blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3035488

EP3035488 - Method and device for charging, in particular for sequential charging of rechargeable batteries and emergency charging of severely drained batteries [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  23.08.2019
Database last updated on 26.06.2024
FormerThe patent has been granted
Status updated on  14.09.2018
FormerGrant of patent is intended
Status updated on  28.05.2018
FormerExamination is in progress
Status updated on  21.07.2017
Most recent event   Tooltip03.07.2020Lapse of the patent in a contracting state
New state(s): CY, HU, MK
published on 05.08.2020  [2020/32]
Applicant(s)For all designated states
Fritec Friedrich & Hitschfel GmbH
Schlehenstrasse 26
90542 Eckental / DE
[2018/40]
Former [2016/25]For all designated states
Fritec Friedrich & Hitschfel GmbH
Mittelrüsselbach 38
91338 Igensdorf / DE
Inventor(s)01 / Friedrich, Uwe
Mittelrüsselbach 38
91338 Igensdorf / DE
 [2016/25]
Representative(s)Schröer, Gernot H.
Meissner Bolte Patentanwälte
Rechtsanwälte Partnerschaft mbB
Bankgasse 3
90402 Nürnberg / DE
[2016/25]
Application number, filing date14199373.319.12.2014
[2016/25]
Filing languageDE
Procedural languageDE
PublicationType: A1 Application with search report 
No.:EP3035488
Date:22.06.2016
Language:DE
[2016/25]
Type: B1 Patent specification 
No.:EP3035488
Date:17.10.2018
Language:DE
[2018/42]
Search report(s)(Supplementary) European search report - dispatched on:EP12.05.2015
ClassificationIPC:H02J7/00
[2016/25]
CPC:
H02J7/0019 (EP)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2016/25]
TitleGerman:Verfahren und Vorrichtung zum Laden, insbesondere zum sequentiellen Laden von wiederaufladbaren Batterien und zum Notladen von tiefst-entladenden Batterien[2018/26]
English:Method and device for charging, in particular for sequential charging of rechargeable batteries and emergency charging of severely drained batteries[2016/25]
French:Procédé et dispositif destinés au chargement, notamment à la charge séquentielle de batteries rechargeables et à la charge de secours de batteries à décharge profonde[2016/25]
Former [2016/25]Verfahren und Vorrichtung zum Laden, insbesondere zum sequentiellen Laden, von wiederaufladbaren Batterien und zum Notladen von tiefst-entladenden Batterien
Examination procedure17.02.2016Amendment by applicant (claims and/or description)
17.02.2016Examination requested  [2016/25]
20.07.2017Despatch of a communication from the examining division (Time limit: M06)
30.01.2018Reply to a communication from the examining division
29.05.2018Communication of intention to grant the patent
10.09.2018Fee for grant paid
10.09.2018Fee for publishing/printing paid
10.09.2018Receipt of the translation of the claim(s)
Opposition(s)18.07.2019No opposition filed within time limit [2019/39]
Fees paidRenewal fee
02.12.2016Renewal fee patent year 03
27.12.2017Renewal fee patent year 04
