blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP2871544

EP2871544 - Interface for data exchange between industrial controllers and simulation applications for simulating a machine [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  21.07.2023
Database last updated on 17.08.2024
FormerThe patent has been granted
Status updated on  12.08.2022
FormerGrant of patent is intended
Status updated on  18.04.2022
FormerExamination is in progress
Status updated on  19.01.2018
Most recent event   Tooltip19.07.2024Lapse of the patent in a contracting state
New state(s): BG
published on 21.08.2024 [2024/34]
Applicant(s)For all designated states
Rockwell Automation Technologies, Inc.
1 Allen-Bradley Drive
Mayfield Heights, OH 44124 / US
[2015/20]
Inventor(s)01 / Maturana, Francisco
4918 Hartley Drive
Lyndhurst, OH 44124 / US
02 / Mansouri, Haithem
26700 Alsace Court, Apt. 207
Beachwood, OH 44122 / US
03 / Kriz, Jaroslav
V Zahradkach 759/29
40001 Usti nad Labem, Klise / CZ
 [2015/20]
Representative(s)Grünecker Patent- und Rechtsanwälte PartG mbB
Leopoldstraße 4
80802 München / DE
[2015/20]
Application number, filing date14192225.207.11.2014
[2015/20]
Priority number, dateUS201361901956P08.11.2013         Original published format: US 201361901956 P
US20141430133010.06.2014         Original published format: US201414301330
[2015/20]
Filing languageEN
Procedural languageEN
PublicationType: A2 Application without search report 
No.:EP2871544
Date:13.05.2015
Language:EN
[2015/20]
Type: A3 Search report 
No.:EP2871544
Date:24.06.2015
Language:EN
[2015/26]
Type: B1 Patent specification 
No.:EP2871544
Date:14.09.2022
Language:EN
[2022/37]
Search report(s)(Supplementary) European search report - dispatched on:EP28.05.2015
ClassificationIPC:G05B19/042, G05B17/02
[2015/26]
CPC:
G05B17/02 (EP,US); G06F30/20 (US); G05B19/0426 (EP,US);
G05B2219/23446 (EP,US); G05B2219/23452 (EP,US); G05B2219/23456 (EP,US)
Former IPC [2015/20]G05B19/042
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2016/06]
Former [2015/20]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:Schnittstelle zum Datenaustausch zwischen industriellen Steuerungen und Simulationsanwendungen zur Simulation einer Maschine[2015/20]
English:Interface for data exchange between industrial controllers and simulation applications for simulating a machine[2015/20]
French:Interface pour l'échange de données entre des systèmes de commande industriels et des applications de simulation permettant de simuler une machine[2015/20]
Examination procedure23.12.2015Amendment by applicant (claims and/or description)
23.12.2015Examination requested  [2016/06]
17.01.2018Despatch of a communication from the examining division (Time limit: M04)
14.05.2018Reply to a communication from the examining division
01.03.2021Despatch of a communication from the examining division (Time limit: M04)
12.07.2021Reply to a communication from the examining division
19.04.2022Communication of intention to grant the patent
09.08.2022Fee for grant paid
09.08.2022Fee for publishing/printing paid
09.08.2022Receipt of the translation of the claim(s)
Opposition(s)15.06.2023No opposition filed within time limit [2023/34]
Fees paidRenewal fee
28.11.2016Renewal fee patent year 03
27.11.2017Renewal fee patent year 04
27.11.2018Renewal fee patent year 05
20.11.2019Renewal fee patent year 06
19.11.2020Renewal fee patent year 07
