
SE11.01.2017
SI11.01.2017
SK11.01.2017
SM11.01.2017
BG11.04.2017
NO11.04.2017
GR12.04.2017
IS11.05.2017
PT11.05.2017
Former [2017/51]CZ11.01.2017
EE11.01.2017
ES11.01.2017
FI11.01.2017
HR11.01.2017
IT11.01.2017
RO11.01.2017
RS11.01.2017
SE11.01.2017
SK11.01.2017
SM11.01.2017
BG11.04.2017
NO11.04.2017
GR12.04.2017
IS11.05.2017
PT11.05.2017
Former [2017/49]CZ11.01.2017
EE11.01.2017
ES11.01.2017
FI11.01.2017
HR11.01.2017
IT11.01.2017
RO11.01.2017
RS11.01.2017
SE11.01.2017
SK11.01.2017
BG11.04.2017
NO11.04.2017
GR12.04.2017
IS11.05.2017
PT11.05.2017
Former [2017/48]CZ11.01.2017
ES11.01.2017
FI11.01.2017
HR11.01.2017
RS11.01.2017
SE11.01.2017
BG11.04.2017
NO11.04.2017
GR12.04.2017
IS11.05.2017
PT11.05.2017
Former [2017/42]ES11.01.2017
FI11.01.2017
HR11.01.2017
RS11.01.2017
SE11.01.2017
BG11.04.2017
NO11.04.2017
GR12.04.2017
IS11.05.2017
PT11.05.2017
Documents cited:Search[XI]WO2011091041  (UNIV WASHINGTON CT COMMERCIALI [US], et al) [X] 1-8,10 * page 7, lines 7-28 * * page 8, line 25 - page 9, line 2 * * page 9, lines 25-29; figure 3 * [I] 9
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.