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU19.12.2014
AL17.10.2018
CY17.10.2018
CZ17.10.2018
EE17.10.2018
FI17.10.2018
HR17.10.2018
IT17.10.2018
LT17.10.2018
LV17.10.2018
MC17.10.2018
MK17.10.2018
MT17.10.2018
PL17.10.2018
RO17.10.2018
RS17.10.2018
SI17.10.2018
SK17.10.2018
SM17.10.2018
TR17.10.2018
BG17.01.2019
GR18.01.2019
IS17.02.2019
PT17.02.2019
[2020/31]
Former [2020/17]AL17.10.2018
CZ17.10.2018
EE17.10.2018
FI17.10.2018
HR17.10.2018
IT17.10.2018
LT17.10.2018
LV17.10.2018
MC17.10.2018
MT17.10.2018
PL17.10.2018
RO17.10.2018
RS17.10.2018
SI17.10.2018
SK17.10.2018
SM17.10.2018
TR17.10.2018
BG17.01.2019
GR18.01.2019
IS17.02.2019
PT17.02.2019
Former [2020/08]AL17.10.2018
CZ17.10.2018
EE17.10.2018
FI17.10.2018
HR17.10.2018
IT17.10.2018
LT17.10.2018
LV17.10.2018
MC17.10.2018
MT17.10.2018
PL17.10.2018
RO17.10.2018
RS17.10.2018
SI17.10.2018
SK17.10.2018
SM17.10.2018
BG17.01.2019
GR18.01.2019
IS17.02.2019
PT17.02.2019
Former [2019/50]AL17.10.2018
CZ17.10.2018
EE17.10.2018
FI17.10.2018
HR17.10.2018
IT17.10.2018
LT17.10.2018
LV17.10.2018
MC17.10.2018
PL17.10.2018
RO17.10.2018
RS17.10.2018
SI17.10.2018
SK17.10.2018
SM17.10.2018
BG17.01.2019
GR18.01.2019
IS17.02.2019
PT17.02.2019
Former [2019/40]AL17.10.2018
CZ17.10.2018
EE17.10.2018
FI17.10.2018
HR17.10.2018
IT17.10.2018
LT17.10.2018
LV17.10.2018
MC17.10.2018
PL17.10.2018
RO17.10.2018
RS17.10.2018
SK17.10.2018
SM17.10.2018
BG17.01.2019
GR18.01.2019
IS17.02.2019
PT17.02.2019
Former [2019/37]AL17.10.2018
CZ17.10.2018
EE17.10.2018
FI17.10.2018
HR17.10.2018
IT17.10.2018
LT17.10.2018
LV17.10.2018
PL17.10.2018
RO17.10.2018
RS17.10.2018
SM17.10.2018
BG17.01.2019
GR18.01.2019
IS17.02.2019
PT17.02.2019
Former [2019/35]AL17.10.2018
CZ17.10.2018
FI17.10.2018
HR17.10.2018
IT17.10.2018
LT17.10.2018
LV17.10.2018
PL17.10.2018
RS17.10.2018
BG17.01.2019
GR18.01.2019
IS17.02.2019
PT17.02.2019
Former [2019/34]AL17.10.2018
FI17.10.2018
HR17.10.2018
IT17.10.2018
LT17.10.2018
LV17.10.2018
PL17.10.2018
RS17.10.2018
BG17.01.2019
GR18.01.2019
IS17.02.2019
PT17.02.2019
Former [2019/26]AL17.10.2018
FI17.10.2018
HR17.10.2018
LT17.10.2018
LV17.10.2018
PL17.10.2018
RS17.10.2018
BG17.01.2019
GR18.01.2019
IS17.02.2019
PT17.02.2019
Former [2019/25]FI17.10.2018
HR17.10.2018
LT17.10.2018
LV17.10.2018
PL17.10.2018
RS17.10.2018
BG17.01.2019
GR18.01.2019
IS17.02.2019
Former [2019/24]FI17.10.2018
HR17.10.2018
LT17.10.2018
LV17.10.2018
PL17.10.2018
BG17.01.2019
GR18.01.2019
IS17.02.2019
Former [2019/23]FI17.10.2018
HR17.10.2018
LT17.10.2018
LV17.10.2018
PL17.10.2018
BG17.01.2019
IS17.02.2019
Former [2019/22]FI17.10.2018
LT17.10.2018
PL17.10.2018
BG17.01.2019
IS17.02.2019
Former [2019/21]FI17.10.2018
LT17.10.2018
IS17.02.2019
Former [2019/20]LT17.10.2018
Documents cited:Search[Y]WO2004049540  (TIAX LLC [US], et al) [Y] 1-15 * page 25 - page 29; figures 7-12 *;
 [Y]US2008211459  (CHOI WON-SUK [KR]) [Y] 1-15* paragraphs [0060] - [0095]; figures 6-8 *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.