18.11.2021Renewal fee patent year 08
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU07.11.2014
AL14.09.2022
AT14.09.2022
BG14.09.2022
CY14.09.2022
CZ14.09.2022
DK14.09.2022
EE14.09.2022
ES14.09.2022
FI14.09.2022
HR14.09.2022
IT14.09.2022
LT14.09.2022
LV14.09.2022
MC14.09.2022
MK14.09.2022
NL14.09.2022
PL14.09.2022
RO14.09.2022
RS14.09.2022
SE14.09.2022
SI14.09.2022
SK14.09.2022
SM14.09.2022
TR14.09.2022
IE07.11.2022
LU07.11.2022
BE30.11.2022
CH30.11.2022
LI30.11.2022
NO14.12.2022
GR15.12.2022
IS14.01.2023
PT16.01.2023
[2024/34]
Former [2024/29]HU07.11.2014
AL14.09.2022
AT14.09.2022
CY14.09.2022
CZ14.09.2022
DK14.09.2022
EE14.09.2022
ES14.09.2022
FI14.09.2022
HR14.09.2022
IT14.09.2022
LT14.09.2022
LV14.09.2022
MC14.09.2022
MK14.09.2022
NL14.09.2022
PL14.09.2022
RO14.09.2022
RS14.09.2022
SE14.09.2022
SI14.09.2022
SK14.09.2022
SM14.09.2022
TR14.09.2022
IE07.11.2022
LU07.11.2022
BE30.11.2022
CH30.11.2022
LI30.11.2022
NO14.12.2022
GR15.12.2022
IS14.01.2023
PT16.01.2023
Former [2024/27]HU07.11.2014
AL14.09.2022
AT14.09.2022
CY14.09.2022
CZ14.09.2022
DK14.09.2022
EE14.09.2022
ES14.09.2022
FI14.09.2022
HR14.09.2022
IT14.09.2022
LT14.09.2022
LV14.09.2022
MC14.09.2022
MK14.09.2022
NL14.09.2022
PL14.09.2022
RO14.09.2022
RS14.09.2022
SE14.09.2022
SI14.09.2022
SK14.09.2022
SM14.09.2022
IE07.11.2022
LU07.11.2022
BE30.11.2022
CH30.11.2022
LI30.11.2022
NO14.12.2022
GR15.12.2022
IS14.01.2023
PT16.01.2023
Former [2024/26]HU07.11.2014
AL14.09.2022
AT14.09.2022
CY14.09.2022
CZ14.09.2022
DK14.09.2022
EE14.09.2022
ES14.09.2022
FI14.09.2022
HR14.09.2022
IT14.09.2022
LT14.09.2022
LV14.09.2022
MC14.09.2022
NL14.09.2022
PL14.09.2022
RO14.09.2022
RS14.09.2022
SE14.09.2022
SI14.09.2022
SK14.09.2022
SM14.09.2022
IE07.11.2022
LU07.11.2022
BE30.11.2022
CH30.11.2022
LI30.11.2022
NO14.12.2022
GR15.12.2022
IS14.01.2023
PT16.01.2023
Former [2024/21]HU07.11.2014
AL14.09.2022
AT14.09.2022
CY14.09.2022
CZ14.09.2022
DK14.09.2022
EE14.09.2022
ES14.09.2022
FI14.09.2022
HR14.09.2022
LT14.09.2022
LV14.09.2022
MC14.09.2022
NL14.09.2022
PL14.09.2022
RO14.09.2022
RS14.09.2022
SE14.09.2022
SI14.09.2022
SK14.09.2022
SM14.09.2022
IE07.11.2022
LU07.11.2022
BE30.11.2022
CH30.11.2022
LI30.11.2022
NO14.12.2022
GR15.12.2022
IS14.01.2023
PT16.01.2023
Former [2024/18]HU07.11.2014
AL14.09.2022
AT14.09.2022
CZ14.09.2022
DK14.09.2022
EE14.09.2022
ES14.09.2022
FI14.09.2022
HR14.09.2022
LT14.09.2022
LV14.09.2022
MC14.09.2022
NL14.09.2022
PL14.09.2022
RO14.09.2022
RS14.09.2022
SE14.09.2022
SI14.09.2022
SK14.09.2022
SM14.09.2022
IE07.11.2022
LU07.11.2022
BE30.11.2022
CH30.11.2022
LI30.11.2022
NO14.12.2022
GR15.12.2022
IS14.01.2023
PT16.01.2023
Former [2023/49]AL14.09.2022
AT14.09.2022
CZ14.09.2022
DK14.09.2022
EE14.09.2022
ES14.09.2022
FI14.09.2022
HR14.09.2022
LT14.09.2022
LV14.09.2022
MC14.09.2022
NL14.09.2022
PL14.09.2022
RO14.09.2022
RS14.09.2022
SE14.09.2022
SI14.09.2022
SK14.09.2022
SM14.09.2022
IE07.11.2022
LU07.11.2022
BE30.11.2022
CH30.11.2022
LI30.11.2022
NO14.12.2022
GR15.12.2022
IS14.01.2023
PT16.01.2023
Former [2023/48]AL14.09.2022
AT14.09.2022
CZ14.09.2022
DK14.09.2022
EE14.09.2022
ES14.09.2022
FI14.09.2022
HR14.09.2022
LT14.09.2022
LV14.09.2022
MC14.09.2022
NL14.09.2022
PL14.09.2022
RO14.09.2022
RS14.09.2022
SE14.09.2022
SI14.09.2022
SK14.09.2022
SM14.09.2022
IE07.11.2022
LU07.11.2022
CH30.11.2022
LI30.11.2022
NO14.12.2022
GR15.12.2022
IS14.01.2023
PT16.01.2023
Former [2023/37]AL14.09.2022
AT14.09.2022
CZ14.09.2022
DK14.09.2022
EE14.09.2022
ES14.09.2022
FI14.09.2022
HR14.09.2022
LT14.09.2022
LV14.09.2022
MC14.09.2022
NL14.09.2022
PL14.09.2022
RO14.09.2022
RS14.09.2022
SE14.09.2022
SI14.09.2022
SK14.09.2022
SM14.09.2022
LU07.11.2022
CH30.11.2022
LI30.11.2022
NO14.12.2022
GR15.12.2022
IS14.01.2023
PT16.01.2023
Former [2023/35]AL14.09.2022
AT14.09.2022
CZ14.09.2022
DK14.09.2022
EE14.09.2022
ES14.09.2022
FI14.09.2022
HR14.09.2022
LT14.09.2022
LV14.09.2022
MC14.09.2022
NL14.09.2022
PL14.09.2022
RO14.09.2022
RS14.09.2022
SE14.09.2022
SK14.09.2022
SM14.09.2022
CH30.11.2022
LI30.11.2022
NO14.12.2022
GR15.12.2022
IS14.01.2023
PT16.01.2023
Former [2023/34]AL14.09.2022
AT14.09.2022
CZ14.09.2022
DK14.09.2022
EE14.09.2022
ES14.09.2022
FI14.09.2022
HR14.09.2022
LT14.09.2022
LV14.09.2022
MC14.09.2022
NL14.09.2022
PL14.09.2022
RO14.09.2022
RS14.09.2022
SE14.09.2022
SK14.09.2022
SM14.09.2022
NO14.12.2022
GR15.12.2022
IS14.01.2023
PT16.01.2023
Former [2023/30]AL14.09.2022
AT14.09.2022
CZ14.09.2022
EE14.09.2022
ES14.09.2022
FI14.09.2022
HR14.09.2022
LT14.09.2022
LV14.09.2022
MC14.09.2022
NL14.09.2022
PL14.09.2022
RO14.09.2022
RS14.09.2022
SE14.09.2022
SK14.09.2022
SM14.09.2022
NO14.12.2022
GR15.12.2022
IS14.01.2023
PT16.01.2023
Former [2023/29]AL14.09.2022
AT14.09.2022
CZ14.09.2022
EE14.09.2022
ES14.09.2022
FI14.09.2022
HR14.09.2022
LT14.09.2022
LV14.09.2022
PL14.09.2022
RO14.09.2022
RS14.09.2022
SE14.09.2022
SK14.09.2022
SM14.09.2022
NO14.12.2022
GR15.12.2022
IS14.01.2023
PT16.01.2023
Former [2023/26]AT14.09.2022
CZ14.09.2022
EE14.09.2022
ES14.09.2022
FI14.09.2022
HR14.09.2022
LT14.09.2022
LV14.09.2022
PL14.09.2022
RO14.09.2022
RS14.09.2022
SE14.09.2022
SK14.09.2022
SM14.09.2022
NO14.12.2022
GR15.12.2022
IS14.01.2023
PT16.01.2023
Former [2023/23]AT14.09.2022
CZ14.09.2022
EE14.09.2022
ES14.09.2022
FI14.09.2022
HR14.09.2022
LT14.09.2022
LV14.09.2022
RO14.09.2022
RS14.09.2022
SE14.09.2022
SK14.09.2022
SM14.09.2022
NO14.12.2022
GR15.12.2022
PT16.01.2023
Former [2023/22]AT14.09.2022
CZ14.09.2022
ES14.09.2022
FI14.09.2022
HR14.09.2022
LT14.09.2022
LV14.09.2022
RO14.09.2022
RS14.09.2022
SE14.09.2022
SM14.09.2022
NO14.12.2022
GR15.12.2022
PT16.01.2023
Former [2023/20]FI14.09.2022
HR14.09.2022
LT14.09.2022
LV14.09.2022
RS14.09.2022
SE14.09.2022
SM14.09.2022
NO14.12.2022
GR15.12.2022
Former [2023/10]FI14.09.2022
HR14.09.2022
LT14.09.2022
LV14.09.2022
RS14.09.2022
SE14.09.2022
NO14.12.2022
GR15.12.2022
Former [2023/09]FI14.09.2022
LT14.09.2022
LV14.09.2022
RS14.09.2022
SE14.09.2022
NO14.12.2022
Former [2023/08]FI14.09.2022
LT14.09.2022
RS14.09.2022
SE14.09.2022
NO14.12.2022
Documents cited:Search[XI]US2009089031  (STURROCK DAVID THAYER [PA], et al) [X] 1,3-5,7,8 * paragraphs [0008] - [0010] * * paragraphs [0021] - [0034]; figures 1-3 * * paragraphs [0060] - [0062]; figure 9 * [I] 2,6,10;
 [XI]EP2498156  (ROCKWELL AUTOMATION TECH INC [US]) [X] 1,3-9 * paragraphs [0010] - [0015] * * paragraphs [0037] - [0041]; figure 1 * * paragraphs [0046] - [0055]; figures 3, 7, 8, 9 * [I] 2,10;
 [XI]EP2500791  (GEN ELECTRIC [US]) [X] 1,3-5,7-9 * paragraphs [0001] - [0009] * * paragraphs [0012] - [0022]; figure 1 * * paragraphs [0023] - [0032]; figures 2, 3 * [I] 2,6,10;
 [A]US2013060378  (SCHMITZ SANDRA [DE], et al) [A] 1-10* the whole document *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.